← Back
BuildNYC
Office with commercial, 7-19 stories
138 WEST 25TH STREET
MANHATTAN · BIN 1014991
💬 Discuss this project
1911Year Built
12Stories
O6Building Class
M1-8A/R11Zoning
96,000 sfGross Floor Area
15Units
LL97 Covered1 Active Violation ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: Tamkat Building · 7,483 sf lot · 12.83 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 9Spar Knitwear28p · 4 filings · 20 docs
Floor 8
Floor 7Spar Knitwear2p · 1 filing · 12 docs
Floor 6
Floor 5Spar Knitwear2 filings · 10 docs
Floor 4Spar Knitwear2 filings · 10 docs
Floor 3
Floor 2
Floor 1Spar Knitwear2p · 1 filing · 12 docs
Site & exteriorSpar Knitwear12p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Tamkat Building12503/22/2026
Spar Knitwear3907/08/2026
Chelsea Manor NYC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Chang Park Architect205/13/2022
Thomas Veltre P.E312/02/2021
A-Squared107/19/2021
Green Design207/14/2021
Jason M Aptowitz Consulting Engineering103/18/2021
Colombo Architectural Studio101/27/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EA Design Group803/21/2026
Municipal Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BBM DevelopmentGeneral Contractor403/21/2026
Andamio ScaffoldingScaffold303/21/2026
American IndustriesGeneral Contractor307/08/2026
Everest ScaffoldingScaffold307/08/2026
Everyday MechanicalPlumbing207/08/2026
Breffni MechanicalGeneral Contractor203/21/2026
Level Solar Inc Dba LevelElectrical203/21/2026
Capitol Fire Sprinkler CoFire Protection107/08/2026
Apollo Electric NYGElectrical103/21/2026
FSM ElectricalElectrical103/21/2026
Goldman ElectricElectrical103/21/2026
Gryglewski DariuszElectrical103/21/2026
Power Masters Electrical ContElectrical103/21/2026
R.C.M. ElectricElectrical103/21/2026
Borowide Elect'l ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Chang Park Arch663205/13/2022
Thomas Veltre, P.E459412/02/2021
Jason M Aptowitz Consulting5671103/18/2021
Colombo Architectural Stu4930101/27/2020
Building Lifecycle
All (125)Filed (10)Permit Issued (11)Signed Off (2)Facade (FISP) (14)Violation (60)Inspection (4)Objection (4)Special Inspection (20)
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/18/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/14/2022
Permit issued — Plumbing
M00544107-I1-PL
10/07/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/03/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/24/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00286653-I1
05/24/2022
Objection raised — Scope
05/24/2022
Objection raised — Scope
05/24/2022
Objection raised — Scope
05/24/2022
Objection raised — Scope
05/17/2022
Cycle 9 facade report signed — SWARMP
05/13/2022
Filed — Alteration
Refurbishment of existing toilets on the 4th & 5th-floor area. No change in use, egress, or occupancy.
