← Back
Condo, commercial tower (mixed-use) [derived]
139 FLATBUSH AVENUE
BROOKLYN · BIN 3348849
💬 Discuss this project
2003Year Built
—Stories
RCBuilding Class
C6-4Zoning
906,158 sfGross Floor Area
2Units
LL97 Covered10 Open Violations ▸FISP: SWARMPFDNY Report ↗
Condo, commercial tower (mixed-use) [derived] · 191,713 sf lot · 4.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
Roof16p · 10 filings · 20 docs
Penthouse1p · 1 filing · 20 docs
Floor 144p · 4 filings · 20 docs
Floor 13
Floor 128p · 5 filings · 20 docs
Floor 1116p · 10 filings · 20 docs
Floor 101p · 2 filings · 6 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 531p · 6 filings · 20 docs
Floor 4
Floor 3
Floor 2Under Construction43p · 3 filings · 20 docs
Floor 1106p · 18 filings · 20 docs
Mezzanine38p · 1 filing · 20 docs
CellarUnder Construction48p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TARGET4507/08/2026
BROOKFIELD PROPERTIES4107/08/2026
FC HANSON OFFICE ASSOCIATES22107/08/2026
TOTAL COMFORT GROUP703/22/2026
GUITAR CENTER503/22/2026
F C HANSON ASSOCIATES52103/22/2026
PRAT ENTERPRISES103/22/2026
PEGASUS INVESTORS, LP403/22/2026
CAVA CONSTRUCTION203/22/2026
ELPANS103/22/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GILBANE BUILDING COMPANYGeneral Contractor1307/08/2026
STEADFAST DEVELOPMENT ANDGeneral Contractor1207/08/2026
VERICON CONSTRUCTION COGeneral Contractor907/08/2026
NATIONAL MAINTENANCEScaffold807/08/2026
PAR PLUMBING CO., INCPlumbing707/08/2026
SCHIMENTI CONSTRUCTION COGeneral Contractor607/08/2026
TOTAL COMFORT MECHANICALGeneral Contractor603/21/2026
JAMES E FITZGERALD INCGeneral Contractor507/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor403/21/2026
COASTAL BUILDING MAINTAINGeneral Contractor407/08/2026
TOMCO MECHANICAL CORPGeneral Contractor403/21/2026
ALLSTATE SPRINKLER LLCFire Protection407/08/2026
JETA LLCGeneral Contractor407/08/2026
MANENGEERING BUREAU INCFire Protection307/08/2026
UNIVERSAL BUILD SUPP LLCGeneral Contractor308/30/2026
H.J. MARTIN & SON INCGeneral Contractor303/21/2026
AIR STREAM AIR CONDITIONINGGeneral Contractor308/01/2026
A & F FIRE PROTECTION COFire Protection307/08/2026
R & R SCAFFOLDING LTDGeneral Contractor203/21/2026
AMM GEN'L CONTRACTING.INCFire Protection207/08/2026
LAWRENCE J. LEVINEFire Protection203/21/2026
SIRINA FIRE PROT CORPFire Protection207/08/2026
BRENNAN OPERATING INCGeneral Contractor207/08/2026
DEMARTINO CONSTR. CO. INCGeneral Contractor206/28/2026
MALATESTA PALADINO, INCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VINCENT J. LIOTTA P. E.1974107/21/2026
QUALITY TESTING, LLC7344305/06/2026
METRIC CONSULTING AND INS1803104/23/2026
MEP INSPECTIONS, INC1102904/22/2026
CATALPA SPECIAL INSPECTIO20042104/22/2026
SKYLINE ENGINEERING, PLLC267609/26/2024
AK ENGINEERING PC678605/16/2024
OBAID MIAN849108/08/2023
SPECIAL INSPECTION SERVIC1200604/03/2023
HORIZON ENGINEERING ASSOC4472301/06/2023
Building Lifecycle
All (300)Filed (54)Permit Issued (45)Signed Off (33)Facade (FISP) (3)Violation (32)Inspection (45)Objection (58)Special Inspection (30)
08/27/2026
Permit issued — Sidewalk Shed
B01352623-I1-SH
07/31/2026
Permit issued — Mechanical Systems
B01386957-I1-MS
07/21/2026
