← Back
Office only, 2-6 stories
140 E 62ND STREET
MANHATTAN · BIN 1083880
💬 Discuss this project
1910Year Built
5Stories
O2Building Class
R8BZoning
30,946 sfGross Floor Area
3Units
LL97 Covered1 Open Violation ▸FDNY Report ↗
Office only, 2-6 stories · Owner of record: ANDREW W MELLON FOUNDATION · 12,049 sf lot · 2.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof3p · 4 filings · 20 docs
Floor 54p · 3 filings · 20 docs
Floor 42p · 2 filings · 20 docs
Floor 33p · 3 filings · 20 docs
Floor 26p · 4 filings · 20 docs
Floor 17p · 4 filings · 20 docs
Cellar5p · 3 filings · 19 docs
Basement3p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY407/08/2026
ANDREW W MELLON FOUNDATION6607/08/2026
UNIVERSAL SYSTEMS INC.903/22/2026
ELSYIUM CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J. CALLAHAN CONSULTING, INC.403/21/2026
J CALLAHAN CONSULTING2403/21/2026
JM ZONING, LLC.503/21/2026
EUROCELT EXPEDITING, INC403/21/2026
GREEN STUDIO203/21/2026
ORGANISATION ARCHITECTURE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ELYSIUM CONSTRUCTION INCGeneral Contractor1107/08/2026
UNIVERSAL SYSTEMS INCGeneral Contractor603/21/2026
THE METRO GROUP, INCGeneral Contractor303/21/2026
PERFECTAIRE CO INCGeneral Contractor203/21/2026
CITY/SUBURBAN PLBG CORPPlumbing107/08/2026
M&T PLBG AND HTG CO., INCPlumbing107/08/2026
PATRIOT ELECTRIC CORPElectrical103/22/2026
VITELLO SEWER W.M H&P SERPlumbing107/08/2026
POWER CONNECT ELECTRIC COElectrical103/22/2026
EMG INDUSTRIAL CHIMNEY INGeneral Contractor107/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.254209/25/2024
NEW AGE ENGINEERING PLLC7746106/06/2024
SPECIAL INSPECTION SERVIC1200402/24/2022
AK ENGINEERING PC678112/22/2020
Building Lifecycle
All (123)Filed (22)Permit Issued (15)Signed Off (12)Violation (14)Inspection (8)Objection (22)Special Inspection (30)
07/06/2026
Signed off — Alteration
Installation of Temporary Structural Bracing to support Interior Demolition and Alteration work noted in Job Numbers M00537595 and M00512019. No change in Use, Egress or Occupancy.
M00611225-I1
06/12/2026
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00700803-I1
06/08/2026
Signed off — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00619793-I1
06/08/2026
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00619815-I1
05/15/2025
Signed off — Alteration
THE SCOPE OF WORK INCLUDES THE INSTALLATION OF NEW LINER FOR EXISTING BOILER AND WATER HEATER VENTING WITHIN EXISTING CHIMNEY FROM CELLAR LEVEL TO ROOF LEVEL. TWO SEPARATE COMBUSTION AIR INTAKE FANS INSTALLED IN EACH RESPECTIVE BOILER ROOM. CONTINUED...
M00441516-I1
02/13/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/04/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/23/2025
Signed off — Alteration
FILING HEREWITH INTERIOR DEMOLITION AND RENOVATION ON THE BASEMENT, 1ST AND 2ND FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00512019-I1
01/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
Kimberly Yao
01/13/2025
Special inspection requirement — Final
Kimberly Yao
01/13/2025
Special inspection requirement — Interior lighting power
Kimberly Yao
01/09/2025
Filed — Alteration
FILING HEREWITH INTERIOR DEMOLITION AND RENOVATION ON THE BASEMENT, 1ST AND 2ND FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00512019-P2
01/08/2025
Special inspection requirement — Final
Kimberly Yao
01/08/2025
Special inspection requirement — Interior lighting power
Kimberly Yao
01/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
Kimberly Yao
11/01/2024
Signed off — Alteration
This Alteration application is being filed for the replacement of boiler and hot water pump. There are no change in use, egress or occupancy.
