Office with commercial, 7-19 stories
135 MADISON AVENUE
MANHATTAN · BIN 1016988
💬 Discuss this project
1912Year Built
12Stories
O6Building Class
C5-2Zoning
180,019 sfGross Floor Area
24Units
LL97 Covered1 Open Violation ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: TRANEL I LLC · 12,837 sf lot · 14.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof1p · 2 filings · 12 docs
Floor 141p · 2 filings · 12 docs
Floor 13
Floor 12
Floor 11
Floor 107p · 2 filings · 20 docs
Floor 96p · 2 filings · 20 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 39p · 2 filings · 20 docs
Floor 223p · 5 filings · 20 docs
Floor 17p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRANEL 1 LLC C O KOEPPEL ROSEN7307/08/2026
TRANEL 110203/22/2026
TRANEL8603/22/2026
GVA WILLIAM REAL ESTATE403/22/2026
902 ASSOC C/O WILLIAMS R.403/22/2026
TO THW OWNER OF 135 MADIS103/22/2026
TO OWNER OF 135 MADISON A103/22/2026
WILLAMS REALTY INC103/22/2026
MASTIVC ASSOCIATES103/22/2026
TRAVEL I LLC303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDING BROTHERS1803/21/2026
EA DESIGN GROUP403/21/2026
WALTER T GORMAN PE403/21/2026
ARCHETYPE CONSULTANTS803/21/2026
METROPOLIS GROUP INC2203/21/2026
WILLIAM VITACCO ASSOCIATES803/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HAP CONSTRUCTION LLCGeneral Contractor1607/08/2026
ACTIVE SIGNSScaffold707/08/2026
MASTER COOLING SERVICE COGeneral Contractor707/08/2026
WEWORK CONSTRUCTION LLCGeneral Contractor603/21/2026
AIK RENOVATION INCGeneral Contractor507/08/2026
CRESTWOOD RENOVATIONS CORGeneral Contractor407/08/2026
MERCURY CONTROL MECHANICGeneral Contractor303/21/2026
CONTORNO, DOMENICKElectrical203/21/2026
M&D FIRE SPRINKLER INCFire Protection207/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection207/08/2026
FIVE STAR AWNINGS INCGeneral Contractor203/21/2026
JESUS CORPORANElectrical203/21/2026
AQUEDUCT MECHANICAL CORPFire Protection107/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor107/08/2026
RINNOVO CONSTRUCTION, LLCGeneral Contractor107/08/2026
JUST PLBG & HTG INCPlumbing107/08/2026
MMI PLUMBING & HEATING INC.Plumbing107/08/2026
P.H. WORKS INCPlumbing107/08/2026
BEKKERMAN, MIKHAILElectrical103/21/2026
FIVE TOWN NEON SIGN CO INScaffold107/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
E G ELECTRICElectrical103/22/2026
FRIEDMAN, STANLEYElectrical103/21/2026
HARTENSVELD JR, THOMASElectrical103/21/2026
HOLNESS, GEORGEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WALTER T. GORMAN, P.E., P268206/19/2024
AK ENGINEERING PC678210/04/2023
RAAD7727309/06/2023
GEIGER ENGINEERING. PC689104/06/2023
MJ ENGINEERING & DESIGN5546104/06/2023
HT ENGINEERING, PLLC62741201/12/2023
DOMANI INSPECTION SERVICE843209/13/2021
Building Lifecycle
All (250)Filed (36)Permit Issued (36)Signed Off (21)Facade (FISP) (9)Violation (60)Inspection (10)Objection (48)Special Inspection (30)
01/27/2025
Signed off — Alteration
Propose to install (4) new A/C rooftop units. No change to use, egress or occupancy.
M01058209-I1
01/24/2025
Permit issued — Mechanical Systems
M01058209-I1-MS
10/01/2024
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEMS
M00927152-I1
10/01/2024
Signed off — Alteration
INSTALLATION OF PLUMBING SYSTEMS
M00927013-I1
09/26/2024
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEMS
M00927198-I1
09/24/2024
Signed off — Alteration
Maxalto - General construction work on the 1st floor as indicated on drawings
M00899251-I1
09/20/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/20/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/17/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/13/2024
Signed off — Alteration
Stair opening at Second Floor and existing stair opening to be reduced at mezzanine. There is no change in occupancy, use, or egress.
