← Back
BuildNYC
Elevator apt, semi-fireproof with stores
Rachel Bridge
1370 ST NICHOLAS AVENUE · BIN 1079909
💬 Discuss this project
1964Year Built
32Stories
D7Building Class
R7-2Zoning
517,910 sfGross Floor Area
485Units
LL97 CoveredRent Stabilized3 Active Violations 3 old, status unconfirmed ▸FISP: SAFE
Elevator apt, semi-fireproof with stores · Owner of record: HP Rachel Bridge Housing Development Fun D · 70,000 sf lot · 7.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMark Medical Care2p · 1 filing · 20 docs
Floor 3Mark Medical Care1p · 2 filings · 7 docs
Floor 2Mark Medical Care1p · 2 filings · 7 docs
Floor 1Mark Medical Care29p · 6 filings · 20 docs
Site & exteriorTriera7p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rachael Bridge1503/21/2026
Department of General Services103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Richard Wainer Architect603/21/2026
Frank Bueno Expediting603/21/2026
Louis Striar403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Triera ContractingScaffold707/08/2026
Island Interiors DesignGeneral Contractor403/21/2026
DNA Plumbing ContractorsPlumbing307/08/2026
L.S. Sign CoSign hanger207/08/2026
Asko Electric Construction & MaintenanceElectrical103/21/2026
?Suk Young KimElectrical103/21/2026
Torres IvanElectrical103/21/2026
A.S. Construction & DevelopmentGeneral Contractor107/08/2026
Nationwide MechanicalPlumbing107/08/2026
Star Electrical ContractorsElectrical103/21/2026
Rock E Small Plumbing & HeatingPlumbing107/08/2026
Woodside ElectricElectrical103/21/2026
Fqe ElectricElectrical103/22/2026
Shtral Elect'l Cont'gElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Joseph Botta, PE1139307/30/2024
M. International Engineering3129406/30/2023
Building Lifecycle
All (148)Filed (15)Permit Issued (13)Signed Off (6)Facade (FISP) (14)Violation (60)Inspection (4)Objection (6)Special Inspection (30)
08/18/2026
Violation issued (ECB, open)
Elevators
08/03/2026
Objection resolved — Open
08/03/2026
Objection resolved — Addressed
08/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/03/2026
Special inspection requirement — Concrete - Cast-In-Place
08/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/17/2026
Objection raised — Other
07/17/2026
Objection raised — Inspections
06/29/2026
Filed — Alteration
ORDINARY REPAIRS AT EXISTING GARAGE AS PER PLANS HEREWITH FILED.
M01395541-I1
06/07/2026
Violation issued (HPD, closed)
A
06/07/2026
Violation issued (HPD, closed)
C
06/02/2026
Special inspection requirement — Final
04/22/2026
Violation issued (HPD, closed)
B
11/28/2025
Permit issued — Plumbing
M01026759-S1-PL
11/12/2025
Violation issued (HPD, closed)
B
11/12/2025
Violation issued (HPD, closed)
B
11/12/2025
Violation issued (HPD, closed)
B
10/23/2025
Violation issued (HPD, closed)
C
10/23/2025
Violation issued (HPD, closed)
A
10/23/2025
Violation issued (HPD, closed)
B
10/23/2025
Violation issued (HPD, closed)
B
10/23/2025
Violation issued (HPD, closed)
B
10/23/2025
Violation issued (HPD, closed)
B
10/20/2025
Violation issued (HPD, closed)
A
10/20/2025
Violation issued (HPD, closed)
B
10/20/2025
Violation issued (HPD, closed)
C
10/20/2025
Violation issued (HPD, closed)
B
10/20/2025
Violation issued (HPD, closed)
A
10/20/2025
Violation issued (HPD, closed)
C
08/14/2025
Violation issued (HPD, closed)
B
08/14/2025
Violation issued (HPD, closed)
B
08/14/2025
Violation issued (HPD, closed)
B
08/14/2025
Violation issued (HPD, closed)
B
08/14/2025
Violation issued (HPD, closed)
C
08/14/2025
Violation issued (HPD, closed)
B
08/14/2025
Violation issued (HPD, closed)
B
07/07/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/18/2025
