RoofUnder Construction14p · 3 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructuralOther
Issued Permit Scope
Supported Scaffold
Outriggers system installation for facade repairs, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
18 documents · 1 drawing sheet
Proposed installation of a temporary pipe scaffolding as per plans submitted. Work shall comply with building code, chapter 33. No changes in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
FACADE REPAIRS AND ROOFING REPAIRS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 3 drawing sheets
BulkheadUnder Construction3p · 2 filings · 20 docs
ArchitectureEquipmentFire Protection
Outriggers system installation for facade repairs, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
18 documents · 1 drawing sheet
FACADE REPAIRS AND ROOFING REPAIRS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 2 drawing sheets
Floor 30Under Construction10p · 1 filing · 11 docs
ArchitectureDM
Issued Permit Scope
General Construction
COMBINATION OF APTS 30FG FILED IN CONJUNCTION WITH DOB NOW PL UNDER TPPN 3/97 . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
11 documents · 4 drawing sheets
Floor 295p · 2 filings · 11 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING FIXTURE INSTALLATION IN CONJUNCTION WITH RENOVATION OF APT 30PR.
On file for this project
7 documents
INTERIOR ALTERATIONS TO EXISTING APT 30PR. DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS AND FINISHES.
On file for this project
4 documents
Floor 2821p · 3 filings · 20 docs
ArchitectureDMElectricalGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing
PL FIXTURES FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
11 documents · 10 drawing sheets
interior renovation of apartment 28k. no change in use egress or occupancy
On file for this project
5 documents
PLUMBING FIXTURES IN APT 29U FILED IN CONJUNCTION WITH DOB NOW GC . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
12 documents · 10 drawing sheets
Floor 2711p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK IN CONNECTION WITH INTERIOR RENOVATION.
On file for this project
7 documents
REPLACEMENT OF PLUMBING FIXTURES AND GAS RANGE ON EXISTING PIPING. INSTALL NEW DISWASHER.
On file for this project
9 documents
REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
Floor 264p · 1 filing · 5 docs
ArchitectureGeneral
Issued Permit Scope
General Construction
Interior alteration to add 1 bedroom and remove kitchen wall
On file for this project
5 documents · 4 drawing sheets
Floor 25
Floor 249p · 2 filings · 11 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
ALT2 PLUMBING FOR MASTER BATHROOM AND NEW WASHER/DRYER PER PLANS.
On file for this project
8 documents
ALT 2 TO COMBINE AND ALTERATIONS TO APT 24G & 24G. SCOPE OF WORK TO INCLUDE DEMOLITION OF INTERIOR FINISHES, REMOVAL OF CABINETS AND PLUMBING FIXTURES TO ALTER KITCHEN. NO EXTERIOR WORK. NO CHANGE OF CO.
On file for this project
3 documents
Floor 23
Floor 22
Floor 215p · 1 filing · 4 docs
Architecture
Issued Permit Scope
General Construction
KITCHEN AND BATHROOM RENOVATION DOING LIKE FOR LIKE FIXTURE REPLACEMENTAND NEW WALL BETWEEN LIVINGROOM AND DINNING ROOM AT UNIT 21M.
On file for this project
4 documents
Floor 208p · 2 filings · 12 docs
Architecture
Issued Permit Scope
General Construction
INTERIOR RENOVATION IN APT 21M. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
6 documents
INTERIOR RENOVATION OF APARTMENT #20AB. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
Floor 1915p · 4 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Alt Type 2 to combine 19A and 19B. New framing, walls and doors. Upgrade bathroom new toilet, sink & shower. Remove kitchen and convert to Laundry Room with sink. No change to Use, Egress or Occupancy.
On file for this project
3 documents
PLUMBING WORK AS INDICATED ON PLANS.
On file for this project
19 documents
HEREBY FILING FOR TO RENOVATE DWELLING UNIT #19M. PLUMBING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 18Under Construction12p · 3 filings · 13 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
FILING ALT 2 TO COMBINE APT 18R AND 18S PER TPPN3/97. REMOVE GAS STOVE IN 18S KITCHEN AND NEW ELECTRIC WASHER AND DRYER AT LAUNDRY ROOM 18S. NO EXT. WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY. EXIST. CERTIFICATE OF OCCUPANCY DOES NOT NEED TO BE AMENDED.
On file for this project
7 documents
combining of 2 privately owned apts (18V & 18W) in accordance with TPPN #3/97. removal of kitchen in apt 18W & conversion of this space to laundry rm. archway to be installed connecting each apartment. no change in egress.removal of non-load bearing walls
On file for this project
3 documents
Combining of apartments 18V & 18W. Removal of kitchen fixtures in 18W, renovation of kitchen in 18V, renovation of bathrooms in 18V & 18W, new laundry room in 18W,
On file for this project
3 documents
Floor 17Under Construction11p · 3 filings · 20 docs
ArchitectureGeneral
Issued Permit Scope
General Construction
Interior alteration of existing apartment to renovate existing bathrooms, install new interior doors and flooring.
On file for this project
8 documents
Interior renovation of existing apartment, renovating kitchen and removing section of non structural interior partition, updating finishes. No change to egress, use or occupancy
On file for this project
4 documents · 3 drawing sheets
Minor renovation to apartment 17K. Partition work as per plans. No change of use, occupancy or egress.
