Elevator co-op, conversion from loft/warehouse
136 WEST 24 STREET
MANHATTAN · BIN 1014963
💬 Discuss this project
1898Year Built
5Stories
D0Building Class
M1-8A/R11Zoning
22,169 sfGross Floor Area
8Units
Rent Stabilized10 Open Violations 8 unresolved · 2 paperwork only ▸
Elevator co-op, conversion from loft/warehouse · Owner of record: 136 LOFT CORP · 4,839 sf lot · 4.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof8p · 1 filing · 10 docs
Floor 57p · 1 filing · 10 docs
Floor 49p · 2 filings · 19 docs
Floor 311p · 2 filings · 20 docs
Floor 27p · 1 filing · 10 docs
Floor 1Under Construction59p · 2 filings · 20 docs
CellarUnder Construction12p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FSI3207/08/2026
OWNERS REP303/22/2026
136 LOFT2803/22/2026
136 LOFT CORP JM REALTY S303/22/2026
136 W 24ST LOFT303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.1103/21/2026
NYCCODE803/21/2026
CNY ENGINEERING PC203/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHOENIX SUTTON STR INCGeneral Contractor1607/08/2026
XHEMA OF N.Y. INCGeneral Contractor607/08/2026
BEDNARZ CONSTRUCTION LLCGeneral Contractor407/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor303/21/2026
DONATO PLUMBING, INCPlumbing307/08/2026
ROYAL USA CONSTRUCTION INGeneral Contractor104/09/2026
A. M. PLUMBING COMPANYPlumbing107/08/2026
MAYO, EUGENEElectrical103/21/2026
NEW AMSTERDAM PLBG & HTGPlumbing107/08/2026
STANISLAW WISZKOWSKIElectrical103/21/2026
C.W.C. FIRE SUPPRESSIONFire Protection107/08/2026
KG SPRINKLER CORPFire Protection107/08/2026
GIOVANNI RENOVATION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROSINI ENGINEERING, PC3282404/16/2026
CHANDLER PIERCE ARCHITECT2113304/15/2026
SWL ENGINEERING INSPECTIO6912209/16/2025
COASTAL CONSTRUCTION SERV3827101/27/2025
GEE2000 ARCHITECT P.C.691107/21/2023
CNY ENGINEERING P.C3304103/13/2023
CES ENGINEERING LLC1277311/28/2022
CATALPA SPECIAL INSPECTIO2004110/29/2021
Building Lifecycle
All (154)Filed (23)Permit Issued (30)Signed Off (8)Violation (29)Inspection (18)Objection (16)Special Inspection (30)
06/23/2026
Permit issued — Mechanical Systems
M00941568-S2-MS
06/23/2026
Permit issued — Foundation
M00941568-S1-GC-CX
06/12/2026
Signed off — Alteration
M01268654-I1
06/12/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01177518-I1
06/04/2026
Permit issued — Sidewalk Shed
M01177518-I1-SH
05/21/2026
Violation issued (ECB, open)
Construction
05/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
David Rosini
05/15/2026
Special inspection requirement — Maintenance information
David Rosini
05/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
David Rosini
05/15/2026
Special inspection requirement — Final
David Rosini
05/15/2026
Special inspection requirement — Sprinkler Systems
David Rosini
05/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
David Rosini
05/15/2026
Special inspection requirement — Mechanical Systems
David Rosini
05/15/2026
Special inspection requirement — Shutoff dampers
David Rosini
05/15/2026
Special inspection requirement — Energy Code Compliance Inspections
David Rosini
04/29/2026
Violation issued (HPD, closed)
A
04/16/2026
Filed — Alteration
Plumbing and Sprinkler modifications as per plans, No change in use egress or occupancy
M00941568-P3
04/16/2026
Filed — Alteration
Plumbing and Sprinkler modifications as per plans, No change in use egress or occupancy
M00941568-P4
04/15/2026
Filed — Alteration
Plumbing and Sprinkler modifications as per plans, No change in use egress or occupancy
M00941568-P2
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chandler Pierce
04/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
Chandler Pierce
04/09/2026
Special inspection requirement — Lighting in dwelling units
JOSEPH FREGLETTE
04/09/2026
Special inspection requirement — Lighting controls
JOSEPH FREGLETTE
04/09/2026
Special inspection requirement — Interior lighting power
JOSEPH FREGLETTE
04/09/2026
Special inspection requirement — Final
Chandler Pierce
04/09/2026
Special inspection requirement — Sprinkler Systems
David Rosini
03/26/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/10/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/16/2025
Permit issued — General Construction
