← Back
BuildNYC
Church, synagogue, chapel
Elyon College
1400 WEST 6TH STREET · Bensonhurst · BIN 3173333
💬 Discuss this project
1958Year Built
2Stories
M1Building Class
R5BZoning
4,600 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Church, synagogue, chapel · 6,133 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Boiler room and gas meter room work1 filing · 3 docs
Floor 2Boiler room and gas meter room work1 filing · 3 docs
Floor 1Boiler room and gas meter room work7p · 2 filings · 13 docs
CellarBoiler room and gas meter room work1 filing · 3 docs
Filed — no permit issuedInterior renovation to enlarge mezzanine and convert basemen18p · 1 filing · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Asher Architect301/09/2025
Jimenez Building Consulting207/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRL Skyline403/21/2026
Eretz Builders Assistance603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
American Power Electric ConsElectrical103/22/2026
American Power Electric ConsElectrical103/21/2026
Winway DevelopmentGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Yang Engineering8376207/19/2022
Building Lifecycle
All (34)Filed (5)Signed Off (1)Violation (4)Objection (6)Special Inspection (18)
01/21/2025
Special inspection requirement — Maintenance information
01/21/2025
Special inspection requirement — Exterior lighting power
01/21/2025
Special inspection requirement — Electrical motors and elevators
01/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
01/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/21/2025
Special inspection requirement — Lighting controls
01/21/2025
Special inspection requirement — Fenestration air leakage
01/21/2025
Special inspection requirement — Insulation placement and R values
01/21/2025
Special inspection requirement — Metering
01/21/2025
Special inspection requirement — Fenestration areas
01/21/2025
Special inspection requirement — Interior lighting power
01/21/2025
Special inspection requirement — Air barrier - visual inspection
01/21/2025
Special inspection requirement — Lighting in dwelling units
01/09/2025
Filed — Alteration CO
INTERIOR RENOVATION TO ENLARGE MEZZANINE AND CONVERT BASEMENT TO A CELLAR
B01068327-P1
01/09/2025
Filed — Alteration
Plumbing work filed in conjunction with GC #B01068327-I1
B01164610-I1
01/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/01/2024
Objection resolved — Addressed
09/30/2024
Objection raised — Other
09/24/2024
Objection resolved — Addressed
09/24/2024
Objection resolved — Addressed
08/23/2024
Objection raised — Accessibility
07/09/2024
Objection raised — Scope
07/04/2024
Filed — Alteration CO
INTERIOR RENOVATION TO ENLARGE MEZZANINE AND CONVERT BASEMENT TO A CELLAR
B01068327-I1
03/24/2023
Violation issued (ECB, closed)
Unknown
08/31/2022
Signed off — Alteration
B00570776-I1
07/19/2022
Filed — Alteration
B00570776-P1
07/19/2022
Special inspection requirement — Lighting controls
Jian Yang
07/19/2022
Special inspection requirement — Interior lighting power
Jian Yang
07/19/2022
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
07/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
08/05/2021
Filed — Alteration
B00570776-I1
03/29/1994
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
05/01/1991
Violation issued (ECB, closed)
Public Assembly
10/05/1987
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISMHISSUEDIty Cooling Ent11/12/1999
1 project · most recent 01/09/2025
Water/Sanitary
FiledStatusContractorScope
01/09/2025——Water/Sanitary
3 projects · most recent 11/09/2023
General Wiring
FiledStatusContractorScope
11/09/2023Permit IssuedAmerican Power Electric ConsGeneral Wiring
10/18/2023CompleteAmerican Power Electric Cons—
03/14/2023CompleteAmerican Power Electric Cons—
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
01/21/2025Maintenance information—energy_progress
01/21/2025Exterior lighting power—energy_progress
01/21/2025Electrical motors and elevators—energy_progress
01/21/2025Fenestration and door U-factor and product ratings—energy_progress
01/21/2025Structural Stability – Alterations of existing buildings—special
01/21/2025Lighting controls—energy_progress
01/21/2025Fenestration air leakage—energy_progress
01/21/2025Insulation placement and R values—energy_progress
01/21/2025Metering—energy_progress
01/21/2025Fenestration areas—energy_progress
01/21/2025Interior lighting power—energy_progress
01/21/2025Air barrier - visual inspection—energy_progress
01/21/2025Lighting in dwelling units—energy_progress
01/09/2025Fire-Resistant Penetrations and Joints—special
07/19/2022Lighting controlsJian Yangenergy_progress
07/19/2022Interior lighting powerJian Yangenergy_progress
07/19/2022Energy Code Compliance InspectionsJian Yangprogress
07/19/2022Fire-Resistant Penetrations and JointsJian Yangspecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00570776-P1Request digital key ↗
09/01/2026B00570776-I1Request digital key ↗
08/24/2026B01068327-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00570776-I1Open ↗
09/01/2026B00570776-P1Open ↗
08/24/2026B01068327-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B00570776-P1Open ↗
08/26/2026B00570776-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B00570776-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00570776-P1Open ↗
09/01/2026B00570776-I1Open ↗
08/24/2026B01068327-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00570776-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
09/01/2026B00570776-P1Open ↗
09/01/2026B00570776-I1Open ↗
08/13/2026B01164610-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/24/2026B01068327-P1Open ↗
08/24/2026B01068327-I1Open ↗