140B 58TH STREET
BROOKLYN · BIN 3347532
💬 Discuss this project
1931Year Built
8Stories
T2Building Class
M2-1Zoning
5,359,400 sfGross Floor Area
6Units
LL97 Covered85 Active Violations 1 unresolved · 84 paperwork only 546 likely answered 7 old, status unconfirmed ▸FDNY Report ↗
Pier, dock, bulkhead · Owner of record: NYC Department of Small Business Services · 2,573,197 sf lot · 2.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsNYC Economic Development CORPUnder Construction2 filings
RoofDepository Trust & Clearing Corporation (DTCC), New York CitUnder Construction19p · 13 filings · 19 docs
PenthouseDTCC Depository Trust Company1 filing · 6 docs
Floor 8Liquid Technology1p · 2 filings
Floor 7Depository Trust & Clearing Corporation (DTCC)1 filing
Floor 6Depository Trust & Clearing Corporation (DTCC)1 filing
Floor 5New York City Economic Development, Depository Trust & ClearUnder Construction2p · 3 filings · 18 docs
Floor 4Depository Trust & Clearing Corporation (DTCC), Ombligo +1Under Construction17p · 5 filings · 3 docs
Floor 3Depository Trust & Clearing Corporation (DTCC)12p · 4 filings
Floor 2Depository Trust & Clearing Corporation (DTCC)41p · 4 filings · 5 docs
Floor 1Depository Trust & Clearing Corporation (DTCC)Under Construction2 filings · 2 docs
CellarDepository Trust & Clearing Corporation (DTCC), Depository TUnder Construction4p · 8 filings · 2 docs
BasementNew York City Economic DevelopmentUnder Construction7p · 1 filing · 18 docs
Sub-BasementNew York City Economic DevelopmentUnder Construction2 filings · 18 docs
Site & exteriorNYC Economic Development CORP2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Economic Developement51810/17/2026
Nycedc5103/21/2026
NYC Public Development1303/21/2026
Biobat503/21/2026
NYC Department of Design and Construction303/21/2026
Citicorp203/21/2026
New York City Public Development203/21/2026
Safeway Atlantic103/21/2026
Alma Bank of New York, Co103/21/2026
EDC103/21/2026
Alma Bank103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY Building Associates210/16/2026
Clifford Dias, PE309/18/2026
HC Pec107/29/2026
Pronto106/30/2026
Highland Associates1006/25/2026
TPG Architecture506/24/2026
Elevated Engineering105/27/2026
Atane705/11/2026
Arup US302/25/2026
Soni Engineering Consulting109/29/2025
Newtec Engineering308/12/2025
CFS Engineering406/17/2025
Simon Arnold411/29/2023
Adal Engineering108/31/2023
Urban Integrations106/28/2023
Fiskaa Engineering205/01/2023
Severud Associates Consulting Engineering109/27/2022
Severud Associates112/01/2021
Concord Associates310/19/2021
M Just Architecture103/11/2021
Salvator A. Caradonna JR103/10/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants1603/21/2026
Construction Permit Services1403/21/2026
CPS Service103/21/2026
Just Architecture103/21/2026
All in Permit Consultants103/21/2026
KM Associates of New York1203/21/2026
Socotec803/21/2026
Big Orange Expediting203/21/2026
Rigid Structural Design103/21/2026
AE Design Solution203/21/2026
S R Solar Design203/21/2026
K & M Associates1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Structure ToneGeneral Contractor807/08/2026
Computer Cool/Ice AgeGeneral Contractor607/08/2026
Hunter Roberts ConstructionGeneral Contractor404/09/2026
Sirina Fire ProtectionFire Protection407/08/2026
Linco Elect'l ContractingElectrical303/21/2026
N.y.fence-A-LotGeneral Contractor307/08/2026
Macaluso General ContGeneral Contractor303/21/2026
Carlitos ContractingScaffold303/21/2026
Emes SolarGeneral Contractor303/21/2026
Vic RenovationsGeneral Contractor303/21/2026
JRM Construction ManagementGeneral Contractor209/16/2026
United Plumbing MechanicalPlumbing207/08/2026
Elbrus Air Conditioning *specialty_contractor207/08/2026
Jam ElectricalElectrical203/21/2026
Core Scaffold SystemsScaffold104/09/2026
PJP InstallersScaffold107/31/2026
R.A.M.S. MechanicalScaffold107/03/2026
Mauceri Sign CoSign hanger107/08/2026
Current Fire ProtectionFire Protection107/08/2026
Forsythe Plumbing & HeatingPlumbing107/08/2026
Preferred MechanicalPlumbing107/08/2026
Tristate Plumbing ServicesPlumbing106/02/2026
Adco ElectricalElectrical103/22/2026
Z.W. Plumbing & HeatingPlumbing107/08/2026
Accurate ElectricalElectrical103/21/2026
Lens ElectricElectrical103/21/2026
Star-Delta ElectricElectrical103/21/2026
RSC Electrical CoElectrical103/21/2026
Indy ElectricElectrical103/21/2026
Laredo ElectricElectrical103/21/2026
M. Farbman and SonsFire Protection103/21/2026
