Office with commercial, 7-19 stories
138 WEST 25 STREET
MANHATTAN · Chelsea-Hudson Yards · BIN 1014991
💬 Discuss this project
1911Year Built
12Stories
O6Building Class
M1-8A/R11Zoning
96,000 sfGross Floor Area
15Units
LL97 Covered11 Open Violations 8 unresolved · 3 paperwork only ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: TAMKAT BUILDING CORP · 7,483 sf lot · 12.83 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Floor 920p · 4 filings · 20 docs
Floor 8
Floor 71p · 1 filing · 12 docs
Floor 6
Floor 52p · 2 filings · 10 docs
Floor 41p · 1 filing · 7 docs
Floor 3
Floor 2
Floor 11p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TAMKIT BUILDING CORP103/22/2026
OWNER OF 138 W 25 ST203/22/2026
TAMKAT REALTY203/22/2026
T CONSTRUCTION WATER P103/22/2026
TAMKAT BLDGE CORP103/22/2026
TAM KAT CORP503/22/2026
OWNER OF POPSY INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EA DESIGN GROUP803/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BBM DEVELOPMENT INCGeneral Contractor403/21/2026
AMERICAN INDUSTRIES LLCGeneral Contractor307/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor307/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor303/21/2026
WEINMAN RESTORATION LLCElectrical203/21/2026
O'DONNELL, MICHAELElectrical203/21/2026
RUCHEFSKY, LEONARDElectrical203/21/2026
BREFFNI MECHANICAL INCGeneral Contractor203/21/2026
EVERYDAY MECHANICAL CORPPlumbing207/08/2026
TOMASZ PUZAElectrical103/21/2026
DARIUSZ GRYGLEWSKIElectrical103/21/2026
DONALD RICHARDSElectrical103/21/2026
GRYGLEWSKI DARIUSZElectrical103/21/2026
NEIL CABERAElectrical103/21/2026
ROBERT MARCHISOTTOElectrical103/21/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
CAPITOL FIRE SPRINKLER COFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHANG PARK ARCH. P.C.663205/13/2022
THOMAS VELTRE, P.E, P.C.459412/02/2021
JASON M APTOWITZ CONSULTI5671103/18/2021
COLOMBO ARCHITECTURAL STU4930101/27/2020
Building Lifecycle
All (129)Filed (10)Permit Issued (11)Signed Off (2)Facade (FISP) (14)Violation (60)Inspection (8)Objection (4)Special Inspection (20)
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/18/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/14/2022
Permit issued — Plumbing
M00544107-I1-PL
10/07/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/03/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/12/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/24/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00286653-I1
05/24/2022
Objection raised — Scope
05/24/2022
Objection raised — Scope
05/24/2022
Objection raised — Scope
05/24/2022
Objection raised — Scope
05/17/2022
Cycle 9 facade report signed — SWARMP
05/13/2022
Filed — Alteration
M00735110-I1
05/13/2022
Filed — Alteration
Refurbishment of existing toilets on the 4th & 5th-floor area. No change in use, egress, or occupancy.