Violation issued (HPD, closed)
B
01/18/2025
Violation issued (HPD, closed)
B
01/18/2025
Violation issued (HPD, closed)
A
12/04/2024
Violation issued (HPD, closed)
B
11/21/2024
Violation issued (HPD, closed)
C
10/21/2024
Violation issued (HPD, closed)
B
10/21/2024
Violation issued (HPD, closed)
B
10/21/2024
Violation issued (HPD, closed)
B
10/21/2024
Violation issued (HPD, closed)
C
10/21/2024
Violation issued (HPD, closed)
A
09/04/2024
Violation issued (HPD, closed)
C
09/04/2024
Violation issued (HPD, closed)
C
07/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/31/2024
Special inspection requirement — Mechanical Systems
JOSEPH BOTTA
07/31/2024
Special inspection requirement — Final
THEODORE STRAUSS
07/30/2024
Filed — Alteration
Installation of plumbing fixtures as per plan, no change in use, occupancy or egress
M01026759-P1
07/23/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/09/2024
Special inspection requirement — Mechanical Systems
JOSEPH BOTTA
07/09/2024
Special inspection requirement — Final
THEODORE STRAUSS
07/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/11/2024
Violation issued (HPD, closed)
C
05/15/2024
Permit issued — Plumbing
M01026759-S1-PL
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNationwide Mechanical11/28/2025
DOB NOWPlumbingSigned-offDNA Plumbing Contractors05/15/2024
DOB NOWMechanical SystemsPermit IssuedA.S. Construction & Development05/10/2024
DOB NOWSignSigned-offWeinfeld, Elliot02/16/2023
DOB NOWSignSigned-offWeinfeld, Elliot02/15/2023
DOB NOWMechanical SystemsSigned-offIsland Interiors Design02/10/2023
DOB NOWSidewalk ShedSigned-offTriera Contracting01/18/2023
DOB NOWPlumbingSigned-offRock E Small Plumbing & Heating10/19/2022
DOB NOWGeneral ConstructionSigned-offIsland Interiors Design05/13/2022
DOB NOWSidewalk ShedSigned-offTriera Contracting01/20/2022
DOB NOWSidewalk ShedSigned-offTriera Contracting01/28/2021
DOB NOWSidewalk ShedSigned-offTriera Contracting10/23/2019
DOB NOWSidewalk ShedSigned-offTriera Contracting10/15/2018
BISOTISSUEDStrauss-Creative Finishes11/07/2022
BISOTISSUEDStrauss-Creative Finishes11/07/2022
BISOTISSUEDStrauss-Creative Finishes08/31/2022
BISOTISSUEDStrauss-Creative Finishes08/31/2022
BISOTISSUEDStrauss-Creative Finishes01/19/2022
BISOTISSUEDStrauss-Creative Finishes01/19/2022
BISOTISSUEDStrauss-Creative Finishes01/03/2022
BISOTISSUEDStrauss-Creative Finishes01/03/2022
BISOTISSUEDStrauss-Creative Finishes12/08/2020
BISOTISSUEDStrauss-Creative Finishes12/08/2020
BISOTISSUEDStrauss-Creative Finishes11/13/2020
BISOTISSUEDStrauss-Creative Finishes11/13/2020
BISOTISSUEDStrauss-Creative Finishes08/06/2020
BISOTISSUEDStrauss-Creative Finishes08/06/2020
BISOTISSUEDStrauss-Creative Finishes11/15/2019
BISOTISSUEDStrauss-Creative Finishes11/15/2019
BISEQISSUEDSkyworx Contracting12/16/2015
BISOTISSUEDStrauss-Creative Finishes11/30/2015
BISOTISSUEDStrauss-Creative Finishes10/21/2015
BISOTISSUEDJRS Construction & Expediting09/03/2015
BISEQISSUEDJRS Construction & Expediting08/20/2015
BISOTISSUEDStrauss-Creative Finishes02/23/2015
BISOTISSUEDStrauss-Creative Finishes07/31/2014
BISOTISSUEDStrauss-Creative Finishes01/13/2011
BISEQISSUEDRock Scaffolding04/21/2010
BISEQISSUEDJ and G General01/31/2003
BISEQISSUEDJ and G General12/11/2002
+ 5 more permits on file
1 project · most recent 07/30/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/30/2024Permit IssuedA.S. Construction & DevelopmentVentilation Systems
Ventilation
1 project · most recent 07/30/2024
Water/Sanitary
FiledStatusContractorScope
07/30/2024Signed-offNationwide MechanicalWater/Sanitary
