BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Flushing Highline Condominium
136-46 41ST AVENUE · BIN 4610805
💬 Discuss this project
2008Year Built
7Stories
RMBuilding Class
R7-1Zoning
41,574 sfGross Floor Area
28Units
LL97 CoveredRent Stabilized30 Active Violations 6 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Hua Yuan Development · 9,896 sf lot · 4.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofThe Flushing Highline Condominium I6p · 1 filing · 20 docs
Floor 7The Flushing Highline Condominium I6p · 1 filing · 20 docs
Floor 6The Flushing Highline Condominium I6p · 1 filing · 20 docs
Floor 5The Flushing Highline Condominium I6p · 1 filing · 20 docs
Floor 4The Flushing Highline Condominium I6p · 1 filing · 20 docs
Floor 3The Flushing Highline Condominium I6p · 1 filing · 20 docs
Floor 2The Flushing Highline Condominium I6p · 1 filing · 20 docs
Floor 1Unit 1B, Unit 1F11p · 4 filings · 20 docs
CellarThe Flushing Highline Condominium I25p · 7 filings · 20 docs
Sub-CellarThe Flushing Highline Condominium I7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hua Yuan Development2007/08/2026
Flushing Highline Condominium I1110/04/2026
NYC Department of Housing Preservation and Development403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Fang Architect809/21/2026
Iseed Construction212/16/2025
CNY Engineering209/21/2023
Zheng & Associates402/10/2022
SY Engineering310/25/2021
LMW Engineering Group112/02/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Indesign Studio1403/21/2026
CNY Engineering403/21/2026
C Plus Design Group603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Splen ConstructionGeneral Contractor303/21/2026
DLC DevelopmentGeneral Contractor307/08/2026
C Plus Design GroupGeneral Contractor203/21/2026
SJ Construction DesignGeneral Contractor104/09/2026
Zaq ConstructionGeneral Contractor107/08/2026
Ariana ContractingPlumbing107/08/2026
HP ServicesPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Fang Architect5513509/21/2026
Iseed Construction8336212/16/2025
Zheng & Associates7330402/10/2022
SY Engineering5149110/02/2021
LMW Engineering Group279112/02/2019
Z & T Engineering591112/02/2019
Building Lifecycle
All (173)Filed (20)Permit Issued (8)Signed Off (6)Violation (60)Inspection (10)Objection (39)Special Inspection (30)
09/21/2026
Filed — Alteration CO
CONVERT EXIST. TREATMENT HEALTH CARE FACILITY TO COMMUNITY CENTER(ADULT DAY CARE) AT CEL. OBTAIN AMENDED C OF O, AND OCCUPANCY OF OTHER FLOORS AS PER CO 402286316F.
Q00793883-P5
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
07/08/2026
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
07/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
07/08/2026
Special inspection requirement — Interior lighting power
DEZHANG FANG
06/21/2026
Violation issued (HPD, closed)
C
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, open)
C
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, open)
C
06/20/2026
Violation issued (HPD, open)
C
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, open)
A
05/11/2026
Signed off — Alteration
TO PROPOSE INTERIOR RENOVATION FOR EXISTING OFFICE #1B AT 001 FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01228018-I1
05/06/2026
Violation issued (HPD, open)
A
05/05/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/14/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/05/2026
Special inspection requirement — Energy Code Compliance Inspections
YIPENG LUAN
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YIPENG LUAN
01/05/2026
Special inspection requirement — Interior lighting power
YIPENG LUAN
01/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
YIPENG LUAN
12/16/2025
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION FOR EXISTING OFFICE #1B AT 001 FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01228018-P1
12/04/2025
Permit issued — General Construction
Q01228018-I1-GC
11/10/2025
Objection resolved — Addressed
10/18/2025
Objection resolved — Addressed
08/29/2025
Violation issued (HPD, open)
C
08/29/2025
Violation issued (HPD, closed)
C
08/29/2025
Violation issued (HPD, closed)
C
08/29/2025
Violation issued (HPD, open)
B
08/29/2025
Violation issued (HPD, open)
B
08/29/2025
Violation issued (HPD, open)
B
08/29/2025
Violation issued (HPD, open)
B
08/28/2025
Violation issued (ECB, open)
Construction
08/20/2025
Violation issued (HPD, open)
A
08/20/2025
Violation issued (HPD, closed)
C
08/20/2025
Violation issued (HPD, open)
A
08/20/2025
Violation issued (HPD, open)
A
08/20/2025
Violation issued (HPD, open)
A
08/20/2025
Violation issued (HPD, open)
A
08/20/2025
Violation issued (HPD, open)
A
08/20/2025
Violation issued (HPD, open)
A
08/20/2025
Violation issued (HPD, open)
C
08/01/2025
Violation issued (FDNY_NOV, closed)
06/13/2025
Objection resolved — Addressed
06/13/2025
