Over six families without stores
1395 BRISTOW STREET
BRONX · Crotona Park East · BIN 2117967
💬 Discuss this project
0Year Built
4.5Stories
C1Building Class
R7-1Zoning
19,944 sfGross Floor Area
29Units
Rent Stabilized14 Open Violations ▸
Over six families without stores · Owner of record: 1395 BRISTOW LLC · 5,530 sf lot · 3.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof38p · 1 filing · 20 docs
Penthouse37p · 1 filing · 20 docs
Floor 444p · 1 filing · 20 docs
Floor 340p · 1 filing · 20 docs
Floor 238p · 1 filing · 20 docs
Floor 140p · 1 filing · 20 docs
Cellar38p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CNC DEVELOPERS3307/08/2026
OWNER'S REP703/22/2026
BLUE SHINE BUILDERS INC DBA BLUE SK603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/28/2023$100K—810 EAST 170TH ST. REALTY CORP. → 1395 BRISTOW LLC$5/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE2203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE CONSTR NYC LLCGeneral Contractor1307/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor603/21/2026
BMG ARCHITECTGeneral Contractor603/22/2026
SKYWARD DEVELOPERS INCGeneral Contractor507/08/2026
CHEN ENGINEERING SERVICESElectrical103/21/2026
MPI PLUMBING CORPPlumbing107/08/2026
SUPERIOR SAFETY CONSULTINElectrical103/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
HIVOLTS ELECTRICAL INC 004090General Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161701/01/2024
Building Lifecycle
All (173)Filed (24)Permit Issued (14)Signed Off (11)Violation (10)Inspection (14)Objection (70)Special Inspection (30)
09/23/2024
Violation issued (HPD, closed)
C
09/23/2024
Violation issued (HPD, open)
C
09/23/2024
Violation issued (HPD, open)
B
08/27/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/28/2024
Signed off — New Building
Filing Plumbing subsequent to primary application X00699014
X00699014-I1
05/29/2024
Signed off — Alteration
Filing Foundation and Support of Excavation in conjunction to primary application
X00732350-I1
01/19/2024
Signed off — Alteration
X00737235-I1
01/05/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/05/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
01/05/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
01/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/05/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
01/05/2024
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
01/05/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
01/05/2024
Special inspection requirement — Preliminary
FAHAD FATEH
01/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/05/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
01/05/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/05/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
01/05/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
01/05/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
01/05/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
01/05/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
01/05/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
01/05/2024
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
01/05/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
01/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/05/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
01/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/05/2024
Special inspection requirement — Metering
FAHAD FATEH
01/05/2024
Special inspection requirement — Air barrier — testing
FAHAD FATEH
01/05/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
01/05/2024
Special inspection requirement — Preliminary
FAHAD FATEH
01/05/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
01/05/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
01/05/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
01/05/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
01/01/2024
Filed — New Building
Filing Plumbing subsequent to primary application X00699014
X00699014-A1
12/20/2023
Signed off — New Building
Filing Plumbing subsequent to primary application X00699014
X00699014-Z1
12/14/2023
Signed off — New Building
Filing Plumbing subsequent to primary application X00699014
X00699014-S8
12/14/2023
Signed off — New Building
Filing Plumbing subsequent to primary application X00699014
X00699014-S9
12/14/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/13/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/06/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
12/06/2023
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
11/30/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/22/2023
Permit issued — Curb Cut
X00699014-S8-CC
11/22/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/21/2023
Filed — New Building
Filing Plumbing subsequent to primary application X00699014
X00699014-P9
11/21/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/20/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/14/2023