M00820876-I1
09/06/2024
Signed off — Alteration
2nd floor- New mechanical duct layout, new diffusers, to connect to existing A/C units. There is no change in occupancy, use, or egress.
M00605911-I1
07/15/2024
Signed off — Alteration
Replacement of awnings fabrics and installation of three new awning on the 1st floor as indicated on drawings. No signage to be included.
M00927053-I1
07/05/2024
Special inspection requirement — Final
RUGGERO SCARABELLO
07/01/2024
Objection raised — Admin
07/01/2024
Objection resolved — Addressed
06/26/2024
Filed — Alteration
Replacement of awnings fabrics and installation of three new awning on the 1st floor as indicated on drawings. No signage to be included.
M00927053-P1
06/19/2024
Filed — Alteration
Propose to install (4) new A/C rooftop units. No change to use, egress or occupancy.
M01058209-I1
06/07/2024
Special inspection requirement — Final
RUGGERO SCARABELLO
04/26/2024
Signed off — Alteration
2nd Floor interior renovation of commercial space, remove and install walls, doors, floor finished and ceiling as per plans. There is no change in occupancy, use, or egress.
M00605874-I1
04/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/17/2024
Signed off — Alteration
2nd floor- installation of new plumbing fixtures and related piping as per plans (replace/relocate 6 water closets, 4 lavs, new- 3 non-res sinks, 3 floor drains, 3 electric water heaters, 1 water piping, 1 sanitary piping
M00605926-I1
01/26/2024
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (Arclinea)
M00939303-I1
01/26/2024
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (MAXALTO)
M00939298-I1
01/25/2024
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (louis poulsen)
M00939304-I1
01/25/2024
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (FLOS)
M00939309-I1
01/25/2024
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (B&B ITALIA)
M00939307-I1
01/25/2024
Signed off — Alteration
M00939306-I1
01/25/2024
Signed off — Alteration
M00939305-I1
01/18/2024
Permit issued — General Construction
M00927053-I1-GC
01/09/2024
Filed — Alteration
M00787674-I1
12/26/2023
Permit issued — Sign
M00939298-I1-SG
12/26/2023
Permit issued — Sign
M00939309-I1-SG
12/22/2023
Permit issued — Sign
M00939306-I1-SG
12/22/2023
Permit issued — Sign
M00939303-I1-SG
12/22/2023
Permit issued — Sign
M00939305-I1-SG
12/22/2023
Permit issued — Sign
M00939304-I1-SG
12/21/2023
Permit issued — Sign
M00939307-I1-SG
12/12/2023
Objection raised — Other
12/08/2023
Permit issued — Mechanical Systems
M00927198-I1-MS
12/06/2023
Permit issued — Mechanical Systems
M00936777-I1-MS
11/30/2023
Permit issued — General Construction
M00605874-I1-GC
11/30/2023
Permit issued — Structural
M00820876-I1-ST
11/30/2023
Permit issued — Mechanical Systems
M00605911-I1-MS
11/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/01/2023
Permit issued — Plumbing
M00927013-I1-PL
10/25/2023
Objection raised — Other
10/25/2023
Objection raised — Other
10/25/2023
Objection resolved — Addressed
10/25/2023
Objection raised — Admin
10/25/2023
Objection resolved — Addressed
10/25/2023
Objection raised — Admin
10/25/2023
Objection resolved — Addressed
10/25/2023
Objection raised — Other
10/25/2023
Objection resolved — Addressed
10/25/2023
Objection raised — Admin
10/25/2023
Objection resolved — Addressed
10/25/2023
Objection raised — Other
10/25/2023
Objection resolved — Addressed
Latest 60 of 250 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMASTER COOLING SERVICE CO01/24/2025
DOB NOWGeneral ConstructionSigned-offFIVE STAR AWNINGS01/18/2024
DOB NOWSignSigned-offACTIVE SIGNS INC12/26/2023
DOB NOWSignSigned-offACTIVE SIGNS INC12/26/2023