M01253218-I1-GC
12/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/17/2025
Violation issued (HPD, closed)
I
11/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/27/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/10/2025
Permit issued — Sprinklers
M00941568-S3-EW-SP
10/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOSHUA LUCKRITZ
10/09/2025
Special inspection requirement — Final
Yakov Weinstein
10/09/2025
Special inspection requirement — Masonry
JOSHUA LUCKRITZ
10/08/2025
Permit issued — Sprinklers
M00941568-S3-PL
09/29/2025
Objection raised — Scope
09/29/2025
Objection resolved — Addressed
09/16/2025
Filed — Alteration
GENERAL CONSTRUCTION FOR LIMITED EXTERIOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01253218-P1
09/09/2025
Special inspection requirement — Final
Yakov Weinstein
09/09/2025
Special inspection requirement — Masonry
JOSHUA LUCKRITZ
09/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOSHUA LUCKRITZ
08/14/2025
Permit issued — Supported Scaffold
M01268654-I1-SF
08/13/2025
Filed — Alteration
M01268654-I1
07/22/2025
Filed — Alteration
GENERAL CONSTRUCTION FOR LIMITED EXTERIOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01253218-I1
07/11/2025
Permit issued — General Construction
M00941568-S1-GC-CX
07/11/2025
Permit issued — Mechanical Systems
M00941568-S2-MS
07/02/2025
Violation issued (ECB, open)
Construction
06/04/2025
Violation issued (HPD, closed)
A
03/10/2025
Objection raised — Admin
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection raised — Energy
03/10/2025
Objection resolved — Addressed
02/26/2025
Filed — Alteration
Plumbing and Sprinkler modifications as per plans, No change in use egress or occupancy
M00941568-S3
02/26/2025
Filed — Alteration
Plumbing and Sprinkler modifications as per plans, No change in use egress or occupancy
M00941568-S2
02/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 154 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedXHEMA OF N.Y. INC06/23/2026
DOB NOWFoundationPermit IssuedXHEMA OF N.Y. INC06/23/2026
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC06/04/2026
DOB NOWGeneral ConstructionPermit IssuedROYAL USA CONSTRUCTION IN12/16/2025
DOB NOWSprinklersPermit IssuedH M SPRINKLER INC10/10/2025
DOB NOWSprinklersPermit IssuedDONATO PLUMBING, INC10/08/2025
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC08/14/2025
DOB NOWGeneral ConstructionPermit IssuedXHEMA OF N.Y. INC07/11/2025
DOB NOWMechanical SystemsPermit IssuedXHEMA OF N.Y. INC07/11/2025
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC02/10/2025
DOB NOWGeneral ConstructionPermit IssuedXHEMA OF N.Y. INC11/01/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC10/31/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC10/31/2023
DOB NOWGeneral ConstructionPermit IssuedXHEMA OF N.Y. INC10/27/2023
DOB NOWPlumbingPermit IssuedA. M. PLUMBING COMPANY07/31/2023
DOB NOWGeneral ConstructionPermit IssuedGIOVANNI RENOVATION CORP07/28/2023
DOB NOWSprinklersSigned-offC.W.C. FIRE SUPPRESSION07/08/2022
DOB NOWPlumbingSigned-offEDWARD FITZSIMMONS03/05/2022
DOB NOWMechanical SystemsSigned-offBEDNARZ CONSTRUCTION LLC03/04/2022
DOB NOWGeneral ConstructionSigned-offBEDNARZ CONSTRUCTION LLC03/03/2022
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC09/22/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/04/2020
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/06/2019
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC07/26/2019
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC10/31/2018
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC10/30/2018
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC03/14/2018
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC03/14/2018
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC12/28/2017
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC12/20/2017
BISOTISSUEDOMNIBUILD CONSTRUCTION IN02/12/2020
BISOTISSUEDOMNIBUILD CONSTRUCTION IN10/15/2019
BISPLISSUEDALL PRO PLBG & HTG INC01/17/2019
BISOTISSUEDMANHATTAN CABINETS, INC01/08/2019
BISOTISSUEDOMNIBUILD CONSTRUCTION IN12/13/2018
BISEQISSUEDSPRING SCAFFOLDING LLC01/09/2013
BISPLISSUEDJUMPER P&H GEN CONTR INC11/28/2012
BISOTISSUEDHP KLEIN INC11/09/2012