Commercial Cooling Servi*General Contractor107/08/2026
NYC Heat SolutionGeneral Contractor107/08/2026
R.A.M.S. Mechanicalspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244210/16/2026
Twin Peaks3171009/18/2026
Shahrish Shuvo Engineering8524506/25/2026
Elevated Engineering3692105/27/2026
MEP Inspections1102511/26/2025
Obaid Mian849308/12/2025
Milrose Consultants2003606/17/2025
Concrete Solutions Lab Co5344211/29/2023
Adal Engineering4205108/31/2023
Urban Engineers of New YO470205/01/2023
AK Engineering678112/01/2021
Synergy Engineering784310/19/2021
Building Lifecycle
All (284)Filed (56)Permit Issued (43)Signed Off (10)Violation (60)Inspection (19)Objection (66)Special Inspection (30)
10/16/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK.
B00993635-P1
09/18/2026
Filed — Alteration
Plumbing work in conjunction with the removal of boilers under application B01322968-I1 and the installation of new boilers under applications B01322981-I1 and B01322994-I1.
B01322975-P2
09/15/2026
Permit issued — Mechanical Systems
B01377675-S1-MS
09/15/2026
Permit issued — General Construction
B01377675-I1-GC
09/14/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
09/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
09/14/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
NARESH MAHANGU
09/14/2026
Special inspection requirement — Final
NARESH MAHANGU
09/14/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
08/03/2026
Special inspection requirement — Post-installed Anchors
Maxim Korngold
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Maxim Korngold
07/30/2026
Permit issued — Supported Scaffold
B01436316-I1-SF
07/29/2026
Filed — Alteration
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01436316-I1
07/22/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
07/14/2026
Filed — Alteration
Plumbing work in conjunction with the removal of boilers under application B01322968-I1 and the installation of new boilers under applications B01322981-I1 and B01322994-I1.
B01322975-P1
07/06/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
07/01/2026
Permit issued — Protection and Mechanical Methods
B01420493-I1-PMM
06/30/2026
Filed — Alteration
Use of knuckleboom for building demolition. This filing is in conjunction with Alteration B01322968
B01420493-I1
06/25/2026
Filed — Alteration
HEREWITH FILING COMMAND CENTER INTERIOR RENOVATIONS ON THE 4TH FLOOR PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01377675-S3
06/25/2026
Filed — Alteration
HEREWITH FILING COMMAND CENTER INTERIOR RENOVATIONS ON THE 4TH FLOOR PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01377675-S2
06/25/2026
Violation issued (ECB, open)
Unknown
06/25/2026
Objection resolved — Open
06/25/2026
Objection resolved — Addressed
06/25/2026
Objection resolved — Open
06/25/2026
Objection resolved — Addressed
06/25/2026
Objection resolved — Addressed
06/24/2026
Filed — Alteration
HEREWITH FILING FOR REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES AND CEILINGS FOR THE 2ND FLR CRYPTO ROOM PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01378149-I1
06/23/2026
Filed — Alteration
HEREWITH FILING COMMAND CENTER INTERIOR RENOVATIONS ON THE 4TH FLOOR PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01377675-S1
06/23/2026
Filed — Alteration
HEREWITH FILING COMMAND CENTER INTERIOR RENOVATIONS ON THE 4TH FLOOR PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01377675-I1
06/22/2026
Special inspection requirement — Sprayed fire-resistant materials
Shahrish Shuvo
06/12/2026
Violation issued (ECB, closed)
Construction
06/12/2026
Objection raised — Zoning
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Scope
06/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
06/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
06/03/2026
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
06/03/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Shahrish Shuvo
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
06/03/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Shahrish Shuvo
06/03/2026
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
05/27/2026
Filed — Alteration
T-Mobile - Relocation of antenna sector, replacement of antennas, installation and replacement of RRUs on the roof. Installation and removal of equipment cabinets on roof. All work in compliance with TPPN 5/98. No change to occupancy, use or egress.