6 projects · most recent 05/02/2025
General Wiring
FiledStatusContractorScope
05/02/2025CompleteShtral Elect'l Cont'gGeneral Wiring
05/09/2024Permit IssuedJoseph Weinstein ElectricGeneral Wiring
11/23/2021CompleteNet Power ElectricGeneral Wiring
08/17/2021Permit IssuedRobert Chimenti6 meters, 1 new_meters
06/11/2019CompleteFqe ElectricGeneral Wiring
10/15/2018Permit IssuedMeo Electric—
1 project · most recent 07/30/2024
FiledStatusContractorScope
07/30/2024Signed-offNationwide Mechanical1 scope_items
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
08/03/2026Tenant Protection Plan Compliance—special
08/03/2026Concrete - Cast-In-Place—special
08/03/2026Structural Stability – Alterations of existing buildings—special
06/02/2026Final—progress
07/31/2024Tenant Protection Plan Compliance—special
07/31/2024Mechanical SystemsJOSEPH BOTTAspecial
07/31/2024FinalTHEODORE STRAUSSprogress
07/09/2024Mechanical SystemsJOSEPH BOTTAspecial
07/09/2024FinalTHEODORE STRAUSSprogress
07/09/2024Tenant Protection Plan Compliance—special
04/22/2024Tenant Protection Plan ComplianceJOSEPH BOTTAspecial
07/11/2023Ventilation and air distribution systemNANIK MASSANDenergy_progress
07/11/2023Heating SystemsNANIK MASSANDspecial
07/11/2023Mechanical SystemsNANIK MASSANDspecial
07/11/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
07/11/2023FinalNANIK MASSANDprogress
07/11/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
07/11/2023Duct leakage testing, insulation and designNANIK MASSANDenergy_progress
07/11/2023Maintenance informationNANIK MASSANDenergy_progress
07/11/2023Shutoff dampersNANIK MASSANDenergy_progress
06/08/2023Shutoff dampersNANIK MASSANDenergy_progress
06/08/2023Ventilation and air distribution systemNANIK MASSANDenergy_progress
06/08/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
06/08/2023Heating SystemsNANIK MASSANDspecial
06/08/2023Mechanical SystemsNANIK MASSANDspecial
Latest 25 of 45.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Mark Medical CareMedical / HealthcareFloors 1–3
Project M00819745 Alteration · LOC Issued · 02/09/2023
Project M00819757 Alteration · LOC Issued · 02/09/2023
Project M00813541 Alteration · Approved · 01/24/2023
Project M00634492 Alteration · LOC Issued · 01/20/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 229 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch13
09/06/2026M00087853-I1Request digital key ↗
09/02/2026M00634492-P1Request digital key ↗
09/02/2026M00634492-P2Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/06/2026M00087853-P2Request digital key ↗
09/06/2026M00087853-I1Request digital key ↗
08/15/2026M00087853-P1Request digital key ↗
▸Applications & Permits48
▸BISPLAN / WORK APPROVAL APPLICATION29
03/13/2023140441181Open ↗
03/06/2023140441181Open ↗
03/03/2023140441181Open ↗
Showing 3 of 29 on file for this type
▸BISWORK PERMIT APPLICATION17
09/01/2022123900118Open ↗
09/01/2022123900118Open ↗
01/20/2022123900118Open ↗
Showing 3 of 17 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
05/22/2017122421762Open ↗
06/14/2013120561668Open ↗
▸Seals & Professional Certifications72
▸DOB NOWProgress Inspector Seal & Signature20
09/21/2026M01026759-P1Open ↗
08/28/2026M00634492-P2Open ↗
08/28/2026M00634492-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/06/2026M00087853-P1Open ↗
09/06/2026M00087853-P2Open ↗
09/06/2026M00087853-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
01/15/2020123794689Open ↗
07/18/2019123900118Open ↗
05/10/2019123900118Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/21/2026M01026759-P1Open ↗
08/28/2026M00634492-P2Open ↗