Filed — Alteration
REPLACEMENT OF 60 TON ROOFTOP UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B01386957-I1
07/06/2026
Permit issued — Plumbing
B01395037-S2-PL
07/01/2026
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
06/26/2026
Permit issued — General Construction
B01395037-I1-GC
06/25/2026
Permit issued — Sprinklers
B01395037-S3-EW-SP
06/25/2026
Permit issued — Mechanical Systems
B01395037-S1-MS
06/22/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/17/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/12/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/10/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/05/2026
Inspection — Fail-Final SD - Fire Pump
Fail
View inspection ↗
06/04/2026
Permit issued — Sidewalk Shed
B01352623-I1-SH
05/18/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
05/14/2026
Permit issued — General Construction
B01393576-I1-GC
05/13/2026
Permit issued — Sprinklers
B00753565-I1-EW-SP
05/11/2026
Filed — Alteration
FACADE REPAIR ON THE 1ST TO THE 5TH FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01393576-I1
05/11/2026
Permit issued — Sprinklers
B01388807-I1-EW-SP
05/11/2026
Permit issued — Plumbing
B01388801-I1-PL
05/07/2026
Permit issued — Mechanical Systems
B01388787-I1-MS
05/07/2026
Permit issued — Structural
B01388764-I1-ST
05/07/2026
Permit issued — General Construction
B01388291-I1-GC
05/06/2026
Filed — Alteration
GAP FACTORY (SPACE#1160) - PLUMBING MODIFICATIONS AND INSTALLATIONS FOR RETAIL RENOVATION.
B01395037-S3
05/06/2026
Filed — Alteration
GAP FACTORY (SPACE#1160) - PLUMBING MODIFICATIONS AND INSTALLATIONS FOR RETAIL RENOVATION.
B01395037-S1
05/06/2026
Filed — Alteration
GAP FACTORY (SPACE#1160) - PLUMBING MODIFICATIONS AND INSTALLATIONS FOR RETAIL RENOVATION.
B01395037-I1
05/06/2026
Filed — Alteration
GAP FACTORY (SPACE#1160) - PLUMBING MODIFICATIONS AND INSTALLATIONS FOR RETAIL RENOVATION.
B01395037-S2
04/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
KEVIN SNEDEKER
04/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
KEVIN SNEDEKER
04/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
KEVIN SNEDEKER
04/30/2026
Special inspection requirement — Energy Code Compliance Inspections
KEVIN SNEDEKER
04/30/2026
Special inspection requirement — Sprinkler Systems
KEVIN SNEDEKER
04/30/2026
Special inspection requirement — Duct leakage testing, insulation and design
KEVIN SNEDEKER
04/29/2026
Special inspection requirement — Mechanical Systems
KEVIN SNEDEKER
04/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
KEVIN SNEDEKER
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KEVIN SNEDEKER
04/29/2026
Special inspection requirement — Final
KEVIN SNEDEKER
04/29/2026
Special inspection requirement — Final
KEVIN SNEDEKER
04/27/2026
Special inspection requirement — Final
JOHN COCCA JR.
04/23/2026
Filed — Alteration
STRUCTURAL WORK TO REMOVE EXISTING ELEVATOR & ESCALATOR WALLS BETWEEN THE CELLAR TO THE 1ST FLOOR AND INFILL ELEVATOR & ESCALATOR OPENINGS IN THE 1ST FLOOR SLAB.
B01388764-I1
04/22/2026
Filed — Alteration
REMOVAL OF MECHANICAL DUCTS AND ASSOCIATED PIPING.
B01388787-I1
04/22/2026
Filed — Alteration
REMOVE AND CAP PLUMBING FIXTURES.
