140 EAST 28TH STREET
MANHATTAN · Gramercy · BIN 1018189
💬 Discuss this project
1931Year Built
13Stories
D4Building Class
R8BZoning
98,359 sfGross Floor Area
108Units
LL97 CoveredRent Stabilized26 Active Violations 8 likely answered ▸FISP: UNSAFE
Elevator cooperative · Owner of record: 140 E 28 St Ownrs · 11,109 sf lot · 8.85 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNew Cingular Wireless Pcs, LLCUnder Construction4p · 6 filings · 18 docs
BulkheadConcrete roof slab with lifeline1p · 1 filing · 3 docs
PenthouseUnit PHAUnder Construction12p · 1 filing · 20 docs
Floor 11Unit 11D6p · 2 filings · 17 docs
Floor 10Unit 10G1 filing · 2 docs
Floor 9
Floor 8
Floor 7Unit 7GUnder Construction7p · 1 filing · 9 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Unit 2BUnder Construction38p · 1 filing · 9 docs
Floor 1New Cingular Wireless Pcs, LLC9p · 4 filings · 13 docs
CellarBoiler and hot water heater replacement6p · 5 filings · 20 docs
Sub-Cellar140 East 28 Owners CORP.Under Construction11p · 2 filings · 20 docs
Site & exteriorLight duty pipe scaffoldUnder Construction15p · 4 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
140 East 28 Owners7510/13/2026
Maxwell - Kates403/21/2026
Mastec Network Solutions307/08/2026
81 Street Dwelling303/21/2026
140 East 28th Street203/21/2026
140 E 28 ST203/21/2026
28th Street203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Fmo Engineering509/04/2026
Architecturefirm108/25/2026
Craft Design Architecture708/04/2026
Chong306/02/2026
KZ Engineering102/04/2026
Mohammad Ahead, PE211/14/2025
John M Banks Architect101/07/2025
Always Fast Services109/23/2024
Lane Engineering Consulting208/01/2024
Moschella Roberts Architects301/26/2024
Ashraf111/06/2023
Bazini Engineering307/17/2023
Moore105/26/2022
Arquitectura Varela109/09/2021
Haider Engineering, P.E205/02/2019
Tectonic Engineering102/15/2018
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold809/07/2026
C. McCormackGeneral Contractor407/08/2026
Billy EnterprisesScaffold303/21/2026
Kings Group NYScaffold303/21/2026
Ecny Electrical ContractorsElectrical203/22/2026
CH Design ConstructionGeneral Contractor208/16/2026
Rainier Restorationspecialty_contractor207/08/2026
Aarco ContractingGeneral Contractor207/08/2026
Levest Electricspecialty_contractor203/21/2026
Next Solutions C.SGeneral Contractor207/08/2026
Arco Plumbing and HeatingPlumbing109/13/2026
Demar MechanicalPlumbing107/08/2026
Essential Plumbing & HeatingPlumbing106/28/2026
Leader Electric CoElectrical103/21/2026
Gregg NY PlumbingPlumbing107/08/2026
L J Electrical ServiceElectrical103/22/2026
Star Electrical ContractorsElectrical103/22/2026
Y.S. ElectricElectrical103/21/2026
American Ventilation Servicespecialty_contractor107/08/2026
Leardon Boiler Worksspecialty_contractor107/08/2026
No Limit ContractingGeneral Contractor109/12/2026
Rise Construction SolutioGeneral Contractor107/08/2026
Aarco ContractingScaffold104/09/2026
Ecto RestorationScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Fmo Engineering1798509/04/2026
Katz Architecture1371409/04/2026
Craft Design Architecture4030708/04/2026
Chong Engineering7411306/02/2026
KZ Engineering4665102/04/2026
R Marsac Consulting329101/07/2025
Lane Engineering Consulting2967208/01/2024
Bazini Engineering1808307/17/2023
Moore Associates3408105/26/2022
Moschella Roberts Architects8151110/25/2021
Tectonic Engineering Cons106102/15/2018
Building Lifecycle
All (249)Filed (37)Permit Issued (38)Signed Off (7)Facade (FISP) (12)Violation (60)Inspection (6)Objection (59)Special Inspection (30)
09/14/2026
Objection raised — Fire_Protection
09/14/2026
Objection raised — Inspections
09/14/2026
Objection raised — Scope
09/14/2026
Objection resolved — Addressed
09/11/2026
Permit issued — Plumbing
M01440593-S1-PL
09/10/2026
Permit issued — General Construction
M01440593-I1-GC
09/04/2026
Filed — Alteration
Filing temporary shoring and structural slab reinforcement work in the sub-cellar and cellar; no change in use, egress, or occupancy.