M00734865-I1
05/13/2022
Filed — Alteration
M00735110-I1
05/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chang Park
05/10/2022
Special inspection requirement — Lighting controls
Chang Park
05/10/2022
Special inspection requirement — Interior lighting power
Chang Park
05/10/2022
Special inspection requirement — Energy Code Compliance Inspections
Chang Park
05/10/2022
Special inspection requirement — Final
Chang Park
04/12/2022
Cycle 9 facade inspection completed
03/09/2022
Cycle 9 facade report submitted
01/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/17/2021
Violation issued (ECB, closed)
Construction
12/04/2021
Special inspection requirement — Sprinkler Systems
Thomas Veltre
12/02/2021
Filed — Alteration
APPLICATION FILED FOR PLUMBING AND SPRINKLER MODIFICATIONS/ADDITIONS ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00544107-P1
11/24/2021
Violation issued (ECB, closed)
Local Law
11/23/2021
Special inspection requirement — Sprinkler Systems
Thomas Veltre
11/03/2021
Permit issued — General Construction
M00462797-I1-GC
10/28/2021
Permit issued — Sprinklers
M00544107-I1-EW-SP
10/07/2021
Permit issued — Plumbing
M00544107-I1-PL
10/06/2021
Permit issued — Sidewalk Shed
M00286653-I1-SH
08/17/2021
Permit issued — Mechanical Systems
M00544074-I1-MS
08/17/2021
Permit issued — General Construction
M00543954-I1-GC
07/21/2021
Filed — Alteration
M00544074-I1
07/21/2021
Filed — Alteration
APPLICATION FILED FOR PLUMBING AND SPRINKLER MODIFICATIONS/ADDITIONS ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00544107-I1
07/20/2021
Permit issued — General Construction
M00462797-I1-GC
07/19/2021
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00543954-I1
07/15/2021
Special inspection requirement — Final
Sunil Saigal
07/14/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00286653-P1
05/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/2021
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00462797-I1
03/12/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/12/2021
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
02/24/2021
Violation issued (ECB, closed)
Elevators
01/29/2021
Special inspection requirement — Final
JASON APTOWITZ
01/29/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
JASON APTOWITZ
01/29/2021
Special inspection requirement — Masonry
JASON APTOWITZ
01/07/2021
Permit issued — Sidewalk Shed
M00286653-I1-SH
11/20/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/18/2020
Cycle 9 facade report submitted
11/18/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/16/2020
Cycle 9 facade inspection completed
11/13/2020
Cycle 9 facade report signed — UNSAFE
05/04/2020
Signed off — Alteration
Install new HVAC units to supply first, seventh and ninth floors on an existing commercial building. No change in use, egress or occupancy.
M00302905-I1
01/30/2020
Permit issued — Mechanical Systems
M00302905-I1-MS
01/27/2020
Filed — Alteration
Install new HVAC units to supply first, seventh and ninth floors on an existing commercial building. No change in use, egress or occupancy.
M00302905-I1
01/24/2020
Special inspection requirement — Maintenance information
Yahaira Volquez Colombo
01/24/2020
Special inspection requirement — HVAC and service water heating system controls
Yahaira Volquez Colombo
01/24/2020
Special inspection requirement — Mechanical Systems
Yahaira Volquez Colombo
01/24/2020
Special inspection requirement — HVAC insulation and sealing
Yahaira Volquez Colombo
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offEveryday Mechanical10/14/2022
DOB NOWGeneral ConstructionPermit IssuedBBM Development11/03/2021
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co10/28/2021
DOB NOWPlumbingSigned-offEveryday Mechanical10/07/2021
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding10/06/2021
DOB NOWMechanical SystemsPermit IssuedJP GC and Construction08/17/2021
DOB NOWGeneral ConstructionPermit IssuedJP GC and Construction08/17/2021
DOB NOWGeneral ConstructionPermit IssuedBBM Development07/20/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding01/07/2021
DOB NOWMechanical SystemsSigned-offBreffni Mechanical01/30/2020
DOB NOWSidewalk ShedSigned-offEverest Scaffolding01/06/2020
BISMHISSUEDBreffni Mechanical05/29/2019
BISOTISSUEDHNL Construction Company01/11/2018
BISOTISSUEDHNL Construction Company12/06/2017