B01114166-I1
05/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/26/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/19/2026
Permit issued — Plumbing
B01322975-I1-PL
05/19/2026
Objection resolved — Addressed
05/14/2026
Objection raised — Other
05/11/2026
Filed — Alteration
Hereby filing sump pit related to elevator rehabilitation.
B01082570-P3
05/08/2026
Permit issued — Mechanical Systems
B01322968-I1-MS
03/25/2026
Special inspection requirement — Final
Shahrish Shuvo
03/24/2026
Special inspection requirement — Final
Shahrish Shuvo
03/11/2026
Permit issued — Structural
B01082570-S3-ST
02/26/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01294037-I1
02/25/2026
Filed — Alteration
Installation of 6 new boilers as per plans herewith. No change to use, egress, or occupancy.
B01322994-I1
02/25/2026
Filed — Alteration
B01322968-I1
Latest 60 of 284 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedJRM Construction Management09/15/2026
DOB NOWGeneral ConstructionPermit IssuedJRM Construction Management09/15/2026
DOB NOWSupported ScaffoldPermit IssuedPJP Installers07/30/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedR.A.M.S. Mechanical07/01/2026
DOB NOWPlumbingPermit IssuedForsythe Plumbing & Heating05/19/2026
DOB NOWMechanical SystemsPermit IssuedR.A.M.S. Mechanical05/08/2026
DOB NOWStructuralPermit IssuedHunter Roberts Construction03/11/2026
DOB NOWPlumbingPermit IssuedTristate Plumbing Services02/25/2026
DOB NOWGeneral ConstructionPermit IssuedComputer Cool/Ice Age02/04/2026
DOB NOWMechanical SystemsPermit IssuedHunter Roberts Construction01/06/2026
DOB NOWGeneral ConstructionPermit IssuedHunter Roberts Construction12/30/2025
DOB NOWGeneral ConstructionPermit IssuedComputer Cool/Ice Age12/08/2025
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems10/01/2025
DOB NOWMechanical SystemsSigned-offCommercial Cooling Servi*08/13/2025
DOB NOWSolarPermit IssuedEmes Solar03/26/2025
DOB NOWPlumbingPermit IssuedZ.W. Plumbing & Heating10/31/2023
DOB NOWGeneral ConstructionPermit IssuedStructure Tone10/24/2023
DOB NOWMechanical SystemsSigned-offStructure Tone10/24/2023
DOB NOWPlumbingPermit IssuedUnited Plumbing Mechanical06/30/2023
DOB NOWSidewalk ShedSigned-offCarlitos Contracting06/28/2023
DOB NOWSprinklersSigned-offCurrent Fire Protection I05/11/2023
DOB NOWStandpipeSigned-offSirina Fire Protection03/01/2023
DOB NOWSprinklersSigned-offSirina Fire Protection03/01/2023
DOB NOWGeneral ConstructionPermit IssuedVic Renovations01/31/2023
DOB NOWStandpipeSigned-offSirina Fire Protection11/10/2022
DOB NOWSprinklersSigned-offSirina Fire Protection11/09/2022
DOB NOWPlumbingSigned-offPreferred Mechanical10/31/2022
DOB NOWGeneral ConstructionPermit IssuedStructure Tone10/25/2022
DOB NOWStructuralSigned-offStructure Tone10/25/2022
DOB NOWMechanical SystemsSigned-offStructure Tone10/21/2022
DOB NOWMechanical SystemsSigned-offElbrus Air Conditioning *08/30/2022
DOB NOWMechanical SystemsPermit IssuedComputer Cool/Ice Age06/02/2022
DOB NOWMechanical SystemsPermit IssuedComputer Cool/Ice Age06/02/2022
DOB NOWStructuralPermit IssuedN.y.fence-A-Lot02/26/2022
DOB NOWGeneral ConstructionSigned-offStructure Tone02/10/2022
DOB NOWBoiler EquipmentSigned-offNew York Heating02/02/2022
DOB NOWPlumbingSigned-offUnited Plumbing Mechanical01/28/2022
DOB NOWMechanical SystemsPermit IssuedComputer Cool/Ice Age01/24/2022
DOB NOWStructuralPermit IssuedN.y.fence-A-Lot01/04/2022
DOB NOWMechanical SystemsSigned-offNYC Heat Solution09/24/2021
+ 53 more permits on file
3 projects · most recent 06/25/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Refrigeration Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
06/25/2026Permit IssuedJRM Construction ManagementAir Conditioning Systems, Heating and Air Conditioning Systems—
06/17/2025Signed-offStructure ToneAir Conditioning Systems, Heating Systems, Refrigeration Systems
Cooling
Multiaqua MHCFC4W-12-1 11,900 BTU · Fan Coil Indoor ×18
MHCFC4W 11,900 BTU · Fan Coil Indoor ×2
Airwise NJ-13/CW/K 30 tons · Ahu ×4
