| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00793557 ↗ | 8760 26 AVENUE BROOKLYN | Alteration | Permit Issued | 08/15/2022 | 05/14/2026 | Design AARON MCDONALD ARCHITECT Owner Innospark Design Contractor T & T PLUMBING INC Filer BASIC GROUPS CORP | PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES AND SPRINKLER FROM CELLAR TO ROOF. PLUMBING AND SPRINKLER WORK AS PERPLAN. NO CHANGE IN USE, … |
| M00710943 ↗ | 2651 BROADWAY MANHATTAN | Alteration | Permit Issued | 04/07/2022 | 04/17/2026 | Design BASIC GROUPS CORP Owner BLUE SKY GROUP Contractor T & T PLUMBING INC Filer BASIC GROUPS CORP | PROPOSED SPRINKLER AND PLUMBING WORK IN CONJUNCTION WITH APPLICATION #120090356 IN EXISTING 7-STORYMIXED USE BUILDING. |
| B00922900 ↗ | 518 58 STREET BROOKLYN | Alteration CO | Permit Issued | 11/24/2023 | 05/06/2025 | Design LONGTIN SOLUTIONS LLC Contractor PLBG P & H INC | PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| X00730960 ↗ | 2501 HUGHES AVENUE BRONX | Alteration | Signed-off | 07/08/2022 | 02/28/2025 | Design BASIC GROUPS CORP Owner BLUE SKY GROUP Contractor AMC PLBG, HTG & CLNG, INC Filer BASIC GROUPS CORP | SUBMIT PLUMBING AND SPRINKLER PLANS INCONJUNCTION WITH ALT-1 APPLICATION #240288693. |
| Q00832261 ↗ | 57-46 156 STREET QUEENS | Alteration | Signed-off | 03/29/2023 | 01/30/2025 | Design LONGTIN SOLUTIONS LLC Contractor CATMAN PLUMBING INC Filer BASIC GROUPS CORP | HEREWITH FILING PLUMBING APPLICATION WITH RESIDENTIAL ENLARGEMENT APPLICATION # Q00832260-I1 |
| B00771572 ↗ | 101 LINCOLN ROAD BROOKLYN | Alteration | Permit Issued | 08/19/2022 | 09/24/2024 | Design LONGTIN SOLUTIONS LLC Owner EFTRI HOLDINGS LLC Contractor AMC PLBG, HTG & CLNG, INC Filer BASIC GROUPS CORP | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT JOB#B00769082. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| Name | Projects together | Most recent |
|---|---|---|
| LONGTIN ENGINEERING INC. | 20 | 10/15/2024 |
| BASIC GROUPS CORP | 12 | 05/14/2026 |
| VICTOR CASTILLO ARCHITECT PC | 2 | 09/09/2024 |
| AARON MCDONALD ARCHITECT | 1 | 04/21/2026 |
| BASIC GROUPS CORP. DIVISION OF PCM | 1 | 07/11/2022 |
| L & C ASSOCIATES | 1 | 07/26/2022 |
| NIC 88 CORP | 1 | 12/03/2025 |
| STUDIO SJ | 1 | 12/03/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| PIPESTYLISTS, INC | 20 | 05/14/2026 |
| AMC PLBG, HTG & CLNG, INC | 16 | 05/14/2026 |
| CUBE BUILDERS GROUP NY | 11 | 10/15/2024 |
| STEEL TONE CONSTRUCTION | 11 | 05/15/2024 |
| BLUESKY DEVELOPMENT | 10 | 11/21/2024 |
| GOOD-WILL MECHANICAL CORP | 6 | 05/07/2024 |
| INNOVATION PLUMBING LLC | 6 | 09/08/2023 |
| NYC BEST REMODELING INC | 4 | 09/27/2024 |
| GN HOME IMPROVEMENT CORP | 3 | 05/31/2023 |
| JEM FIRE PREVENTION INC | 3 | 04/21/2026 |
| AD LINE NYC INC | 2 | 04/07/2023 |
| ADELPHI ARTS INC | 2 | 08/16/2022 |
| AL PLUMBING & CONT. INC | 2 | 09/22/2023 |
| CATMAN PLUMBING INC | 2 | 09/02/2024 |
| CROSSFIELD P & H CORP | 2 | 04/21/2026 |
| DAVID CONSTRUCTING NY, IN | 2 | 08/18/2023 |
| DAYS SERVICE GROUP LLC | 2 | 12/29/2022 |
| EH PLUMBING & HEATING COR | 2 | 08/17/2023 |
| JC HI TECH INC | 2 | 01/31/2023 |
| JOHN FITZGERALD PLBG &HTG | 2 | 12/28/2022 |
| KLE CONSTRUCTION INC | 2 | 04/20/2023 |
| S & S PLUMBING CORP | 2 | 07/26/2022 |
| SPLEN CONSTRUCTION INC | 2 | 09/12/2022 |
| VILLAGE P & H NY INC | 2 | 07/28/2022 |
| XR GROUP CORP | 2 | 10/11/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| BLUE SKY GROUP | 22 | 05/14/2026 |
| DROX LLC | 5 | 10/11/2024 |
| ASPEN TRUSS, INC. | 3 | 04/07/2023 |
| EFTRI HOLDINGS LLC | 3 | 05/31/2023 |
| Horace Mann School | 3 | 05/07/2024 |
| URBAN STANDARD CAPITAL | 3 | 09/21/2023 |
| BAUGHMAN REALTY, LLC | 2 | 09/20/2022 |
| BRC MANAGEMENT GROUP | 2 | 03/15/2023 |
| LOPEZ & ROMERO, P.C. | 2 | 08/24/2022 |
| MARKIS MANAGEMENT LLC | 2 | 07/11/2022 |
| PLEASANT PLAINS ANIMAL HOSPITAL | 2 | 11/01/2023 |
| SKYLINEBUILDERS USA INC. | 2 | 12/30/2022 |
| 247 WEST REALTY | 1 | 04/20/2023 |
| ADELPHI ARTS, INC. | 1 | 08/16/2022 |
| AKAM ASSOCIATES, INC. | 1 | 08/04/2022 |
| BASIC GROUPS CORP | 1 | 10/15/2024 |
| GC SHL, LLC | 1 | 04/07/2022 |
| GN HOME IMPROVEMENT CORP. | 1 | 10/15/2024 |
| GOOD-WILL MECHANICAL CORP. | 1 | 01/19/2023 |
| Innospark Design | 1 | 04/21/2026 |
| JIA HE SUPERMARKET INC. | 1 | 08/15/2023 |
| KIMCO REALTY | 1 | 06/30/2022 |
| MERIDIAN PROPERTIES, LLC | 1 | 05/19/2022 |
| MK IMPROVEMENT GROUP | 1 | 07/21/2022 |
| RABER ENTERPRISES LLC | 1 | 09/09/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| BASIC GROUPS CORP | 116 | 05/14/2026 |
| BMB BUILDING CONSULTING INC. | 2 | 09/09/2024 |
| Bealin Groups Corp | 2 | 05/14/2026 |
| N AND N CONSULTANT CORP. | 2 | 07/11/2022 |
| VIBEN BUILDING LLC | 2 | 12/29/2022 |
| NEXUS CONSULTING NYC, INC | 1 | 12/03/2025 |
| PROJECT ENTRY | 1 | 09/24/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00793557 ↗ | 8760 26 AVENUE BROOKLYN | Alteration | Permit Issued | 08/15/2022 | 05/14/2026 | Design AARON MCDONALD ARCHITECT Owner Innospark Design Contractor T & T PLUMBING INC Filer BASIC GROUPS CORP | PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES AND SPRINKLER FROM CELLAR TO ROOF. PLUMBING AND SPRINKLER WORK AS PERPLAN. NO CHANGE IN USE, … |
