← Back
Elevator co-op, conversion from loft/warehouse
139-143 WEST 19 STREET
MANHATTAN · Chelsea-Hudson Yards · BIN 1078655
💬 Discuss this project
1909Year Built
8Stories
D0Building Class
C6-3AZoning
68,671 sfGross Floor Area
23Units
LL97 CoveredRent Stabilized19 Open Violations ▸FISP: SWARMP
Elevator co-op, conversion from loft/warehouse · Owner of record: CHELSEA LOFTS CORP · 11,225 sf lot · 6.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Roof15p · 3 filings · 14 docs
Floor 823p · 2 filings · 5 docs
Floor 7
Floor 68p · 1 filing · 3 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 19p · 1 filing · 11 docs
Cellar9p · 1 filing · 11 docs
Site & exterior13p · 5 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHELSEA LOFTS CORP C O ANDREWS1103/21/2026
ROCK GROUP NY807/08/2026
139 WEST 19TH ST. CO., L.P.503/22/2026
PLATINUM SERVICES NY503/22/2026
CHELSEA LOFT CORP C O ANDREWS BC503/21/2026
Charter Communications103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ZEN CONSTRUCTION CONSULTING203/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
GREEN STUDIO403/21/2026
MIDTOWN PRESERVATION ARCHITECTURE203/21/2026
JULIAN A. GOMEZ203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CANIDO BASONAS CONST SVCGeneral Contractor704/09/2026
ROCK GROUP NY CORPGeneral Contractor707/08/2026
A.M.N. CORPORATIONPlumbing407/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor303/21/2026
VRF SOLUTIONS LLCGeneral Contractor303/21/2026
CANIDO BASONAS CONSTRUCTIGeneral Contractor303/21/2026
COTTAM HEATING & AIR CONDIT.General Contractor203/21/2026
REMODELING SPACE NY LLCGeneral Contractor204/09/2026
MOCK,JR, PElectrical103/21/2026
WARNOCK JR, GARYElectrical103/21/2026
ROBERT CHIMENTIElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018212/03/2024
ABS ENGINEERING, PLLC4835208/15/2024
GEORGE J. XERAKIAS, PE1658104/09/2024
MIDTOWN PRESERVATION ARCH2634103/14/2024
METROSPEC SIA6420105/20/2021
Building Lifecycle
All (127)Filed (10)Permit Issued (17)Signed Off (8)Facade (FISP) (15)Violation (60)Inspection (3)Special Inspection (14)
11/10/2025
Signed off — Alteration
Plumbing work in conjunction with interior renovation of existing class "A" apartment. No change of use, egress or occupancy under this application.
M01138411-I1
11/10/2025
Signed off — Alteration
Renovation of existing class "A" apartment. No change of use, egress or occupancy under this application.
M01138390-I1
10/01/2025
Signed off — Alteration
Installation of outriggers for facade repair and inspection
M01026407-I1
09/08/2025
Cycle 10 facade report submitted
09/08/2025
Cycle 10 facade report signed — SAFE
08/15/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/17/2025
Cycle 10 facade inspection completed
06/30/2025
Permit issued — General Construction
M01138390-I1-GC
05/13/2025
Signed off — Alteration
M00997586-I1
04/25/2025
Permit issued — Supported Scaffold
M01033065-I1-SF
04/24/2025
Permit issued — Suspended Scaffold
M01026407-I1-SC
03/04/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01030109-I1
02/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/27/2025
Permit issued — Plumbing
M01138411-I1-PL
01/17/2025
Permit issued — General Construction
M01138390-I1-GC
12/03/2024
Filed — Alteration
Plumbing work in conjunction with interior renovation of existing class "A" apartment. No change of use, egress or occupancy under this application.
M01138411-I1
12/03/2024
Filed — Alteration
Renovation of existing class "A" apartment. No change of use, egress or occupancy under this application.
M01138390-I1
11/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
09/11/2024
Permit issued — Mechanical Systems
M01054623-I1-MS
08/15/2024
Filed — Alteration
Remove & replacement of existing HVAC System. No change to use, egress or occupancy.