B01388801-I1
04/22/2026
Filed — Alteration
B01388807-I1
04/21/2026
Filed — Alteration
THE GAP - REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND FINISHES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01388291-I1
04/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
04/16/2026
Special inspection requirement — Mechanical Systems
ERIC BERLENT
04/16/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
04/16/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
04/16/2026
Special inspection requirement — Final
ERIC BERLENT
04/16/2026
Special inspection requirement — Final
ERIC BERLENT
04/16/2026
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
04/16/2026
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
04/16/2026
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
04/16/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
04/16/2026
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
04/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
ERIC BERLENT
04/14/2026
Special inspection requirement — Final
Vincent Liotta
04/14/2026
Special inspection requirement — Maintenance information
Vincent Liotta
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedUNIVERSAL BUILD SUPP LLC08/27/2026
DOB NOWMechanical SystemsPermit IssuedAIR STREAM AIR CONDITIONING07/31/2026
DOB NOWPlumbingPermit IssuedBLUEWATER PLBG& HTG INC07/06/2026
DOB NOWGeneral ConstructionPermit IssuedDEMARTINO CONSTR. CO. INC06/26/2026
DOB NOWSprinklersPermit IssuedA & F FIRE PROTECTION CO06/25/2026
DOB NOWMechanical SystemsPermit IssuedDEMARTINO CONSTR. CO. INC06/25/2026
DOB NOWSidewalk ShedPermit IssuedUNIVERSAL BUILD SUPP LLC06/04/2026
DOB NOWGeneral ConstructionPermit IssuedMALATESTA PALADINO, INC05/14/2026
DOB NOWSprinklersPermit IssuedMANENGEERING BUREAU INC05/13/2026
DOB NOWSprinklersPermit IssuedCAPITOL FIRE SPRINKLER CO05/11/2026
DOB NOWPlumbingSigned-offSKINNER PLUMBING & HEATING05/11/2026
DOB NOWMechanical SystemsPermit IssuedSTEADFAST DEVELOPMENT AND05/07/2026
DOB NOWStructuralPermit IssuedSTEADFAST DEVELOPMENT AND05/07/2026
DOB NOWGeneral ConstructionPermit IssuedSTEADFAST DEVELOPMENT AND05/07/2026
DOB NOWSidewalk ShedPermit IssuedUNIVERSAL BUILD SUPP LLC03/04/2026
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC09/29/2025
DOB NOWGeneral ConstructionSigned-offH.J. MARTIN & SON INC08/15/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedR & R SCAFFOLDING LTD09/10/2024
DOB NOWGeneral ConstructionSigned-offJETA LLC08/22/2024
DOB NOWMechanical SystemsSigned-offJETA LLC08/21/2024
DOB NOWGeneral ConstructionSigned-offCOASTAL BUILDING MAINTAIN04/26/2024
DOB NOWStructuralSigned-offMALATESTA PALADINO, INC09/29/2023
DOB NOWSprinklersSigned-offMANENGEERING BUREAU INC09/15/2023
DOB NOWSignSigned-offSIGNS CAD CORP09/14/2023
DOB NOWSignSigned-offMAUCERI SIGN CO., INC08/30/2023
DOB NOWMechanical SystemsSigned-offAIR STREAM AIR CONDITIONI08/09/2023
DOB NOWGeneral ConstructionSigned-offVERICON CONSTRUCTION CO07/07/2023
DOB NOWMechanical SystemsSigned-offVERICON CONSTRUCTION CO05/25/2023
DOB NOWGeneral ConstructionSigned-offVERICON CONSTRUCTION CO05/24/2023
DOB NOWProtection and Mechanical MethodsSigned-offARSENAL SCAFFOLD INC05/02/2023
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP03/01/2023
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC01/30/2023
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP01/17/2023
DOB NOWPlumbingSigned-offM&T PLBG AND HTG CO., INC01/12/2023
DOB NOWSprinklersSigned-offADVANCED AUTO SPR.CO.,INC01/11/2023
DOB NOWMechanical SystemsSigned-offVERICON CONSTRUCTION CO11/29/2022
DOB NOWGeneral ConstructionSigned-offVERICON CONSTRUCTION CO11/29/2022
DOB NOWSprinklersSigned-offAMM GEN'L CONTRACTING.INC09/13/2022
DOB NOWSprinklersSigned-offALLSTATE SPRINKLER LLC09/06/2022
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC08/12/2022
+ 60 more permits on file
3 projects · most recent 07/21/2026
Air Conditioning Systems Heating and Air Conditioning Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
07/21/2026Permit IssuedAIR STREAM AIR CONDITIONIAir Conditioning Systems