| M00710943 ↗ | 2651 BROADWAY MANHATTAN | Alteration | Permit Issued | 04/07/2022 | 04/17/2026 | Design BASIC GROUPS CORP Owner BLUE SKY GROUP Contractor T & T PLUMBING INC Filer BASIC GROUPS CORP | PROPOSED SPRINKLER AND PLUMBING WORK IN CONJUNCTION WITH APPLICATION #120090356 IN EXISTING 7-STORYMIXED USE BUILDING. |
| B00922900 ↗ | 518 58 STREET BROOKLYN | Alteration CO | Permit Issued | 11/24/2023 | 05/06/2025 | Design LONGTIN SOLUTIONS LLC Contractor PLBG P & H INC | PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| X00730960 ↗ | 2501 HUGHES AVENUE BRONX | Alteration | Signed-off | 07/08/2022 | 02/28/2025 | Design BASIC GROUPS CORP Owner BLUE SKY GROUP Contractor AMC PLBG, HTG & CLNG, INC Filer BASIC GROUPS CORP | SUBMIT PLUMBING AND SPRINKLER PLANS INCONJUNCTION WITH ALT-1 APPLICATION #240288693. |
| Q00832261 ↗ | 57-46 156 STREET QUEENS | Alteration | Signed-off | 03/29/2023 | 01/30/2025 | Design LONGTIN SOLUTIONS LLC Contractor CATMAN PLUMBING INC Filer BASIC GROUPS CORP | HEREWITH FILING PLUMBING APPLICATION WITH RESIDENTIAL ENLARGEMENT APPLICATION # Q00832260-I1 |
| B00771572 ↗ | 101 LINCOLN ROAD BROOKLYN | Alteration | Permit Issued | 08/19/2022 | 09/24/2024 | Design LONGTIN SOLUTIONS LLC Owner EFTRI HOLDINGS LLC Contractor AMC PLBG, HTG & CLNG, INC Filer BASIC GROUPS CORP | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT JOB#B00769082. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| M00725806 ↗ | 83 LEONARD STREET MANHATTAN | Alteration | Permit Issued | 05/02/2022 | 08/30/2024 | Design LONGTIN SOLUTIONS LLC Owner SRM MANAGEMENT LLC Contractor AL PLUMBING & CONT. INC Filer BASIC GROUPS CORP | PLUMBING WORK ON 3RD AND 5TH FLOOR. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| M00725772 ↗ | 83 LEONARD STREET MANHATTAN | Alteration | Permit Issued | 05/02/2022 | 08/13/2024 | Design LONGTIN SOLUTIONS LLC Contractor STEEL TONE CONSTRUCTION | PROPOSE INTERIOR RENOVATION ON 3RD FLOOR AND 5TH FLOOR OF EXISTING 5 STORYBUILDING .CONSTRUCTIONS WORKS AS PER PLAN, NO CHANGE ON EGRESS, US… |
| X00698171 ↗ | 349 EAST 139 STREET BRONX | Alteration | Signed-off | 03/24/2022 | 06/05/2024 | Design VICTOR CASTILLO ARCHITECT PC Contractor ROCK E SMALL PLBG&HTG INC | PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH DESIGN JOB #X00760156-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| X01046477 ↗ | 4401 CAYUGA AVENUE BRONX | Alteration | Signed-off | 05/07/2024 | 05/09/2024 | Design LONGTIN SOLUTIONS LLC Owner Horace Mann School Contractor GOODWILL MECHANICAL Filer BASIC GROUPS CORP | FILING TO ADD MECHANICAL SYSTEMS. ALL WORK COMPLETED UNDER JOB#X00792681-I1. NO WORK IS BEING DONE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| X01018677 ↗ | 514 EAST 188 STREET BRONX | Alteration | Signed-off | 03/13/2024 | 04/26/2024 | Design LONGTIN SOLUTIONS LLC Contractor BLUESKY DEVELOPMENT Filer BASIC GROUPS CORP | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT JOB#X01018677-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00741998 ↗ | 135 BAY 38 STREET BROOKLYN | Alteration | Signed-off | 05/21/2022 | 03/11/2024 | Design LONGTIN SOLUTIONS LLC Contractor CUBE BUILDERS GROUP NY Filer BASIC GROUPS CORP | PROPOSE INTERIOR RENOVATION ON EXISTING 2 STORY BUILDING, CONSTRUCTIONS WORKS AS PER PLAN. NO CHANGE ON EGRESS USE OR OCCUPANCY. |
| B00887583 ↗ | 482 TOMPKINS AVENUE BROOKLYN | Alteration | Signed-off | 09/21/2023 | 03/07/2024 | Design LONGTIN SOLUTIONS LLC Owner URBAN STANDARD CAPITAL Contractor A & A BUILDING RENOVATION Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF APT#1A ON EXISTING 4 STORY BUILDING. PARTITION WORK AS PER PLANS. NO CHANGE ON EGRESS, USE OR OCCUPANCY. |
| Q08048987 ↗ | 404 ONDERDONK AVENUE QUEENS | Alteration | Permit Issued | 12/05/2022 | 02/22/2024 | Design LONGTIN SOLUTIONS LLC Owner BLUE SKY GROUP Contractor AMC PLBG, HTG & CLNG, INC Filer BASIC GROUPS CORP | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT JOB#Q07997666. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00933456 ↗ | 459 9 STREET BROOKLYN | Alteration | Signed-off | 09/15/2023 | 02/17/2024 | Design LONGTIN SOLUTIONS LLC Owner DROX LLC Contractor STEEL TONE CONSTRUCTION Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION ON EXISTING 3 STORY BUILDING, NO CHANGE ON EGRESS, USE OR OCCUPANCY. |
| B00712736 ↗ | 590 HART STREET BROOKLYN | Alteration | Signed-off | 07/11/2022 | 02/01/2024 | Owner MARKIS MANAGEMENT LLC Contractor LG ELITE PLUMBING INC Filer N AND N CONSULTANT CORP. | FILING HEREWITH APPLICATION FOR PLUMBING WORK TYPE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00781344 ↗ | 317 EAST 78 STREET MANHATTAN | Alteration | Permit Issued | 07/29/2022 | 01/22/2024 | Design LONGTIN SOLUTIONS LLC Contractor NYC BEST REMODELING INC Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF APT#1A, 3C, 3D, 4A, 4C & LOBBY ON EXISTING 4 STORYBUILDING. PARTITION WORK AS PER PLANS. NO CHANGE ON EGRESS… |