BISEQISSUEDSPRING SCAFFOLDING LLC07/05/2012
BISOTISSUEDT.R. FOX CONTRACTING INC10/26/2011
+ 10 more permits on file
2 projects · most recent 04/16/2026
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/16/2026Permit IssuedXHEMA OF N.Y. INCHeating and Air Conditioning Systems
Heat / Cool
Lg ARNU073M2A4 (FCU-1-1) /ARUN024GSS4 (CU-1) 470 CFM · Vrf Outdoor ×1
ARNU073M2A4 (FCU-1-2) /ARUN024GSS4 (CU-1) 470 CFM · Vrf Indoor ×1
ARNU123M2A4 (FCU-1-3) /ARUN024GSS4 (CU-1) 520 CFM · Vrf Indoor ×1
ARNU243M2A4 (FCU-2) /ARUN024GSS4 (CU-2) 640 CFM · Vrf Indoor ×1
ARNU243M2A4(FCU-3/CU-3) 640 CFM · Vrf Indoor ×1
ARNU243M2A4(FCU-4/CU-4) 640 CFM · Vrf Indoor ×1
ZRNU243M2AA (FCU-1) / ZRUN024GSS0 (CU-1) 640 CFM · Vrf Indoor ×1
ZRNU243M2AA (FCU-2) /ZRUN024GSS0 (CU-2) 640 CFM · Vrf Indoor ×1
ZRNU243M2AA (FCU-3) / ZRUN024GSS0 (CU-3) 640 CFM · Vrf Indoor ×1
ZRNU243M2AA (FCU-4) / ZRUN024GSS0 (CU-4) 640 CFM · Vrf Indoor ×1
ZRUN243M2AA (FCU-5) /ZRUN024GSS0 (CU-5) 640 CFM · Vrf Outdoor ×1
03/13/2023——Air Conditioning Systems
Cooling
Mitsubishi Electric MUY-GL09NA-U2 9,000 BTU · Condensing Unit ×1
1 project · most recent 04/16/2026
FiledStatusContractorScope
04/16/2026Permit IssuedKG SPRINKLER CORP257 heads
3 projects · most recent 04/16/2026
Water/Sanitary Gas
FiledStatusContractorScope
04/16/2026Permit IssuedDONATO PLUMBING, INCGas, Water/Sanitary
10/11/2023Signed-offDONATO PLUMBING, INCGas, Water/Sanitary
07/23/2023Permit IssuedA. M. PLUMBING COMPANYWater/Sanitary
8 projects · most recent 12/23/2025
General Wiring
FiledStatusContractorScope
12/23/2025Permit IssuedAE ELECTRIC INCGeneral Wiring
02/10/2025CompleteWCK ELECTRIC CORP.—
01/24/2024CompleteCAPUTEK ELEC'L SERVICES,—
11/02/2023Permit IssuedAE ELECTRIC INC—
08/01/2023CompleteA.L. ELECTRICAL CORP.General Wiring
12/07/2022CompleteJUMPER ELECTRIC CORPGeneral Wiring
07/31/2019CompleteLENS ELECTRIC, INCGeneral Wiring
12/15/2017CompleteELPO ELECTRICAL CONTG INC—
1 project · most recent 04/16/2026
Steel Concrete Masonry
FiledStatusContractorScope
04/16/2026Permit IssuedXHEMA OF N.Y. INCSteel, Concrete, Masonry
1 project · most recent 02/07/2025
Sidewalk Shed
FiledStatusContractorScope
02/07/2025Signed-offPHOENIX SUTTON STR INCSidewalk Shed
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
03/26/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/26/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/10/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/10/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/28/2023Fail-Final CND-Occupancy InspectionFailView ↗
12/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/10/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/21/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
05/15/2026FinalDavid Rosiniprogress
05/15/2026Energy Code Compliance InspectionsDavid Rosiniprogress
05/15/2026Maintenance informationDavid Rosinienergy_progress
05/15/2026HVAC-R and service water heating equipmentDavid Rosinienergy_progress
05/15/2026HVAC-R and service water piping design and insulationDavid Rosinienergy_progress
05/15/2026HVAC-R and service water heating system controlsDavid Rosinienergy_progress
05/15/2026Shutoff dampersDavid Rosinienergy_progress
05/15/2026Mechanical SystemsDavid Rosinispecial
05/15/2026Sprinkler SystemsDavid Rosinispecial
04/09/2026Sprinkler SystemsDavid Rosinispecial
04/09/2026Interior lighting powerJOSEPH FREGLETTEenergy_progress
04/09/2026Lighting controlsJOSEPH FREGLETTEenergy_progress
04/09/2026Lighting in dwelling unitsJOSEPH FREGLETTEenergy_progress
04/09/2026Fire-Resistance Rated ConstructionChandler Pierceprogress
04/09/2026FinalChandler Pierceprogress
04/09/2026Fire-Resistant Penetrations and JointsChandler Piercespecial
10/09/2025MasonryJOSHUA LUCKRITZspecial
10/09/2025Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
10/09/2025FinalYakov Weinsteinprogress
09/09/2025MasonryJOSHUA LUCKRITZspecial
09/09/2025Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
09/09/2025FinalYakov Weinsteinprogress
12/19/2024Structural Stability – Alterations of existing buildingsJOSEPH FREGLETTEspecial
12/19/2024Concrete - Cast-In-PlaceJOSEPH FREGLETTEspecial
12/19/2024MasonryJOSEPH FREGLETTEspecial
Latest 25 of 67.