M00999168-I1
10/11/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
10/04/2024
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
09/25/2024
Filed — Alteration
This Alteration application is being filed for the replacement of boiler and hot water pump. There are no change in use, egress or occupancy.
M00999168-P1
09/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
09/25/2024
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
09/23/2024
Signed off — Alteration
FILING HEREWITH INSTALLATION OF HVAC SYSTEM ON THE BASEMENT,1ST,2ND,3RD 5TH AND ROOF AS INDICATED ON THE DRAWINGS NO. CHANGE IN USE, EGRESS OR OCCUPANCY.
M00589845-I1
08/12/2024
Signed off — Alteration
FILING HEREWITH STRUCTURAL WORK ON THE 1ST & 2ND FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00537595-I1
07/25/2024
Signed off — Alteration
M00936599-I1
06/06/2024
Filed — Alteration
M00936599-I1
06/06/2024
Permit issued — Mechanical Systems
M00936599-I1-MS
05/20/2024
Signed off — Alteration
HEREWITH FILING FOR UNDERGROUND PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01004468-I1
05/15/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/13/2024
Permit issued — Boiler Equipment
M00999168-I1-BE
05/01/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/30/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/03/2024
Objection resolved — Addressed
03/28/2024
Objection raised — Scope
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection raised — Fire_Protection
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection raised — Admin
03/18/2024
Filed — Alteration
This Alteration application is being filed for the replacement of boiler and hot water pump. There are no change in use, egress or occupancy.
M00999168-I1
02/29/2024
Permit issued — Plumbing
M01004468-I1-PL
02/24/2024
Filed — Alteration
HEREWITH FILING FOR UNDERGROUND PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01004468-I1
10/20/2023
Violation issued (FDNY_ORDER, closed)
10/10/2023
Filed — No Work
M00939017-I1
10/10/2023
Objection raised — Admin
10/10/2023
Objection resolved — Addressed
10/10/2023
Objection raised — Inspections
10/10/2023
Objection resolved — Addressed
09/26/2023
Filed — Alteration
M00923953-I1
05/02/2023
Objection resolved — Addressed
05/01/2023
Objection resolved — Addressed
04/29/2023
Objection raised — Other
04/29/2023
Objection raised — Structural
04/28/2023
Filed — No Work
M00866769-I1
04/27/2023
Signed off — Alteration
FILING HEREWITH MODIFICTION OF PLUMBINGS WORK ON THE BASEMENT, 1ST2ND,3RD,4TH AND ROOF AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00589905-I1
03/30/2023
Filed — Alteration
FILING HEREWITH INTERIOR DEMOLITION AND RENOVATION ON THE BASEMENT, 1ST AND 2ND FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00512019-P1
03/24/2023
Objection raised — Scope
03/24/2023
Objection raised — Scope
03/24/2023
Objection raised — Scope
03/24/2023
Objection raised — Scope
03/17/2023
Filed — Alteration
HEREWITH FILING CIVIL WORK & MODIFICAION TO EXISTING PLUMBING SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00429167-I1
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTHE METRO GROUP, INC06/06/2024
DOB NOWBoiler EquipmentSigned-offCITY/SUBURBAN PLBG CORP05/13/2024
DOB NOWPlumbingSigned-offVITELLO SEWER W.M H&P SER02/29/2024
DOB NOWGeneral ConstructionSigned-offELYSIUM CONSTRUCTION INC07/13/2022
DOB NOWStructuralSigned-offELYSIUM CONSTRUCTION INC07/12/2022
DOB NOWSidewalk ShedSigned-offUNIVERSAL SYSTEMS INC11/01/2021
DOB NOWStructuralSigned-offELYSIUM CONSTRUCTION INC10/29/2021
DOB NOWSupported ScaffoldSigned-offUNIVERSAL SYSTEMS INC10/27/2021