| M00781350 ↗ | 317 EAST 78 STREET MANHATTAN | Alteration | Permit Issued | 07/29/2022 | 01/22/2024 | Design LONGTIN SOLUTIONS LLC Contractor INNOVATION PLUMBING LLC Filer BASIC GROUPS CORP | PLUMBING WORK ON APT#1A ON 1ST FLOOR, APT#3C,3D ON 3RD FLOOR,APT#4A,4C ON 4TH FLOOR. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B00779166 ↗ | 367 PALMETTO STREET BROOKLYN | Alteration | Signed-off | 07/27/2022 | 01/16/2024 | Design LONGTIN SOLUTIONS LLC Owner BLUE SKY GROUP Contractor BLUESKY DEVELOPMENT Filer BASIC GROUPS CORP | INTERIOR RENOVATION ON CELLAR, APT#1L,2L OF EXISTING 3 STORY BUILDING. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B00937161 ↗ | 459 9 STREET BROOKLYN | Alteration | Signed-off | 09/22/2023 | 12/13/2023 | Design LONGTIN SOLUTIONS LLC Owner DROX LLC Contractor AL PLUMBING & CONT. INC Filer BASIC GROUPS CORP | PLUMBING WORK OF EXISTING 3 STORY BUILDING, PLUMBING WORKS AS PERPLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B00779492 ↗ | 367 PALMETTO STREET BROOKLYN | Alteration | Signed-off | 07/27/2022 | 12/04/2023 | Design LONGTIN SOLUTIONS LLC Owner BLUE SKY GROUP Contractor AMC PLBG, HTG & CLNG, INC Filer BASIC GROUPS CORP | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT JOB#B00779166. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| S00939606 ↗ | 386 ADELAIDE AVENUE STATEN ISLAND | Alteration | Signed-off | 09/26/2023 | 12/04/2023 | Design LONGTIN SOLUTIONS LLC Owner BASIC GROUPS CORP Contractor AMC PLBG, HTG & CLNG, INC | PARTIAL INTERIOR RENOVATION OF FIRST FLOOR RESIDENTIAL SPACE. CAP & REMOVE KITCHEN AND LEGALIZE BAHTROOM IN CELLAR. FILED TO ADDRESS HRP COR… |
| B00737833 ↗ | 6823 3 AVENUE BROOKLYN | Alteration | Signed-off | 05/19/2022 | 11/13/2023 | Design LONGTIN SOLUTIONS LLC Owner MERIDIAN PROPERTIES, LLC Contractor AMC PLBG, HTG & CLNG, INC Filer BASIC GROUPS CORP | INSTALL 9 NEW BOILERS FROM CELLAR THRU 4TH FLOOR. PLUMBING WORK AS PERPLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| X00896592 ↗ | 231 WEST 246 STREET BRONX | Alteration | Signed-off | 07/17/2023 | 11/06/2023 | Design LONGTIN SOLUTIONS LLC Owner Horace Mann School Contractor GOODWILL MECHANICAL Filer BASIC GROUPS CORP | INSTALL NEW HVAC SYSTEM ON 1ST FLOOR LOCKER ROOM. MECHANICAL WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| X00760156 ↗ | 349 EAST 139 STREET BRONX | Alteration | Signed-off | 06/22/2022 | 10/26/2023 | Design VICTOR CASTILLO ARCHITECT PC Contractor MORELL BUILDERS INC | STRUCTURAL WORK ON BASEMENT THROUGH 003. NO CHANGE IN EGRESS, USE OR OCCUPANCY |
| Q00749394 ↗ | 42-45 27 STREET QUEENS | Alteration | Permit Issued | 06/14/2022 | 10/10/2023 | Design LONGTIN SOLUTIONS LLC Contractor RRP PLUMBING CORP Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF EXISTING 1ST FLOOR. PLUMBING PLAN AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| M00823473 ↗ | 170 1 AVENUE MANHATTAN | Alteration | Permit Issued | 07/12/2023 | 09/11/2023 | Design BASIC GROUPS CORP Contractor NYC BEST REMODELING INC Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF APT#0 ON 1ST FLOOR , INSTALL NEW METAL STAIRS FROM CELLAR TO APT#0 . CONSTRUCTIONS WORKS AS PER PLAN, NO CH… |
| Q00832260 ↗ | 57-46 156 STREET QUEENS | Alteration CO | Permit Issued | 03/29/2023 | 09/06/2023 | Design LONGTIN SOLUTIONS LLC Contractor TLS CONSTRUCTION GROUP I* Filer PROJECT ENTRY | CONVERT ONE FAMILY DWELLING UNIT TO TWO FAMILY DWELLING UNITS WITH VERTICAL AND HORIZONTAL EXTENSION AND INTERIOR RENOVATION OF EXISTING ONE… |
| B00787174 ↗ | 596 ARGYLE ROAD BROOKLYN | Alteration | Permit Issued | 09/20/2022 | 08/31/2023 | Design LONGTIN SOLUTIONS LLC Owner BAUGHMAN REALTY, LLC Contractor STEEL TONE CONSTRUCTION Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF APT#19 ON 3RD FLOOR, APT#23 ON 4TH FLOOR, PARTITION WORKS AS PER PLANS. NO CHANGE ON EGRESS, USE OR OCCUPANC… |
| M00728940 ↗ | 170 1 AVENUE MANHATTAN | Alteration | Permit Issued | 05/05/2022 | 08/18/2023 | Design LONGTIN SOLUTIONS LLC Contractor NYC BEST REMODELING INC Filer BASIC GROUPS CORP | REPAIR STAIRCASE OF EXISTING 5 STORY BUILDING. CONSTRUCTIONS WORKS AS PER PLAN, NO CHANGE ON EGRESS, USE OR OCCUPANCY. |
| Q07996833 ↗ | 57-16 MYRTLE AVENUE QUEENS | Alteration | Signed-off | 08/31/2022 | 08/17/2023 | Design LONGTIN SOLUTIONS LLC Contractor SENID PL & HTG CORP | DIRECT REPLACEMENT OF 1 HWH AND 1 BOILER ON 002. FILED TO ADDRESS ECB VIOLATION# 32093321P. PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGR… |
| B00900957 ↗ | 219 KINGSLAND AVENUE BROOKLYN | Alteration | Permit Issued | 07/12/2023 | 08/04/2023 | Design LONGTIN SOLUTIONS LLC Contractor BLUESKY DEVELOPMENT Filer BASIC GROUPS CORP | Combine apartment #7 and #11 & combine apartment #14 and #9. no changes to use, egress or occupancy |