Cooling
Daikin DPSA060 60 tons · Rooftop Unit ×1
05/06/2026Permit IssuedDEMARTINO CONSTR. CO. INCHeating and Air Conditioning Systems
Heat / Cool
Climatemaster SB-096 99,400 BTU · Wshp ×2
SC-060 56,400 BTU · Wshp ×1
04/03/2023Signed-offSCHIMENTI CONSTRUCTION COAir Conditioning Systems, Refrigeration Systems
Cooling
York ZJ049 43,000 BTU · Rooftop Unit ×1
Refrigeration
Bohn ADT-140 25,300 BTU · Refrigeration Unit ×2
LLE-204 39,675 BTU · Refrigeration Unit ×2
BNL-D04-A028 272,600 BTU · Condensing Unit ×1
3 projects · most recent 05/06/2026
FiledStatusContractorScope
05/06/2026Permit IssuedA & F FIRE PROTECTION CO100 heads
04/03/2023Signed-offA & F FIRE PROTECTION CO132 heads
09/21/2022Permit IssuedMANENGEERING BUREAU INC48 heads
5 projects · most recent 05/06/2026
Water/Sanitary Gas
FiledStatusContractorScope
05/06/2026Permit IssuedBLUEWATER PLBG& HTG INCWater/Sanitary
04/22/2026Signed-offSKINNER PLUMBING & HEATINWater/Sanitary
04/13/2026Permit IssuedPAR PLUMBING CO., INCWater/Sanitary
04/03/2023Signed-offPAR PLUMBING CO., INCGas, Water/Sanitary
08/18/2022Signed-offPAR PLUMBING CO., INCWater/Sanitary
25 projects · most recent 08/18/2026
General Wiring
FiledStatusContractorScope
08/18/2026Permit IssuedM.C. ELECTRICAL NY INCGeneral Wiring
08/05/2026Permit IssuedH. & L. ELECTRIC INCGeneral Wiring
08/04/2026Permit IssuedM & M CONTROL WIRING &General Wiring
02/10/2026Permit IssuedCITY ELEC'L SIGN ERECTORS—
08/11/2025Permit IssuedPRIORE ELEC CORPORATIONGeneral Wiring
07/29/2025CompleteTHANASI ELECTRICAL, LLC—
03/05/2025CompleteCITY ELEC'L SIGN ERECTORS—
03/05/2025CompleteCITY ELEC'L SIGN ERECTORS—
02/03/2025CompleteB & G ELECL CONTR OF NY I—
10/30/2024CompleteELECTRIC ESSENTIALS CORPGeneral Wiring
08/22/2024Permit IssuedASCUATECH ELECTRICAL CORPGeneral Wiring
06/25/2024CompleteNEAD ELECTRIC INC.—
11/17/2023Permit IssuedH. & L. ELECTRIC INCGeneral Wiring
11/08/2023CompleteKLEINKNECHT ELEC. CO.,INCGeneral Wiring
07/27/2023CompleteSIGNS CAD CORP—
2 projects · most recent 04/23/2026
Concrete Steel
FiledStatusContractorScope
04/23/2026Permit IssuedSTEADFAST DEVELOPMENT ANDSteel, Concrete
04/03/2023Signed-offPAR PLUMBING CO., INCConcrete
1 project · most recent 04/01/2026
Sidewalk Shed
FiledStatusContractorScope
04/01/2026Permit IssuedUNIVERSAL BUILD SUPP LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 50
DateTypeResultReport
07/01/2026Pass-Final SD - Fire PumpPassView ↗
06/22/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/17/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/12/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/05/2026Fail-Final SD - Fire PumpFailView ↗
05/18/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/02/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/02/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/20/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/18/2025Fail-Final General Construction Non-Directive 14FailView ↗
11/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/09/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/27/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/17/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/06/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 50.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/30/2026HVAC-R and service water heating equipmentKEVIN SNEDEKERenergy_progress
04/30/2026Sprinkler SystemsKEVIN SNEDEKERspecial
04/30/2026Energy Code Compliance InspectionsKEVIN SNEDEKERprogress
04/30/2026HVAC-R and service water heating system controlsKEVIN SNEDEKERenergy_progress
04/30/2026Duct leakage testing, insulation and designKEVIN SNEDEKERenergy_progress
04/30/2026HVAC-R and service water piping design and insulationKEVIN SNEDEKERenergy_progress
04/29/2026Fire-Resistant Penetrations and JointsKEVIN SNEDEKERspecial
04/29/2026Mechanical SystemsKEVIN SNEDEKERspecial
04/29/2026FinalKEVIN SNEDEKERprogress
04/29/2026Fire-Resistance Rated ConstructionKEVIN SNEDEKERprogress
04/29/2026FinalKEVIN SNEDEKERprogress
04/27/2026FinalJOHN COCCA JR.progress