M01157256-P3
09/04/2026
Objection raised — Other
09/03/2026
Permit issued — Supported Scaffold
M01115162-I1-SF
08/25/2026
Filed — Alteration
Interior renovation of Apt. 10G, work is general construction only, addition of a partition wall (area of work is 48 sf.) PW3 cost is based on 48 SF of general construction work..
M01413987-I1
08/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
David Katz
08/21/2026
Special inspection requirement — Designated Seismic System
FRANCESCO MO
08/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANCESCO MO
08/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
David Katz
08/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Katz
08/21/2026
Special inspection requirement — Structural Steel - High Strength Bolting
FRANCESCO MO
08/21/2026
Special inspection requirement — Final
FRANCESCO MO
08/21/2026
Special inspection requirement — Structural Steel - Welding
FRANCESCO MO
08/21/2026
Special inspection requirement — Structural Steel - Details
FRANCESCO MO
08/14/2026
Permit issued — General Construction
M01167246-I1-GC
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection resolved — Resolved
08/10/2026
Objection raised — Inspections
08/10/2026
Objection raised — Other
08/10/2026
Objection raised — Scope
08/04/2026
Filed — Alteration
REPAIR, REPLACEMENT OF EXISTING FIXTURES ON EXISTING ROUGH. NEW, INSTALLATION OF FIXTURES AS SHOWN ON PLANS.
M01440593-S1
08/04/2026
Filed — Alteration
REPAIR, REPLACEMENT OF EXISTING FIXTURES ON EXISTING ROUGH. NEW, INSTALLATION OF FIXTURES AS SHOWN ON PLANS.
M01440593-I1
08/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Dutch Osborne
08/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Dutch Osborne
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dutch Osborne
07/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/11/2026
Permit issued — Structural
M01157256-I1-ST
06/08/2026
Special inspection requirement — Final
06/02/2026
Filed — Alteration
HEREWITH FILE PLANS FOR INTERIOR RENOVATION OF AN EXISTING DWELLING UNIT 7G LOCATED ON SEVENTH FLOOR. WORK WILL INCLUDE NEW PARTITIONS, FLOOR AND CELING WITH NEW FINISHES THROUGHOUT SPACE. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01332193-P1
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tae Chong
05/29/2026
Permit issued — General Construction
M01088780-I1-GC
05/22/2026
Objection resolved — Addressed
05/21/2026
Special inspection requirement — Structural Steel - Details
FRANCESCO MO
05/21/2026
Special inspection requirement — Structural Steel - Welding
FRANCESCO MO
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Katz
05/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
David Katz
05/21/2026
Special inspection requirement — Structural Steel - High Strength Bolting
FRANCESCO MO
05/21/2026
Special inspection requirement — Final
FRANCESCO MO
05/21/2026
Special inspection requirement — Designated Seismic System
FRANCESCO MO
05/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
David Katz
05/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANCESCO MO
05/19/2026
Objection raised — Scope
05/07/2026
Filed — Alteration
REPAIR, REPLACEMENT OF EXISTING FIXTURES ON EXISTING ROUGH. NEW, INSTALLATION OF FIXTURES AS SHOWN ON PLANS.
M01167246-S2
05/04/2026
Filed — Alteration
REPAIR, REPLACEMENT OF EXISTING FIXTURES ON EXISTING ROUGH. NEW, INSTALLATION OF FIXTURES AS SHOWN ON PLANS.