DOB NOWSignSigned-offACTIVE SIGNS INC12/22/2023
DOB NOWSignSigned-offACTIVE SIGNS INC12/22/2023
DOB NOWSignSigned-offACTIVE SIGNS INC12/22/2023
DOB NOWSignSigned-offACTIVE SIGNS INC12/22/2023
DOB NOWSignSigned-offACTIVE SIGNS INC12/21/2023
DOB NOWMechanical SystemsSigned-offMERCURY CONTROL MECHANIC12/08/2023
DOB NOWMechanical SystemsPermit IssuedMASTER COOLING SERVICE CO12/06/2023
DOB NOWGeneral ConstructionSigned-offAIK RENOVATION INC11/30/2023
DOB NOWStructuralSigned-offAIK RENOVATION INC11/30/2023
DOB NOWMechanical SystemsSigned-offAIK RENOVATION INC11/30/2023
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK11/01/2023
DOB NOWGeneral ConstructionSigned-offCRESTWOOD RENOVATIONS COR10/19/2023
DOB NOWSprinklersSigned-offAQUEDUCT MECHANICAL CORP10/06/2023
DOB NOWGeneral ConstructionSigned-offCRESTWOOD RENOVATIONS COR09/18/2023
DOB NOWGeneral ConstructionSigned-offHAP CONSTRUCTION LLC08/09/2023
DOB NOWSprinklersPermit IssuedM&D FIRE SPRINKLER INC07/24/2023
DOB NOWStructuralSigned-offHAP CONSTRUCTION LLC05/03/2023
DOB NOWSprinklersPermit IssuedM&D FIRE SPRINKLER INC03/21/2023
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH02/28/2023
DOB NOWGeneral ConstructionSigned-offHAP CONSTRUCTION LLC02/02/2023
DOB NOWMechanical SystemsSigned-offHAP CONSTRUCTION LLC02/02/2023
DOB NOWMechanical SystemsSigned-offMASTER COOLING SERVICE CO03/04/2022
DOB NOWSprinklersPermit IssuedSAFETY FIRE SPRINKLER CORP01/21/2022
DOB NOWSprinklersPermit IssuedSAFETY FIRE SPRINKLER CORP01/21/2022
DOB NOWMechanical SystemsSigned-offHAP CONSTRUCTION LLC12/28/2021
DOB NOWGeneral ConstructionSigned-offHAP CONSTRUCTION LLC12/27/2021
DOB NOWMechanical SystemsSigned-offRINNOVO CONSTRUCTION, LLC04/05/2021
DOB NOWMechanical SystemsSigned-offWEWORK CONSTRUCTION LLC12/31/2019
DOB NOWPlumbingSigned-offP.H. WORKS INC12/05/2019
DOB NOWMechanical SystemsSigned-offWEWORK CONSTRUCTION LLC12/03/2019
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC01/09/2019
DOB NOWSignSigned-offENRICO PASSARO04/09/2018
BIS—ISSUEDRINNOVO CONSTRUCTION, LLC06/28/2021
BISOTISSUEDWEWORK CONSTRUCTION LLC08/11/2020
BISOTISSUEDA.R. EQUIPMENT LLC06/17/2020
BISMHISSUEDWEWORK CONSTRUCTION LLC05/04/2020
+ 46 more permits on file
2 projects · most recent 10/04/2023
Air Conditioning Systems Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/04/2023Permit IssuedMASTER COOLING SERVICE COAir Conditioning Systems
Cooling
Daikin DX13SX0603AE 60,000 BTU · Condensing Unit ×2
DAT12043AA 120,000 BTU · Fan Coil Indoor ×1
09/13/2021Signed-offRINNOVO CONSTRUCTION, LLCAir Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
Cooling
United Cool Air VA20G3AHA10-C-X 248,700 BTU ×6
ED3G1ASTA 3,600 BTU · Condensing Unit ×3
WRM-42 42,000 BTU · Condensing Unit ×3
Ventilation
N/A N/A 300 CFM · Exhaust Fan ×14
Ducts & Piping
N/A N/A 300 CFM · Exhaust Fan ×1
1 project · most recent 01/11/2023
FiledStatusContractorScope
01/11/2023Permit IssuedSAFETY FIRE SPRINKLER COR8 heads
17 projects · most recent 04/09/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
04/09/2026Permit IssuedDENMAR ELECTRIC CORP11 meters, 3 new_meters
02/11/2025CompleteUPDATE SYSTEMS ELECTRICALGeneral Wiring
10/03/2023Permit IssuedDIDONATO & SONS ELCL CONT—
09/12/2023Permit IssuedDIDONATO & SONS ELCL CONT—
03/29/2023Permit IssuedNEE ELECTRICAL, LLC—
03/13/2023CompleteDIDONATO & SONS ELCL CONTGeneral Wiring
01/25/2022Permit IssuedDIDONATO & SONS ELCL CONTGeneral Wiring
06/29/2021CompleteDENMAR ELECTRIC CORPGeneral Wiring
04/22/2021CompleteJIM ELECTRIC CORP.HVAC Wiring
01/18/2021CompleteFOLKS ELECTRICAL INCGeneral Wiring
12/15/2020CompleteMIKOMA ELECTRIC LLCGeneral Wiring
