← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Parkchester South Condominium
1370 VIRGINIA AVENUE · Parkchester · BIN 2096623
💬 Discuss this project
0Year Built
—Stories
RMBuilding Class
R6Zoning
1,842,649 sfGross Floor Area
2,141Units
Rent Stabilized655 Active Violations 648 unresolved · 7 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Parkchester South Condominium Associates · 914,087 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofWalgreens14p · 2 filings · 16 docs
BulkheadBuilding Envelope Roof Work2p · 1 filing · 9 docs
Floor 7Unit 7A, Unit 7B, Unit 7C +316p · 1 filing · 12 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Walgreens2p · 2 filings · 20 docs
CellarWalgreens5p · 2 filings · 20 docs
Site & exteriorBuilding Envelope Roof Work9p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Parkchester Preservation Company2203/21/2026
Mayefeld Architect103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Polarworx105/19/2025
Connolly Engineering202/22/2023
Mohammad Ahead, PE103/14/2022
Sullivan102/26/2022
Metro Structures207/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Pinnacle Building Con203/21/2026
Outsource Consultants303/21/2026
J A Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Michael James IndustriesGeneral Contractor407/08/2026
Two-Tone ContractingGeneral Contractor403/21/2026
Proto Restoration ConstructionGeneral Contractor303/21/2026
Air Exchange and Energy SGeneral Contractor104/09/2026
High Quality Electric ofElectrical103/21/2026
Kings Group NYScaffold107/08/2026
Ecny Electrical ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SGM Engineering2366105/19/2025
Connolly Engineering, PLL3427202/22/2023
Rimkus New York8123102/26/2022
Superior - Home Inspectio1804207/28/2021
Building Lifecycle
All (123)Filed (7)Permit Issued (7)Signed Off (5)Facade (FISP) (12)Violation (60)Objection (2)Special Inspection (30)
12/17/2025
Signed off — Alteration
REPLACEMENT OF HVAC UNIT. NO CHANGE TO USE, EGRESS, OR OCCUPLANCY.
X01221548-I1
06/09/2025
Permit issued — Mechanical Systems
X01221548-I1-MS
05/19/2025
Filed — Alteration
REPLACEMENT OF HVAC UNIT. NO CHANGE TO USE, EGRESS, OR OCCUPLANCY.
X01221548-I1
05/19/2025
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
05/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
05/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
05/06/2025
Special inspection requirement — Mechanical Systems
steven Giammona
05/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
steven Giammona
05/06/2025
Special inspection requirement — Final
steven Giammona
11/27/2024
Violation issued (HPD, closed)
C
11/27/2024
Violation issued (HPD, closed)
C
11/14/2024
Violation issued (HPD, closed)
C
11/13/2024
Violation issued (HPD, closed)
B
10/31/2024
Violation issued (HPD, closed)
C
10/30/2024
Violation issued (HPD, closed)
C
10/30/2024
Violation issued (HPD, closed)
C
01/11/2024
Signed off — Alteration
THIS APPLICATION IS BEING FILED FOR STRUCTURAL WORK AT THE SUBJECT PREMISES FOR THE REPAIR OF THE UNDERSIDE INTERIOR OF THE ROOF SLAB in Apt #7A, 7B, 7C, 7D, 7E, 7F, 7G, 7H, & HALLWAY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X08030246-I1
11/29/2023
Violation issued (HPD, closed)
B
11/29/2023
Violation issued (HPD, closed)
A
11/29/2023
Violation issued (HPD, closed)
B
11/29/2023
Violation issued (HPD, closed)
A
11/29/2023
Violation issued (HPD, closed)
B
11/29/2023
Violation issued (HPD, closed)
A
11/29/2023
Violation issued (HPD, closed)
A
11/29/2023
Violation issued (HPD, closed)
A
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, closed)
B
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, closed)
B
11/29/2023
Violation issued (HPD, closed)
B
11/29/2023
Violation issued (HPD, closed)
B
11/29/2023
Violation issued (HPD, closed)
C
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, open)
C
03/24/2023
Permit issued — Structural
X08030246-I1-ST
03/08/2023
Permit issued — Structural
X08030246-I1-ST
03/01/2023
Special inspection requirement — Post-installed Anchors
daniel connolly
03/01/2023
Special inspection requirement — Structural Steel - High Strength Bolting