DOB NOWMechanical SystemsSigned-offPERFECTAIRE CO INC10/27/2021
DOB NOWPlumbingSigned-offM&T PLBG AND HTG CO., INC10/15/2021
DOB NOWStructuralSigned-offELYSIUM CONSTRUCTION INC08/09/2021
DOB NOWGeneral ConstructionSigned-offELYSIUM CONSTRUCTION INC08/09/2021
DOB NOWGeneral ConstructionSigned-offELYSIUM CONSTRUCTION INC07/12/2021
DOB NOWStructuralSigned-offELYSIUM CONSTRUCTION INC07/02/2021
DOB NOWMechanical SystemsSigned-offEMG INDUSTRIAL CHIMNEY IN02/25/2021
BISOTISSUEDKELCO CONSTRUCTION INC05/15/2023
BISOTISSUEDKELCO CONSTRUCTION INC05/18/2021
BISOTISSUEDSTAMFORD TENT & EQUIP CO07/19/2019
BISOTISSUEDSTAMFORD TENT & EQUIP CO03/12/2018
BISOTISSUEDYORKE CONSTRUCTION CORP04/07/2005
BISOTISSUEDYORKE CONSTRUCTION CORP04/14/2004
BISOTISSUEDYORKE CONSTRUCTION CORP08/25/2003
2 projects · most recent 09/26/2023
Water/Sanitary
FiledStatusContractorScope
09/26/2023——Water/Sanitary
03/17/2023——Water/Sanitary
6 projects · most recent 08/17/2023
General Wiring Lighting
FiledStatusContractorScope
08/17/2023CompletePATRIOT ELECTRIC CORPGeneral Wiring
11/17/2022CancelledPOWER CONNECT ELECTRIC COGeneral Wiring, Lighting
10/25/2021CompleteTOP SHELF ELECTRIC CORP—
07/19/2021CompletePATRIOT ELECTRIC CORP—
04/13/2021Permit IssuedALLIANCE ELEVATOR COMPANY—
04/27/2019CompleteKWONG MING ELECTRIC INCGeneral Wiring
1 project · most recent 10/24/2021
FiledStatusContractorScope
10/24/2021Signed-offELYSIUM CONSTRUCTION INC1 scope_items
3 projects · most recent 03/18/2022
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/18/2022——Scaffold
10/27/2021Signed-offUNIVERSAL SYSTEMS INCScaffold
10/27/2021Signed-offUNIVERSAL SYSTEMS INCSidewalk Shed
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/13/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/04/2025Fail-Final General Construction Non-Directive 14FailView ↗
10/11/2024Pass-Final Boiler Equipment InspectionPassView ↗
05/15/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/01/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/30/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
01/13/2025Fire-Resistance Rated ConstructionKimberly Yaoprogress
01/13/2025FinalKimberly Yaoprogress
01/13/2025Interior lighting powerKimberly Yaoenergy_progress
01/08/2025FinalKimberly Yaoprogress
01/08/2025Interior lighting powerKimberly Yaoenergy_progress
01/08/2025Fire-Resistance Rated ConstructionKimberly Yaoprogress
10/04/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
10/04/2024Heating SystemsMAURICIO ANDRADEspecial
09/25/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
09/25/2024Heating SystemsMAURICIO ANDRADEspecial
03/02/2022FinalChristopher Drutjonsprogress
03/02/2022Structural Steel - DetailsChristopher Drutjonsspecial
03/02/2022Structural Wood FrameChristopher Drutjonsprogress
03/02/2022Structural Stability – Alterations of existing buildingsChristopher Drutjonsspecial
03/02/2022Structural Steel - WeldingChristopher Drutjonsspecial
03/02/2022Structural Steel - High Strength BoltingChristopher Drutjonsspecial
03/02/2022Post-installed AnchorsChristopher Drutjonsspecial
02/24/2022Structural Steel - WeldingChristopher Drutjonsspecial
02/24/2022Post-installed AnchorsChristopher Drutjonsspecial
02/24/2022Structural Stability – Alterations of existing buildingsChristopher Drutjonsspecial
02/24/2022Structural Steel - DetailsChristopher Drutjonsspecial
02/24/2022Structural Steel - High Strength BoltingChristopher Drutjonsspecial
02/24/2022FinalChristopher Drutjonsprogress
02/24/2022Structural Wood FrameChristopher Drutjonsprogress
10/13/2021Structural Stability – Alterations of existing buildingsChristopher Drutjonsspecial
Latest 25 of 32.