| M00772683 ↗ | 1767 2 AVENUE MANHATTAN | Alteration | Signed-off | 07/20/2022 | 08/02/2023 | Design LONGTIN SOLUTIONS LLC Contractor STEEL TONE CONSTRUCTION Filer BASIC GROUPS CORP | INSTALL NEW HOOD IN EXIST KITCHEN ON 1ST FLOOR. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| M00757111 ↗ | 666 9 AVENUE MANHATTAN | Alteration | Signed-off | 06/21/2022 | 07/31/2023 | Design LONGTIN SOLUTIONS LLC Owner BLUE SKY GROUP Contractor INNOVATION PLUMBING LLC Filer BASIC GROUPS CORP | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT/MS JOB#M00756630-I1. PLUMBING WORK FROM CELLAR TO 5TH FLOOR. REPAIR GAS LEAK PIPE… |
| Q00908830 ↗ | 49-01 MASPETH AVENUE QUEENS | Alteration | Signed-off | 07/27/2023 | 07/28/2023 | Design LONGTIN SOLUTIONS LLC Owner WAYNE O LLC Contractor GOODWILL MECHANICAL Filer BASIC GROUPS CORP | REPLACE EXISTING OUTDOOR UNIT AND EXISTING EXHAUST DUCT ON ROOF OF EXISTING 1 STORY BUILDING. MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRE… |
| X00878980 ↗ | 2458 LORILLARD PLACE BRONX | Alteration | Signed-off | 05/24/2023 | 07/28/2023 | Design LONGTIN SOLUTIONS LLC Contractor EH PLUMBING & HEATING COR Filer BASIC GROUPS CORP | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT JOB#X00878953. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| X00730948 ↗ | 2501 HUGHES AVENUE BRONX | Alteration | Signed-off | 07/08/2022 | 07/18/2023 | Design LONGTIN SOLUTIONS LLC Owner BLUE SKY GROUP Contractor STEEL TONE CONSTRUCTION Filer BASIC GROUPS CORP | SUBMIT MECHANICAL PLAN IN CONJUNCTION WITH ALT-1 APPLICATION #240288693 |
| M00775110 ↗ | 155 WEST 70 STREET MANHATTAN | Alteration | Signed-off | 09/22/2022 | 07/11/2023 | Design LONGTIN SOLUTIONS LLC Contractor LWS CONSTRUCTION INC Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON GROUND FLOOR. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| X00878953 ↗ | 2458 LORILLARD PLACE BRONX | Alteration | Signed-off | 05/24/2023 | 06/22/2023 | Design LONGTIN SOLUTIONS LLC Contractor ASKI CONSTRUCTION CORP Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION ON 1ST & 2ND FLOOR OF EXISTING 2 STORY BUILDING, PARTITION WORKS AS PER PLANS. NO CHANGE USE OR OCCUPANCY. |
| B08045437 ↗ | 559 CLINTON STREET BROOKLYN | Alteration | Signed-off | 11/29/2022 | 06/14/2023 | Design LONGTIN SOLUTIONS LLC Owner DROX LLC Contractor XR GROUP CORP Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION ON CELLAR THRU 3RD FLOOR, NO CHANGE ON EGRESS, USE OR OCCUPANCY. |
| B08045440 ↗ | 559 CLINTON STREET BROOKLYN | Alteration | Signed-off | 11/29/2022 | 06/14/2023 | Design LONGTIN SOLUTIONS LLC Owner DROX LLC Contractor XR GROUP CORP Filer BASIC GROUPS CORP | MECHANICAL WORK ON CELLAR FLOOR THROUGH ROOF. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| M00729878 ↗ | 320 ST NICHOLAS AVENUE MANHATTAN | Alteration | Signed-off | 05/03/2022 | 06/05/2023 | Design LONGTIN SOLUTIONS LLC Contractor PRIME PLMBG & HTG OF NY Filer BASIC GROUPS CORP | PLUMBING WORK ON CELLAR AND 1ST FLOOR COMMERCIAL SPACE. NO CHANGE IN EGRESS, USE OR OCCUPANCY |
| B00872113 ↗ | 126 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 05/11/2023 | 05/30/2023 | Design LONGTIN SOLUTIONS LLC Owner THE MANN GROUP Contractor BOLT BUILDS INC Filer BASIC GROUPS CORP | Hood and ductwork in existing kitchen working with commercial kitchen cooking equipment. Install Air Conditioning Systems. No change to egre… |
| Q00792390 ↗ | 42-45 27 STREET QUEENS | Alteration | Permit Issued | 08/12/2022 | 05/05/2023 | Design LONGTIN SOLUTIONS LLC Contractor KLE CONSTRUCTION INC | PROPOSED INTERIOR RENOVATION OF EXISTING 1ST FLOOR. MECHANICAL JOB FOR EXHAUST HOOD IN COMMERCIAL KITCHEN OF EATING AND DRINKING ESTABLISHME… |
| S00759738 ↗ | 28 PEARL STREET STATEN ISLAND | Alteration | Signed-off | 06/22/2022 | 04/28/2023 | Design LONGTIN SOLUTIONS LLC Contractor UNIQUE CONST CONCEPTS INC Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF EXISTING BASEMENT, 1ST AND 2ND FLOOR. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| Q00774065 ↗ | 23-79 27 STREET QUEENS | Alteration | Signed-off | 07/26/2022 | 04/24/2023 | Design LONGTIN SOLUTIONS LLC Contractor CELATECH CONSTRUCTION COR Filer BASIC GROUPS CORP | PROPOSED RESIDENTIAL RENOVATION OF CELLAR, 1ST & 2ND FLOOR. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| M08005374 ↗ | 155 WEST 70 STREET MANHATTAN | Alteration | Signed-off | 09/22/2022 | 04/12/2023 | Design LONGTIN SOLUTIONS LLC Contractor DPH PLUMBING & HTG CORP Filer BASIC GROUPS CORP | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT JOB#M00775110. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| X00807279 ↗ | 2507 HUGHES AVENUE BRONX | Alteration | Signed-off | 01/19/2023 | 04/07/2023 | Design LONGTIN SOLUTIONS LLC Owner BLUE SKY GROUP Contractor AMC PLBG, HTG & CLNG, INC | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT JOB#X00807239. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| X00807239 ↗ | 2507 HUGHES AVENUE BRONX | Alteration | Signed-off | 01/19/2023 | 04/02/2023 | Design LONGTIN SOLUTIONS LLC Owner BLUE SKY GROUP Contractor STEEL TONE CONSTRUCTION | Repair water damage throughout the building due to roof leak. All plans in accordance with existing record CO 29696-60 and ALT 491-59. No … |
