← Back
Elevator cooperative
The Beekman Regent Condominium
141 AMSTERDAM AVENUE · Upper West Side-Lincoln Square · BIN 1028837
💬 Discuss this project
1962Year Built
21Stories
D4Building Class
C4-7Zoning
386,850 sfGross Floor Area
385Units
LL97 CoveredRent Stabilized16 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 165 W 66 ST APT CORP · 31,450 sf lot · 12.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction9p · 1 filing · 13 docs
Floor 182p · 2 filings · 13 docs
Floor 172p · 1 filing · 3 docs
Floor 16
Floor 15
Floor 143p · 3 filings · 16 docs
Floor 13
Floor 12
Floor 113p · 1 filing · 15 docs
Floor 106p · 1 filing · 11 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 21 filing · 3 docs
Floor 167p · 3 filings · 20 docs
CellarUnder Construction35p · 5 filings · 20 docs
Basement2p · 1 filing · 12 docs
Sub-BasementUnder Construction20p · 4 filings · 20 docs
Site & exterior6p · 2 filings · 6 docs
Filed — no permit issued8p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
165 WEST 66TH STREET APT CORP3403/21/2026
165 WEST 66 ST APARTMENT CORP.2903/21/2026
165 WEST 66TH APARTMENT1203/21/2026
FirstService Residential1109/13/2026
CHARLES H GREENTHAL MANAGEMENT1003/21/2026
165 W 66 ST APT403/22/2026
155 APT403/21/2026
165 WEST 66TH APT403/21/2026
BEEKMAN REGENT CONDOMINIUM203/21/2026
LASERAWAY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADG903/21/2026
MICHAEL ZENREICH ARCHITECT403/21/2026
BG & ASSOCIATES403/21/2026
DOMANI CONSULTING1003/21/2026
ADG ARCHITECTURE DESIGN803/21/2026
AK CONSULTING SERVICES403/21/2026
JENNY FLORES EXPEDITING203/21/2026
BOHLER ENGINEERING103/21/2026
M HASHAS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMSTERDAM RESTORATION LLCGeneral Contractor807/08/2026
EDWIN SOTO, JR.Electrical403/21/2026
SAJO INCGeneral Contractor403/21/2026
BAKER INTERIORS INCGeneral Contractor407/08/2026
MCMANUS MECHANICAL MAINTAElectrical403/21/2026
J. CHRISTOPHER INTERIORSGeneral Contractor403/21/2026
KROMER CONTRACTING & HOMEGeneral Contractor303/21/2026
TOLMAC CONCEPTS INCGeneral Contractor303/21/2026
AIR STREAM AIR CONDITIONINGGeneral Contractor203/21/2026
JGM CONSTRUCTION DEVELOPMENTGeneral Contractor206/27/2026
METHOD MANAGEMENT LLCGeneral Contractor204/09/2026
CHAMP PLUMBING & HTG CORPPlumbing207/08/2026
BEDROCK PLBG. & HTG., INCPlumbing107/08/2026
CARA PLUMBING GROUP INCPlumbing107/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
GRZEGORZ WIDELSKIElectrical103/21/2026
L.J.F. & SONS ELECL CONTSElectrical103/22/2026
PHILIP ZUARDIElectrical103/21/2026
ROBERT COVELLOElectrical103/21/2026
ROOPCHAND SINGHElectrical103/21/2026
S.E. ELECTL CONTNG CORPElectrical103/22/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010104/15/2026
Z & T ENGINEERING, P.C.591504/03/2026
ADG ACHITECTURE AND DESIG3044502/11/2026
COMPLY BUILDING GROUP8622111/14/2024
FUTURE TECH CONSULTANTS O589209/01/2023
SKYLINE ENGINEERING, PLLC267403/23/2023
VALERIO ASSOCIATES, P.C.1379203/08/2023
JAMES D. FERRANTE, ARCHIT8149204/04/2022
AVCON ENGINEERING PC548101/04/2022
OUTSOURCE SPECIAL INSPECT2827210/26/2021
Building Lifecycle
All (229)Filed (38)Permit Issued (31)Signed Off (18)Facade (FISP) (16)Violation (60)Inspection (20)Objection (16)Special Inspection (30)
08/26/2026
Violation issued (HPD, open)
C
08/11/2026
Signed off — Alteration
M00674188-S1
08/11/2026
Signed off — Alteration
M00674188-I1
08/11/2026
Cycle 10 facade inspection completed
08/06/2026
Cycle 10 facade report signed — SWARMP
07/22/2026
Signed off — Alteration
Hereby filing an application to merge Apartment 17J and 17H, by removing the closet space in between the two apartments.
