← Back
Elevator apt, semi-fireproof with stores
Rachel Bridge
1360 ST NICHOLAS AVENUE · BIN 1079909
💬 Discuss this project
1964Year Built
32Stories
D7Building Class
R7-2Zoning
517,910 sfGross Floor Area
485Units
LL97 CoveredRent Stabilized9 Open Violations ▸FISP: SAFE
Elevator apt, semi-fireproof with stores · Owner of record: HP RACHEL BRIDGE HOUSING DEVELOPMENT FUN D · 70,000 sf lot · 7.4 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Roof1p · 1 filing · 20 docs
Floor 14p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIERA CONTRACTING1407/08/2026
TRIERA CONTRACTING INC 1103/22/2026
RACHAEL BRIDGE CORP JACOB203/22/2026
ROCHEL BRIDGE CORP.203/22/2026
KISLAK MORTGAGE103/22/2026
DEPT OF GENERAL SERVICES103/21/2026
SKYWORX CONTRACTING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RICHARD WAINER ARCHITECT, PLLC603/21/2026
FRANK BUENO EXPEDITING603/21/2026
LOUIS STRIAR403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIERA CONTRACTING INCGeneral Contractor707/08/2026
ISLAND INTERIORS DESIGNGeneral Contractor403/21/2026
DNA PLUMBING CONTR. INCPlumbing307/08/2026
L S SIGNScaffold207/08/2026
MP & L METAL INCElectrical103/21/2026
SUK KIMElectrical103/21/2026
?SUK YOUNG KIMElectrical103/21/2026
SUTTON, ALEXElectrical103/21/2026
BEKKERMAN, MIKHAILElectrical103/21/2026
A.S. CONSTR. & DEVELOPMENTGeneral Contractor107/08/2026
NATIONWIDE MECHANICAL INCPlumbing107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
TORRES IVANElectrical103/21/2026
COLE, VINCENTElectrical103/21/2026
FQE ELECTRIC LLCElectrical103/22/2026
LEIBY FISCHERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSEPH BOTTA, PE, PC1139307/30/2024
M. INT'L ENGINEERING PLLC3129406/30/2023
Building Lifecycle
All (149)Filed (15)Permit Issued (13)Signed Off (6)Facade (FISP) (14)Violation (60)Inspection (5)Objection (6)Special Inspection (30)
08/18/2026
Violation issued (ECB, open)
Elevators
08/03/2026
Objection resolved — Open
08/03/2026
Objection resolved — Addressed
08/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/03/2026
Special inspection requirement — Concrete - Cast-In-Place
08/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/17/2026
Objection raised — Other
07/17/2026
Objection raised — Inspections
06/29/2026
Filed — Alteration
ORDINARY REPAIRS AT EXISTING GARAGE AS PER PLANS HEREWITH FILED.