Objection resolved — Addressed
06/13/2025
Objection resolved — Addressed
06/13/2025
Objection resolved — Addressed
06/12/2025
Objection raised — Cost
06/12/2025
Objection raised — Structural
06/12/2025
Objection raised — Energy
06/12/2025
Objection raised — Fire_Protection
06/12/2025
Objection raised — Structural
06/12/2025
Objection raised — Structural
06/11/2025
Violation issued (HPD, open)
A
05/27/2025
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION FOR EXISTING OFFICE #1B AT 001 FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01228018-I1
05/01/2025
Violation issued (FDNY_NOV, closed)
Latest 60 of 173 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSJ Construction Design12/04/2025
DOB NOWGeneral ConstructionPermit IssuedZaq Construction06/07/2023
DOB NOWPlumbingSigned-offHP Services01/12/2022
DOB NOWGeneral ConstructionSigned-offSplen Construction01/05/2022
DOB NOWStructuralSigned-offDLC Development01/01/2022
DOB NOWPlumbingSigned-offAriana Contracting10/18/2021
DOB NOWGeneral ConstructionSigned-offC Plus Design Group10/06/2021
DOB NOWStructuralSigned-offDLC Development01/08/2020
BISOTISSUEDTriborough Construction S09/27/2017
BISPLISSUEDRRP Plumbing05/23/2017
BISEQISSUEDTriborough Construction S05/18/2017
BIS—ISSUEDTriborough Construction S05/16/2017
BISSDISSUEDRRP Plumbing02/13/2017
BISEQISSUEDTriborough Construction S06/07/2016
BIS—ISSUEDTriborough Construction S06/06/2016
BISEQISSUEDMC Superstructure05/26/2016
BISPLISSUEDRRP Plumbing05/03/2016
BISEQISSUEDTri Borough Scaffolding04/13/2016
BISEQISSUEDTri Borough Scaffolding03/28/2016
BIS—ISSUEDTriborough Construction S03/11/2016
BISEQISSUEDTriborough Construction S03/10/2016
BISEQISSUEDLakhi General Contractor01/13/2011
BISEQISSUEDLakhi General Contractor02/09/2010
BISEQISSUEDNew York Ladder & Scaffold03/02/2009
BISSDISSUEDJulian Sprinkler08/27/2008
BIS—ISSUEDSpeedy Group08/11/2008
BISEQISSUEDSpeedy Group08/11/2008
BISPLISSUEDJulian Plumbing & Heating07/24/2008
BISEQISSUEDSpeedy Group05/20/2008
BISEQISSUEDNew York Ladder & Scaffold04/09/2008
BIS—ISSUEDSpeedy Group03/25/2008
BISEQISSUEDSpeedy Group01/24/2008
BISEQISSUEDSpeedy Group09/18/2007
BISOTISSUEDSpeedy Group08/07/2007
BIS—ISSUEDSpeedy Group06/21/2007
BISEQISSUEDSpeedy Group06/21/2007
BISOTISSUEDSpeedy Group06/12/2007
1 project · most recent 09/21/2023
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/21/2023——Air Conditioning Systems, Heating Systems
Cooling
Fujitsu AOU48RLAVM 48,000 BTU · Condensing Unit ×1
Heating
Fujitsu AOU48RLAVM 54,000 BTU · Condensing Unit ×1
1 project · most recent 09/21/2023
FiledStatusContractorScope
09/21/2023——7 heads
1 project · most recent 09/21/2023
Water/Sanitary
FiledStatusContractorScope
09/21/2023——Water/Sanitary
1 project · most recent 11/11/2021
General Wiring Lighting
FiledStatusContractorScope
11/11/2021CompleteY.S. ElectricGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/05/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/14/2026Fail-Final General Construction Non-Directive 14FailView ↗
06/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2022Pass-Final General Construction Non-Directive 14PassView ↗
01/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2021Pass-Final General Construction Non-Directive 14PassView ↗
11/02/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
07/08/2026Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
07/08/2026Energy Code Compliance InspectionsDEZHANG FANGprogress
07/08/2026Fire-Resistance Rated ConstructionDEZHANG FANGprogress
07/08/2026Interior lighting powerDEZHANG FANGenergy_progress
01/05/2026Energy Code Compliance InspectionsYIPENG LUANprogress
01/05/2026Fire-Resistant Penetrations and JointsYIPENG LUANspecial
01/05/2026Interior lighting powerYIPENG LUANenergy_progress
01/05/2026Tenant Protection Plan ComplianceYIPENG LUANspecial
03/05/2024Fire-Resistance Rated ConstructionDEZHANG FANGprogress
03/05/2024Interior lighting powerDEZHANG FANGenergy_progress
03/05/2024Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
03/05/2024Energy Code Compliance InspectionsDEZHANG FANGprogress
11/15/2023Public Assembly Emergency LightingDEZHANG FANGprogress
11/15/2023Public Assembly Emergency LightingDEZHANG FANGprogress
10/12/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
10/12/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
10/12/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
10/12/2023Interior lighting powerDEZHANG FANGenergy_progress
09/12/2023Tenant Protection Plan Compliance—special
09/12/2023Energy Code Compliance Inspections—progress
09/12/2023Fire-Resistant Penetrations and Joints—special
09/12/2023Tenant Protection Plan Compliance—special
09/11/2023Sprinkler Systems—special
09/11/2023Mechanical Systems—special
09/11/2023Fire-Resistant Penetrations and Joints—special
Latest 25 of 39.