M01167246-P2
05/04/2026
Filed — Alteration
REPAIR, REPLACEMENT OF EXISTING FIXTURES ON EXISTING ROUGH. NEW, INSTALLATION OF FIXTURES AS SHOWN ON PLANS.
M01167246-P1
05/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
Dutch Osborne
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Dutch Osborne
05/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Dutch Osborne
05/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Dutch Osborne
05/04/2026
Special inspection requirement — Lighting in dwelling units
Dutch Osborne
05/04/2026
Special inspection requirement — Post-installed Anchors
Dutch Osborne
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dutch Osborne
04/21/2026
Filed — Alteration
Filing temporary shoring and structural slab reinforcement work in the sub-cellar and cellar; no change in use, egress, or occupancy.
M01157256-P2
04/20/2026
Violation issued (ECB, open)
Local Law
Latest 60 of 249 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedArco Plumbing and Heating09/11/2026
DOB NOWGeneral ConstructionPermit IssuedNo Limit Contracting09/10/2026
DOB NOWSupported ScaffoldPermit IssuedPlatinum Services NY09/03/2026
DOB NOWGeneral ConstructionPermit IssuedCH Design Construction08/14/2026
DOB NOWStructuralPermit IssuedRainier Restoration06/11/2026
DOB NOWGeneral ConstructionPermit IssuedAarco Contracting05/29/2026
DOB NOWStructuralPermit IssuedRainier Restoration04/09/2026
DOB NOWPlumbingPermit IssuedEssential Plumbing & Heating03/17/2026
DOB NOWSuspended ScaffoldPermit IssuedRH Expert02/11/2026
DOB NOWPlumbingPermit IssuedGregg NY Plumbing01/27/2026
DOB NOWGeneral ConstructionPermit IssuedRise Construction Solutio01/23/2026
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY11/03/2025
DOB NOWSuspended ScaffoldSigned-offRH Expert10/29/2025
DOB NOWSupported ScaffoldPermit IssuedPlatinum Services NY09/15/2025
DOB NOWSuspended ScaffoldSigned-offAarco Contracting09/05/2025
DOB NOWGeneral ConstructionPermit IssuedCH Design Construction09/04/2025
DOB NOWBoiler EquipmentPermit IssuedLeardon Boiler Works06/24/2025
DOB NOWGeneral ConstructionPermit IssuedAarco Contracting05/22/2025
DOB NOWSuspended ScaffoldSigned-offRH Expert05/02/2025
DOB NOWSuspended ScaffoldSigned-offPPM Telecom04/09/2025
DOB NOWAntennaPermit IssuedNext Solutions C.S03/03/2025
DOB NOWAntennaPermit IssuedNext Solutions C.S02/06/2025
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY11/04/2024
DOB NOWSuspended ScaffoldSigned-offRH Expert10/23/2024
DOB NOWSupported ScaffoldPermit IssuedPlatinum Services NY09/23/2024
DOB NOWBoiler EquipmentPermit IssuedLeardon Boiler Works06/27/2024
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY11/08/2023
DOB NOWGeneral ConstructionSigned-offC McCormack10/27/2023
DOB NOWBoiler EquipmentPermit IssuedLeardon Boiler Works07/21/2023
DOB NOWMechanical SystemsPermit IssuedLeardon Boiler Works07/21/2023
DOB NOWMechanical SystemsPermit IssuedAmerican Ventilation Service07/12/2023
DOB NOWGeneral ConstructionSigned-offC McCormack11/16/2022
DOB NOWPlumbingSigned-offDemar Mechanical03/03/2022
DOB NOWGeneral ConstructionSigned-offC McCormack03/01/2022
DOB NOWSupported ScaffoldPermit IssuedEcto Restoration09/13/2021
DOB NOWSidewalk ShedSigned-offKings Group NY06/03/2019
DOB NOWAntennaSigned-offLevest Electric06/20/2018
DOB NOWSidewalk ShedPermit IssuedBilly Enterprises05/09/2018
BISPLISSUEDMcManus Mechanical Maintenance P&H12/08/2022
BISPLISSUEDOrbit Plumbing & Heating07/23/2020
+ 48 more permits on file