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED, PIPE SCAFFOLDING, AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00894033-I1
11/14/2023
Permit issued — Sprinklers
X00699014-S9-EW-SP
11/08/2023
Signed off — New Building
Filing Plumbing subsequent to primary application X00699014
X00699014-Z2
11/08/2023
Signed off — New Building
Filing Plumbing subsequent to primary application X00699014
X00699014-S3
11/08/2023
Signed off — New Building
Filing Plumbing subsequent to primary application X00699014
X00699014-Z3
11/08/2023
Objection resolved — Addressed
11/02/2023
Objection resolved — Addressed
10/31/2023
Filed — New Building
Filing Plumbing subsequent to primary application X00699014
X00699014-P8
Latest 60 of 173 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offINNOVATIVE CONSTR NYC LLC11/22/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC11/14/2023
DOB NOWMechanical SystemsSigned-offINNOVATIVE CONSTR NYC LLC10/10/2023
DOB NOWPlumbingSigned-offYG SERVICES INC08/10/2023
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES07/19/2023
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES07/19/2023
DOB NOWFoundationSigned-offINNOVATIVE CONSTR NYC LLC06/05/2023
DOB NOWEarth WorkSigned-offSKYWARD DEVELOPERS INC06/01/2023
DOB NOWGeneral ConstructionSigned-offINNOVATIVE CONSTR NYC LLC05/11/2023
DOB NOWStructuralSigned-offINNOVATIVE CONSTR NYC LLC05/11/2023
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC05/11/2023
DOB NOWConstruction FenceSigned-offINNOVATIVE CONSTR NYC LLC03/10/2023
DOB NOWConstruction FenceSigned-offSKYWARD DEVELOPERS INC07/20/2022
DOB NOWConstruction FenceSigned-offSKYWARD DEVELOPERS INC05/20/2022
BIS—ISSUEDYATZIV CORP04/21/2023
1 project · most recent 01/01/2024
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/01/2024Signed-offINNOVATIVE CONSTR NYC LLCHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Amana PTH153G35DXXX 15,000 BTU · Ptac ×255
PTH123G35DXXX 11,500 BTU · Ptac ×135
Heating
Qmark MUH0381 3 kW · Unit Heater ×20
MUH0581 5 kW · Unit Heater ×20
King W1215 175 CFM · Electric Heater ×20
Ventilation
Nutone BHF110 50 CFM · Exhaust Fan ×150
QTXEN150 100 CFM · Kitchen Exhaust ×150
Greenheck G-080-VG 200 CFM · Exhaust Fan ×5
G-140-VG 1,550 CFM · Exhaust Fan ×5
1 project · most recent 01/01/2024
Sprinkler System
FiledStatusContractorScope
01/01/2024Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 01/01/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/01/2024Signed-offMPI PLUMBING CORPGas, Storm, Water/Sanitary
3 projects · most recent 11/07/2023
General Wiring
FiledStatusContractorScope
11/07/2023CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
07/14/2023CompleteHIVOLTS ELECTRICAL INC—
07/09/2023CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 01/01/2024
FiledStatusContractorScope
01/01/2024Signed-offINNOVATIVE CONSTR NYC LLC3 scope_items
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
08/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/14/2023Pass-Final CND-Occupancy InspectionPassView ↗
12/13/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
12/06/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
12/06/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
11/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/22/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/02/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/15/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
08/24/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
01/05/2024Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
01/05/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
01/05/2024PreliminaryFAHAD FATEHprogress
01/05/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/05/2024Air barrier — testing FAHAD FATEHenergy_progress
01/05/2024Maintenance informationFAHAD FATEHenergy_progress
01/05/2024Exterior lighting powerFAHAD FATEHenergy_progress
01/05/2024Protection of exposed foundation insulationFAHAD FATEHenergy_progress
01/05/2024Fenestration air leakageFAHAD FATEHenergy_progress
01/05/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/05/2024Interior lighting powerFAHAD FATEHenergy_progress
01/05/2024MeteringFAHAD FATEHenergy_progress
01/05/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
01/05/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
01/05/2024Fenestration areasFAHAD FATEHenergy_progress
01/05/2024Lighting controlsFAHAD FATEHenergy_progress
01/05/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/05/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
01/05/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/05/2024MeteringFAHAD FATEHenergy_progress
01/05/2024Exterior lighting powerFAHAD FATEHenergy_progress
01/05/2024Fenestration air leakageFAHAD FATEHenergy_progress
01/05/2024Air barrier — testing FAHAD FATEHenergy_progress
01/05/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
01/05/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
Latest 25 of 150.