M01054623-I1
05/24/2024
Permit issued — Supported Scaffold
M01033065-I1-SF
05/24/2024
Permit issued — General Construction
M00997586-I1-GC
04/25/2024
Permit issued — Supported Scaffold
M01033065-I1-SF
04/24/2024
Filed — Alteration
M01033065-I1
04/24/2024
Permit issued — Suspended Scaffold
M01026407-I1-SC
04/10/2024
Permit issued — Sidewalk Shed
M01030109-I1-SH
04/09/2024
Filed — Alteration
Installation of outriggers for facade repair and inspection
M01026407-I1
04/09/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01030109-I1
04/09/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
04/09/2024
Special inspection requirement — Post-installed Anchors
George Xerakias
03/14/2024
Filed — Alteration
M00997586-I1
01/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
KATHLEEN NEEDHAM-INOCCO
01/29/2024
Special inspection requirement — Final
KATHLEEN NEEDHAM-INOCCO
11/15/2023
Violation issued (HPD, closed)
I
11/02/2022
Violation issued (HPD, closed)
I
06/10/2022
Cycle 9 facade report signed — SWARMP
02/15/2022
Cycle 9 facade report submitted
01/25/2022
Cycle 9 facade inspection completed
07/01/2021
Signed off — Alteration
Installation of one (1) outdoor VRF condenser unit and three (3) indoor units on basement and ground floor.
M00523010-I1
06/08/2021
Permit issued — Mechanical Systems
M00523010-I1-MS
05/20/2021
Filed — Alteration
Installation of one (1) outdoor VRF condenser unit and three (3) indoor units on basement and ground floor.
M00523010-I1
05/16/2021
Special inspection requirement — HVAC-R and service water heating system controls
Michael Risbergs
05/16/2021
Special inspection requirement — Permanent certificate
Michael Risbergs
05/16/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Risbergs
05/16/2021
Special inspection requirement — Mechanical Systems
Michael Risbergs
05/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Risbergs
05/16/2021
Special inspection requirement — Final
NANIK MASSAND
05/16/2021
Special inspection requirement — HVAC-R and service water heating equipment
Michael Risbergs
11/18/2020
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD . ALL EQUIPMENT COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00081979-I1
10/23/2020
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00075879-I1
10/01/2020
Permit issued — Sidewalk Shed
M00075879-I1-SH
12/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/20/2019
Permit issued — Sidewalk Shed
M00075879-I1-SH
12/18/2019
Violation issued (ECB, closed)
Plumbing
06/04/2019
Violation issued (ECB, closed)
Construction
12/19/2018
Permit issued — Sidewalk Shed
M00075879-I1-SH
09/28/2018
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD . ALL EQUIPMENT COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00081979-I1
09/28/2018
Permit issued — Supported Scaffold
M00081979-I1-SF
09/24/2018
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00075879-I1
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offREMODELING SPACE NY LLC06/30/2025
DOB NOWSupported ScaffoldSigned-offCANIDO BASONAS CONST SVC04/25/2025
DOB NOWSuspended ScaffoldSigned-offCANIDO BASONAS CONST. COR04/24/2025
DOB NOWPlumbingSigned-offA.M.N. CORPORATION01/27/2025
DOB NOWGeneral ConstructionSigned-offREMODELING SPACE NY LLC01/17/2025
DOB NOWMechanical SystemsPermit IssuedCOTTAM HEATING AIR COND09/11/2024
DOB NOWSupported ScaffoldSigned-offCANIDO BASONAS CONST SVC05/24/2024
DOB NOWGeneral ConstructionSigned-offCANIDO BASONAS CONST SVC05/24/2024
DOB NOWSupported ScaffoldSigned-offCANIDO BASONAS CONSTRUCTI04/25/2024
DOB NOWSuspended ScaffoldSigned-offCANIDO BASONAS CONST. COR04/24/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC04/10/2024
DOB NOWMechanical SystemsSigned-offVRF SOLUTIONS LLC06/08/2021
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP10/01/2020
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP12/20/2019
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP12/19/2018
DOB NOWSupported ScaffoldSigned-offROCK GROUP NY CORP09/28/2018
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP09/24/2018
BISPLISSUEDMCMANUS MECH MAINT P&H INC01/19/2022
BISPLISSUEDMCMANUS MECH MAINT P&H INC03/07/2019
BISOTISSUEDSATO CONSTRUCTION CO.INC01/10/2019
BISSPISSUEDAAA TOTAL PLUMBING INC10/25/2018
BISOTISSUEDSATO CONSTRUCTION CO.INC10/05/2018
BISMHISSUEDOTTE CONSTRUCTION SVCS IN05/16/2018