M01386303-I1
07/02/2026
Cycle 10 facade report submitted
06/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/10/2026
Violation issued (HPD, open)
A
06/10/2026
Violation issued (HPD, open)
A
06/10/2026
Violation issued (HPD, open)
A
06/10/2026
Violation issued (HPD, open)
C
06/10/2026
Violation issued (HPD, open)
A
06/10/2026
Violation issued (HPD, open)
A
06/10/2026
Violation issued (HPD, open)
A
05/26/2026
Permit issued — Plumbing
M01354382-S1-PL
05/21/2026
Violation issued (HPD, open)
B
05/21/2026
Violation issued (HPD, open)
B
05/21/2026
Violation issued (HPD, open)
B
05/09/2026
Violation issued (HPD, closed)
B
05/09/2026
Violation issued (HPD, open)
B
05/09/2026
Violation issued (HPD, closed)
C
05/08/2026
Permit issued — General Construction
M01349985-I1-GC
05/07/2026
Permit issued — Mechanical Systems
M01354382-I1-MS
05/06/2026
Permit issued — General Construction
M01386303-I1-GC
04/29/2026
Signed off — Alteration
Scope of work will include plumbing include gas piping and new gas meter 2 gas hot water heaters booster pimp as indicated on plans. No change in use occupancy or egress .
M00669894-I1
04/20/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/15/2026
Filed — Alteration
Hereby filing an application to merge Apartment 17J and 17H, by removing the closet space in between the two apartments.
M01386303-I1
04/15/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Fei Zeng
04/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
Fei Zeng
04/15/2026
Special inspection requirement — Maintenance information
Fei Zeng
04/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Fei Zeng
04/15/2026
Special inspection requirement — Post-installed Anchors
Fei Zeng
04/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
Fei Zeng
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fei Zeng
04/15/2026
Special inspection requirement — Heating Systems
Fei Zeng
04/03/2026
Filed — Alteration
M00674188-P4
04/03/2026
Filed — Alteration
M00674188-P3
04/01/2026
Filed — Alteration
IRA to assist with Condition Assessment
M01381516-I1
04/01/2026
Special inspection requirement — Interior lighting power
Christopher Carrano
04/01/2026
Special inspection requirement — Lighting controls
Christopher Carrano
04/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/01/2026
Special inspection requirement — Final
Christopher Carrano
04/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Carrano
03/31/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION TO EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01349985-P1
03/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/30/2026
Special inspection requirement — Interior lighting power
Christopher Carrano
03/30/2026
Special inspection requirement — Lighting controls
Christopher Carrano
03/30/2026
Special inspection requirement — Final
Christopher Carrano
03/10/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/06/2026
Permit issued — Mechanical Systems
M01354382-I1-MS
03/02/2026
Permit issued — Boiler Equipment
M00674188-I1-BE
02/27/2026
Permit issued — Boiler Equipment
M00674188-S1-BE
02/18/2026
Permit issued — General Construction
M01349985-I1-GC
02/11/2026
Filed — Alteration
M01354382-S1
02/08/2026
Filed — Alteration
M01354382-I1
02/06/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION TO EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01349985-I1
02/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
Fei Zeng
02/05/2026
Special inspection requirement — Interior lighting power
Fei Zeng
Latest 60 of 229 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBEDROCK PLBG. & HTG., INC05/26/2026
DOB NOWGeneral ConstructionPermit IssuedJGM CONSTRUCTION DEVELOPMENT05/08/2026
DOB NOWMechanical SystemsSigned-offJGM CONSTRUCTION DEVELOPMENT05/07/2026
DOB NOWGeneral ConstructionSigned-offBAKER INTERIORS INC05/06/2026
DOB NOWMechanical SystemsSigned-offMETHOD MANAGEMENT LLC03/06/2026
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP03/02/2026
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP02/27/2026
DOB NOWGeneral ConstructionPermit IssuedMETHOD MANAGEMENT LLC02/18/2026
DOB NOWPlumbingSigned-offCHAMP PLUMBING & HTG CORP04/30/2025
DOB NOWGeneral ConstructionSigned-offTECHCREW INC12/04/2024