M01395541-I1
06/07/2026
Violation issued (HPD, closed)
A
06/07/2026
Violation issued (HPD, closed)
C
06/02/2026
Special inspection requirement — Final
04/22/2026
Violation issued (HPD, closed)
B
11/28/2025
Permit issued — Plumbing
M01026759-S1-PL
11/12/2025
Violation issued (HPD, closed)
B
11/12/2025
Violation issued (HPD, closed)
B
11/12/2025
Violation issued (HPD, closed)
B
10/23/2025
Violation issued (HPD, closed)
C
10/23/2025
Violation issued (HPD, closed)
A
10/23/2025
Violation issued (HPD, closed)
B
10/23/2025
Violation issued (HPD, closed)
B
10/23/2025
Violation issued (HPD, closed)
B
10/23/2025
Violation issued (HPD, closed)
B
10/20/2025
Violation issued (HPD, closed)
A
10/20/2025
Violation issued (HPD, closed)
B
10/20/2025
Violation issued (HPD, closed)
C
10/20/2025
Violation issued (HPD, closed)
B
10/20/2025
Violation issued (HPD, closed)
A
10/20/2025
Violation issued (HPD, closed)
C
08/14/2025
Violation issued (HPD, closed)
B
08/14/2025
Violation issued (HPD, closed)
B
08/14/2025
Violation issued (HPD, closed)
B
08/14/2025
Violation issued (HPD, closed)
B
08/14/2025
Violation issued (HPD, closed)
C
08/14/2025
Violation issued (HPD, closed)
B
08/14/2025
Violation issued (HPD, closed)
B
07/07/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/18/2025
Violation issued (HPD, closed)
B
01/18/2025
Violation issued (HPD, closed)
B
01/18/2025
Violation issued (HPD, closed)
A
12/04/2024
Violation issued (HPD, closed)
B
11/21/2024
Violation issued (HPD, closed)
C
10/21/2024
Violation issued (HPD, closed)
B
10/21/2024
Violation issued (HPD, closed)
B
10/21/2024
Violation issued (HPD, closed)
B
10/21/2024
Violation issued (HPD, closed)
C
10/21/2024
Violation issued (HPD, closed)
A
09/04/2024
Violation issued (HPD, closed)
C
09/04/2024
Violation issued (HPD, closed)
C
07/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/31/2024
Special inspection requirement — Mechanical Systems
JOSEPH BOTTA
07/31/2024
Special inspection requirement — Final
THEODORE STRAUSS
07/30/2024
Filed — Alteration
Installation of plumbing fixtures as per plan, no change in use, occupancy or egress
M01026759-P1
07/23/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/09/2024
Special inspection requirement — Mechanical Systems
JOSEPH BOTTA
07/09/2024
Special inspection requirement — Final
THEODORE STRAUSS
07/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/11/2024
Violation issued (HPD, closed)
C
05/15/2024
Permit issued — Plumbing
M01026759-S1-PL
Latest 60 of 149 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC11/28/2025
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC05/15/2024
DOB NOWMechanical SystemsPermit IssuedA.S. CONSTR. & DEVELOPMEN05/10/2024
DOB NOWSignSigned-offWEINFELD, ELLIOT02/16/2023
DOB NOWSignSigned-offWEINFELD, ELLIOT02/15/2023
DOB NOWMechanical SystemsSigned-offISLAND INTERIORS DESIGN02/10/2023
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC01/18/2023
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC10/19/2022
DOB NOWGeneral ConstructionSigned-offISLAND INTERIORS DESIGN05/13/2022
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC01/20/2022
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC01/28/2021
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC10/23/2019
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC10/15/2018
BISOTISSUEDSTRAUSS-CREATIVE FINISHES11/07/2022
BISOTISSUEDSTRAUSS-CREATIVE FINISHES11/07/2022
BISOTISSUEDSTRAUSS-CREATIVE FINISHES08/31/2022
