← Back
Primarily 2 family with 1 store or office
1407 CROSBY AVENUE
BRONX · Throgs Neck-Schuylerville · BIN 2074608
💬 Discuss this project
1925Year Built
2Stories
S2Building Class
R4AZoning
3,104 sfGross Floor Area
3Units
Primarily 2 family with 1 store or office · Owner of record: HAN TANG REALTY INC · 1,566 sf lot · 1.98 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 11p · 1 filing · 5 docs
Cellar2p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HAN TANG REALTY407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/31/2022$975K—— → —$314/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AKIMU GARUBA208/02/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DOUG'S PLBG & HTG SERV COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKIMU GARUBA6853208/02/2024
Building Lifecycle
All (15)Filed (2)Permit Issued (1)Inspection (6)Special Inspection (6)
04/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/19/2024
Permit issued — Plumbing
X01090113-I1-PL
08/02/2024
Filed — Alteration
Removal of Existing Oil Tank and Oil Boiler. Installation of Electric Water Heaters to supply domestic hot water throughout the building
X01090113-I1
08/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akimu Garuba
08/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Akimu Garuba
08/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
Akimu Garuba
08/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
Akimu Garuba
07/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/18/2024
Filed — Alteration
Removal of Existing Oil Tank and Oil Boiler. Installation of Electric Water Heaters to supply domestic hot water throughout the building
X01070749-I1
06/23/2024
Special inspection requirement — Mechanical Systems
Akimu Garuba
06/23/2024
Special inspection requirement — Final
Akimu Garuba
03/22/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedDOUG'S PLBG & HTG SERV CO09/19/2024
1 project · most recent 07/18/2024
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/18/2024——Heating Systems
Heating
Rheem PERFORMANCE® electric water heaters - Model # XE40M06ST45U1 4 kW · Water Heater ×3
1 project · most recent 08/02/2024
Water/Sanitary
FiledStatusContractorScope
08/02/2024Permit IssuedDOUG'S PLBG & HTG SERV COWater/Sanitary
2 projects · most recent 01/18/2026
HVAC Wiring General Wiring
FiledStatusContractorScope
01/18/2026Permit IssuedWCK ELECTRIC CORP.HVAC Wiring
10/18/2024CompleteAMERICAN ENG ELECL SVCS IGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/22/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/01/2024Fire-Resistant Penetrations and JointsAkimu Garubaspecial
08/01/2024HVAC-R and service water piping design and insulationAkimu Garubaenergy_progress
08/01/2024HVAC-R and service water heating system controlsAkimu Garubaenergy_progress
08/01/2024HVAC-R and service water heating equipmentAkimu Garubaenergy_progress
06/23/2024Mechanical SystemsAkimu Garubaspecial
06/23/2024FinalAkimu Garubaprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026X01070749-I1Request digital key ↗
08/21/2026X01090113-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026X01070749-I1Open ↗
08/22/2026X01090113-I1Open ↗
08/22/2026X01090113-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026X01090113-I1Open ↗
08/13/2026X01070749-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026X01070749-I1Open ↗
08/22/2026X01090113-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026X01090113-I1Open ↗
08/13/2026X01070749-I1Open ↗