0 Active ViolationsFDNY Report ↗
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofGreen Street Group USA LLC67p · 3 filings · 20 docs
BulkheadGreen Street Group USA LLC7p · 3 filings · 20 docs
Floor 4Unit 4L72p · 4 filings · 20 docs
Floor 3Green Street Group USA LLC72p · 4 filings · 20 docs
Floor 2Green Street Group USA LLC72p · 4 filings · 20 docs
Floor 1Green Street Group USA LLC74p · 4 filings · 20 docs
Site & exterior140 Central AV. LLC26p · 6 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
140 Central Av108/31/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Associates506/02/2026
Ashraf505/27/2025
Yaker Engineering801/22/2025
Mohammad Ahead, PE104/27/2022
Diego Aguilera Architects102/19/2021
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing3941206/02/2026
Metric Consulting and Ins1803201/22/2025
Building Lifecycle
All (90)Filed (19)Signed Off (9)Violation (7)Objection (25)Special Inspection (30)
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/05/2026
Special inspection requirement — Maintenance information
Paul Raymond
06/05/2026
Special inspection requirement — Heating Systems
Paul Raymond
06/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
06/05/2026
Special inspection requirement — Shutoff dampers
Paul Raymond
06/05/2026
Special inspection requirement — Mechanical Systems
Paul Raymond
06/05/2026
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
06/05/2026
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
06/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
06/05/2026
Special inspection requirement — Final
Paul Raymond
06/05/2026
Special inspection requirement — Duct leakage testing, insulation and design
Paul Raymond
06/05/2026
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
06/02/2026
Filed — Alteration
installation for mechanical split air conditioner units
B00440317-P5
06/01/2026
Special inspection requirement — Heating Systems
Paul Raymond
06/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
06/01/2026
Special inspection requirement — Duct leakage testing, insulation and design
Paul Raymond
06/01/2026
Special inspection requirement — Mechanical Systems
Paul Raymond
06/01/2026
Special inspection requirement — Final
Paul Raymond
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/01/2026
Special inspection requirement — Shutoff dampers
Paul Raymond
06/01/2026
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
06/01/2026
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
06/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
06/01/2026
Special inspection requirement — Maintenance information
Paul Raymond
06/01/2026
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
02/13/2026
Filed — Alteration
installation for mechanical split air conditioner units
B00440317-P4
02/10/2026
Signed off — Alteration
PROVIDE NEW PLUMBING SYSTEM {DOMESTIC WATER SYSTEM, STORM WATER SYSTEM, SANITARY WATER SYSTEM) FOR ENTIRE BUILDING
B00433488-I1
02/10/2026
Special inspection requirement — Final
Paul Raymond
02/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
02/10/2026
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
02/10/2026
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
02/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
02/10/2026
Special inspection requirement — Shutoff dampers
Paul Raymond
02/09/2026
Signed off — Alteration
Filing for a partial hand held demolition of a CMU shaft of a 4 story new building.
B00460550-I1
02/09/2026
Signed off — Alteration
B00464662-I1
11/11/2025
Signed off — Alteration
B00460511-I1
09/17/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01106534-I1
09/17/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01038716-I1
09/17/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
B01106537-I1
09/17/2025
Signed off — Alteration
new construction fence in conjunction with 340779580
B00433358-I1
07/09/2025
Violation issued (ECB, closed)
Construction
07/09/2025
Violation issued (ECB, closed)
Unknown
05/27/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01038716-P1
04/10/2025
Objection raised — Plumbing
03/27/2025
Objection resolved — Addressed
03/21/2025
Objection raised — Plumbing
03/19/2025
Filed — Alteration
FILING FOR EXTERIOR PLUMBING WORK IN CONJUCTION WITH NB#340779580
B01197389-I1
03/04/2025
Violation issued (ECB, closed)
Construction
03/04/2025
Violation issued (ECB, closed)
Construction
01/22/2025
Filed — Alteration
Filing for a partial hand held demolition of a CMU shaft of a 4 story new building.
B00460550-P5
01/14/2025
Violation issued (ECB, closed)
Construction
12/19/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01106534-P1
09/30/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01106534-I1
09/30/2024
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
B01106537-I1
08/29/2024
Filed — Alteration
Filing for a partial hand held demolition of a CMU shaft of a 4 story new building.
B00460550-P3
05/27/2024
Signed off — Alteration
B00725730-I1
04/19/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01038716-I1
04/06/2024
Filed — Alteration
Filing for a partial hand held demolition of a CMU shaft of a 4 story new building.
