← Back
Condo, residential unit in 2-10 unit building
137 DUPONT STREET
BROOKLYN · BIN 3390805
💬 Discuss this project
2004Year Built
4Stories
R1Building Class
R6BZoning
4,177 sfGross Floor Area
8Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential unit in 2-10 unit building · 2,500 sf lot · 1.67 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Cellar3p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENPOINT DEVELOPMENT1803/22/2026
GREENPIONT DEVELOPERS LLC203/22/2026
137 DUPONT703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M JUST ARCHITECTURE PC201/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JUST ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IRWIN FRIEDMAN & SON INCPlumbing507/08/2026
GOTHAM GC CORPGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BECKER ENGINEERING, PC633201/27/2021
Building Lifecycle
All (49)Filed (2)Permit Issued (2)Signed Off (2)Violation (26)Objection (8)Special Inspection (9)
11/20/2025
Violation issued (HPD, closed)
I
06/13/2025
Violation issued (HPD, closed)
A
04/17/2024
Violation issued (HPD, closed)
A
03/31/2023
Violation issued (HPD, closed)
A
03/09/2022
Violation issued (HPD, closed)
A
07/30/2021
Signed off — Alteration
general construction to include partition changes, millwork, patch and repair ceilings and flooring, install interior door, toilet exhaust fan and finishes at cellar. No change in Use Egress or Occupancy under this application.
B00454180-I1
07/30/2021
Signed off — Alteration
Install 1 lav, 1 Water closet at cellar, Relocate 1 washing machine and 1 laundry standpipe at cellar. No change in Use Egress or Occupancy under this application
B00454244-I1
05/10/2021
Permit issued — Mechanical Systems
B00454180-I1-GC-CX
05/03/2021
Permit issued — Plumbing
B00454244-I1-PL
04/19/2021
Violation issued (HPD, closed)
A
02/01/2021
Objection raised — Accessibility
02/01/2021
Objection resolved — Addressed
02/01/2021
Objection raised — Scope
02/01/2021
Objection resolved — Addressed
01/28/2021
Objection raised — Scope
01/28/2021
Objection resolved — Addressed
01/28/2021
Objection raised — Scope
01/28/2021
Objection resolved — Addressed
01/27/2021
Filed — Alteration
general construction to include partition changes, millwork, patch and repair ceilings and flooring, install interior door, toilet exhaust fan and finishes at cellar. No change in Use Egress or Occupancy under this application.
B00454180-I1
01/27/2021
Filed — Alteration
Install 1 lav, 1 Water closet at cellar, Relocate 1 washing machine and 1 laundry standpipe at cellar. No change in Use Egress or Occupancy under this application
B00454244-I1
01/18/2021
Special inspection requirement — Energy Code Compliance
John Becker
01/18/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
John Becker
01/18/2021
Special inspection requirement — Energy Code Compliance Inspections
John Becker
01/18/2021
Special inspection requirement — Fire-Resistance Rated Construction
John Becker
01/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Becker
01/18/2021
Special inspection requirement — Ventilation and air distribution system
John Becker
01/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Becker
01/14/2021
Special inspection requirement — Final
John Becker
01/14/2021
Special inspection requirement — Mechanical Systems
John Becker
12/24/2015
Violation issued (FDNY_NOV, closed)
10/20/2015
Violation issued (HPD, closed)
I
01/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/27/2012
Violation issued (ECB, closed)
Construction
08/26/2010
Violation issued (FDNY_NOV, closed)
08/26/2010
Violation issued (FDNY_NOV, closed)
08/26/2010
Violation issued (FDNY_NOV, closed)
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/21/2005
Violation issued (ECB, closed)
Construction
04/21/2005
Violation issued (ECB, closed)
Construction
10/20/2004
Violation issued (ECB, closed)
Construction
10/20/2004
Violation issued (ECB, closed)
Construction
10/05/2004
Violation issued (ECB, closed)
Construction
10/05/2004
Violation issued (ECB, closed)
Construction
03/04/2004
Violation issued (ECB, closed)
Construction
03/04/2004
Violation issued (ECB, closed)
Construction
09/19/2003
Violation issued (ECB, closed)
Construction
09/11/2003
Violation issued (ECB, closed)
Construction
09/11/2003
Violation issued (ECB, closed)
Construction
11/15/2001
Violation issued (ECB, closed)
Site Safety
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offGOTHAM GC05/10/2021
DOB NOWPlumbingSigned-offIRWIN FRIEDMAN & SON INC05/03/2021
BISBLISSUEDJULIAN PLBG & HTG CORP06/13/2005
BISPLISSUEDJULIAN PLBG & HTG CORP04/15/2005
BIS—RE-ISSUEDGREENPOINT DEVELOPMENT, LLC02/02/2005
BISEQISSUEDGREENPOINT DEVELOPMENT, LLC01/25/2005
BISSPISSUEDJULIAN SPRINKLER CORP10/13/2004
BIS—ISSUEDGREENPOINT DEVELOPMENT, LLC05/17/2004
BISEQISSUEDGREENPOINT DEVELOPMENT, LLC05/17/2004
BISPLISSUEDJULIAN PLBG & HTG CORP04/07/2004
BIS—ISSUEDGOLDEN VALE CONSTRUCTION CORP06/05/2000
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
01/18/2021Energy Code ComplianceJohn Beckerprogress
01/18/2021HVAC-R and service water piping design and insulationJohn Beckerenergy_progress
01/18/2021Energy Code Compliance InspectionsJohn Beckerprogress
01/18/2021Fire-Resistance Rated ConstructionJohn Beckerprogress
01/18/2021Fire-Resistant Penetrations and JointsJohn Beckerspecial
01/18/2021Ventilation and air distribution systemJohn Beckerenergy_progress
01/18/2021Fire-Resistant Penetrations and JointsJohn Beckerspecial
01/14/2021FinalJohn Beckerprogress
01/14/2021Mechanical SystemsJohn Beckerspecial
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026B00454180-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026B00454244-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026B00454180-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00454244-I1Open ↗
09/01/2026B00454244-I1Open ↗
08/28/2026B00454180-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/01/2026B00454244-I1Open ↗
09/01/2026B00454180-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00454244-I1Open ↗
08/28/2026B00454180-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026B00454244-I1Open ↗
08/15/2026B00454180-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/15/2026B00454244-I1Open ↗
08/15/2026B00454180-I1Open ↗