BISOTISSUEDOTTE CONSTRUCTION SVCS IN05/16/2018
BISPLISSUEDMCMANUS MECH MAINT P&H INC03/30/2018
BISMHISSUEDREMODELING SPACE NY LLC02/27/2018
BISPLISSUEDA.M.N. CORPORATION01/17/2018
BISOTISSUEDREMODELING SPACE NY LLC12/29/2017
BISSPISSUEDAAA TOTAL PLUMBING INC08/10/2017
BISPLISSUEDAAA TOTAL PLUMBING, INC08/10/2017
BISMHISSUEDOTTE CONSTRUCTION SVCS IN08/08/2017
BISOTISSUEDOTTE CONSTRUCTION SVCS IN08/08/2017
BISMHISSUEDAGGRESSIVE HEATING INC12/29/2016
BISPLISSUEDGO GREENER PLUMBING LLC04/27/2016
BISPLISSUEDZARA PLUMBING CORP12/01/2014
BISOTISSUEDISSEKS BROTHERS INC09/19/2014
BISOTISSUEDCORNERSTONE CONTRACTING C06/03/2014
BISOTISSUEDCORNERSTONE CONTRACTING C06/03/2014
BISMHISSUEDCORNERSTONE CONTRACTING C06/03/2014
BISPLISSUEDREEM PLBG & HTG CORP02/10/2014
+ 27 more permits on file
1 project · most recent 08/15/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/15/2024Permit IssuedCOTTAM HEATING & AIR CONDHeating and Air Conditioning Systems
Heat / Cool
Daikin RXTQ60TBVJUA 57,500 BTU · Vrf Outdoor ×1
12 projects · most recent 05/27/2025
General Wiring
FiledStatusContractorScope
05/27/2025CompleteLUME ELECTRIC INCGeneral Wiring
01/27/2025CompleteP & Z ELECTRIC CORPGeneral Wiring
04/10/2024CompleteILLUMINOUS ELECTRIC CORP.—
11/17/2023CompleteAMC ELEC'L SERVICES, INC.General Wiring
10/27/2022Permit IssuedR.C.M. ELECTRIC CORP.—
04/26/2022CompleteROBERT CHIMENTI24 meters, 1 new_meters
11/29/2021CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
11/28/2021CompleteWILLDAN ELECTRICAL OF NY—
04/22/2021CompleteA.DAVINO ELEC'L CONT'G COGeneral Wiring
05/01/2019CompleteJUSTAN ELEC'L CONTR'G.General Wiring
11/07/2018CompleteE & M ELECTRICAL NY CORPGeneral Wiring
08/31/2018CompleteTOP SHELF ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
11/18/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
04/09/2024Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
04/09/2024Post-installed AnchorsGeorge Xerakiasspecial
01/29/2024Tenant Protection Plan ComplianceKATHLEEN NEEDHAM-INOCCOspecial
01/29/2024FinalKATHLEEN NEEDHAM-INOCCOprogress
05/16/2021HVAC-R and service water heating system controlsMichael Risbergsenergy_progress
05/16/2021Permanent certificateMichael Risbergsenergy_progress
05/16/2021HVAC-R and service water piping design and insulationMichael Risbergsenergy_progress
05/16/2021Mechanical SystemsMichael Risbergsspecial
05/16/2021Fire-Resistant Penetrations and JointsMichael Risbergsspecial
05/16/2021FinalNANIK MASSANDprogress
05/16/2021HVAC-R and service water heating equipmentMichael Risbergsenergy_progress
09/24/2018Preliminaryasif jamilprogress
08/31/2018Finalasif jamilprogress
▾Documents — 498 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/06/2026M00075879-I1Request digital key ↗
09/06/2026M00081979-I1Request digital key ↗
09/03/2026M00523010-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits116
▸BISPLAN / WORK APPROVAL APPLICATION64
07/14/2025102165069Open ↗
02/18/2025102165069Open ↗
01/15/2025120018140Open ↗
Showing 3 of 64 on file for this type
▸BISWORK PERMIT APPLICATION50
01/19/2022100518833Open ↗
07/30/2019123512458Open ↗
03/08/2019104179933Open ↗
Showing 3 of 50 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/13/2025120018140Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
11/19/2018123456090Open ↗
▸Seals & Professional Certifications83
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION50
09/09/2019123512458Open ↗
07/30/2019123512458Open ↗
05/08/2018123456090Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/06/2026M00081979-I1Open ↗
09/03/2026M00523010-I1Open ↗
08/27/2026M01030109-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026M00997586-I1Open ↗
09/01/2026M00075879-I1Open ↗
09/01/2026M00075879-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M01138411-I1Open ↗
09/01/2026M00997586-I1Open ↗
08/24/2026M00523010-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
07/30/2019123512458Open ↗
Showing 1 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/30/2019123512458Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment54
▸BISSELF-CERT PLUMBING NOTICE18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISSCHEDULE B - PLUMBING17
06/02/2022100518833Open ↗
05/27/2022100518833Open ↗
01/27/2022100518833Open ↗
Showing 3 of 17 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
