← Back
BuildNYC
Miscellaneous two family
139 ST FELIX STREET
BROOKLYN · Fort Greene · BIN 3059192
💬 Discuss this project
1858Year Built
2Stories
B9Building Class
R6BZoning
2,360 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Miscellaneous two family · 1,700 sf lot · 1.39 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Refrigerant piping1p · 1 filing · 11 docs
Floor 1
CellarBoiler replacement9p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Memo NY1007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Piro Studio508/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DI Dio Architecture1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sessa's Licensed PLB & HeatingPlumbing307/08/2026
Palone Brothers Airspecialty_contractor203/21/2026
H.D. Noble RenovationGeneral Contractor109/12/2008
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Piro Studio7503508/01/2023
Building Lifecycle
08/25/2023
Signed off — Alteration
Removal of (2 total ) existing gas burning boilers and (2 total) hot water retention tanks, under this application & B08003093-S1. Installation of (2 total) new wall mounted boilers for residential heating needs, under this application & B08003093-S1.
B08003093-S1
08/25/2023
Signed off — Alteration
Removal of (2 total ) existing gas burning boilers and (2 total) hot water retention tanks, under this application & B08003093-S1. Installation of (2 total) new wall mounted boilers for residential heating needs, under this application & B08003093-S1.
B08003093-I1
08/22/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/16/2023
Permit issued — Boiler Equipment
B08003093-S1-BE
08/01/2023
Filed — Alteration
Removal of (2 total ) existing gas burning boilers and (2 total) hot water retention tanks, under this application & B08003093-S1. Installation of (2 total) new wall mounted boilers for residential heating needs, under this application & B08003093-S1.
B08003093-S1
38 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offSessa's Licensed PLB & Heating08/16/2023
DOB NOWBoiler EquipmentSigned-offSessa's Licensed PLB & Heating06/06/2023
DOB NOWBoiler EquipmentSigned-offSessa's Licensed PLB & Heating01/24/2023
DOB NOWMechanical SystemsSigned-offPalone Brothers Air01/11/2022
BISOTISSUEDH.D. Noble Renovation09/12/2008
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/22/2023Pass-Final Boiler Equipment InspectionPassView ↗
07/25/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
07/31/2023HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
07/31/2023Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
07/31/2023HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
07/31/2023HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
07/31/2023Heating SystemsPIETRO ROSATOspecial
07/27/2023HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
07/27/2023HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
07/27/2023Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
07/27/2023Heating SystemsPIETRO ROSATOspecial
07/27/2023HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
06/23/2023HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
06/23/2023Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
06/23/2023Heating SystemsPIETRO ROSATOspecial
06/23/2023HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
06/23/2023HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
01/02/2022HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
01/02/2022HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
01/02/2022HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
01/02/2022Energy Code Compliance InspectionsPIETRO ROSATOprogress
01/02/2022Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
11/15/2021Mechanical SystemsPIETRO ROSATOspecial
11/15/2021FinalPIETRO ROSATOprogress
49 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account