BISOTISSUEDSTRAUSS-CREATIVE FINISHES08/31/2022
BISOTISSUEDSTRAUSS-CREATIVE FINISHES01/19/2022
BISOTISSUEDSTRAUSS-CREATIVE FINISHES01/19/2022
BISOTISSUEDSTRAUSS-CREATIVE FINISHES01/03/2022
BISOTISSUEDSTRAUSS-CREATIVE FINISHES01/03/2022
BISOTISSUEDSTRAUSS-CREATIVE FINISHES12/08/2020
BISOTISSUEDSTRAUSS-CREATIVE FINISHES12/08/2020
BISOTISSUEDSTRAUSS-CREATIVE FINISHES11/13/2020
BISOTISSUEDSTRAUSS-CREATIVE FINISHES11/13/2020
BISOTISSUEDSTRAUSS-CREATIVE FINISHES08/06/2020
BISOTISSUEDSTRAUSS-CREATIVE FINISHES08/06/2020
BISOTISSUEDSTRAUSS-CREATIVE FINISHES11/15/2019
BISOTISSUEDSTRAUSS-CREATIVE FINISHES11/15/2019
BISEQISSUEDSKYWORX CONTRACTING INC12/16/2015
BISOTISSUEDSTRAUSS-CREATIVE FINISHES11/30/2015
BISOTISSUEDSTRAUSS-CREATIVE FINISHES10/21/2015
BISOTISSUEDJRS CONSTRUCTION & EXPEDITING09/03/2015
BISEQISSUEDJRS CONSTRUCTION & EXPEDITING08/20/2015
BISOTISSUEDSTRAUSS-CREATIVE FINISHES02/23/2015
BISOTISSUEDSTRAUSS-CREATIVE FINISHES07/31/2014
BISOTISSUEDSTRAUSS-CREATIVE FINISHES01/13/2011
BISEQISSUEDROCK SCAFFOLDING CORP04/21/2010
BISEQISSUEDJ AND G GENERAL INC01/31/2003
BISEQISSUEDJ AND G GENERAL INC12/11/2002
+ 5 more permits on file
1 project · most recent 07/30/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/30/2024Permit IssuedA.S. CONSTR. & DEVELOPMENVentilation Systems
Ventilation
1 project · most recent 07/30/2024
Water/Sanitary
FiledStatusContractorScope
07/30/2024Signed-offNATIONWIDE MECHANICAL INCWater/Sanitary
6 projects · most recent 05/02/2025
General Wiring
FiledStatusContractorScope
05/02/2025CompleteSHTRAL ELECT'L CONT'G CORGeneral Wiring
05/09/2024Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
11/23/2021CompleteNET POWER ELECTRIC CORPGeneral Wiring
08/17/2021Permit IssuedROBERT CHIMENTI6 meters, 1 new_meters
06/11/2019CompleteFQE ELECTRIC LLCGeneral Wiring
10/15/2018Permit IssuedMEO ELECTRIC CORP—
1 project · most recent 07/30/2024
FiledStatusContractorScope
07/30/2024Signed-offNATIONWIDE MECHANICAL INC1 scope_items
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2023Pass-Final Sign Permit InspectionPassView ↗
12/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
08/03/2026Tenant Protection Plan Compliance—special
08/03/2026Concrete - Cast-In-Place—special
08/03/2026Structural Stability – Alterations of existing buildings—special
06/02/2026Final—progress
07/31/2024Tenant Protection Plan Compliance—special
07/31/2024Mechanical SystemsJOSEPH BOTTAspecial
07/31/2024FinalTHEODORE STRAUSSprogress
07/09/2024Mechanical SystemsJOSEPH BOTTAspecial
07/09/2024FinalTHEODORE STRAUSSprogress
07/09/2024Tenant Protection Plan Compliance—special
04/22/2024Tenant Protection Plan ComplianceJOSEPH BOTTAspecial
07/11/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
07/11/2023Heating SystemsNANIK MASSANDspecial
07/11/2023Mechanical SystemsNANIK MASSANDspecial
07/11/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
07/11/2023FinalNANIK MASSANDprogress
07/11/2023Duct leakage testing, insulation and designNANIK MASSANDenergy_progress
07/11/2023Maintenance informationNANIK MASSANDenergy_progress
07/11/2023Shutoff dampersNANIK MASSANDenergy_progress
07/11/2023Ventilation and air distribution systemNANIK MASSANDenergy_progress
06/08/2023Ventilation and air distribution systemNANIK MASSANDenergy_progress
06/08/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
06/08/2023Heating SystemsNANIK MASSANDspecial
06/08/2023Mechanical SystemsNANIK MASSANDspecial
06/08/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
Latest 25 of 45.