Stulz EBD-122-5-E011 73,000 BTU · Crac Unit ×2
OHS-060-F-FC 5 tons · Crac Unit ×2
International Enviro-Tec HDD20 36,000 BTU · Fan Coil Indoor ×2
Heating
International Enviro-Tec HDD12 15,000 BTU · Fan Coil Indoor ×2
Refrigeration
Arctic Chill PACVMV030004-MM-FC 150 tons · Chiller ×2
01/12/2022Permit IssuedComputer Cool/Ice AgeAir Conditioning Systems, Associated Ducts and Piping
Cooling
Vertiv DME044C 24,000 BTU · Exhaust Fan ×2
2 projects · most recent 06/25/2026
Sprinkler System
FiledStatusContractorScope
06/25/2026——Sprinkler System
05/01/2023Signed-offCurrent Fire Protection I—
6 projects · most recent 09/18/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
09/18/2026Permit IssuedForsythe Plumbing & HeatingGas, Water/Sanitary
06/25/2026——Water/Sanitary
05/11/2026Permit IssuedTristate Plumbing ServicesStorm
05/22/2024Signed-offUnited Plumbing MechanicalWater/Sanitary
08/31/2023Permit IssuedZ.W. Plumbing & HeatingGas
08/01/2022Permit IssuedUnited Plumbing MechanicalWater/Sanitary
8 projects · most recent 09/24/2026
General Wiring Lighting
FiledStatusContractorScope
09/24/2026Permit IssuedLevest Electric—
07/23/2026CompleteKleinknecht Electric CoGeneral Wiring
06/23/2026CompleteKriscorp Electrical Contng1 meters, 1 new_meters
04/23/2026Permit IssuedLevest ElectricGeneral Wiring
11/03/2025Permit IssuedTransel Elev. & ElectricGeneral Wiring
12/07/2023CompleteKleinknecht Electric CoGeneral Wiring
02/17/2023CompleteA'S Electric ContractingGeneral Wiring
08/01/2018CompleteAdco ElectricalGeneral Wiring, Lighting
2 projects · most recent 05/11/2026
Concrete Steel
FiledStatusContractorScope
05/11/2026Permit IssuedHunter Roberts ConstructionConcrete
12/01/2021Permit IssuedN.y.fence-A-LotSteel
1 project · most recent 10/16/2026
FiledStatusContractorScope
10/16/2026Permit IssuedEmes Solar2,500 panels, 1,450 kw, 305,472.3 roof_area_sqft
1 project · most recent 07/29/2026
Scaffold
FiledStatusContractorScope
07/29/2026Permit IssuedPJP InstallersScaffold
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
05/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/26/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/16/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/18/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/08/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/08/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/27/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2022Pass-Final Boiler Equipment InspectionPassView ↗
04/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 125
DateRequirementInspectorRole
09/14/2026FinalNARESH MAHANGUprogress
09/14/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
09/14/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)NARESH MAHANGUspecial
09/14/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
09/14/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
08/03/2026Fire-Resistant Penetrations and JointsMaxim Korngoldspecial
08/03/2026Post-installed AnchorsMaxim Korngoldspecial
07/22/2026Post-installed AnchorsMAXIM KORNGOLDspecial
07/22/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
07/06/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
07/06/2026Post-installed AnchorsMAXIM KORNGOLDspecial
06/22/2026Sprayed fire-resistant materialsShahrish Shuvospecial
06/03/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
06/03/2026Post-installed AnchorsShahrish Shuvospecial
06/03/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Shahrish Shuvospecial
06/03/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
06/03/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
06/03/2026Post-installed AnchorsShahrish Shuvospecial
06/03/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Shahrish Shuvospecial
06/03/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
03/25/2026FinalShahrish Shuvoprogress
03/24/2026FinalShahrish Shuvoprogress
02/23/2026Structural Stability – Alterations of existing buildingsMAXIM KORNGOLDspecial
02/23/2026Concrete - Cast-In-PlaceMAXIM KORNGOLDspecial
02/23/2026FinalMAXIM KORNGOLDprogress