1 project · most recent 05/07/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/07/2026Permit IssuedCH Design ConstructionHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MLZ-KX06NL 7,200 BTU · Vrf Indoor ×1
MSZ-GX09NL 10,900 BTU · Vrf Indoor ×1
MSZ-GX15NL 18,000 BTU · Vrf Indoor ×1
MXZ-4D30NL 28,600 BTU · Vrf Outdoor ×1
4 projects · most recent 08/04/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/04/2026Permit IssuedArco Plumbing and HeatingWater/Sanitary
06/02/2026Permit IssuedGregg NY PlumbingGas, Water/Sanitary
05/07/2026Permit IssuedEssential Plumbing & HeatingWater/Sanitary
05/26/2022——Gas, Water/Sanitary
25 projects · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026Permit IssuedGo Pro Electric NYCGeneral Wiring
09/09/2026Permit IssuedJP & Son ElectricGeneral Wiring
08/31/2026CompleteJP & Son ElectricGeneral Wiring
08/22/2026CompleteJP & Son ElectricGeneral Wiring
08/09/2026Permit IssuedAmber Electl ContngGeneral Wiring
07/14/2026Permit IssuedRichard Neu—
06/09/2026Permit IssuedGo Pro Electric NYCGeneral Wiring
01/21/2026Permit IssuedPrecision Electrical ContGeneral Wiring
11/12/2025Permit IssuedLeader Electric CoGeneral Wiring
06/13/2024CompleteElpo Electrical ContgGeneral Wiring
12/19/2023CompleteLina ElectricGeneral Wiring
11/16/2023Permit IssuedIlluminous ElectricGeneral Wiring
02/24/2023CompleteLina Electric—
01/30/2023CompleteEcny Electrical ContractorsGeneral Wiring
01/24/2023CompleteLina Electric—
2 projects · most recent 09/04/2026
Steel
FiledStatusContractorScope
09/04/2026Permit IssuedRainier RestorationSteel
03/10/2026Permit IssuedRainier Restoration1 scope_items
1 project · most recent 09/09/2021
Scaffold
FiledStatusContractorScope
09/09/2021Permit IssuedEcto RestorationScaffold
1 project · most recent 08/04/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/04/2026Permit IssuedArco Plumbing and HeatingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
08/21/2026Structural Steel - DetailsFRANCESCO MOspecial
08/21/2026Structural Steel - High Strength BoltingFRANCESCO MOspecial
08/21/2026Structural Steel - WeldingFRANCESCO MOspecial
08/21/2026Designated Seismic SystemFRANCESCO MOspecial
08/21/2026Tenant Protection Plan ComplianceDavid Katzspecial
08/21/2026FinalFRANCESCO MOprogress
08/21/2026Fire-Resistance Rated ConstructionDavid Katzprogress
08/21/2026Fire-Resistant Penetrations and JointsDavid Katzspecial
08/21/2026Structural Stability – Alterations of existing buildingsFRANCESCO MOspecial
08/04/2026Energy Code Compliance InspectionsDutch Osborneprogress
08/04/2026Fire-Resistant Penetrations and JointsDutch Osbornespecial
08/04/2026HVAC-R and service water piping design and insulationDutch Osborneenergy_progress
06/08/2026Final—progress
06/01/2026Fire-Resistant Penetrations and JointsTae Chongspecial
05/21/2026Designated Seismic SystemFRANCESCO MOspecial
05/21/2026Fire-Resistance Rated ConstructionDavid Katzprogress
05/21/2026Structural Steel - WeldingFRANCESCO MOspecial
05/21/2026Structural Stability – Alterations of existing buildingsFRANCESCO MOspecial
05/21/2026Structural Steel - High Strength BoltingFRANCESCO MOspecial
05/21/2026Fire-Resistant Penetrations and JointsDavid Katzspecial
05/21/2026Structural Steel - DetailsFRANCESCO MOspecial
05/21/2026Tenant Protection Plan ComplianceDavid Katzspecial
05/21/2026FinalFRANCESCO MOprogress
05/04/2026HVAC-R and service water piping design and insulationDutch Osborneenergy_progress
05/04/2026Energy Code Compliance InspectionsDutch Osborneprogress
Latest 25 of 82.
