← Back
Condo, residential unit in elevator building
Parkchester South Condominium
14 METROPOLITAN OVAL · BIN 2096724
💬 Discuss this project
0Year Built
—Stories
R4Building Class
R6Zoning
2,409,161 sfGross Floor Area
3,378Units
Rent Stabilized1,671 Open Violations 1,664 unresolved · 7 paperwork only ▸FISP: SAFE
Condo, residential unit in elevator building · Owner of record: PARKCHESTER SOUTH CONDOMINIUM ASSOC · 1,399,921 sf lot · 1.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof3p · 1 filing · 3 docs
Bulkhead1p · 1 filing · 3 docs
Floor 71p · 1 filing · 3 docs
Floor 6
Floor 51p · 1 filing · 3 docs
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY CORP503/22/2026
PARKCHESTER SOUTH CONDO1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONNOLLY ENGINEERING, PLLC101/09/2024
MOHAMMAD AHEAD, PE104/09/2023
RIMKUS NEW YORK PLLC111/02/2022
GREEN DESIGN106/18/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.203/21/2026
ARSENAL BUILDING CONSULTANTS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS GROUP NY CORPGeneral Contractor303/21/2026
PROTO RESTORATION CONSTRUCTIONGeneral Contractor303/21/2026
LEMX CORPGeneral Contractor207/08/2026
ALEXANDER EUGENEElectrical103/21/2026
HEMANCHAL DEONARINEElectrical103/21/2026
VINCO BUILDERS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONNOLLY ENGINEERING, PLL3427201/09/2024
OUTSOURCE SPECIAL INSPECT2827101/09/2024
RIMKUS NEW YORK, PLLC8123111/02/2022
Building Lifecycle
All (94)Filed (4)Permit Issued (5)Signed Off (4)Facade (FISP) (12)Violation (60)Objection (8)Special Inspection (1)
06/20/2026
Violation issued (HPD, closed)
C
06/27/2025
Violation issued (HPD, closed)
B
06/27/2025
Violation issued (HPD, closed)
B
04/29/2024
Signed off — Alteration
THIS APPLICATION IS BEING FILED FOR STRUCTURAL WORK AT THE SUBJECT PREMISES FOR THE REPAIR OF THE UNDERSIDE INTERIOR OF THE CEILING SLAB AS PER PLANS AT APTS 5A, 7A, 7B, 7C, 7D, 7E, 7F, 7G, 7H & HALLWAY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00958700-I1
03/11/2024
Signed off — Alteration
X00843161-I1
02/12/2024
Cycle 9 facade report submitted
02/12/2024
Cycle 9 facade report signed — SAFE
02/09/2024
Permit issued — General Construction
X00958700-I1-GC-CX
02/09/2024
Cycle 9 facade inspection completed
01/17/2024
Objection resolved — Addressed
01/16/2024
Objection raised — Inspections
01/09/2024
Filed — Alteration
THIS APPLICATION IS BEING FILED FOR STRUCTURAL WORK AT THE SUBJECT PREMISES FOR THE REPAIR OF THE UNDERSIDE INTERIOR OF THE CEILING SLAB AS PER PLANS AT APTS 5A, 7A, 7B, 7C, 7D, 7E, 7F, 7G, 7H & HALLWAY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00958700-I1
11/22/2023
Violation issued (HPD, closed)
C
11/02/2023
Violation issued (HPD, open)
C
11/02/2023
Violation issued (HPD, closed)
B
11/02/2023
Violation issued (HPD, closed)
C
11/02/2023
Violation issued (HPD, closed)
B
11/02/2023
Violation issued (HPD, closed)
B
11/02/2023
Violation issued (HPD, closed)
A
11/02/2023
Violation issued (HPD, closed)
C
10/31/2023
Signed off — Alteration
FILED HEREWITH FOR ROOF COVERING REPLACEMENT AND RAILING INSTALLATION WORK AS SHOWN ON PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X08026533-I1
10/11/2023
Violation issued (HPD, closed)
B
05/04/2023
Permit issued — General Construction
X08026533-I1-GC
04/10/2023
Permit issued — Sidewalk Shed
X00843161-I1-SH
04/09/2023
Filed — Alteration
X00843161-I1
03/26/2023
Violation issued (HPD, closed)
B
03/26/2023
Violation issued (HPD, closed)
B
03/26/2023
Violation issued (HPD, closed)
B
03/19/2023
Violation issued (HPD, closed)
A
03/19/2023
Violation issued (HPD, closed)
C
03/19/2023
Violation issued (HPD, closed)
C
03/19/2023
Violation issued (HPD, closed)
B
02/17/2023
Violation issued (HPD, closed)
B
02/17/2023
Violation issued (HPD, closed)
B
02/17/2023
Violation issued (HPD, open)
C
02/17/2023
Violation issued (HPD, closed)
B
02/17/2023
Violation issued (HPD, closed)
B
11/27/2022
Violation issued (HPD, open)
B
11/27/2022
Violation issued (HPD, open)
B
11/27/2022
Violation issued (HPD, open)
B
11/27/2022
Violation issued (HPD, open)
B
11/27/2022
Violation issued (HPD, open)
B
11/27/2022
Violation issued (HPD, open)
B
11/27/2022
Violation issued (HPD, closed)
B
11/27/2022
Violation issued (HPD, closed)
B
11/27/2022
Violation issued (HPD, open)
B
11/27/2022
Violation issued (HPD, closed)