08/28/2026M00634492-P2Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
01/15/2020123794689Open ↗
11/03/2015122075930Open ↗
10/19/2015122075930Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
01/15/2020123794689Open ↗
06/05/2019140848698Open ↗
12/15/2015140441181Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/05/2019140848698Open ↗
12/15/2015140441181Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/05/2019140848698Open ↗
12/15/2015140441181Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/20/2010120324791Open ↗
▸Safety & Tenant Protection6
▸BISTENANT PROTECTION PLAN AND NOTES5
02/14/2023103325046Open ↗
02/01/2023101782563Open ↗
06/05/2019140848698Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00087853-P2Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026M01026759-S1Open ↗
08/27/2026M01026759-I1Open ↗
08/27/2026M01026759-P1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
06/05/2019140848698Open ↗
05/10/2019123900118Open ↗
06/08/2015122421762Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026M00634492-S1Open ↗
08/13/2026M00634492-S2Open ↗
08/13/2026M00813541-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/29/2010120561668Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
07/28/2014122075930Open ↗
▸BIS* ASBESTOS ACP 7 OR 5 OR ASB 41
02/19/2023120324791Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/20/2010120324791Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/10/2019123900118Open ↗
03/29/2017122421762Open ↗
06/08/2015122421762Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
12/22/2017122075930Open ↗
03/29/2017122421762Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/05/2019140848698Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/05/2019140848698Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/23/2023123900118Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00634492-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
01/04/2023101782563Open ↗
01/04/2023103325046Open ↗
01/04/2023103325046Open ↗
Showing 3 of 6 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
01/04/2023101782563Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
01/04/2023101782563Open ↗
▸Approvals, Objections & Sign-offs20
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
03/15/2023140441181Open ↗
02/23/2023123900118Open ↗
02/22/2023120324791Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER6
09/01/2022123900118Open ↗
09/01/2022123900118Open ↗
01/20/2022123900118Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL3
02/20/2023140441181Open ↗
02/20/2023123900118Open ↗
01/04/2023120324791Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
12/29/2010120561668Open ↗
04/20/2010120324791Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
11/16/2015122421762Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT12
01/15/2020123794689Open ↗
07/18/2019123900118Open ↗
06/05/2019140848698Open ↗
Showing 3 of 12 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/21/2023123900118Open ↗
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET7
01/15/2020123794689Open ↗
05/10/2019123900118Open ↗
05/10/2019123900118Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM4
09/01/2022123900118Open ↗
01/20/2022123900118Open ↗
08/07/2020123900118Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
06/05/2019140848698Open ↗
12/15/2015140441181Open ↗
▸BISADDITIONAL INFORMATION1
03/03/2023140441181Open ↗
▸Other Documents4
▸DOB NOWBSA Meeting Minutes/BSA Resolution3
08/13/2026M00087853-P2Open ↗
08/13/2026M00087853-P1Open ↗
08/13/2026M00087853-I1Open ↗
▸BISDHCR DOCUMENT1
02/07/2023103325046Open ↗