| M00713891 ↗ | 38 8 AVENUE MANHATTAN | Alteration | Permit Issued | 06/16/2022 | 03/31/2023 | Design LONGTIN SOLUTIONS LLC Owner 247 WEST REALTY Contractor COCHRANE PLBG & HTG Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF EXISTING RESTAURANT ON 1ST FLOOR ANDCELLAR. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OROCCUPANCY. |
| M08030291 ↗ | 23 EAST 17 STREET MANHATTAN | Alteration | Signed-off | 11/02/2022 | 03/23/2023 | Design LONGTIN SOLUTIONS LLC Owner ASPEN TRUSS, INC. Contractor AD LINE NYC INC Filer BASIC GROUPS CORP | PROPOSED KITCHEN HOOD VENTILATION SYSTEM WORK ON ROOF AND EXISTING CELLAR & 1ST FLOOR COMMERCIAL SPACE. NO CHANGE IN EGRESS, USE OR OCCUPAN… |
| Q00749196 ↗ | 42-45 27 STREET QUEENS | Alteration | Signed-off | 06/14/2022 | 03/09/2023 | Design LONGTIN SOLUTIONS LLC Contractor SPLEN CONSTRUCTION INC Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF EXISTING 1ST FLOOR. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B07995121 ↗ | 219 KINGSLAND AVENUE BROOKLYN | Alteration | Signed-off | 09/21/2022 | 02/24/2023 | Design LONGTIN SOLUTIONS LLC Owner BLUE SKY GROUP Contractor AMC PLBG, HTG & CLNG, INC Filer BASIC GROUPS CORP | PLUMBING WORK ON CELLAR THRU 4TH FLOOR. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B07995720 ↗ | 219 KINGSLAND AVENUE BROOKLYN | Alteration | Permit Issued | 09/21/2022 | 02/24/2023 | Design LONGTIN SOLUTIONS LLC Owner BLUE SKY GROUP Contractor BLUESKY DEVELOPMENT Filer BASIC GROUPS CORP | INSTALL AIR HANDLING UNITS ON 001 THRU 004 AND 8 CONDENSING UNITS ON ROOF. MECHANICAL WORK AS PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B07995041 ↗ | 219 KINGSLAND AVENUE BROOKLYN | Alteration | Signed-off | 09/21/2022 | 02/23/2023 | Design LONGTIN SOLUTIONS LLC Owner BLUE SKY GROUP Contractor BLUESKY DEVELOPMENT Filer BASIC GROUPS CORP | INTERIOR RENOVATION OF 1ST FLOOR THRU 4TH FLOOR. PARTITION WORK AS PER PLANS, PLUMBING WORK TO BE FILED UNDER SEPARATE APPLICATION. NO CHANG… |
| Q00459602 ↗ | 58-29 48 STREET | Alteration | Signed-off | 01/25/2021 | 01/12/2023 | Design LONGTIN SOLUTIONS LLC Contractor S & L PLUMBING INC Filer BASIC GROUPS CORP | SUBMIT SPRINKLER PLAN IN CONJUNCTION WITH ALT-1 APPLICATION #440648961 |
| M08000808 ↗ | 69 BAYARD STREET MANHATTAN | Alteration | Signed-off | 09/09/2022 | 01/07/2023 | Design LONGTIN SOLUTIONS LLC Owner RABER ENTERPRISES LLC Contractor QMB PLUMBING & HEATING INC Filer BASIC GROUPS CORP | PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES AND SPRINKLER ON 1ST FLOOR. PLUMBING AND SPRINKLER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS… |
| B07998062 ↗ | 5816 7 AVENUE BROOKLYN | Alteration | Signed-off | 09/07/2022 | 01/06/2023 | Design LONGTIN SOLUTIONS LLC Contractor AMC PLBG, HTG & CLNG, INC Filer BASIC GROUPS CORP | REPAIR EXISTING LEAK GAS PIPES ON CELLAR BOILER ROOM. PLUMBING WORK AS PER PLAN, NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00783316 ↗ | 309 MENAHAN STREET BROOKLYN | Alteration | Signed-off | 07/29/2022 | 01/04/2023 | Design LONGTIN SOLUTIONS LLC Owner BLUE SKY GROUP Contractor BLUESKY DEVELOPMENT Filer BASIC GROUPS CORP | REPAIR DAMAGED CEILING JOISTS IN BATHROOM AREA OF APT #1L TO RESOLVE VIOLATION #35579032H,#39059234M AND #39059233K. PROPOSED INTERIOR RENOV… |
| B00783390 ↗ | 309 MENAHAN STREET BROOKLYN | Alteration | Permit Issued | 07/29/2022 | 01/04/2023 | Design LONGTIN SOLUTIONS LLC Owner BLUE SKY GROUP Contractor AMC PLBG, HTG & CLNG, INC Filer BASIC GROUPS CORP | replace all plumbing risers throughout building with new as per HPD order, TO RESOLVEVIOLATION #35579032H, #39059234M AND #39059233K. PROPO… |
| B00804377 ↗ | 280 GRANT AVENUE BROOKLYN | Alteration | Signed-off | 12/28/2022 | 01/04/2023 | Design LONGTIN SOLUTIONS LLC Contractor JOHN FITZGERALD PLBG &HTG | EXISITNG 2PC BATHROOM TO BE LEGALIZED. REMOVE GAS STOVE, SHOWER AT CELLAR. |
| B00804297 ↗ | 280 GRANT AVENUE BROOKLYN | Alteration | Signed-off | 12/28/2022 | 01/03/2023 | Design LONGTIN SOLUTIONS LLC Contractor DAVID CONSTRUCTING NY, IN | INTERIOR RENOVATION OF EXISTING 2 FAMILY HOUSE AT CELLAR, REAR YARD. RESTORE EXISTING DECK, REMOVE PARTITIONS & KITCHEN AT CELLAR. NO CHANGE… |
| B08045442 ↗ | 559 CLINTON STREET BROOKLYN | Alteration | Signed-off | 11/29/2022 | 12/29/2022 | Design LONGTIN SOLUTIONS LLC Owner DROX LLC Contractor EH PLUMBING & HEATING COR Filer BASIC GROUPS CORP | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT JOB#B08045437. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00582460 ↗ | 185 PARK ROW MANHATTAN | Alteration | Signed-off | 09/03/2021 | 12/27/2022 | Design LONGTIN SOLUTIONS LLC Contractor AMC PLBG, HTG & CLNG, INC | INTERIOR RENOVATION OF APT#15D ON 15TH FLOOR. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. |