▾Documents — 165 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch17
09/03/2026M00589845-I1Request digital key ↗
09/03/2026M00611225-I1Request digital key ↗
09/03/2026M00619793-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
08/15/2026M08002090-I1Request digital key ↗
08/15/2026M00866769-I1Request digital key ↗
08/14/2026M00939017-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/14/2026M00429167-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00441516-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
02/11/2021140982355Open ↗
01/14/2021140982355Open ↗
01/11/2021140982355Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
05/15/2023140982355Open ↗
05/15/2023140982355Open ↗
07/19/2019123496118Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/09/2021140982355Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
02/09/2021140982355Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/09/2021140982355Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
02/09/2021140982355Open ↗
▸Seals & Professional Certifications60
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/04/2026M00441516-I1Open ↗
09/03/2026M00589845-I1Open ↗
09/03/2026M00619793-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026M00999168-I1Open ↗
09/01/2026M00999168-P1Open ↗
08/31/2026M00611225-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026M00512019-P2Open ↗
09/01/2026M00512019-P2Open ↗
09/01/2026M00512019-P2Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/03/2018123496118Open ↗
03/27/2018123384943Open ↗
03/13/2018123384943Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/03/2018123496118Open ↗
03/13/2018123384943Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/03/2018123496118Open ↗
03/13/2018123384943Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/07/2020140982355Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/03/2026M00589845-I1Open ↗
09/03/2026M00589905-I1Open ↗
08/13/2026M00537595-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026M00936599-I1Open ↗
08/13/2026M00999168-I1Open ↗
08/13/2026M00429167-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/07/2020140982355Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/24/2021140982355Open ↗
02/11/2021140982355Open ↗
12/07/2020140982355Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00589845-I1Open ↗
08/13/2026M00512019-I1Open ↗
▸BISLIGHTING CONTROLS1
07/06/2022140982355Open ↗
▸BISEXTERIOR LIGHTING POWER1
07/06/2022140982355Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/06/2022140982355Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY5
03/24/2021140982355Open ↗
12/31/2020140982355Open ↗
12/07/2020140982355Open ↗
Showing 3 of 5 on file for this type
▸BISSUBGRADE INSP / SOILS-SITE PREP1
07/06/2022140982355Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
03/24/2021140982355Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
03/24/2021140982355Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
07/06/2022140982355Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
07/06/2022140982355Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
05/19/2023140982355Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/06/2022140982355Open ↗
▸Approvals, Objections & Sign-offs25
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
09/04/2026M00441516-I1Open ↗
09/03/2026M00589845-I1Open ↗
09/03/2026M00589905-I1Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
05/15/2023140982355Open ↗
12/31/2020140982355Open ↗
12/31/2020140982355Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/19/2023140982355Open ↗
09/28/2020123496118Open ↗
03/27/2018123384943Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT (FINAL): PW31
07/06/2022140982355Open ↗
▸BISCOST AFFIDAVIT1
12/07/2020140982355Open ↗
▸Filing & Intake Forms8
▸BISBOROUGH INTAKE FORM3
05/15/2023140982355Open ↗
05/12/2023140982355Open ↗
03/27/2018123384943Open ↗
▸BISADDITIONAL INFORMATION2
01/27/2021140982355Open ↗
12/31/2020140982355Open ↗
▸BISEFILING COVER SHEET2
10/03/2018123496118Open ↗
03/13/2018123384943Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/07/2020140982355Open ↗
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/13/2026M00999168-I1Open ↗
08/13/2026M00999168-P1Open ↗