12/03/2019104179933Open ↗
11/07/2019104179933Open ↗
09/06/2018104179933Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS4
02/10/2024123297887Open ↗
02/10/2024123297887Open ↗
Showing 2 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
02/10/2024123297887Open ↗
Showing 1 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
02/09/2024123297887Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
02/09/2024123297887Open ↗
▸BISSPRINKLER SYSTEMS1
02/09/2024123297887Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes7
07/30/2019123512458Open ↗
11/28/2018123456090Open ↗
11/28/2018123456090Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos23
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/06/2026M00081979-I1Open ↗
09/03/2026M00523010-I1Open ↗
08/13/2026M01054623-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
12/11/2017123146274Open ↗
12/11/2017123146274Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
10/09/2018123456090Open ↗
10/05/2018123456090Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00997586-I1Open ↗
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
09/09/2019123512458Open ↗
07/30/2019123512458Open ↗
05/08/2018123456090Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
11/06/2020123456090Open ↗
09/09/2019123512458Open ↗
04/16/2018123146274Open ↗
Showing 3 of 5 on file for this type
▸BISINSULATION PLACEMENT & R VALUES1
02/09/2024123297887Open ↗
▸BISTR8 INSPECTOR TO CONFIRM AS-BUILT VALUES1
02/09/2024123297887Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/27/2024123297887Open ↗
▸BIS* HVAC INSULATION AND SEALING1
02/09/2024123297887Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/09/2024123297887Open ↗
▸BISFENESTRATION AIR LEAKAGE1
02/09/2024123297887Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/09/2024123297887Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/06/2020123456090Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00523010-I1Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY12
11/06/2025102165069Open ↗
03/03/2025102165069Open ↗
05/23/2022100518833Open ↗
Showing 3 of 12 on file for this type
▸BISPOST-INSTALLED ANCHORS2
02/27/2024123297887Open ↗
02/27/2024123297887Open ↗
▸BISMECHANICAL SYSTEMS1
02/09/2024123297887Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/09/2024123297887Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/09/2024123297887Open ↗
▸Approvals, Objections & Sign-offs69
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST31
11/27/2024122138294Open ↗
02/28/2024123297887Open ↗
12/15/2022100518833Open ↗
Showing 3 of 31 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
03/18/2025120018140Open ↗
Showing 1 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
11/24/2021120018140Open ↗
10/20/2021120018140Open ↗
12/17/2020120018140Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
09/09/2019123512458Open ↗
08/15/2017123297887Open ↗
Showing 2 of 5 on file for this type
▸BISSUPERSEDING LETTER5
01/19/2022100518833Open ↗
07/12/2018123297887Open ↗
07/12/2018123297887Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL2
11/26/2024122138294Open ↗
02/27/2024123297887Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
11/19/2018123456090Open ↗
11/19/2018123456090Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M00997586-I1Open ↗
▸Cost, Insurance & Ownership38
▸BISCOST AFFIDAVIT36
05/23/2022100518833Open ↗
11/09/2020123456090Open ↗
06/08/2020104179933Open ↗
Showing 3 of 36 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
11/18/2024122138294Open ↗
02/27/2024123297887Open ↗
▸Filing & Intake Forms48
▸BISEFILING COVER SHEET22
07/30/2019123512458Open ↗
04/23/2018123456090Open ↗
12/11/2017123146274Open ↗
Showing 3 of 22 on file for this type
▸BISBOROUGH INTAKE FORM15
03/23/2020120018140Open ↗
11/07/2019104179933Open ↗
10/22/2019123456090Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION10
11/06/2025102165069Open ↗
11/06/2025102165069Open ↗
05/14/2025120018140Open ↗
Showing 3 of 10 on file for this type
▸BISeFiling Job Application Cover Sheet1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents4
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/19/2018123456090Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01026407-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01026407-I1Open ↗