| Q08053012 ↗ | 249-20 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 12/21/2022 | 12/27/2022 | Design LONGTIN SOLUTIONS LLC Owner JIA HE SUPERMARKET INC. Contractor GOODWILL MECHANICAL Filer BASIC GROUPS CORP | SUBSEQUENT FILING FOR MECHANICAL WORK IN CONJUNCTION WITH OT JOB#Q00717460-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| S07998803 ↗ | 237 CROMWELL AVENUE STATEN ISLAND | Alteration | Signed-off | 09/09/2022 | 12/27/2022 | Design LONGTIN SOLUTIONS LLC Contractor AMC PLBG, HTG & CLNG, INC Filer BASIC GROUPS CORP | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT JOB#S07998765. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q00476996 ↗ | 243-02 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 03/03/2021 | 11/30/2022 | Design LONGTIN SOLUTIONS LLC Owner BRC MANAGEMENT GROUP Contractor METRO BUILDERS GROUP LLC | MECHANICAL WORK ON CELLAR, 1ST THROUGH 3RD FLOORS AND ROOF. INSTALL A NEW KITCHEN HOOD,EXHAUST FAN, AND ASSOCIATED DUCT WORK AS PER PLAN. NO… |
| X00784802 ↗ | 657 EAST 187 STREET BRONX | Alteration | Signed-off | 08/22/2022 | 11/23/2022 | Design LONGTIN ENGINEERING INC. Contractor BLUESKY DEVELOPMENT | PROPOSED INTERIOR RENOVATION ON CELLAR AND APT#1L, NO CHANGE ON EGRESS, USE OR OCCUPANCY. |
| Q07997666 ↗ | 404 ONDERDONK AVENUE QUEENS | Alteration | Signed-off | 09/12/2022 | 11/20/2022 | Design LONGTIN SOLUTIONS LLC Owner BLUE SKY GROUP Contractor BLUESKY DEVELOPMENT Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION ON 1ST FLOOR OF EXISTING 3 STORY BUILDING, PARTITION WORKS AS PER PLANS. NO CHANGE ON EGRESS, USE OR OCCUPANCY. |
| M00729385 ↗ | 320 ST NICHOLAS AVENUE MANHATTAN | Alteration | Signed-off | 05/03/2022 | 11/19/2022 | Design LONGTIN SOLUTIONS LLC Contractor ATLANTIC CONSTRUCTION SER Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON CELLAR AND 1ST FLOOR. PARTITION WORKS AS PER PLAN. PLUMBING WORK TO BE FILED UN… |
| M00756630 ↗ | 666 9 AVENUE MANHATTAN | Alteration | Permit Issued | 06/21/2022 | 11/16/2022 | Design LONGTIN SOLUTIONS LLC Owner BLUE SKY GROUP Contractor BLUESKY DEVELOPMENT Filer BASIC GROUPS CORP | PROPOSED REPAIRING OF FIRE DAMAGED AREA AND INTERIOR RENOVATION FROM CELLAR TO ROOF. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B00784485 ↗ | 127 70 STREET BROOKLYN | Alteration | Permit Issued | 09/28/2022 | 10/20/2022 | Design LONGTIN SOLUTIONS LLC Contractor CROSSFIELD PLBG.&HTG | REMOVE AND CAP EXISTING PLUMBING FIXTURES AT 1ST AND 2ND FLOOR. INSTALL NEW PLUMBING FIXTURES. INSTALL NEW COMBI-BOILERS. |
| M00709529 ↗ | 490 GREENWICH STREET MANHATTAN | Alteration | Signed-off | 10/04/2022 | 10/18/2022 | Design LONGTIN SOLUTIONS LLC Contractor AIR DEPOT COMM REFR COR Filer BASIC GROUPS CORP | SUBSEQUENT FILING FOR MECHANICAL WORK TYPE IN CONJUNCTION WITH APPLICATION #M00539629. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| Q00792713 ↗ | 37-14 MAIN STREET QUEENS | Alteration | Signed-off | 09/02/2022 | 10/06/2022 | Design LONGTIN SOLUTIONS LLC Contractor JOHN FITZGERALD PLBG &HTG Filer BASIC GROUPS CORP | PLUMBING WORK ON CELLAR. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| S00759794 ↗ | 28 PEARL STREET STATEN ISLAND | Alteration | Signed-off | 06/22/2022 | 09/30/2022 | Design LONGTIN SOLUTIONS LLC Contractor R.S.F. PLBG & HTG CORP. Filer BASIC GROUPS CORP | FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT JOB#S00759738-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M08003048 ↗ | 183 BLEECKER STREET MANHATTAN | Alteration | Permit Issued | 09/23/2022 | 09/29/2022 | Design LONGTIN SOLUTIONS LLC Contractor JC HI TECH INC Filer BASIC GROUPS CORP | Replace air handling units on 1st floor and mezzanine and 2 condensing units on 1st floor roof of existing building. Mechanical work as per … |
| B00770600 ↗ | 395 ST JOHNS PLACE BROOKLYN | Alteration | Signed-off | 08/19/2022 | 09/26/2022 | Design LONGTIN SOLUTIONS LLC Owner EFTRI HOLDINGS LLC Contractor GN HOME IMPROVEMENT CORP Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF EXISTING CELLAR AND APT#1D ON 1ST FLOOR. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANC… |
| B00788641 ↗ | 518 4 AVENUE BROOKLYN | Alteration | Signed-off | 08/18/2022 | 09/26/2022 | Design LONGTIN SOLUTIONS LLC Contractor PAGE CONTRACTING CORP | REPLACEMENT OF FRONT FACADE WINDOW LINTELS ON EXISTING 4-STORY BUILDING. STRUCTURAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY… |
| M00739561 ↗ | 2 CHARLTON STREET MANHATTAN | Alteration | Permit Issued | 05/31/2022 | 09/26/2022 | Design LONGTIN SOLUTIONS LLC Contractor T & T PLUMBING INC Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF EXISTING APARTMENT #15D ON 15THFLOOR. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OROCCUPANCY. |
| B00784484 ↗ | 127 70 STREET BROOKLYN | Alteration | Signed-off | 08/30/2022 | 09/23/2022 | Design LONGTIN SOLUTIONS LLC Contractor DAVID CONSTRUCTING NY, IN | INTERIOR RENOVATION WITH OF EXISTING 2 FAMILY HOUSE AT CELLAR, 1ST AND 2ND. PLUMBING WORK WILL BE FILLED UNDER SEPARARTE APPLICATION. NO CHA… |
| B00769082 ↗ | 101 LINCOLN ROAD BROOKLYN | Alteration | Signed-off | 08/19/2022 | 09/20/2022 | Design LONGTIN SOLUTIONS LLC Owner EFTRI HOLDINGS LLC Contractor GN HOME IMPROVEMENT CORP Filer BASIC GROUPS CORP | INTERIOR RENOVATION OF APT#1C ON CELLAR/1ST FLOOR, APT#3M ON 3RD FLOOR, APT#4M ON 4TH FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPAN… |