daniel connolly
03/01/2023
Special inspection requirement — Structural Steel - Details
daniel connolly
03/01/2023
Special inspection requirement — Structural Steel - Welding
daniel connolly
03/01/2023
Special inspection requirement — Final
daniel connolly
03/01/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
daniel connolly
02/28/2023
Objection resolved — Addressed
02/23/2023
Objection raised — Other
02/22/2023
Filed — Alteration
THIS APPLICATION IS BEING FILED FOR STRUCTURAL WORK AT THE SUBJECT PREMISES FOR THE REPAIR OF THE UNDERSIDE INTERIOR OF THE ROOF SLAB in Apt #7A, 7B, 7C, 7D, 7E, 7F, 7G, 7H, & HALLWAY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X08030246-P1
02/21/2023
Special inspection requirement — Final
daniel connolly
02/21/2023
Special inspection requirement — Structural Steel - High Strength Bolting
daniel connolly
02/21/2023
Special inspection requirement — Structural Steel - Details
daniel connolly
02/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
daniel connolly
02/21/2023
Special inspection requirement — Post-installed Anchors
daniel connolly
02/21/2023
Special inspection requirement — Structural Steel - Welding
daniel connolly
02/20/2023
Cycle 9 facade report submitted
02/20/2023
Cycle 9 facade report signed — SAFE
02/13/2023
Signed off — Alteration
X00681018-I1
02/13/2023
Signed off — Alteration
X00661215-I1
02/02/2023
Cycle 9 facade inspection completed
11/18/2022
Violation issued (HPD, closed)
B
11/18/2022
Violation issued (HPD, closed)
B
11/04/2022
Filed — Alteration
THIS APPLICATION IS BEING FILED FOR STRUCTURAL WORK AT THE SUBJECT PREMISES FOR THE REPAIR OF THE UNDERSIDE INTERIOR OF THE ROOF SLAB in Apt #7A, 7B, 7C, 7D, 7E, 7F, 7G, 7H, & HALLWAY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X08030246-I1
10/28/2022
Violation issued (HPD, closed)
B
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAir Exchange and Energy S06/09/2025
DOB NOWStructuralSigned-offTwo-Tone Contracting03/24/2023
DOB NOWStructuralSigned-offTwo-Tone Contracting03/08/2023
DOB NOWGeneral ConstructionSigned-offProto Restoration Construction06/08/2022
DOB NOWSidewalk ShedSigned-offKings Group NY03/14/2022
DOB NOWMechanical SystemsSigned-offMichael James Industries02/02/2021
DOB NOWMechanical SystemsSigned-offMichael James Industries10/22/2020
BISSPISSUEDUniversal Fire Sprinkler12/01/2014
BISPLISSUEDMetrotech Mechanical04/10/2014
BISMHISSUEDAra Construction04/07/2014
BISOTISSUEDAra Construction04/07/2014
BISOTISSUEDEbcor Construction NY06/19/2013
BISOTISSUEDEbcor Construction NY06/10/2013
BISEQISSUEDOutdoor Installation12/14/2007
BISEQRE-ISSUEDOutdoor Installation04/12/2007
BISOTISSUEDTechnical Construction Srvces08/03/2005
BISOTISSUEDDNA Contracting06/19/2003
BISOTISSUEDPPC Construction07/30/2002
BISPLISSUEDThe Right Connection P&H07/18/2002
BISPLISSUEDBlueprint PLG04/04/2002
BISOTISSUEDPPC Construction04/04/2002
3 projects · most recent 11/20/2025
General Wiring
FiledStatusContractorScope
11/20/2025CompleteLion ElectricGeneral Wiring
04/14/2022CompleteHigh Quality Electric of—
01/24/2022CompleteEcny Electrical ContractorsGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
05/19/2025Energy Code Compliance Inspectionssteven Giammonaprogress
05/16/2025HVAC-R and service water heating system controlssteven Giammonaenergy_progress
05/16/2025HVAC-R and service water heating equipmentsteven Giammonaenergy_progress
05/06/2025Mechanical Systemssteven Giammonaspecial
05/06/2025Tenant Protection Plan Compliancesteven Giammonaspecial
05/06/2025Finalsteven Giammonaprogress
03/01/2023Post-installed Anchorsdaniel connollyspecial
03/01/2023Structural Steel - High Strength Boltingdaniel connollyspecial
03/01/2023Structural Steel - Detailsdaniel connollyspecial
03/01/2023Structural Steel - Weldingdaniel connollyspecial
03/01/2023Finaldaniel connollyprogress
03/01/2023Structural Stability – Alterations of existing buildingsdaniel connollyspecial
02/21/2023Finaldaniel connollyprogress
02/21/2023Structural Steel - High Strength Boltingdaniel connollyspecial
02/21/2023Structural Steel - Detailsdaniel connollyspecial