B
11/27/2022
Violation issued (HPD, open)
B
11/03/2022
Objection raised — Structural
11/03/2022
Objection resolved — Addressed
11/03/2022
Objection raised — Scope
11/03/2022
Objection resolved — Addressed
11/03/2022
Objection raised — Other
11/03/2022
Objection resolved — Addressed
11/02/2022
Filed — Alteration
FILED HEREWITH FOR ROOF COVERING REPLACEMENT AND RAILING INSTALLATION WORK AS SHOWN ON PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X08026533-I1
09/21/2022
Violation issued (HPD, open)
C
09/21/2022
Violation issued (HPD, open)
C
06/28/2022
Violation issued (HPD, closed)
A
06/28/2022
Violation issued (HPD, closed)
A
06/28/2022
Violation issued (HPD, closed)
C
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offVINCO BUILDERS LLC02/09/2024
DOB NOWGeneral ConstructionSigned-offPROTO RESTORATION CONSTRU05/04/2023
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP04/10/2023
DOB NOWSidewalk ShedSigned-offLEMX CORP12/18/2020
DOB NOWSidewalk ShedSigned-offLEMX CORP06/18/2020
BISOTISSUEDJEPOL CONSTRUCTION INC02/02/2021
BISOTISSUEDJEPOL CONSTRUCTION INC08/06/2020
BISOTISSUEDTWO-TONE CONTRACTING CORP.01/23/2020
BISOTISSUEDPPC CONSTRUCTION LLC07/17/2000
BISPLRE-ISSUEDBLUEPRINT PLG CORP05/09/2000
BISOTISSUEDPPC CONSTRUCTION LLC05/09/2000
2 projects · most recent 04/10/2023
FiledStatusContractorScope
04/10/2023Permit IssuedHIGH QUALITY ELECTRIC OF—
06/19/2020CompleteELPO ELECTRICAL CONTG INC—
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
06/18/2020FinalBRIAN T. O'CONNORprogress
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/23/2026X00843161-I1Request digital key ↗
08/21/2026X00958700-I1Request digital key ↗
08/15/2026X08026533-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00359614-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
04/24/2020220726864Open ↗
04/21/2020220726864Open ↗
02/25/2020220726864Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
08/10/2020220726864Open ↗
01/24/2020220693587Open ↗
▸Seals & Professional Certifications9
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
08/10/2020220726864Open ↗
02/25/2020220726864Open ↗
01/24/2020220693587Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026X00359614-I1Open ↗
08/23/2026X00843161-I1Open ↗
08/21/2026X00958700-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026X00359614-I1Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
02/25/2020220726864Open ↗
11/13/2019220693587Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00359614-I1Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/31/2020220726864Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/24/2020220693587Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026X00958700-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026X08026533-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/24/2020220726864Open ↗
08/06/2020220726864Open ↗
06/02/2020220693587Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/25/2020220726864Open ↗
11/13/2019220693587Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
11/30/2023220726864Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/02/2020220693587Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/30/2023220726864Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/30/2023220726864Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/31/2020220726864Open ↗
06/02/2020220693587Open ↗
04/27/2020220726864Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/30/2023220726864Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/30/2023220726864Open ↗
▸BISMASONRY1
11/30/2023220726864Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION5
04/27/2020220726864Open ↗
04/27/2020220726864Open ↗
04/27/2020220726864Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/01/2023220726864Open ↗
06/02/2020220693587Open ↗
▸BISFINAL1
11/30/2023220726864Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT5
07/31/2020220726864Open ↗
06/02/2020220693587Open ↗
04/27/2020220726864Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/30/2023220726864Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET3
04/27/2020220726864Open ↗
02/25/2020220726864Open ↗
11/13/2019220693587Open ↗
▸BISADDITIONAL INFORMATION3
02/25/2020220726864Open ↗
01/14/2020220693587Open ↗
11/13/2019220693587Open ↗
▸BISBOROUGH INTAKE FORM1
04/24/2020220726864Open ↗