← Back
Walk-up cooperative
137 EAST 15 STREET
MANHATTAN · Gramercy · BIN 1017802
💬 Discuss this project
1910Year Built
4Stories
C6Building Class
R8BZoning
8,920 sfGross Floor Area
5Units
Rent Stabilized2 Open Violations ▸
Walk-up cooperative · Owner of record: 137 EAST 15 STREET CORP · 2,435 sf lot · 3.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingOther
Roof6p · 4 filings · 19 docs
Floor 42p · 1 filing · 16 docs
Floor 31p · 1 filing · 6 docs
Floor 22p · 2 filings · 16 docs
Floor 13p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LILIA LEVINE DESIGN904/09/2026
137 EAST 15 STREET CORP103/22/2026
137 E 15 ST CORP103/22/2026
137 EAST 15TH STREET703/21/2026
137E15TH STREET CORP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONCORD CONSULTING ENGINEERING PC210/28/2024
OPERA STUDIO ARCHITECTURE, LLC210/22/2024
FRANCISCO D PEREZ PE403/11/2024
CUONO ENGINEERING PLLC202/16/2022
FIELD LINES202/10/2022
JANE KIM DESIGN405/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC803/21/2026
MUNICIPAL BUILDING CONSULTANTS403/21/2026
SEVERINO ASSOCIATES803/21/2026
DOMANI CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CYPRESS GREEN CONST COGeneral Contractor1207/08/2026
BMS CONSTRUCTION CORPGeneral Contractor204/09/2026
CJ HEATING & MECHANICAL CPlumbing207/08/2026
EMERALD MECHL SOLUTIONS IPlumbing207/08/2026
MEDITERRANEAN MARBLE&TIL*General Contractor107/08/2026
QEC ELECTRICAL SVCE CORPElectrical103/22/2026
BENJAMIN DREBINElectrical103/21/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OPERA STUDIO ARCHITECTURE5970410/28/2024
FRANCISCO D. PEREZ PE3306403/11/2024
CHEN ENGINEERING SERVICES1826202/16/2022
Building Lifecycle
All (121)Filed (16)Permit Issued (14)Signed Off (9)Violation (30)Inspection (6)Objection (20)Special Inspection (26)
05/26/2026
Signed off — Alteration
M01010976-I1
04/29/2026
Violation issued (HPD, closed)
A
04/07/2026
Signed off — Alteration
Plumbing work related to the renovation of unit #1B. There is no change in occupancy, use, or egress.
M01011005-I1
01/07/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2025
Permit issued — Plumbing
M01011005-I1-PL
11/17/2025
Violation issued (HPD, closed)
I
06/04/2025
Violation issued (HPD, closed)
A
05/13/2025
Permit issued — General Construction
M01010976-I1-GC
11/25/2024
Signed off — Alteration
Post Approval Amendment to show the "As Built Conditions".
M00698702-I1
11/22/2024
Violation issued (HPD, closed)
I
11/20/2024
Special inspection requirement — Wood – Seismic Resistance
FRANCISCO PEREZ
11/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
11/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
11/04/2024
Special inspection requirement — Final
Thomas Barry
11/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
Thomas Barry
10/28/2024
Filed — Alteration
Plumbing work related to the renovation of unit #1B. There is no change in occupancy, use, or egress.
M01011005-P1
10/22/2024
Filed — Alteration
M01010976-P1
10/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
10/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
Thomas Barry
10/21/2024
Special inspection requirement — Final
Thomas Barry
10/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
06/05/2024
Permit issued — Plumbing
M01011005-I1-PL
05/30/2024
Permit issued — General Construction
M01010976-I1-GC
04/03/2024
Signed off — Alteration
Plumbing work in conjunction with General Construction Job # M00698702
M00701492-I1
04/01/2024
Violation issued (HPD, closed)
A
03/12/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/11/2024
Filed — Alteration
Plumbing work in conjunction with General Construction Job # M00698702
M00701492-P1
03/08/2024
Filed — Alteration
Plumbing work related to the renovation of unit #1B. There is no change in occupancy, use, or egress.