DOB NOWPlumbingSigned-offPRIME PLMBG & HTG OF NY05/07/2024
DOB NOWGeneral ConstructionSigned-offGENCO LEE RENOVATION INC05/06/2024
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC09/08/2023
DOB NOWGeneral ConstructionSigned-offSAJO INC07/14/2023
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP04/06/2023
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC04/05/2023
DOB NOWGeneral ConstructionSigned-offTOLMAC CONCEPTS INC03/27/2023
DOB NOWGeneral ConstructionPermit IssuedCHAMPION COMBUSTION CORP02/16/2023
DOB NOWGeneral ConstructionSigned-offSAJO INC02/10/2023
DOB NOWPlumbingSigned-offCHAMP PLUMBING & HTG CORP04/27/2022
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP04/27/2022
DOB NOWMechanical SystemsSigned-offAIR STREAM AIR CONDITIONI03/14/2022
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP02/15/2022
DOB NOWGeneral ConstructionSigned-offKROMER CONTRACTING & HOME12/03/2021
DOB NOWGeneral ConstructionSigned-offJ CHRISTOPHER INTERIORS10/25/2021
DOB NOWGeneral ConstructionSigned-offBAKER INTERIORS INC07/28/2021
DOB NOWGeneral ConstructionSigned-offJ CHRISTOPHER INTERIORS07/09/2021
DOB NOWSidewalk ShedSigned-offAMSTERDAM RESTORATION LLC06/11/2021
DOB NOWSupported ScaffoldSigned-offAMSTERDAM RESTORATION LLC06/01/2021
DOB NOWSidewalk ShedSigned-offAMSTERDAM RESTORATION LLC02/23/2021
DOB NOWSupported ScaffoldSigned-offAMSTERDAM RESTORATION LLC02/18/2021
BIS—ISSUEDBAKER INTERIORS, INC.07/23/2021
BISOTISSUEDAMSTERDAM RESTORATION LLC03/16/2021
BISPLISSUEDCOSME PLBG & HTG CORP10/09/2019
BISPLISSUEDEBM PLUMBING CORP11/28/2018
BISOTISSUEDMANHATTAN RESTORATION LLC10/10/2018
BISPLISSUEDTRI STATE PLBG & HTG INC10/05/2018
BISOTISSUEDH&K NY CORP09/10/2018
BISPLISSUEDCOSME PLBG & HTG CORP07/09/2018
BISOTISSUEDDMN BROTHERS CONSTRUCTION06/05/2018
+ 41 more permits on file
1 project · most recent 06/18/2021
Air Conditioning Systems
FiledStatusContractorScope
06/18/2021——Air Conditioning Systems
25 projects · most recent 07/22/2026
General Wiring
FiledStatusContractorScope
07/22/2026CompleteEMPIRE LIC ELECL CONTRS—
07/20/2026CancelledEMPIRE LIC ELECL CONTRSGeneral Wiring
05/29/2026Permit IssuedCITYWIDE ELEC'L WIRING INGeneral Wiring
05/06/2026CompleteA&L ELECTRIC & AUTOMATION—
05/05/2026CompleteROBERT CHIMENTI—
01/14/2026Permit IssuedL.J.F. & SONS ELECL CONTSGeneral Wiring
12/16/2025Permit IssuedL.J.F. & SONS ELECL CONTSGeneral Wiring
10/08/2025Permit IssuedTHE METRO GROUP ELECTRICGeneral Wiring
06/03/2025CompleteITS ELECTRIC 45 INCGeneral Wiring
05/01/2025CompleteTHE METRO GROUP ELECTRIC—
04/16/2025CompleteGRX EURO ELECTRIC CORPGeneral Wiring
02/27/2025CompleteSNB ELECTRICAL CONTNG CORGeneral Wiring
01/27/2025CompleteAPOLLO ELECTRIC USA, INC—
12/04/2024CompleteDENNISON ELECTRIC CORPGeneral Wiring
11/07/2024CompleteAPOLLO ELECTRIC USA, INC—
1 project · most recent 04/01/2026
FiledStatusContractorScope
04/01/2026———
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
06/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/20/2026Pass-Final Boiler Equipment InspectionPassView ↗
03/10/2026Pass-Final Boiler Equipment InspectionPassView ↗
07/24/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/11/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/02/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/13/2023Fail-Final Boiler Equipment InspectionFailView ↗
06/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/17/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
04/15/2026Fire-Resistant Penetrations and JointsFei Zengspecial
04/15/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsFei Zengspecial
04/15/2026HVAC-R and service water piping design and insulationFei Zengenergy_progress
04/15/2026Maintenance informationFei Zengenergy_progress
04/15/2026HVAC-R and service water heating equipmentFei Zengenergy_progress
04/15/2026HVAC-R and service water heating system controlsFei Zengenergy_progress
04/15/2026Post-installed AnchorsFei Zengspecial
04/15/2026Heating SystemsFei Zengspecial
04/01/2026Tenant Protection Plan Compliance—special
04/01/2026Lighting controlsChristopher Carranoenergy_progress
04/01/2026Interior lighting powerChristopher Carranoenergy_progress
04/01/2026FinalChristopher Carranoprogress