02/21/2023Structural Stability – Alterations of existing buildingsdaniel connollyspecial
02/21/2023Post-installed Anchorsdaniel connollyspecial
02/21/2023Structural Steel - Weldingdaniel connollyspecial
01/12/2022MasonryBrian Sullivanspecial
01/12/2022Post-installed AnchorsBrian Sullivanspecial
01/12/2022FinalBrian Sullivanprogress
01/12/2022Air barrier - visual inspectionBrian Sullivanenergy_progress
01/12/2022Insulation placement and R valuesBrian Sullivanenergy_progress
07/30/2021HVAC and service water heating system controls Augustine Angbaenergy_progress
07/30/2021HVAC insulation and sealing Augustine Angbaenergy_progress
Latest 25 of 35.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
WalgreensRetailCellar, Floor 1, Roof
Project X01221548 Alteration · LOC Issued · 05/19/2025
Project X00387381 Alteration · LOC Issued · 08/21/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
08/24/2026X00661215-I1Request digital key ↗
08/24/2026X00681018-I1Request digital key ↗
08/23/2026X08030246-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/25/2026X00387381-I1Request digital key ↗
08/25/2026X00387381-P1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION11
09/14/2015220366468Open ↗
02/18/2015220366477Open ↗
10/31/2014220366468Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION6
12/08/2014220366495Open ↗
10/31/2014220366495Open ↗
04/15/2014220366477Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications54
▸DOB NOWProgress Inspector Seal & Signature17
08/28/2026X08030246-I1Open ↗
08/27/2026X01221548-I1Open ↗
08/27/2026X01221548-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
02/26/2015220366477Open ↗
02/18/2015220366477Open ↗
12/30/2014220366477Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/28/2026X08030246-I1Open ↗
08/28/2026X08030246-I1Open ↗
08/28/2026X08030246-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026X00387381-P1Open ↗
08/25/2026X00387381-I1Open ↗
08/24/2026X00661215-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
10/31/2014220366495Open ↗
04/08/2014220366477Open ↗
04/08/2014220366495Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/08/2014220366477Open ↗
04/08/2014220366477Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/10/2013220283501Open ↗
▸Trade Schedules & Equipment9
▸BISEQUIPMENT USE PERMITS3
03/03/2015220366477Open ↗
03/03/2015220366477Open ↗
03/03/2015220366477Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
12/31/2014220366495Open ↗
11/28/2014220366477Open ↗
05/06/2014220366477Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/08/2014220366477Open ↗
04/08/2014220366495Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
03/03/2015220366477Open ↗
▸Safety & Tenant Protection3
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
06/04/2013220283501Open ↗
04/26/2013220283501Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/10/2013220283501Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
04/15/2014220366468Open ↗
04/08/2014220366477Open ↗
04/08/2014220366495Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026X08030246-I1Open ↗
08/14/2026X08030246-P1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
04/10/2013220283501Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026X00661215-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
12/30/2014220366477Open ↗
06/14/2014220366495Open ↗
04/08/2014220366477Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections1
04/15/2014220366495Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/30/2014220366477Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00661215-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/03/2015220366477Open ↗
01/08/2015220366477Open ↗
12/30/2014220366477Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
12/30/2014220366477Open ↗
04/15/2014220366468Open ↗
04/08/2014220366477Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET5
04/15/2014220366468Open ↗
04/08/2014220366477Open ↗
04/08/2014220366477Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸DOB NOWDHCR Document3
08/25/2026X00387381-P1Open ↗
08/25/2026X00387381-P1Open ↗
08/13/2026X00387381-I1Open ↗