M00734865-I1
05/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chang Park
05/10/2022
Special inspection requirement — Lighting controls
Chang Park
05/10/2022
Special inspection requirement — Interior lighting power
Chang Park
05/10/2022
Special inspection requirement — Energy Code Compliance Inspections
Chang Park
05/10/2022
Special inspection requirement — Final
Chang Park
04/12/2022
Cycle 9 facade inspection completed
03/09/2022
Cycle 9 facade report submitted
01/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/04/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/29/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/21/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/17/2021
Violation issued (ECB, closed)
Construction
12/04/2021
Special inspection requirement — Sprinkler Systems
Thomas Veltre
12/02/2021
Filed — Alteration
APPLICATION FILED FOR PLUMBING AND SPRINKLER MODIFICATIONS/ADDITIONS ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00544107-P1
11/24/2021
Violation issued (ECB, closed)
Local Law
11/23/2021
Special inspection requirement — Sprinkler Systems
Thomas Veltre
11/03/2021
Permit issued — General Construction
M00462797-I1-GC
10/28/2021
Permit issued — Sprinklers
M00544107-I1-EW-SP
10/07/2021
Permit issued — Sprinklers
M00544107-I1-PL
10/06/2021
Permit issued — Sidewalk Shed
M00286653-I1-SH
08/17/2021
Permit issued — Mechanical Systems
M00544074-I1-MS
08/17/2021
Permit issued — General Construction
M00543954-I1-GC
07/21/2021
Filed — Alteration
APPLICATION FILED FOR PLUMBING AND SPRINKLER MODIFICATIONS/ADDITIONS ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00544107-I1
07/21/2021
Filed — Alteration
M00544074-I1
07/20/2021
Permit issued — General Construction
M00462797-I1-GC
07/19/2021
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00543954-I1
07/15/2021
Special inspection requirement — Final
Sunil Saigal
07/14/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00286653-P1
05/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/2021
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00462797-I1
03/12/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/12/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/24/2021
Violation issued (ECB, closed)
Elevators
01/29/2021
Special inspection requirement — Final
JASON APTOWITZ
01/29/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
JASON APTOWITZ
01/29/2021
Special inspection requirement — Masonry
JASON APTOWITZ
01/07/2021
Permit issued — Sidewalk Shed
M00286653-I1-SH
11/20/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/18/2020
Cycle 9 facade report submitted
11/18/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/16/2020
Cycle 9 facade inspection completed
11/13/2020
Cycle 9 facade report signed — UNSAFE
05/04/2020
Signed off — Alteration
Install new HVAC units to supply first, seventh and ninth floors on an existing commercial building. No change in use, egress or occupancy.
M00302905-I1
01/30/2020
Permit issued — Mechanical Systems
M00302905-I1-MS
01/27/2020
Filed — Alteration
Install new HVAC units to supply first, seventh and ninth floors on an existing commercial building. No change in use, egress or occupancy.
M00302905-I1
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offEVERYDAY MECHANICAL CORP10/14/2022
DOB NOWGeneral ConstructionPermit IssuedBBM DEVELOPMENT INC11/03/2021
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO10/28/2021
DOB NOWSprinklersSigned-offEVERYDAY MECHANICAL CORP10/07/2021
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC10/06/2021
DOB NOWMechanical SystemsPermit IssuedJP GC AND CONSTRUCTION08/17/2021
DOB NOWGeneral ConstructionPermit IssuedJP GC AND CONSTRUCTION08/17/2021
DOB NOWGeneral ConstructionPermit IssuedBBM DEVELOPMENT INC07/20/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC01/07/2021
DOB NOWMechanical SystemsSigned-offBREFFNI MECHANICAL01/30/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC01/06/2020
BISMHISSUEDBREFFNI MECHANICAL INC05/29/2019
BISOTISSUEDHNL CONSTRUCTION COMPANY01/11/2018
BISOTISSUEDHNL CONSTRUCTION COMPANY12/06/2017
BISMHISSUEDHNL CONSTRUCTION COMPANY12/06/2017
BISSPISSUEDQMB PLUMBING & HTG INC11/16/2017
BISOTISSUEDHNL CONSTRUCTION COMPANY11/14/2017
