RoofUnder Construction47p · 5 filings · 20 docs
ArchitectureDMEquipmentMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents · 9 drawing sheets
OUTRIGGERS SYSTEM AND HOIST INSTALLATION FOR FACADE REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 27Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 26Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 25Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 24Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 23Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 22Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 21Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 20Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 19Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 18Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 17Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 16Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 15Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 14Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 13Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 12Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 11Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 10Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 9Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 8Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 7Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 6Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 5Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 4Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 3Under Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 2Under Construction68p · 4 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents · 16 drawing sheets
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents · 6 drawing sheets
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 1Under Construction53p · 5 filings · 20 docs
ArchitectureEquipmentMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 5 filings on this floor.
CellarUnder Construction8p · 1 filing · 6 docs
Plumbing
Issued Permit Scope
Plumbing
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Sub-BasementUnder Construction52p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.
On file for this project
13 documents
General Construction work for main entry plaza & driveway reconstruction, interior at basement lobby & common areas throughout including storefront windows & non-structural partitions & hallway renovations. No change to use, egress or occupancy.
On file for this project
8 documents
Plumbing work for domestic hot water system upgrade, domestic water pressure booster pump system, water riser replacement, new water piping insulation; drain repair & sanitary main waste clean-outs & trap repair. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.