▾Documents — 331 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch16
08/27/2026Q00604197-P1Request digital key ↗
08/27/2026Q00604197-I1Request digital key ↗
08/27/2026Q00604197-S1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/23/2026Q00963293-I1Request digital key ↗
08/23/2026Q00963289-I1Request digital key ↗
08/23/2026Q00963295-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/28/2026Q00268362-I1Request digital key ↗
▸Applications & Permits50
▸BISPLAN / WORK APPROVAL APPLICATION31
02/27/2019402286316Open ↗
01/23/2019402297518Open ↗
06/20/2018402286316Open ↗
Showing 3 of 31 on file for this type
▸BISWORK PERMIT APPLICATION14
10/05/2017421555310Open ↗
06/01/2017402286316Open ↗
05/31/2017402286316Open ↗
Showing 3 of 14 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1133
01/29/2018420138826Open ↗
01/29/2018402601984Open ↗
01/29/2018402611189Open ↗
▸BISINTENT TO REVOKE APPROVAL/PERMIT1
08/02/2017421523952Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/02/2017402286316Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
01/23/2019402297518Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00793883-I1Open ↗
▸Seals & Professional Certifications87
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
01/15/2019402286316Open ↗
03/19/2018402286316Open ↗
03/14/2018402286316Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
10/04/2026Q00793883-P5Open ↗
08/27/2026Q00604197-I1Open ↗
08/27/2026Q00604197-S1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
10/08/2026Q00963289-I1Open ↗
10/04/2026Q00793883-P5Open ↗
10/04/2026Q00793883-P5Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
10/04/2026Q00793883-P5Open ↗
09/01/2026Q00655721-P1Open ↗
08/29/2026Q00655726-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
09/26/2017421555310Open ↗
07/05/2017421523952Open ↗
Showing 2 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/26/2017421555310Open ↗
07/05/2017421523952Open ↗
04/05/2016440298900Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/05/2016440298900Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/05/2016440298900Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment77
▸BISEQUIPMENT USE PERMITS43
01/22/2019402286316Open ↗
01/22/2019402286316Open ↗
01/22/2019402286316Open ↗
Showing 3 of 43 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE16
04/13/2018410154835Open ↗
04/11/2018410154835Open ↗
03/30/2018410154835Open ↗
Showing 3 of 16 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT14
01/22/2019402286316Open ↗
01/22/2019402286316Open ↗
01/22/2019402286316Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
01/07/2019421631559Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/15/2019402286316Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
02/16/2017402286316Open ↗
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist5
08/24/2026Q00793883-P5Open ↗
08/13/2026Q00793883-P1Open ↗
08/13/2026Q00793883-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
01/19/2019402286316Open ↗
08/17/2017421523952Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
01/22/2019402286316Open ↗
▸BISSTREET TREES SITE PLAN1
01/19/2019421523952Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00793883-I1Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026Q00793883-I1Open ↗
08/13/2026Q00655721-I1Open ↗
08/13/2026Q00604197-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/05/2016440298900Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/05/2016440298900Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
10/19/2017402286316Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/28/2017402286316Open ↗
▸Approvals, Objections & Sign-offs30
▸BISLETTERS - SUPPORTING DOCUMENTATION9
02/28/2019421592761Open ↗
01/23/2019402297518Open ↗
01/16/2019421592761Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
03/19/2019402286316Open ↗
01/08/2019421631559Open ↗
01/08/2019410154835Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
01/22/2019402286316Open ↗
01/22/2019402286316Open ↗
12/26/2017402286316Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
07/05/2017421523952Open ↗
Showing 1 of 5 on file for this type
▸BISSUPERSEDING LETTER2
06/01/2017402286316Open ↗
05/27/2016402286316Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
01/08/2019421631559Open ↗
01/08/2019410154835Open ↗
11/09/2017421555310Open ↗
Showing 3 of 6 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
03/19/2019402286316Open ↗
▸Filing & Intake Forms27
▸BISBOROUGH INTAKE FORM10
01/23/2019402297518Open ↗
06/20/2018402286316Open ↗
02/28/2018410154835Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET8
05/16/2018421631559Open ↗
01/18/2018421592761Open ↗
09/26/2017421555310Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION6
03/19/2019402286316Open ↗
01/16/2019402286316Open ↗
12/17/2018410154835Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/05/2017421523952Open ↗
▸Other Documents9
▸DOB NOWProperty Ownership Certification5
08/24/2026Q00793883-P5Open ↗
08/24/2026Q00793883-P2Open ↗
08/15/2026Q00793883-P3Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/05/2016440298900Open ↗
Showing 1 of 2 on file for this type
▸BISRESTRICTION: DEED1
06/07/2016402286316Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00793883-I1Open ↗