B00460550-P2
07/28/2022
Violation issued (ECB, closed)
Construction
07/28/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 90 events.
Nothing on file for this building.
1 project · most recent 06/02/2026
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/02/2026Signed-offM.N.C. General ContractingAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-SM42NAMHZ2 42,000 BTU · Heat Pump Outdoor ×22
MXZ-St.442NAMHZ2 42,000 BTU · Vrf Outdoor ×3
Heating
Stelpro ASS01001WCW 3,840 BTU · Baseboard ×15
Ventilation
Greenheck G-080-VG, G-090-VG, G-097-VG, SQ-60-VG 200 CFM · Exhaust Fan ×12
Ducts & Piping
Smacna/Nibco SMACNA Standard Galvanized Steel Ductwork / NIBCO Piping 50 CFM · Ductwork ×12
1 project · most recent 03/19/2025
Storm Water/Sanitary
FiledStatusContractorScope
03/19/2025——Storm, Water/Sanitary
2 projects · most recent 05/05/2026
General Wiring
FiledStatusContractorScope
05/05/2026CompleteNion ElectricGeneral Wiring
04/19/2024CompleteRichard Neu—
1 project · most recent 01/22/2025
FiledStatusContractorScope
01/22/2025Signed-offM.N.C. General Contracting1 scope_items
▾Special Inspection Requirements (DOB NOW) — 87
DateRequirementInspectorRole
06/05/2026Heating SystemsPaul Raymondspecial
06/05/2026HVAC and service water heating system controls Paul Raymondenergy_progress
06/05/2026Shutoff dampersPaul Raymondenergy_progress
06/05/2026Duct leakage testing, insulation and designPaul Raymondenergy_progress
06/05/2026HVAC insulation and sealing Paul Raymondenergy_progress
06/05/2026HVAC and service water heating equipment Paul Raymondenergy_progress
06/05/2026Maintenance informationPaul Raymondenergy_progress
06/05/2026Energy Code Compliance InspectionsPaul Raymondprogress
06/05/2026FinalPaul Raymondprogress
06/05/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
06/05/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/05/2026Mechanical SystemsPaul Raymondspecial
06/01/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/01/2026Duct leakage testing, insulation and designPaul Raymondenergy_progress
06/01/2026HVAC and service water heating system controls Paul Raymondenergy_progress
06/01/2026HVAC and service water heating equipment Paul Raymondenergy_progress
06/01/2026Shutoff dampersPaul Raymondenergy_progress
06/01/2026HVAC insulation and sealing Paul Raymondenergy_progress
06/01/2026Maintenance informationPaul Raymondenergy_progress
06/01/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
06/01/2026FinalPaul Raymondprogress
06/01/2026Energy Code Compliance InspectionsPaul Raymondprogress
06/01/2026Mechanical SystemsPaul Raymondspecial
06/01/2026Heating SystemsPaul Raymondspecial
02/10/2026HVAC insulation and sealing Paul Raymondenergy_progress
Latest 25 of 87.
▾Documents — 117 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch8
09/01/2026B00460550-S1Request digital key ↗
08/29/2026B00725730-I1Request digital key ↗
08/24/2026B01106537-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Structural5
09/01/2026B00460550-I1Request digital key ↗
09/01/2026B00460550-P3Request digital key ↗
09/01/2026B00460550-P5Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/18/2026B00440317-I1Request digital key ↗
08/18/2026B00440317-P5Request digital key ↗
08/15/2026B00440317-P4Request digital key ↗
▸DOB NOWPlans/Sketch - Foundation1
09/01/2026B00464662-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/14/2026B00433488-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/14/2026B00433488-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/01/2026B00433358-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Support of Excavation1
09/01/2026B00460511-I1Request digital key ↗
▸Seals & Professional Certifications94
▸DOB NOWSpecial Inspector Seal & Signature44
09/01/2026B00460550-P3Open ↗
09/01/2026B00460550-P3Open ↗
09/01/2026B00460550-P3Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/01/2026B00460550-P3Open ↗
08/29/2026B00460550-I1Open ↗
08/25/2026B00460550-P1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/02/2026B00433488-I1Open ↗
09/01/2026B00460550-I1Open ↗
09/01/2026B00460550-P1Open ↗
Showing 3 of 19 on file for this type
▸Other Documents2
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
09/01/2026B00460550-I1Open ↗
▸DOB NOWAdjoining Owners Notification1