| B00787199 ↗ | 596 ARGYLE ROAD BROOKLYN | Alteration | Filed — no permit on record | 09/20/2022 | — | Design LONGTIN SOLUTIONS LLC Owner BAUGHMAN REALTY, LLC Filer BASIC GROUPS CORP | — |
| S07998765 ↗ | 237 CROMWELL AVENUE STATEN ISLAND | Alteration | Signed-off | 09/09/2022 | 09/15/2022 | Design LONGTIN SOLUTIONS LLC Contractor CUBE BUILDERS GROUP NY Filer BASIC GROUPS CORP | INTERIOR RENOVATION OF EXISTING 2 STORY BUILDING. PARTITION WORKS AS PER PLANS. NO CHANGE ON EGRESS, USE OR OCCUPANCY. |
| M07996018 ↗ | 180 1 AVENUE MANHATTAN | Alteration | Signed-off | 08/31/2022 | 09/12/2022 | Design LONGTIN SOLUTIONS LLC Contractor AMC PLBG, HTG & CLNG, INC Filer BASIC GROUPS CORP | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT JOB#M07996050. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q07996862 ↗ | 163-62 22 AVENUE QUEENS | Alteration | Signed-off | 09/02/2022 | 09/08/2022 | Design LONGTIN SOLUTIONS LLC Contractor AAA TOTAL PLUMBING, INC Filer BASIC GROUPS CORP | PROPOSED PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| M07996050 ↗ | 180 1 AVENUE MANHATTAN | Alteration | Permit Issued | 08/31/2022 | 09/06/2022 | Design LONGTIN SOLUTIONS LLC Contractor NYC BEST REMODELING INC Filer BASIC GROUPS CORP | INTERIOR RENOVATION ON 2ND FLOOR, 3RD FLOOR, 4TH FLOOR AND 5TH FLOOR. COMBINE APARTMENTS ON 2ND FLOOR AND 4TH FLOORS. PARTITION WORKS AS PER… |
| X00792681 ↗ | 4401 CAYUGA AVENUE BRONX | Alteration | Signed-off | 09/01/2022 | 09/06/2022 | Design LONGTIN SOLUTIONS LLC Owner Horace Mann School Contractor GOODWILL MECHANICAL Filer BASIC GROUPS CORP | Replace air handling units on 1st and 2nd floor and 2 condensing units on roof of existing school. Mechanical work as per plan. No change in… |
| X00785313 ↗ | 657 EAST 187 STREET BRONX | Alteration | Signed-off | 08/04/2022 | 09/01/2022 | Design LONGTIN SOLUTIONS LLC Owner BLUE SKY GROUP Contractor AMC PLBG, HTG & CLNG, INC Filer BASIC GROUPS CORP | PROPOSED PLUMBING WORK ON APT#1L OF EXISTING 4 STORY BUILDING. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| X00767395 ↗ | 1742 EAST 172 STREET BRONX | Alteration | Signed-off | 07/15/2022 | 08/31/2022 | Design LONGTIN SOLUTIONS LLC Contractor STEEL TONE CONSTRUCTION Filer BASIC GROUPS CORP | REMOVE ILLEGAL DOORS, PARTITIONS, DOOR LOCKS ON CELLAR AS PER PLAN TO REMEDY ECB VIOLATIONS#35207597H;35006533H;35459167Z;35342414H;35221200… |
| M00791994 ↗ | 69 HORATIO STREET MANHATTAN | Alteration | Filed — no permit on record | 08/24/2022 | — | Design LONGTIN SOLUTIONS LLC Owner LOPEZ & ROMERO, P.C. Filer BASIC GROUPS CORP | — |
| M00792044 ↗ | 69 HORATIO STREET MANHATTAN | Alteration | Filed — no permit on record | 08/24/2022 | — | Design LONGTIN SOLUTIONS LLC Owner LOPEZ & ROMERO, P.C. Filer BASIC GROUPS CORP | — |
| Q00774127 ↗ | 23-79 27 STREET QUEENS | Alteration | Signed-off | 07/26/2022 | 08/24/2022 | Design LONGTIN SOLUTIONS LLC Contractor T.N.T. PLBG & HTG, INC Filer BASIC GROUPS CORP | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT JOB#Q00774065. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00791514 ↗ | 623 53 STREET BROOKLYN | Alteration | Signed-off | 08/18/2022 | 08/20/2022 | Design LONGTIN SOLUTIONS LLC Contractor STEEL TONE CONSTRUCTION Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION ON CELLAR THRU 2ND FLOOR. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B00789012 ↗ | 211 5 AVENUE BROOKLYN | Alteration | Signed-off | 08/16/2022 | 08/19/2022 | Design LONGTIN SOLUTIONS LLC Owner ADELPHI ARTS, INC. Contractor ADELPHI ARTS Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION AND REPLACE STORE SIGNBOARD OF EXISTING COMMERCIAL SPACE ON 1ST FLOOR. NO CHANGE IN EGRESS USE OR OCCUPANCY. |
| B00784883 ↗ | 2063 EAST 35 STREET BROOKLYN | Alteration | Signed-off | 08/15/2022 | 08/18/2022 | Design LONGTIN SOLUTIONS LLC Contractor CUBE BUILDERS GROUP NY Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF EXISTING BASEMENT AND 1ST FLOOR. CONSTRUCTION AND MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR O… |
| M00768444 ↗ | 809 WEST 177 STREET MANHATTAN | Alteration | Signed-off | 07/15/2022 | 08/18/2022 | Design LONGTIN SOLUTIONS LLC Contractor STEEL TONE CONSTRUCTION | REMOVE ILLEGAL DOORS, PARTITIONS ON CELLAR; REMOVE ILLEGAL DOOR AND PARTITION AT APT#3H ON 3RD FLOOR AS PER PLAN TO REMEDY ECB VIOLATIONS #3… |
| B00784681 ↗ | 2063 EAST 35 STREET BROOKLYN | Alteration | Signed-off | 08/15/2022 | 08/17/2022 | Design LONGTIN SOLUTIONS LLC Contractor INNOVATION PLUMBING LLC Filer BASIC GROUPS CORP | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT JOB#B00784883. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00792688 ↗ | 8760 26 AVENUE BROOKLYN | Alteration | Filed — no permit on record | 08/15/2022 | — | Design LONGTIN SOLUTIONS LLC | — |