01/15/2020CompleteJIM ELECTRIC CORP.5 meters, 2 new_meters
11/11/2019Permit IssuedE G ELECTRIC INCGeneral Wiring
05/11/2019CompleteBRANDL ELECTRIC INC.—
05/10/2019CancelledBRANDL ELECTRIC INC.General Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/20/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/17/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/12/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 97
DateRequirementInspectorRole
07/05/2024FinalRUGGERO SCARABELLOprogress
06/07/2024FinalRUGGERO SCARABELLOprogress
10/03/2023HVAC-R and service water piping design and insulationAri Kamoenergy_progress
10/03/2023HVAC-R and service water heating system controlsAri Kamoenergy_progress
10/03/2023HVAC-R and service water heating equipmentAri Kamoenergy_progress
10/03/2023Maintenance informationAri Kamoenergy_progress
10/03/2023Energy Code Compliance InspectionsAri Kamoprogress
10/03/2023Duct leakage testing, insulation and designAri Kamoenergy_progress
09/25/2023FinalLEON SKVIRSKYprogress
09/25/2023FinalLEON SKVIRSKYprogress
09/25/2023FinalLEON SKVIRSKYprogress
09/25/2023FinalLEON SKVIRSKYprogress
09/25/2023FinalLEON SKVIRSKYprogress
09/20/2023Mechanical SystemsAri Kamospecial
09/20/2023FinalAri Kamoprogress
09/11/2023FinalRUGGERO SCARABELLOprogress
08/30/2023Ventilation and air distribution systemNICHOLAS AZADIANenergy_progress
08/30/2023Duct leakage testing, insulation and designNICHOLAS AZADIANenergy_progress
08/30/2023HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
08/30/2023FinalNICHOLAS AZADIANprogress
08/30/2023Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
08/30/2023Mechanical SystemsNICHOLAS AZADIANspecial
08/30/2023Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
08/30/2023FinalRUGGERO SCARABELLOprogress
08/30/2023HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
Latest 25 of 97.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
MaxaltoRetailFloor 1
Project M00899251 Alteration · LOC Issued · 08/08/2023
FlosOfficeFloor 2
Project M00605911 Alteration · LOC Issued · 12/17/2021
Project M00605934 Alteration · Permit Entire · 12/17/2021
Project M00605874 Alteration · LOC Issued · 12/07/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,111 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch31
09/06/2026M00025295-I1Request digital key ↗
09/03/2026M00618958-I1Request digital key ↗
09/03/2026M00605874-P1Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00237366-I1Request digital key ↗
08/15/2026M00237366-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00237352-I1Request digital key ↗
09/03/2026M00237352-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00115306-I1Request digital key ↗
▸Applications & Permits220
▸BISWORK PERMIT APPLICATION111
06/28/2021121206774Open ↗
05/27/2021123188488Open ↗
05/27/2021123188497Open ↗
Showing 3 of 111 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION105
10/20/2025104904757Open ↗
08/17/2021120232603Open ↗
08/17/2021104746973Open ↗
Showing 3 of 105 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
09/20/2021121206774Open ↗
05/11/2020121206774Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/30/2020123871319Open ↗
▸Seals & Professional Certifications325
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION119
03/16/2020123832111Open ↗
01/21/2020123188442Open ↗
01/21/2020123188442Open ↗
Showing 3 of 119 on file for this type
▸DOB NOWProgress Inspector Seal & Signature60
09/23/2026M00605874-P1Open ↗
09/23/2026M00605874-P1Open ↗
09/23/2026M00605874-P1Open ↗
Showing 3 of 60 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT39
03/16/2020123832111Open ↗
11/08/2019123742165Open ↗