BISMHISSUEDHNL CONSTRUCTION COMPANY11/14/2017
BISEQISSUEDGLENHILL CONSTRUCTION COR09/28/2015
BISSPISSUEDACCURATE MECHANICAL INC09/15/2015
BISPLISSUEDACCURATE MECHANICAL INC09/15/2015
BISMHISSUEDGLENHILL CONSTRUCTION COR09/08/2015
BISOTISSUEDGLENHILL CONSTRUCTION COR04/30/2015
BISOTISSUEDGLENHILL CONSTRUCTION COR05/01/2014
BISEQISSUEDGLENHILL CONSTRUCTION COR05/01/2014
BISFPISSUEDMASTER FIRE SYSTEMS, INC04/07/2014
BISMHISSUEDBREFFNI MECHANICAL INC07/23/2013
BISMHISSUEDBREFFNI MECHANICAL INC06/07/2013
BISMHISSUEDAIR STREAM AIR CONDITIONING10/17/2011
BISEQISSUEDEVEREST SCAFFOLDING INC08/10/2011
BISOTISSUEDURBAN D.C. INC05/25/2011
BISOTISSUEDTELETEMP COOLING CORP04/14/2011
BISEQISSUEDEVEREST SCAFFOLDING INC03/17/2011
BISOTISSUEDURBAN D.C. INC03/07/2011
BISMHISSUEDJ. KANE CONTRACTING CORP02/03/2011
BISOTISSUEDJ. KANE CONTRACTING CORP11/17/2010
BISOTISSUEDGLOBAL TEAM US INC09/01/2010
BISOTISSUEDTELETEMP COOLING CORP08/03/2010
BISPLISSUEDMETROPOLITAN HEAT & POWER CO07/16/2010
BISSPISSUEDHEADS UP FIRE SPRINKLER05/06/2010
+ 21 more permits on file
1 project · most recent 12/02/2021
FiledStatusContractorScope
12/02/2021Signed-offCAPITOL FIRE SPRINKLER CO2 heads
1 project · most recent 12/02/2021
Water/Sanitary
FiledStatusContractorScope
12/02/2021Signed-offEVERYDAY MECHANICAL CORPWater/Sanitary
2 projects · most recent 03/15/2023
FiledStatusContractorScope
03/15/2023CompleteGLENDALE ELECTL CONTNG IN—
12/24/2019CompleteBOROWIDE ELECT'L CONTR'S—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/07/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/03/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/12/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/04/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/29/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/21/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
05/10/2022Fire-Resistant Penetrations and JointsChang Parkspecial
05/10/2022Lighting controlsChang Parkenergy_progress
05/10/2022Interior lighting powerChang Parkenergy_progress
05/10/2022Energy Code Compliance InspectionsChang Parkprogress
05/10/2022FinalChang Parkprogress
12/04/2021Sprinkler SystemsThomas Veltrespecial
11/23/2021Sprinkler SystemsThomas Veltrespecial
07/15/2021FinalSunil Saigalprogress
01/29/2021FinalJASON APTOWITZprogress
01/29/2021Structural Stability – Alterations of existing buildingsJASON APTOWITZspecial
01/29/2021MasonryJASON APTOWITZspecial
01/24/2020HVAC and service water heating system controlsYahaira Volquez Colomboenergy_progress
01/24/2020Shutoff dampersYahaira Volquez Colomboenergy_progress
01/24/2020Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
01/24/2020Mechanical SystemsYahaira Volquez Colombospecial
01/24/2020HVAC insulation and sealingYahaira Volquez Colomboenergy_progress
01/24/2020FinalYahaira Volquez Colomboprogress
01/24/2020Electrical motorsYahaira Volquez Colomboenergy_progress
01/24/2020HVAC and service water heating equipmentYahaira Volquez Colomboenergy_progress
01/24/2020Maintenance informationYahaira Volquez Colomboenergy_progress
▾Documents — 519 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch6
09/03/2026M00543954-I1Request digital key ↗
09/03/2026M00544074-I1Request digital key ↗
09/03/2026M00544107-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00286653-I1Request digital key ↗
08/15/2026M00286653-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00462797-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00302905-I1Request digital key ↗
▸Applications & Permits87
▸BISPLAN / WORK APPROVAL APPLICATION45
07/15/2022122757310Open ↗
05/24/2019140850470Open ↗
02/26/2019122757310Open ↗
Showing 3 of 45 on file for this type
▸BISWORK PERMIT APPLICATION37
05/24/2019140850470Open ↗
11/17/2017123255324Open ↗
11/14/2017123255324Open ↗
Showing 3 of 37 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
09/28/2015120788807Open ↗
09/25/2015120788807Open ↗
09/24/2015120625190Open ↗
▸BISPLACE OF ASSEMBLY2
07/01/2016122737299Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications141
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION58
11/21/2019140850470Open ↗
05/16/2018123255324Open ↗
05/16/2018123255324Open ↗
Showing 3 of 58 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST17