BISMHISSUEDHNL Construction Company12/06/2017
BISSPISSUEDQMB Plumbing & Heating11/16/2017
BISOTISSUEDHNL Construction Company11/14/2017
BISMHISSUEDHNL Construction Company11/14/2017
BISEQISSUEDGlenhill Construction09/28/2015
BISSPISSUEDAccurate Mechanical09/15/2015
BISPLISSUEDAccurate Mechanical09/15/2015
BISMHISSUEDGlenhill Construction09/08/2015
BISOTISSUEDGlenhill Construction04/30/2015
BISOTISSUEDGlenhill Construction05/01/2014
BISEQISSUEDGlenhill Construction05/01/2014
BISFPISSUEDMaster Fire Systems04/07/2014
BISMHISSUEDBreffni Mechanical07/23/2013
BISMHISSUEDBreffni Mechanical06/07/2013
BISMHISSUEDAir Stream Air Conditioning10/17/2011
BISEQISSUEDEverest Scaffolding08/10/2011
BISOTISSUEDUrban D.C05/25/2011
BISOTISSUEDTeletemp Cooling04/14/2011
BISEQISSUEDEverest Scaffolding03/17/2011
BISOTISSUEDUrban D.C03/07/2011
BISMHISSUEDJ. Kane Contracting02/03/2011
BISOTISSUEDJ. Kane Contracting11/17/2010
BISOTISSUEDGlobal Team US09/01/2010
BISOTISSUEDTeletemp Cooling08/03/2010
BISPLISSUEDMetropolitan Heat & Power Co07/16/2010
BISSPISSUEDHeads Up Fire Sprinkler05/06/2010
+ 21 more permits on file
1 project · most recent 12/02/2021
FiledStatusContractorScope
12/02/2021Signed-offCapitol Fire Sprinkler Co2 heads
1 project · most recent 12/02/2021
Water/Sanitary
FiledStatusContractorScope
12/02/2021Signed-offEveryday MechanicalWater/Sanitary
2 projects · most recent 03/15/2023
FiledStatusContractorScope
03/15/2023CompleteGlendale Electl Contng—
12/24/2019CompleteBorowide Elect'l Contractors—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/07/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/03/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
05/10/2022Fire-Resistant Penetrations and JointsChang Parkspecial
05/10/2022Lighting controlsChang Parkenergy_progress
05/10/2022Interior lighting powerChang Parkenergy_progress
05/10/2022Energy Code Compliance InspectionsChang Parkprogress
05/10/2022FinalChang Parkprogress
12/04/2021Sprinkler SystemsThomas Veltrespecial
11/23/2021Sprinkler SystemsThomas Veltrespecial
07/15/2021FinalSunil Saigalprogress
01/29/2021FinalJASON APTOWITZprogress
01/29/2021Structural Stability – Alterations of existing buildingsJASON APTOWITZspecial
01/29/2021MasonryJASON APTOWITZspecial
01/24/2020Maintenance informationYahaira Volquez Colomboenergy_progress
01/24/2020HVAC and service water heating system controlsYahaira Volquez Colomboenergy_progress
01/24/2020Mechanical SystemsYahaira Volquez Colombospecial
01/24/2020HVAC insulation and sealingYahaira Volquez Colomboenergy_progress
01/24/2020Shutoff dampersYahaira Volquez Colomboenergy_progress
01/24/2020Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
01/24/2020FinalYahaira Volquez Colomboprogress
01/24/2020Electrical motorsYahaira Volquez Colomboenergy_progress
01/24/2020HVAC and service water heating equipmentYahaira Volquez Colomboenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Spar KnitwearIndustrial / WarehouseFloors 1, 4, 5, 7, 9
Project M00734865 Alteration · Objections · 05/13/2022
Project M00462797 Alteration · Permit Entire · 03/18/2021
Project M00302905 Alteration · LOC Issued · 01/27/2020
Project M00286653 Alteration · LOC Issued · 01/03/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 519 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch6
09/03/2026M00543954-I1Request digital key ↗
09/03/2026M00544074-I1Request digital key ↗
09/03/2026M00544107-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00286653-I1Request digital key ↗
08/15/2026M00286653-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00462797-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00302905-I1Request digital key ↗
▸Applications & Permits87
▸BISPLAN / WORK APPROVAL APPLICATION45
07/15/2022122757310Open ↗
05/24/2019140850470Open ↗
02/26/2019122757310Open ↗
Showing 3 of 45 on file for this type
▸BISWORK PERMIT APPLICATION37
05/24/2019140850470Open ↗
11/17/2017123255324Open ↗
11/14/2017123255324Open ↗
Showing 3 of 37 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
09/28/2015120788807Open ↗
09/25/2015120788807Open ↗
09/24/2015120625190Open ↗
▸BISPLACE OF ASSEMBLY2
07/01/2016122737299Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications141
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION58
11/21/2019140850470Open ↗
05/16/2018123255324Open ↗