Latest 25 of 125.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Depository Trust & Clearing Corporation (DTCC)OfficeCellar, Floors 1–7, Penthouse, Roof
Project B01378149 Alteration · Approved · 06/24/2026
Project B01377675 Alteration · Permit Entire · 06/23/2026
Project B01300008 Alteration · Permit Entire · 11/26/2025
Project B00787958 Alteration CO · Permit Entire · 09/28/2022
Project B00787901 Alteration · LOC Issued · 09/27/2022
Project B00787934 Alteration · Permit Entire · 09/27/2022
Project B07998837 Alteration · LOC Issued · 09/27/2022
Project B00647403 Alteration · LOC Issued · 01/25/2022
T-MobileTelecom siteRoof
Project B01114166 Alteration · Plan Examiner Review · 05/27/2026
New York City Economic DevelopmentOfficeSub-basement, Roof
Project B01322968 Alteration · Permit Entire · 02/25/2026
Project B01322981 Alteration · Approved · 02/25/2026
Project B01322994 Alteration · Approved · 02/25/2026
Project B01322975 Alteration · Permit Entire · 02/24/2026
OmbligoOfficeFloor 4
Project B08047110 Alteration · Permit Entire · 12/09/2022
DTCC Depository Trust CompanyOfficeCellar, Floor 4, Penthouse, Roof
Project B00628261 Alteration · Permit Entire · 01/12/2022
Project B00628282 Alteration · Permit Entire · 01/12/2022
Project B00628300 Alteration · Permit Entire · 01/12/2022
Depository Trust CoorporationOfficeCellar, Roof
Project B00460005 Alteration · Permit Entire · 12/01/2021
Project B00770724 Alteration · Permit Entire · 08/01/2022
Liquid TechnologyOfficeFloor 8, Roof
Project B00188307 Alteration · Permit Entire · 07/30/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,892 on file (BIS + DOB NOW)
▸Plans & Drawings53
▸DOB NOWPlans/Sketch47
09/01/2026B00480587-I1Request digital key ↗
08/31/2026B00628300-I1Request digital key ↗
08/31/2026B00628282-P1Request digital key ↗
Showing 3 of 47 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/02/2026B00188307-I1Request digital key ↗
09/01/2026B00473282-I1Request digital key ↗
09/01/2026B00473282-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/02/2026B00307762-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits516
▸BISPLAN / WORK APPROVAL APPLICATION283
06/18/2025300424912Open ↗
06/12/2025300424912Open ↗
06/05/2025300424912Open ↗
Showing 3 of 283 on file for this type
▸BISWORK PERMIT APPLICATION218
10/16/2020340704580Open ↗
08/22/2019321969802Open ↗
06/04/2019321830550Open ↗
Showing 3 of 218 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION15
01/23/2020321442248Open ↗
08/06/2019321692263Open ↗
Showing 2 of 15 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/17/2021300424912Open ↗
▸Seals & Professional Certifications590
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION315
07/12/2019321658461Open ↗
07/12/2019321658461Open ↗
06/25/2019321969802Open ↗
Showing 3 of 315 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature56
10/18/2026B00993635-P1Open ↗
10/18/2026B00993635-P1Open ↗
10/05/2026B01322975-P2Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature54
10/18/2026B00993635-P1Open ↗
09/01/2026B00473282-I1Open ↗
09/01/2026B00473282-P1Open ↗
Showing 3 of 54 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST48
06/25/2019321969802Open ↗
Showing 1 of 48 on file for this type
▸DOB NOWProgress Inspector Seal & Signature43
10/18/2026B00993635-P1Open ↗
10/18/2026B00993635-P1Open ↗
10/05/2026B01378149-I1Open ↗
Showing 3 of 43 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISPC FULL REPORT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Trade Schedules & Equipment423
▸BISSELF-CERT PLUMBING NOTICE128
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 128 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT98
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 98 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE90
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 90 on file for this type
▸BISSCHEDULE B - PLUMBING50
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 50 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISEQUIPMENT USE PERMITS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA10