M01011005-I1
03/07/2024
Filed — Alteration
M01010976-I1
03/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANCISCO PEREZ
02/13/2024
Special inspection requirement — Lighting in dwelling units
FRANCISCO PEREZ
02/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANCISCO PEREZ
02/13/2024
Special inspection requirement — Structural Steel - Details
FRANCISCO PEREZ
02/13/2024
Special inspection requirement — Final
JORGE ANDRES DIAZ
02/13/2024
Special inspection requirement — Structural Wood Frame
FRANCISCO PEREZ
02/07/2024
Filed — Alteration
Post Approval Amendment to show the "As Built Conditions".
M00698702-P1
01/17/2024
Special inspection requirement — Structural Wood Frame
11/15/2023
Violation issued (HPD, closed)
I
10/23/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANCISCO PEREZ
10/23/2023
Special inspection requirement — Lighting in dwelling units
FRANCISCO PEREZ
10/23/2023
Special inspection requirement — Final
JORGE ANDRES DIAZ
10/23/2023
Special inspection requirement — Structural Steel - Details
FRANCISCO PEREZ
08/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/11/2023
Permit issued — Plumbing
M00701492-I1-PL
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/23/2023
Signed off — Alteration
2B: STRUCTURAL WORK IN RELATION TO RENOVATION OF ROOF TERRACE AS PER PLANS FILED HEREWITH.
M00668065-I1
05/22/2023
Signed off — Alteration
2B: General Construction for renovation of private Terrace Roof as per plans filed herewith. No change to use, egress or occupancy.
M00668061-I1
05/20/2023
Signed off — Alteration
M00668057-I1
05/19/2023
Signed off — Alteration
2A: General construction to renovate private terrace roof as per plans filed herewith. No change to use, egress or occupancy.
M00668053-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/13/2023
Permit issued — General Construction
M00698702-I1-GC-CX
04/04/2023
Permit issued — Plumbing
M00701492-I1-PL
03/19/2023
Objection raised — Scope
03/19/2023
Objection resolved — Addressed
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA & C PLBG & HTG CO., INC12/16/2025
DOB NOWGeneral ConstructionSigned-offBMS CONSTRUCTION CORP05/13/2025
DOB NOWPlumbingSigned-offA & C PLBG & HTG CO., INC06/05/2024
DOB NOWGeneral ConstructionSigned-offBMS CONSTRUCTION CORP05/30/2024
DOB NOWPlumbingSigned-offCJ HEATING & MECHANICAL C07/11/2023
DOB NOWGeneral ConstructionSigned-offMEDITERRANEAN MARBLE&TIL*04/13/2023
DOB NOWPlumbingSigned-offCJ HEATING & MECHANICAL C04/04/2023
DOB NOWGeneral ConstructionSigned-offCYPRESS GREEN CONST CO02/28/2023
DOB NOWGeneral ConstructionSigned-offCYPRESS GREEN CONST CO02/28/2023
DOB NOWStructuralSigned-offCYPRESS GREEN CONST CO06/29/2022
DOB NOWStructuralSigned-offCYPRESS GREEN CONST CO06/29/2022
DOB NOWGeneral ConstructionSigned-offCYPRESS GREEN CONST CO06/08/2022
DOB NOWGeneral ConstructionSigned-offCYPRESS GREEN CONST CO06/08/2022
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG07/30/2020
BISOTISSUEDBRIGHTON CONTRACTORS INC06/23/2020
BISPLISSUEDDOVAL PLBG & HTG CORP03/10/2016
BISPLISSUEDDYCKMAN PLBG AND HTG INC06/12/2015
BISOTISSUEDSOHOME WORK INC06/04/2015
BISOTISSUEDSOHOME WORK INC06/03/2015
BISMHISSUEDSOHOME WORK INC06/03/2015
BISOTISSUED6TH AVENUE CONSTRUCTION &10/15/2007
2 projects · most recent 09/24/2025
General Wiring
FiledStatusContractorScope
09/24/2025Pending PaymentACCURATE ELEC'L CORP.General Wiring
05/22/2023CompleteQEC ELECTRICAL SVCE CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
11/20/2024Wood – Seismic ResistanceFRANCISCO PEREZspecial
11/12/2024Fire-Resistant Penetrations and JointsThomas Barryspecial
11/04/2024Fire-Resistant Penetrations and JointsThomas Barryspecial
11/04/2024FinalThomas Barryprogress
11/04/2024Fire-Resistance Rated ConstructionThomas Barryprogress
10/21/2024Fire-Resistant Penetrations and JointsThomas Barryspecial
