Roof10p · 1 filing · 20 docs
DMMechanicalStructural
Issued Permit Scope
Structural
interior & exterior repairs: Reinforce and replace existing roof and floor joists; Remove interior partitions walls; Repair interior masonry walls.; No change to use, occupancy or egress
On file for this project
27 documents · 4 drawing sheets
Floor 349p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
THE HVAC CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, HOISTING AND RIGGING,SCAFFOLDING AND SERVICES NECESSARY TO COMPLETE THE SYSTEM CONSISTING OF ALL HVACEQUIPMENT, DUCTWORK, PIPING, INSULATION, CONTROLS, ACCESSORIES AND ASSOCIATED WORK.B. T
On file for this project
113 documents · 1 drawing sheet
FILING HEREWITH FOR INSTALLATION OF sprinkler FIXTURES, EQUIPMENT AND ASSOCIATED PIPING THROUGHOUT THE BUILDING AS PER PLANS IN CONJUNCTION W/ ALT CO DOB NOW JOB# M00644488. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
17 documents · 2 drawing sheets
interior & exterior repairs: Reinforce and replace existing roof and floor joists; Remove interior partitions walls; Repair interior masonry walls.; No change to use, occupancy or egress
On file for this project
27 documents
Floor 253p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
THE HVAC CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, HOISTING AND RIGGING,SCAFFOLDING AND SERVICES NECESSARY TO COMPLETE THE SYSTEM CONSISTING OF ALL HVACEQUIPMENT, DUCTWORK, PIPING, INSULATION, CONTROLS, ACCESSORIES AND ASSOCIATED WORK.B. T
On file for this project
113 documents · 1 drawing sheet
FILING HEREWITH FOR INSTALLATION OF sprinkler FIXTURES, EQUIPMENT AND ASSOCIATED PIPING THROUGHOUT THE BUILDING AS PER PLANS IN CONJUNCTION W/ ALT CO DOB NOW JOB# M00644488. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
17 documents · 4 drawing sheets
interior & exterior repairs: Reinforce and replace existing roof and floor joists; Remove interior partitions walls; Repair interior masonry walls.; No change to use, occupancy or egress
On file for this project
27 documents · 2 drawing sheets
Floor 149p · 3 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
THE HVAC CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, HOISTING AND RIGGING,SCAFFOLDING AND SERVICES NECESSARY TO COMPLETE THE SYSTEM CONSISTING OF ALL HVACEQUIPMENT, DUCTWORK, PIPING, INSULATION, CONTROLS, ACCESSORIES AND ASSOCIATED WORK.B. T
On file for this project
113 documents
FILING HEREWITH FOR INSTALLATION OF sprinkler FIXTURES, EQUIPMENT AND ASSOCIATED PIPING THROUGHOUT THE BUILDING AS PER PLANS IN CONJUNCTION W/ ALT CO DOB NOW JOB# M00644488. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
17 documents · 3 drawing sheets
interior & exterior repairs: Reinforce and replace existing roof and floor joists; Remove interior partitions walls; Repair interior masonry walls.; No change to use, occupancy or egress
On file for this project
27 documents
Cellar42p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Structural
THE HVAC CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, HOISTING AND RIGGING,SCAFFOLDING AND SERVICES NECESSARY TO COMPLETE THE SYSTEM CONSISTING OF ALL HVACEQUIPMENT, DUCTWORK, PIPING, INSULATION, CONTROLS, ACCESSORIES AND ASSOCIATED WORK.B. T
On file for this project
113 documents · 2 drawing sheets
FILING HEREWITH FOR INSTALLATION OF sprinkler FIXTURES, EQUIPMENT AND ASSOCIATED PIPING THROUGHOUT THE BUILDING AS PER PLANS IN CONJUNCTION W/ ALT CO DOB NOW JOB# M00644488. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
17 documents · 4 drawing sheets
interior & exterior repairs: Reinforce and replace existing roof and floor joists; Remove interior partitions walls; Repair interior masonry walls.; No change to use, occupancy or egress
On file for this project
27 documents · 2 drawing sheets
Basement12p · 1 filing · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
THE HVAC CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, HOISTING AND RIGGING,SCAFFOLDING AND SERVICES NECESSARY TO COMPLETE THE SYSTEM CONSISTING OF ALL HVACEQUIPMENT, DUCTWORK, PIPING, INSULATION, CONTROLS, ACCESSORIES AND ASSOCIATED WORK.B. T
On file for this project
113 documents
Sub-Basement34p · 2 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Sprinklers · Structural
FILING HEREWITH FOR INSTALLATION OF sprinkler FIXTURES, EQUIPMENT AND ASSOCIATED PIPING THROUGHOUT THE BUILDING AS PER PLANS IN CONJUNCTION W/ ALT CO DOB NOW JOB# M00644488. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
17 documents
interior & exterior repairs: Reinforce and replace existing roof and floor joists; Remove interior partitions walls; Repair interior masonry walls.; No change to use, occupancy or egress
On file for this project
27 documents
Site & exterior10p · 2 filings · 4 docs
ArchitectureElectricalEquipmentMechanicalStructural
Issued Permit Scope
Construction Fence · Sidewalk Shed · Supported Scaffold
INSTALLATION OF TEMPORARY PLYWOOD CONSTRUCTION FENCE TO ENCLOSE CONSTRUCTION SITE.
On file for this project
2 documents · 5 drawing sheets
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
On file for this project
2 documents · 5 drawing sheets