12/31/2019321071530Open ↗
03/05/2019321802279Open ↗
11/21/2018321647401Open ↗
Showing 3 of 10 on file for this type
▸BISSPRINKLER INSP REPORT : FP-859
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-842
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWStreet Tree Checklist3
08/27/2026B00787958-P2Open ↗
Showing 1 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos130
▸BISASBESTOS: CERTIFICATION (DEP ACP5)46
11/27/2019340704580Open ↗
06/25/2019321969802Open ↗
04/02/2019321830550Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report44
10/18/2026B00993635-P1Open ↗
09/01/2026B00480587-I1Open ↗
08/31/2026B00460005-I1Open ↗
Showing 3 of 44 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance233
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS149
06/25/2019321969802Open ↗
04/02/2019321830550Open ↗
03/25/2019321799782Open ↗
Showing 3 of 149 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS48
09/24/2020321691086Open ↗
03/25/2019321799782Open ↗
01/09/2019321644066Open ↗
Showing 3 of 48 on file for this type
▸BISTR8: Energy Code Progress Inspections17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
09/24/2020321691086Open ↗
11/27/2019340704580Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/01/2026B00473282-I1Open ↗
Showing 1 of 3 on file for this type
▸Inspections & Test Reports57
▸BISTECHNICAL REPORT: RESPONSIBILITY30
03/28/2025321692263Open ↗
06/23/2021300424912Open ↗
06/23/2021300424912Open ↗
Showing 3 of 30 on file for this type
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION3
10/29/2020300197775Open ↗
10/29/2020300235298Open ↗
05/07/2020320242340Open ↗
▸Approvals, Objections & Sign-offs304
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST120
01/20/2022321691086Open ↗
04/23/2021320751726Open ↗
02/26/2021300424912Open ↗
Showing 3 of 120 on file for this type
▸BISADMINISTRATIVE OBJECTIONS75
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 75 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION41
06/03/2025300424912Open ↗
09/24/2020340704580Open ↗
09/24/2020340704580Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter40
08/31/2026B00628300-I1Open ↗
08/31/2026B00628282-I1Open ↗
08/31/2026B00628282-P1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)11
10/18/2026B00993635-P1Open ↗
08/31/2026B00628300-I1Open ↗
08/28/2026B08032216-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)6
08/31/2026B00628300-I1Open ↗
08/28/2026B08032216-I1Open ↗
Showing 2 of 6 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLANDMARKS APPROVAL3
07/26/2019321692263Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
06/18/2025300424912Open ↗
06/12/2025300424912Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
01/17/2020340704580Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership231
▸BISCOST AFFIDAVIT230
10/21/2020321130646Open ↗
10/21/2020302046587Open ↗
10/21/2020321658461Open ↗
Showing 3 of 230 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/23/2021320751726Open ↗
▸Filing & Intake Forms300
▸BISEFILING COVER SHEET134
06/26/2019321969802Open ↗
04/02/2019321830550Open ↗
10/31/2018321071530Open ↗
Showing 3 of 134 on file for this type
▸BISADDITIONAL INFORMATION119
08/28/2025300424912Open ↗
01/20/2022321691086Open ↗
06/22/2021321691086Open ↗
Showing 3 of 119 on file for this type
▸BISBOROUGH INTAKE FORM39
01/19/2021320455716Open ↗
04/09/2020300344018Open ↗
04/07/2020320455716Open ↗
Showing 3 of 39 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
11/26/2019340704580Open ↗
Showing 1 of 8 on file for this type
▸Other Documents33
▸BISINTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸DOB NOWProof of Historic Building8
08/18/2026B01322975-P2Open ↗
08/18/2026B01322975-P1Open ↗
Showing 2 of 8 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
06/16/2021321830550Open ↗
06/11/2021321830550Open ↗
04/29/2020320242340Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISECCCNYS Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type