10/21/2024Fire-Resistance Rated ConstructionThomas Barryprogress
10/21/2024FinalThomas Barryprogress
10/21/2024Fire-Resistant Penetrations and JointsThomas Barryspecial
03/05/2024Fire-Resistant Penetrations and JointsFRANCISCO PEREZspecial
02/13/2024Lighting in dwelling unitsFRANCISCO PEREZenergy_progress
02/13/2024Structural Stability – Alterations of existing buildingsFRANCISCO PEREZspecial
02/13/2024Structural Steel - DetailsFRANCISCO PEREZspecial
02/13/2024FinalJORGE ANDRES DIAZprogress
02/13/2024Structural Wood FrameFRANCISCO PEREZprogress
01/17/2024Structural Wood Frame—progress
10/23/2023Structural Stability – Alterations of existing buildingsFRANCISCO PEREZspecial
10/23/2023Lighting in dwelling unitsFRANCISCO PEREZenergy_progress
10/23/2023FinalJORGE ANDRES DIAZprogress
10/23/2023Structural Steel - DetailsFRANCISCO PEREZspecial
02/22/2022Air barrier - visual inspectionMarc Ackersonenergy_progress
01/24/2022Structural Cold-Formed SteelHENLIA CHENspecial
01/24/2022MasonryHENLIA CHENspecial
01/24/2022FinalMarc Ackersonprogress
01/24/2022FinalHENLIA CHENprogress
Latest 25 of 26.
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch12
09/02/2026M00668057-I1Request digital key ↗
08/28/2026M00698702-P1Request digital key ↗
08/27/2026M00701492-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/03/2026M00350526-I1Request digital key ↗
09/03/2026M00350526-P3Request digital key ↗
09/03/2026M00350526-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION7
06/23/2020123874110Open ↗
03/28/2016122282902Open ↗
07/07/2015122282902Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
05/13/2020123874110Open ↗
08/28/2015122282902Open ↗
03/04/2015122282902Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/03/2026M00350526-I1Open ↗
09/03/2026M00350526-P3Open ↗
09/03/2026M00350526-P2Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
05/13/2020123874110Open ↗
10/13/2016122282902Open ↗
10/13/2016122282902Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/28/2026M01011005-P1Open ↗
08/31/2026M00698702-I1Open ↗
08/31/2026M00698702-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/31/2026M00698702-I1Open ↗
08/31/2026M00698702-I1Open ↗
08/31/2026M00698702-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/13/2020123874110Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/13/2020123874110Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/28/2015122282902Open ↗
03/04/2015122282902Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
10/02/2015122282902Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan4
09/03/2026M00350526-P1Open ↗
09/03/2026M00350526-I1Open ↗
09/03/2026M00350526-P3Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes1
05/13/2020123874110Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/03/2026M00350526-I1Open ↗
09/03/2026M00350526-P3Open ↗
09/03/2026M00350526-P2Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/13/2020123874110Open ↗
03/04/2015122282902Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/13/2020123874110Open ↗
06/15/2015122282902Open ↗
03/04/2015122282902Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
06/08/2021123874110Open ↗
10/13/2016122282902Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00698702-I1Open ↗
08/13/2026M00668061-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/08/2021123874110Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/08/2021123874110Open ↗
10/13/2016122282902Open ↗
▸BISSUPERSEDING LETTER1
03/28/2016122282902Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
06/08/2021123874110Open ↗
05/13/2020123874110Open ↗
10/13/2016122282902Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
05/08/2020123874110Open ↗
03/04/2015122282902Open ↗
03/04/2015122282902Open ↗
Showing 3 of 4 on file for this type