04/20/2026Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
04/16/2026Post-installed AnchorsSAMI HAJJAR P.Especial
04/16/2026Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
04/16/2026Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
04/16/2026Structural Steel - WeldingSAMI HAJJAR P.Especial
04/16/2026Structural Steel - DetailsSAMI HAJJAR P.Especial
04/16/2026FinalSAMI HAJJAR P.Eprogress
04/16/2026FinalERIC BERLENTprogress
04/16/2026Fire-Resistance Rated ConstructionERIC BERLENTprogress
04/16/2026Fire-Resistant Penetrations and JointsERIC BERLENTspecial
04/16/2026Sprinkler SystemsNicolas Crosettospecial
04/16/2026FinalERIC BERLENTprogress
04/16/2026Mechanical SystemsERIC BERLENTspecial
Latest 25 of 150.
▾Documents — 2,387 on file (BIS + DOB NOW)
▸Plans & Drawings106
▸DOB NOWPlans/Sketch81
09/03/2026B00040862-I1Request digital key ↗
09/03/2026B00040852-I1Request digital key ↗
09/03/2026B00040846-I1Request digital key ↗
Showing 3 of 81 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems8
09/02/2026B00343288-I1Request digital key ↗
09/02/2026B00345689-I1Request digital key ↗
09/02/2026B00387615-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
09/02/2026B00188012-I1Request digital key ↗
09/02/2026B00343329-I1Request digital key ↗
09/02/2026B00345714-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/02/2026B00343319-I1Request digital key ↗
09/02/2026B00345627-I1Request digital key ↗
09/02/2026B00385623-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sign2
09/02/2026B00122623-I1Request digital key ↗
09/02/2026B00242318-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00413277-I1Request digital key ↗
09/02/2026B00413277-P1Request digital key ↗
▸Applications & Permits380
▸BISPLAN / WORK APPROVAL APPLICATION189
12/20/2023321019508Open ↗
10/26/2023301849132Open ↗
08/22/2022321740229Open ↗
Showing 3 of 189 on file for this type
▸BISWORK PERMIT APPLICATION176
08/16/2022321740229Open ↗
10/17/2020340767236Open ↗
10/16/2020340767236Open ↗
Showing 3 of 176 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION11
10/28/2019321928544Open ↗
10/28/2019321928544Open ↗
09/24/2019321954541Open ↗
Showing 3 of 11 on file for this type
▸BISPLACE OF ASSEMBLY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Seals & Professional Certifications780
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION312
05/22/2020322070218Open ↗
03/28/2020321934216Open ↗
03/28/2020321934216Open ↗
Showing 3 of 312 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature107
09/03/2026B00040862-I1Open ↗
09/03/2026B00040852-I1Open ↗
09/03/2026B00040846-I1Open ↗
Showing 3 of 107 on file for this type
▸DOB NOWProgress Inspector Seal & Signature98
09/30/2026B01388291-I1Open ↗
09/06/2026B00723180-I1Open ↗
09/06/2026B00723180-I1Open ↗
Showing 3 of 98 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST71
07/15/2020321934216Open ↗
05/22/2020322070218Open ↗
11/13/2019322006253Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature70
09/30/2026B01388291-I1Open ↗
09/02/2026B00607078-P1Open ↗
09/02/2026B00607078-P1Open ↗
Showing 3 of 70 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT45
09/22/2020340767236Open ↗
05/22/2020322070218Open ↗
11/13/2019322006253Open ↗
Showing 3 of 45 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM43
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 43 on file for this type
▸BISPC FULL REPORT12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISProfessional and Owner Certification (POC3)10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
09/22/2020340767236Open ↗
Showing 1 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
09/22/2020340767236Open ↗
Showing 1 of 5 on file for this type
▸Trade Schedules & Equipment185
▸BISSELF-CERT PLUMBING NOTICE51
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 51 on file for this type
▸BISSCHEDULE B - PLUMBING34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISEQUIPMENT USE PERMITS29
02/06/2020321621526Open ↗
02/06/2020321621526Open ↗
02/06/2020321621526Open ↗