05/16/2018123255324Open ↗
Showing 3 of 58 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST17
11/14/2017123255324Open ↗
08/28/2015122490072Open ↗
04/28/2014121985673Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
05/24/2019140850470Open ↗
11/14/2017123255324Open ↗
11/14/2017123255324Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/30/2026M00734865-I1Open ↗
09/30/2026M00734865-I1Open ↗
08/31/2026M00286653-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/04/2026M00462797-I1Open ↗
09/03/2026M00544074-I1Open ↗
09/02/2026M00735110-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/30/2026M00734865-I1Open ↗
09/01/2026M00544107-P1Open ↗
08/24/2026M00544107-I1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
05/24/2019140850470Open ↗
03/02/2017140605245Open ↗
09/25/2015140407833Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
05/24/2019140850470Open ↗
03/02/2017140605245Open ↗
09/25/2015140407833Open ↗
Showing 3 of 6 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment52
▸BISEQUIPMENT USE PERMITS18
11/19/2019140850470Open ↗
11/19/2019140850470Open ↗
11/19/2019140850470Open ↗
Showing 3 of 18 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
07/30/2013140095661Open ↗
07/11/2013140069397Open ↗
07/02/2013110040571Open ↗
Showing 3 of 11 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
12/29/2015122490072Open ↗
12/21/2015122490072Open ↗
11/03/2015122490072Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
12/29/2015122490072Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/14/2017123255324Open ↗
08/28/2015122490072Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER/STANDPIPE ELECTRICAL LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
08/20/2014121960814Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST5
04/08/2016122757310Open ↗
09/17/2015122519140Open ↗
04/28/2014121985673Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00286653-P1Open ↗
08/13/2026M00286653-I1Open ↗
▸Environmental & Asbestos40
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
05/24/2019140850470Open ↗
11/14/2017123255324Open ↗
03/02/2017140605245Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/04/2026M00462797-I1Open ↗
09/03/2026M00544074-I1Open ↗
09/02/2026M00735110-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance34
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
11/21/2019140850470Open ↗
05/16/2018123255324Open ↗
05/16/2018123255324Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
11/21/2019140850470Open ↗
05/16/2018123255324Open ↗
05/16/2018123255324Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
05/24/2019140850470Open ↗
03/02/2017140605245Open ↗
04/29/2015140337669Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
05/24/2019140850470Open ↗
03/02/2017140605245Open ↗
04/29/2015140337669Open ↗
Showing 3 of 5 on file for this type
▸BISNYCECC ANALYSIS3
05/24/2019140850470Open ↗
07/22/2013140095661Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00734865-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
05/29/2019140850470Open ↗
05/24/2019140850470Open ↗
03/02/2017140605245Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs48
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
11/21/2019140850470Open ↗
05/16/2018123255324Open ↗
11/19/2015121985673Open ↗
Showing 3 of 20 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
07/02/2013110040571Open ↗
Showing 1 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
04/08/2016122757310Open ↗
09/17/2015122519140Open ↗
▸Cost, Insurance & Ownership48
▸BISCOST AFFIDAVIT48
11/21/2019140850470Open ↗
05/24/2019140850470Open ↗
05/16/2018123255324Open ↗
Showing 3 of 48 on file for this type
▸Filing & Intake Forms39
▸BISEFILING COVER SHEET24
08/06/2018123472161Open ↗
11/14/2017123255324Open ↗
11/14/2017123255324Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
05/24/2019140850470Open ↗
03/02/2017140605245Open ↗
09/25/2015140407833Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION5
01/25/2016122490072Open ↗
Showing 1 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
11/21/2019140850470Open ↗
02/26/2019122757310Open ↗
05/16/2018123255324Open ↗
▸Other Documents6
▸BISPLOT DIAGRAM3
04/08/2016122757310Open ↗
09/17/2015122519140Open ↗
04/28/2014121985673Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Deferment1
08/28/2015122490072Open ↗