▾Documents — 174 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
08/24/2026X00737235-I1Request digital key ↗
08/24/2026X00776879-I1Request digital key ↗
08/22/2026X00894033-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION6
03/12/2024240318866Open ↗
03/05/2024240318866Open ↗
06/15/2023240318866Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
06/29/2023240318866Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026X00699014-P9Open ↗
08/13/2026X00699014-A1Open ↗
08/13/2026X00699014-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026X00699014-A1Open ↗
08/13/2026X00699014-P9Open ↗
08/13/2026X00699014-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00699014-I1Open ↗
▸Seals & Professional Certifications62
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/24/2026X00737235-I1Open ↗
08/24/2026X00776879-I1Open ↗
08/22/2026X00732350-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/27/2026X00699014-P1Open ↗
09/27/2026X00699014-P1Open ↗
09/24/2026X00699014-Z3Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/27/2026X00699014-P1Open ↗
09/27/2026X00699014-P1Open ↗
09/24/2026X00699014-Z3Open ↗
Showing 3 of 17 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/23/2022240318866Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026X00699014-P5Open ↗
08/13/2026X00699014-P1Open ↗
08/13/2026X00699014-P9Open ↗
Showing 3 of 5 on file for this type
▸BISELECTRIC CUT-OFF1
04/26/2023220740928Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
04/26/2023220740928Open ↗
▸Safety & Tenant Protection14
▸DOB NOWStreet Tree Checklist5
08/22/2026X00699014-I1Open ↗
08/22/2026X00699014-A1Open ↗
08/22/2026X00699014-P9Open ↗
Showing 3 of 5 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
04/26/2023220740928Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/26/2023220740928Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/27/2023240318866Open ↗
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
04/26/2023220740928Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/23/2023240318866Open ↗
▸BISSTREET TREE CHECKLIST1
06/27/2023240318866Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00699014-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00699014-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00699014-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/26/2023220740928Open ↗
▸BISRODENT CONTROL1
04/26/2023220740928Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00699014-Z1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00699014-I1Open ↗
▸Inspections & Test Reports10
▸DOB NOWSOIL REPORT4
08/13/2026X00732350-P1Open ↗
08/13/2026X00737235-I1Open ↗
08/13/2026X00732350-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Plot Diagram3
08/13/2026X00699014-S5Open ↗
08/13/2026X00737235-I1Open ↗
08/13/2026X00732350-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026X00699014-S5Open ↗
08/13/2026X00732350-I1Open ↗
08/13/2026X00737235-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION4
04/26/2023220740928Open ↗
04/26/2023220740928Open ↗
04/26/2023220740928Open ↗
Showing 3 of 4 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
04/26/2023220740928Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
04/26/2023220740928Open ↗
▸Filing & Intake Forms8
▸BISBOROUGH INTAKE FORM2
04/26/2023220740928Open ↗
04/13/2022220740928Open ↗
▸BISADDITIONAL INFORMATION2
06/27/2023240318866Open ↗
04/26/2023220740928Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
06/27/2023240318866Open ↗
▸BISEFILING COVER SHEET1
04/13/2022220740928Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/23/2022240318866Open ↗
▸DOB NOWAI1 Form1
08/13/2026X00699014-S8Open ↗
▸Other Documents21
▸DOB NOWSite Survey: Initial5
08/13/2026X00699014-P1Open ↗
08/13/2026X00699014-P5Open ↗
08/13/2026X00699014-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026X00699014-P1Open ↗
08/13/2026X00699014-I1Open ↗
08/13/2026X00699014-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/22/2026X00699014-A1Open ↗
08/22/2026X00699014-P9Open ↗
08/22/2026X00699014-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00737235-I1Open ↗
08/13/2026X00732350-I1Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
04/26/2023220740928Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
06/27/2023240318866Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
06/13/2023240318866Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00699014-I1Open ↗