Showing 3 of 29 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA20
07/06/2021321748016Open ↗
08/15/2019321621517Open ↗
Showing 2 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE18
10/01/2019321954541Open ↗
Showing 1 of 18 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT13
01/17/2020321954541Open ↗
01/17/2020321954541Open ↗
10/24/2019301108735Open ↗
Showing 3 of 13 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8511
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSIGN HANGER CERTIFICATE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISRPZ/DDCV TEST REPORT : GEN215B1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/31/2026B00627465-P1Open ↗
08/31/2026B00627465-I1Open ↗
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos62
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/02/2026B00413277-I1Open ↗
09/02/2026B00413277-P1Open ↗
09/01/2026B00470570-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance149
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS77
05/26/2020322070218Open ↗
01/17/2020321954541Open ↗
01/17/2020321954541Open ↗
Showing 3 of 77 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS37
03/28/2020321934216Open ↗
01/17/2020321954541Open ↗
01/06/2020321928544Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.12
09/01/2026B00510774-I1Open ↗
08/29/2026B00723201-I1Open ↗
Showing 2 of 12 on file for this type
▸BISTR8: Energy Code Progress Inspections11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
06/17/2021340767236Open ↗
10/16/2020340767236Open ↗
09/22/2020340767236Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
09/22/2020340767236Open ↗
Showing 1 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
06/17/2021340767236Open ↗
10/29/2020322070218Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY9
06/17/2021340767236Open ↗
10/29/2020322070218Open ↗
10/16/2020321647394Open ↗
Showing 3 of 9 on file for this type
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT8
10/22/2019301108735Open ↗
10/22/2019301108735Open ↗
10/22/2019301108735Open ↗
Showing 3 of 8 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Approvals, Objections & Sign-offs228
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST116
12/01/2022321740229Open ↗
07/23/2021321748016Open ↗
06/17/2021340767236Open ↗
Showing 3 of 116 on file for this type
▸BISADMINISTRATIVE OBJECTIONS79
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 79 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
07/21/2022301108735Open ↗
07/21/2022301108735Open ↗
05/26/2022301108735Open ↗
▸BISFINAL1
11/30/2022321740229Open ↗
▸BISOIL TANK REMOVAL CERT : LETTER-FO1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership229
▸BISCOST AFFIDAVIT225
07/23/2021321748016Open ↗
09/22/2020340767236Open ↗
08/12/2020321621517Open ↗
Showing 3 of 225 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
10/27/2022321740229Open ↗
06/17/2021340767236Open ↗
10/29/2020322070218Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms202
▸BISEFILING COVER SHEET121
05/22/2020322070218Open ↗
11/13/2019322006253Open ↗
Showing 2 of 121 on file for this type
▸BISADDITIONAL INFORMATION51
12/18/2019321954541Open ↗
12/18/2019321954541Open ↗
10/29/2019321954541Open ↗
Showing 3 of 51 on file for this type
▸BISBOROUGH INTAKE FORM23
08/16/2022321740229Open ↗
04/10/2020301108735Open ↗
03/28/2020321934216Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
09/22/2020340767236Open ↗
Showing 1 of 7 on file for this type
▸Other Documents27
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION14
07/17/2020301108735Open ↗
10/22/2019301108735Open ↗
10/22/2019301108735Open ↗
Showing 3 of 14 on file for this type
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
07/22/2019321954541Open ↗
07/22/2019321954541Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWProperty Ownership Certification3
08/31/2026B00627465-I1Open ↗
08/31/2026B00627465-P1Open ↗
08/31/2026B00627465-P2Open ↗
▸BISSAFETY MONITORING PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISECCCNYS Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type