11/14/2017123255324Open ↗
08/28/2015122490072Open ↗
04/28/2014121985673Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
05/24/2019140850470Open ↗
11/14/2017123255324Open ↗
11/14/2017123255324Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/30/2026M00734865-I1Open ↗
09/30/2026M00734865-I1Open ↗
08/31/2026M00286653-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/04/2026M00462797-I1Open ↗
09/03/2026M00544074-I1Open ↗
09/02/2026M00735110-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/30/2026M00734865-I1Open ↗
09/01/2026M00544107-P1Open ↗
08/24/2026M00544107-I1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
05/24/2019140850470Open ↗
03/02/2017140605245Open ↗
09/25/2015140407833Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
05/24/2019140850470Open ↗
03/02/2017140605245Open ↗
09/25/2015140407833Open ↗
Showing 3 of 6 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment52
▸BISEQUIPMENT USE PERMITS18
11/19/2019140850470Open ↗
11/19/2019140850470Open ↗
11/19/2019140850470Open ↗
Showing 3 of 18 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
07/30/2013140095661Open ↗
07/11/2013140069397Open ↗
07/02/2013110040571Open ↗
Showing 3 of 11 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
12/29/2015122490072Open ↗
12/21/2015122490072Open ↗
11/03/2015122490072Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
12/29/2015122490072Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/14/2017123255324Open ↗
08/28/2015122490072Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER/STANDPIPE ELECTRICAL LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
08/20/2014121960814Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST5
04/08/2016122757310Open ↗
09/17/2015122519140Open ↗
04/28/2014121985673Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00286653-I1Open ↗
08/13/2026M00286653-P1Open ↗
▸Environmental & Asbestos40
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
05/24/2019140850470Open ↗
11/14/2017123255324Open ↗
03/02/2017140605245Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/04/2026M00462797-I1Open ↗
09/03/2026M00544074-I1Open ↗
09/02/2026M00735110-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance34
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
11/21/2019140850470Open ↗
05/16/2018123255324Open ↗
05/16/2018123255324Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
11/21/2019140850470Open ↗
05/16/2018123255324Open ↗
05/16/2018123255324Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
05/24/2019140850470Open ↗
03/02/2017140605245Open ↗
04/29/2015140337669Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
05/24/2019140850470Open ↗
03/02/2017140605245Open ↗
04/29/2015140337669Open ↗
Showing 3 of 5 on file for this type
▸BISNYCECC ANALYSIS3
05/24/2019140850470Open ↗
07/22/2013140095661Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00734865-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
05/29/2019140850470Open ↗
05/24/2019140850470Open ↗
03/02/2017140605245Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs48
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
11/21/2019140850470Open ↗
05/16/2018123255324Open ↗
11/19/2015121985673Open ↗
Showing 3 of 20 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
07/02/2013110040571Open ↗
Showing 1 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
04/08/2016122757310Open ↗
09/17/2015122519140Open ↗
▸Cost, Insurance & Ownership48
▸BISCOST AFFIDAVIT48
11/21/2019140850470Open ↗
05/24/2019140850470Open ↗
05/16/2018123255324Open ↗
Showing 3 of 48 on file for this type
▸Filing & Intake Forms39
▸BISEFILING COVER SHEET24
08/06/2018123472161Open ↗
11/14/2017123255324Open ↗
11/14/2017123255324Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
05/24/2019140850470Open ↗
03/02/2017140605245Open ↗
09/25/2015140407833Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION5
01/25/2016122490072Open ↗
Showing 1 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
11/21/2019140850470Open ↗
02/26/2019122757310Open ↗
05/16/2018123255324Open ↗
▸Other Documents6
▸BISPLOT DIAGRAM3
04/08/2016122757310Open ↗
09/17/2015122519140Open ↗
04/28/2014121985673Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Deferment1
08/28/2015122490072Open ↗