▾Documents — 209 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch21
09/06/2026M00007097-I1Request digital key ↗
09/06/2026M00007085-I1Request digital key ↗
09/01/2026M00602366-P1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00198635-I1Request digital key ↗
▸Applications & Permits22
▸BISWORK PERMIT APPLICATION15
01/18/2019123530660Open ↗
01/08/2019123530660Open ↗
12/14/2018123593398Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
12/12/2018123593398Open ↗
10/18/2018123530660Open ↗
02/16/2016122676096Open ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
04/04/2016122676103Open ↗
04/04/2016122676096Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
04/04/2016122676103Open ↗
04/04/2016122676096Open ↗
▸Seals & Professional Certifications86
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/01/2026M00602366-S2Open ↗
09/01/2026M00602366-S1Open ↗
09/01/2026M00602366-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/02/2026M00941568-S1Open ↗
09/02/2026M00941568-S1Open ↗
08/29/2026M00198635-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/02/2026M00941568-S1Open ↗
09/02/2026M00941568-S1Open ↗
09/02/2026M00941568-S1Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
10/30/2019123530660Open ↗
10/24/2019123530660Open ↗
12/14/2018123593398Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
12/12/2018123593398Open ↗
12/12/2018123593398Open ↗
02/16/2016122676096Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
12/12/2018123593398Open ↗
02/16/2016122676096Open ↗
02/11/2016122676103Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/30/2008110332916Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE3
05/08/2012120760266Open ↗
04/11/2012120760266Open ↗
10/20/2011120760266Open ↗
▸BISSCHEDULE B - PLUMBING2
08/06/2012121155533Open ↗
07/22/2011120760266Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/18/2018123530660Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes2
12/12/2018123593398Open ↗
10/18/2018123530660Open ↗
▸BISSTREET TREE CHECKLIST1
04/04/2016122676096Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00198635-I1Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026M00602366-P1Open ↗
09/01/2026M00602366-I1Open ↗
09/01/2026M00602366-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/29/2026M00941574-I1Open ↗
08/13/2026M00941568-S2Open ↗
08/13/2026M00941568-S3Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/18/2018123530660Open ↗
08/06/2012121155533Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/30/2008110332916Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/22/2011120760266Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
10/24/2019123530660Open ↗
10/18/2018123530660Open ↗
02/16/2016122676096Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
10/24/2019123530660Open ↗
10/03/2013120760266Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00602366-I1Open ↗
08/13/2026M00602366-S1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
07/22/2011120760266Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/20/2021123593398Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
01/20/2021123593398Open ↗
01/20/2021123593398Open ↗
10/30/2019123530660Open ↗
Showing 3 of 5 on file for this type
▸BISSHED LETTER2
07/06/2012110332916Open ↗
09/01/2010110332916Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
07/22/2011120760266Open ↗
08/30/2008110332916Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/11/2013110332916Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
02/16/2016122676096Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/21/2026M01253218-I1Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT9
10/24/2019123530660Open ↗
12/12/2018123593398Open ↗
10/18/2018123530660Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/20/2021123593398Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET7
12/12/2018123593398Open ↗
10/19/2018123530660Open ↗
02/16/2016122676096Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM2
10/30/2019123530660Open ↗
10/24/2019123530660Open ↗
▸BISADDITIONAL INFORMATION1
08/08/2019123593398Open ↗
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
04/19/2016122676096Open ↗
02/16/2016122676096Open ↗
07/06/2012110332916Open ↗
Showing 3 of 4 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
01/08/2019123530660Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00007085-I1Open ↗