▾Documents — 495 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch35
09/06/2026M00036371-I1Request digital key ↗
09/03/2026M00515283-I1Request digital key ↗
09/03/2026M00599575-I1Request digital key ↗
Showing 3 of 35 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00161476-I1Request digital key ↗
▸Applications & Permits74
▸BISPLAN / WORK APPROVAL APPLICATION37
07/12/2023110060745Open ↗
07/11/2023110060745Open ↗
07/05/2023110060745Open ↗
Showing 3 of 37 on file for this type
▸BISWORK PERMIT APPLICATION33
12/09/2022102464888Open ↗
07/24/2020123414741Open ↗
07/10/2020123414741Open ↗
Showing 3 of 33 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
11/01/2022102464888Open ↗
11/01/2022102464888Open ↗
10/20/2022110008697Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications161
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION44
10/23/2019103865471Open ↗
10/17/2019103865471Open ↗
09/16/2019103865471Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature43
10/14/2026M01157256-P3Open ↗
10/14/2026M01157256-P3Open ↗
10/14/2026M01157256-P3Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
10/14/2026M01157256-P3Open ↗
09/06/2026M00036371-I1Open ↗
09/05/2026M00161476-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature28
10/14/2026M01157256-P3Open ↗
10/14/2026M01157256-P3Open ↗
10/12/2026M00599575-I1Open ↗
Showing 3 of 28 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment23
▸BISSELF-CERT PLUMBING NOTICE11
09/29/2015122257440Open ↗
07/14/2015122263825Open ↗
04/15/2015122263825Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING6
01/20/2023102464888Open ↗
03/09/2015122257440Open ↗
Showing 2 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
11/30/2018123595270Open ↗
11/20/2018123414741Open ↗
11/01/2018123414741Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes8
12/11/2018123595270Open ↗
11/30/2018123595270Open ↗
11/01/2018123414741Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos43
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
10/14/2026M01157256-P3Open ↗
08/30/2026M00873522-I1Open ↗
08/28/2026M00599604-I1Open ↗
Showing 3 of 21 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
11/30/2018123595270Open ↗
11/01/2018123414741Open ↗
11/14/2017123120121Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/31/2026M08022395-I1Open ↗
08/29/2026M00873517-I1Open ↗
08/13/2026M01088780-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance30
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
07/10/2019123595270Open ↗
07/10/2019123595270Open ↗
11/30/2018123595270Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
07/10/2019123595270Open ↗
09/13/2018123120121Open ↗
07/16/2018122257440Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/08/2021123414741Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/08/2021123414741Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00599575-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
02/01/2023102464888Open ↗
02/01/2023102464888Open ↗
10/25/2022110008697Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs39
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
09/13/2023110060745Open ↗
02/06/2023102464888Open ↗
10/26/2022110008697Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
12/09/2022102464888Open ↗
06/02/2022104852633Open ↗
10/17/2019103865471Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER1
12/09/2022102464888Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT30
02/06/2023102464888Open ↗
10/25/2022110008697Open ↗
10/17/2019103865471Open ↗
Showing 3 of 30 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
09/12/2023110060745Open ↗
06/02/2022104852633Open ↗
12/08/2021123414741Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET13
11/30/2018123595270Open ↗
11/01/2018123414741Open ↗
11/14/2017123120121Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM11
10/23/2019103865471Open ↗
10/17/2019103865471Open ↗
07/18/2019103865471Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION5
09/16/2019103865471Open ↗
12/11/2018123595270Open ↗
12/11/2018123595270Open ↗
Showing 3 of 5 on file for this type
▸Other Documents11
▸DOB NOWManufacturer's Specifications4
08/13/2026M01095270-I1Open ↗
08/13/2026M01276028-P1Open ↗
08/13/2026M01354129-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/13/2026M01276028-P1Open ↗
08/13/2026M01095270-I1Open ↗
08/13/2026M01354129-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution2
09/06/2026M00036371-I1Open ↗
09/05/2026M00161476-I1Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01169641-I1Open ↗