| M00780017 ↗ | 630 1 AVENUE MANHATTAN | Alteration | Signed-off | 08/04/2022 | 08/09/2022 | Design LONGTIN SOLUTIONS LLC Owner AKAM ASSOCIATES, INC. Contractor GOODWILL MECHANICAL Filer BASIC GROUPS CORP | REPLACED EXISTING INDOOR UNIT ON CELLAR. MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| M00727757 ↗ | 320 ST NICHOLAS AVENUE MANHATTAN | Alteration | Filed — no permit on record | 08/08/2022 | — | Design LONGTIN SOLUTIONS LLC Filer BASIC GROUPS CORP | — |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 04/23/2026 | HVAC-R and service water heating equipment | 8760 26 AVENUE | Aaron McDonald | energy_progress |
| 04/23/2026 | Maintenance information | 8760 26 AVENUE | Aaron McDonald | energy_progress |
| 04/23/2026 | HVAC-R and service water heating system controls | 8760 26 AVENUE | Aaron McDonald | energy_progress |
| 04/23/2026 | HVAC-R and service water piping design and insulation | 8760 26 AVENUE | Aaron McDonald | energy_progress |
| 04/23/2026 | Energy Code Compliance Inspections | 8760 26 AVENUE | TIM TSAI | progress |
| 04/23/2026 | Sprinkler Systems | 8760 26 AVENUE | TIM TSAI | special |
| 04/23/2026 | Fire-Resistant Penetrations and Joints | 8760 26 AVENUE | TIM TSAI | special |
| 04/20/2026 | HVAC-R and service water heating system controls | 8760 26 AVENUE | Aaron McDonald | energy_progress |
| 04/20/2026 | HVAC-R and service water heating equipment | 8760 26 AVENUE | Aaron McDonald | energy_progress |
| 04/20/2026 | HVAC-R and service water piping design and insulation | 8760 26 AVENUE | Aaron McDonald | energy_progress |
| 04/20/2026 | Maintenance information | 8760 26 AVENUE | Aaron McDonald | energy_progress |
| 04/06/2026 | Energy Code Compliance Inspections | 8760 26 AVENUE | TIM TSAI | progress |
| 04/06/2026 | Sprinkler Systems | 8760 26 AVENUE | TIM TSAI | special |
| 04/06/2026 | Fire-Resistant Penetrations and Joints | 8760 26 AVENUE | TIM TSAI | special |
| 10/16/2025 | Fire-Resistant Penetrations and Joints | 518 58 STREET | TIM TSAI | special |
| 09/26/2025 | Air barrier - visual inspection | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | Metering | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | Insulation placement and R values | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | HVAC-R and service water heating equipment | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | Maintenance information | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | Fenestration air leakage | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | Interior lighting power | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | HVAC-R and service water heating system controls | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | Fenestration areas | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | Fenestration and door U-factor and product ratings | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | Permanent certificate | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | Protection of exposed foundation insulation | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | HVAC-R and service water piping design and insulation | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | Final | 57-46 156 STREET | TIM TSAI | progress |
| 09/26/2025 | Footing and Foundation | 57-46 156 STREET | TIM TSAI | progress |
| 09/26/2025 | Energy Code Compliance Inspections | 57-46 156 STREET | TIM TSAI | progress |
| 09/26/2025 | Fire-Resistance Rated Construction | 57-46 156 STREET | TIM TSAI | progress |
| 09/26/2025 | Masonry | 57-46 156 STREET | TIM TSAI | special |
| 09/26/2025 | Construction Operations Influencing Adjacent Structures | 57-46 156 STREET | TIM TSAI | special |
| 09/26/2025 | Concrete - Cast-In-Place | 57-46 156 STREET | TIM TSAI | special |
| 09/26/2025 | Subsurface Investigations (Borings/Test Pits) | 57-46 156 STREET | Rajasekhar Sakhamuri | special |
| 09/26/2025 | Excavations - Sheeting, Shoring, and Bracing | 57-46 156 STREET | TIM TSAI | special |
| 09/26/2025 | Structural Steel - Details | 57-46 156 STREET | TIM TSAI | special |
| 09/26/2025 | Structural Steel - Welding | 57-46 156 STREET | TIM TSAI | special |
| 09/26/2025 | Structural Stability – Alterations of existing buildings | 57-46 156 STREET | TIM TSAI | special |
| 09/26/2025 | Fire-Resistant Penetrations and Joints | 57-46 156 STREET | TIM TSAI | special |
| 09/26/2025 | Mechanical Systems | 57-46 156 STREET | TIM TSAI | special |
| 09/26/2025 | Protection of exposed foundation insulation | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | HVAC-R and service water heating equipment | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | Metering | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | Permanent certificate | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | Air barrier - visual inspection | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | Fenestration areas | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | Maintenance information | 57-46 156 STREET | TIM TSAI | energy_progress |
| 09/26/2025 | HVAC-R and service water heating system controls | 57-46 156 STREET | TIM TSAI | energy_progress |