▾Documents — 229 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch13
09/06/2026M00087853-I1Request digital key ↗
09/02/2026M00634492-P1Request digital key ↗
09/02/2026M00634492-P2Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/06/2026M00087853-P2Request digital key ↗
09/06/2026M00087853-I1Request digital key ↗
08/15/2026M00087853-P1Request digital key ↗
▸Applications & Permits48
▸BISPLAN / WORK APPROVAL APPLICATION29
03/13/2023140441181Open ↗
03/06/2023140441181Open ↗
03/03/2023140441181Open ↗
Showing 3 of 29 on file for this type
▸BISWORK PERMIT APPLICATION17
09/01/2022123900118Open ↗
09/01/2022123900118Open ↗
01/20/2022123900118Open ↗
Showing 3 of 17 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
05/22/2017122421762Open ↗
06/14/2013120561668Open ↗
▸Seals & Professional Certifications72
▸DOB NOWProgress Inspector Seal & Signature20
09/21/2026M01026759-P1Open ↗
08/28/2026M00634492-P2Open ↗
08/28/2026M00634492-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/06/2026M00087853-P1Open ↗
09/06/2026M00087853-P2Open ↗
09/06/2026M00087853-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
01/15/2020123794689Open ↗
07/18/2019123900118Open ↗
05/10/2019123900118Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/21/2026M01026759-P1Open ↗
08/28/2026M00634492-P2Open ↗
08/28/2026M00634492-P2Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
01/15/2020123794689Open ↗
11/03/2015122075930Open ↗
10/19/2015122075930Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
01/15/2020123794689Open ↗
06/05/2019140848698Open ↗
12/15/2015140441181Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/05/2019140848698Open ↗
12/15/2015140441181Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/05/2019140848698Open ↗
12/15/2015140441181Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/20/2010120324791Open ↗
▸Safety & Tenant Protection6
▸BISTENANT PROTECTION PLAN AND NOTES5
02/14/2023103325046Open ↗
02/01/2023101782563Open ↗
06/05/2019140848698Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00087853-P2Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026M01026759-S1Open ↗
08/27/2026M01026759-I1Open ↗
08/27/2026M01026759-P1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
06/05/2019140848698Open ↗
05/10/2019123900118Open ↗
06/08/2015122421762Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026M00813541-I1Open ↗
08/13/2026M00634492-S1Open ↗
08/13/2026M00634492-S2Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/29/2010120561668Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
07/28/2014122075930Open ↗
▸BIS* ASBESTOS ACP 7 OR 5 OR ASB 41
02/19/2023120324791Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/20/2010120324791Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/10/2019123900118Open ↗
03/29/2017122421762Open ↗
06/08/2015122421762Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
12/22/2017122075930Open ↗
03/29/2017122421762Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/05/2019140848698Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/05/2019140848698Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/23/2023123900118Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00634492-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
01/04/2023101782563Open ↗
01/04/2023103325046Open ↗
01/04/2023103325046Open ↗
Showing 3 of 6 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
01/04/2023101782563Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
01/04/2023101782563Open ↗
▸Approvals, Objections & Sign-offs20
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
03/15/2023140441181Open ↗
02/23/2023123900118Open ↗
02/22/2023120324791Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER6
09/01/2022123900118Open ↗
09/01/2022123900118Open ↗
01/20/2022123900118Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL3
02/20/2023140441181Open ↗
02/20/2023123900118Open ↗
01/04/2023120324791Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
12/29/2010120561668Open ↗
04/20/2010120324791Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
11/16/2015122421762Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT12
01/15/2020123794689Open ↗
07/18/2019123900118Open ↗
06/05/2019140848698Open ↗
Showing 3 of 12 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/21/2023123900118Open ↗
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET7
01/15/2020123794689Open ↗
05/10/2019123900118Open ↗
05/10/2019123900118Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM4
09/01/2022123900118Open ↗
01/20/2022123900118Open ↗
08/07/2020123900118Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
06/05/2019140848698Open ↗
12/15/2015140441181Open ↗
▸BISADDITIONAL INFORMATION1
03/03/2023140441181Open ↗
▸Other Documents4
▸DOB NOWBSA Meeting Minutes/BSA Resolution3
08/13/2026M00087853-I1Open ↗
08/13/2026M00087853-P2Open ↗
08/13/2026M00087853-P1Open ↗
▸BISDHCR DOCUMENT1
02/07/2023103325046Open ↗