On file for this project
10 documents
Floor 1618p · 2 filings · 20 docs
ArchitectureDMGeneralMechanicalPlumbingOther
Issued Permit Scope
General Construction · Plumbing
Floor 16 Apartment 17CD - Plumbing in conjunction with i1 filing--
On file for this project
7 documents
RENOVATE APARTMENT 17T ON THE 16 TH FLOOR AS PER ARCHITECTURAL PLANS. PLUMBING WORK FILED AS SUBSEQUENT APPLICATION AS PER PLUMBING PLANS. NO CHANGE TO USE, EGRESS OROCCUPANCY.
On file for this project
13 documents · 5 drawing sheets
Floor 154p · 1 filing · 11 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Herewith file plumbing plans to combine Apts. 15V and 15W, filed in conjunction with general construction.
On file for this project
11 documents
Floor 144p · 1 filing · 3 docs
ArchitectureGeneral
Issued Permit Scope
General Construction
INSTALLING NEW DRYWALL PARTITION AND DOOR TO CREATE NEW BEDROOM. CONSTRUCTING SOFFIT AROUND EXISTING KITCHNETTE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Floor 1319p · 1 filing · 16 docs
ArchitectureDMGeneralMechanicalPlumbingOther
Issued Permit Scope
General Construction · Plumbing
PLUMBING FIXTURES FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
16 documents · 11 drawing sheets
Floor 125p · 2 filings · 14 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
INTERIOR RENOVATION OF EXISTING UNIT 12B AT 12TH FLOOR. MINOR PARTITION WORK AND COSMETIC IMPROVEMENTS AS INDICATED ON DRAWINGS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
10 documents · 1 drawing sheet
Removal of cooking equipment on floor 12T; replacement of plumbing fixtures on floors 11, 12. No change to use egress or occupancy
On file for this project
4 documents
Floor 112p · 1 filing · 4 docs
Plumbing
Issued Permit Scope
Plumbing
Removal of cooking equipment on floor 12T; replacement of plumbing fixtures on floors 11, 12. No change to use egress or occupancy
On file for this project
4 documents
Floor 1011p · 2 filings · 14 docs
ArchitectureDMPlumbing
Issued Permit Scope
General Construction · Plumbing
General construction work associated with an interior renovation of Apt. 10M. No change in use, occupancy, or means of egress.
On file for this project
4 documents · 2 drawing sheets
Subsequent application to Modify plumbing fixtures as indicated. No Exterior work proposed. No site safety requirements are needed for this application. No change to egress, occupancy or use.
On file for this project
10 documents · 2 drawing sheets
Floor 9
Floor 81p · 1 filing · 3 docs
Architecture
Issued Permit Scope
General Construction
Apt, #8L: RENOVATE BATHROOM, RENOVATE KITCHEN,. NEW ELECTRICAL PANEL, SAND, STAIN AND POLYURETHANE EXISTING FLOORS, . UPGRADE FINISHES THROUGHOUT. NO CHANGE TO USE, EGRESS OF OCCUPANCY NOTE: PLUMBING WORK TO BE FILED UNDER AN LAA APPLICATION.
On file for this project
3 documents
Floor 7Under Construction5p · 1 filing · 13 docs
Architecture
Issued Permit Scope
General Construction
INTERIOR RENOVATION AS INDICATED ON DRAWINGS.
On file for this project
13 documents
Floor 6
Floor 5
Floor 48p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Combination of apartments 4V and 4W. Interior non load bearing wall modification per plans. Converting former kitchen in 4V into a laundry room. Creation of one new bedroom in apartment 4V. No change in use, egress, or occupancy.
On file for this project
9 documents
Scope of work will include demo, flooring finishes, partition finishes and millwork , installations , flooring finishes, partitions with finishes , replace doors and millwork as indicated. No change in use, occupancy or egress.
On file for this project
5 documents
1. Bath: replace all fixtures on exist. rough-in.2. Kitchen: relocate gas stove, kitchen sink and dishwasher.3. Install new washer4. Replace former kitchen sink with laundry sink.
On file for this project
6 documents
Floor 3
Floor 28p · 1 filing · 12 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Plumbing modifications as shown on plans in conjunction with combination of apartments 2M and 2N on the 2nd Floor. Application filed as per TPPN #3/97. General Const. work under Initial Filing DOB NOW M01071498-I1. No change in Use, Egress or Occupancy
On file for this project
12 documents · 4 drawing sheets
Floor 113p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Plumbing application to 1st fl. existing medical office unit #1RS. No change in egress occupancy or use.
On file for this project
22 documents
FILING FOR INTERIOR ALTERATION OF UNIT #1J ON THE 1ST FLOOR THAT INCLUDES NEW INTERIOR PARTITIONS AND INTERIOR DOORS ONLY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents
- Install partitions and doors on the 1st floor medical office as per plans filed. No change to use, egress or occupancy is involved.
On file for this project
5 documents
Site & exteriorUnder Construction38p · 3 filings · 16 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructuralOther
Issued Permit Scope
General Construction · Sidewalk Shed · Supported Scaffold
Proposed installation of a temporary heavy duty 300PSF sidewalk shed as per plans submitted. Work shall comply with2022 building codes, chapter 33. No change in use, egress or occupancy.
On file for this project
6 documents · 12 drawing sheets
FACADE REPAIRS AND ROOFING REPAIRS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 12 drawing sheets
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents · 9 drawing sheets
Filed — no permit issued13p · 2 filings · 14 docs
ArchitectureGeneralLandscapePlumbingStructuralOther
INTERIOR WORK IN APT 8N AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
6 documents · 9 drawing sheets
Structural framing in association with new staircase for combined apartment. No change to use, egress or occupancy
On file for this project
8 documents · 4 drawing sheets