07/01/2019123753768Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/06/2026M00025295-I1Open ↗
09/04/2026M00237366-I1Open ↗
09/03/2026M00237352-P1Open ↗
Showing 3 of 36 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST34
03/16/2020123832111Open ↗
11/08/2019123742165Open ↗
07/01/2019123753768Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/23/2026M00605874-P1Open ↗
09/23/2026M00605874-P1Open ↗
09/05/2026M00237352-P1Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment68
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE25
04/25/2019123871319Open ↗
Showing 1 of 25 on file for this type
▸BISEQUIPMENT USE PERMITS20
01/15/2020123188442Open ↗
01/15/2020123188442Open ↗
01/15/2020123188442Open ↗
Showing 3 of 20 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT9
01/15/2020123188442Open ↗
01/15/2020123188442Open ↗
01/15/2020123188442Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
04/11/2022123162709Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
01/31/2020121206774Open ↗
Showing 1 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos95
▸BISASBESTOS: CERTIFICATION (DEP ACP5)41
03/16/2020123832111Open ↗
11/08/2019123742165Open ↗
07/01/2019123753768Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
09/03/2026M00618958-I1Open ↗
09/03/2026M00605874-I1Open ↗
09/03/2026M00605874-P1Open ↗
Showing 3 of 30 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM6
04/25/2019123871266Open ↗
04/25/2019123871319Open ↗
Showing 2 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/03/2026M00237352-I1Open ↗
08/13/2026M00237366-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
06/23/2021121206774Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance75
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS46
03/16/2020123832111Open ↗
01/21/2020123188442Open ↗
01/21/2020123188442Open ↗
Showing 3 of 46 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
05/14/2021123832111Open ↗
12/10/2020123742165Open ↗
07/28/2020123453869Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
12/10/2020123742165Open ↗
12/10/2020123742165Open ↗
07/28/2020123453869Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00618958-I1Open ↗
08/13/2026M00605911-I1Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports28
▸BISTECHNICAL REPORT: RESPONSIBILITY28
10/28/2025123188488Open ↗
10/28/2025123188488Open ↗
08/02/2021123188497Open ↗
Showing 3 of 28 on file for this type
▸Approvals, Objections & Sign-offs59
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST37
10/28/2025123188488Open ↗
04/12/2022123162709Open ↗
08/02/2021123188497Open ↗
Showing 3 of 37 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
05/08/2020123871266Open ↗
05/05/2020123890995Open ↗
Showing 2 of 5 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
08/12/2020123742165Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership102
▸BISCOST AFFIDAVIT101
08/05/2021123188488Open ↗
08/02/2021123188497Open ↗
05/14/2021123832111Open ↗
Showing 3 of 101 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/11/2022123162709Open ↗
▸Filing & Intake Forms93
▸BISEFILING COVER SHEET58
03/16/2020123832111Open ↗
11/08/2019123742165Open ↗
07/01/2019123753768Open ↗
Showing 3 of 58 on file for this type
▸BISBOROUGH INTAKE FORM17
05/27/2021123188488Open ↗
05/27/2021123188497Open ↗
08/12/2020123742165Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION15
07/01/2020123871319Open ↗
06/30/2020123654492Open ↗
12/06/2019123753768Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLOT DIAGRAM2
01/31/2020121206774Open ↗
Showing 1 of 2 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPro Cert Restriction Exception (LL158/17)1
08/13/2026M00787674-I1Open ↗