04/01/2026Tenant Protection Plan ComplianceChristopher Carranospecial
03/30/2026Interior lighting powerChristopher Carranoenergy_progress
03/30/2026FinalChristopher Carranoprogress
03/30/2026Tenant Protection Plan Compliance—special
03/30/2026Lighting controlsChristopher Carranoenergy_progress
02/05/2026Shutoff dampersFei Zengenergy_progress
02/05/2026Post-installed AnchorsFei Zengspecial
02/05/2026Interior lighting powerFei Zengenergy_progress
02/05/2026HVAC-R and service water heating equipmentFei Zengenergy_progress
02/05/2026HVAC-R and service water heating system controlsFei Zengenergy_progress
02/05/2026HVAC-R and service water piping design and insulationFei Zengenergy_progress
02/05/2026Lighting controlsFei Zengenergy_progress
02/05/2026Maintenance informationFei Zengenergy_progress
Latest 25 of 78.
▾Documents — 1,172 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch36
09/04/2026M00464888-P1Request digital key ↗
09/04/2026M00464888-I1Request digital key ↗
09/03/2026M00598329-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00464888-P1Request digital key ↗
09/04/2026M00464888-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00434116-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/03/2026M00470628-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00434166-I1Request digital key ↗
▸Applications & Permits238
▸BISPLAN / WORK APPROVAL APPLICATION138
02/14/2023120715645Open ↗
02/13/2023120715645Open ↗
01/27/2023121209423Open ↗
Showing 3 of 138 on file for this type
▸BISWORK PERMIT APPLICATION94
07/26/2021121209423Open ↗
03/16/2021123830364Open ↗
Showing 2 of 94 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
04/11/2023120715645Open ↗
12/02/2021102729282Open ↗
Showing 2 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/19/2021121209423Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
03/16/2021123830364Open ↗
▸BISSIDEWALK SHED APPLICATION & PERMIT1
03/16/2021123830364Open ↗
▸Seals & Professional Certifications254
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION98
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 98 on file for this type
▸DOB NOWProgress Inspector Seal & Signature44
09/30/2026M01349985-I1Open ↗
09/30/2026M01349985-I1Open ↗
09/30/2026M01349985-I1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature38
09/04/2026M00464888-P1Open ↗
09/04/2026M00464888-I1Open ↗
09/03/2026M00598312-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/30/2026M01349985-I1Open ↗
09/26/2026M00674188-P2Open ↗
09/26/2026M00674188-P2Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
03/03/2021140999329Open ↗
Showing 1 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/03/2021140999329Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/03/2021140999329Open ↗
Showing 1 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment86
▸BISSELF-CERT PLUMBING NOTICE35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸BISSCHEDULE B - PLUMBING21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
10/20/2021140479104Open ↗
10/19/2021140479104Open ↗
10/19/2021140479104Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS8
10/20/2021140479104Open ↗
10/20/2021140479104Open ↗
10/20/2021140479104Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection26
▸BISTENANT PROTECTION PLAN AND NOTES19
02/09/2022120974918Open ↗
12/21/2021101551768Open ↗
12/06/2021121797190Open ↗
Showing 3 of 19 on file for this type
▸BISST-1 Street Tree Checklist3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTREET TREE CHECKLIST2
06/22/2021121209423Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00434116-I1Open ↗
08/13/2026M00434166-I1Open ↗
▸Environmental & Asbestos84
▸DOB NOWDEP ACP-5: Asbestos Assessment Report33
09/04/2026M00464888-I1Open ↗
09/04/2026M00464888-P1Open ↗
09/03/2026M00598329-I1Open ↗
Showing 3 of 33 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)24
06/02/2021121209423Open ↗
01/27/2021123830364Open ↗
01/12/2021123830364Open ↗
Showing 3 of 24 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance90
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS27
03/28/2024121209423Open ↗
09/26/2022121209423Open ↗
09/15/2022121722706Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
09/15/2022121722706Open ↗
10/19/2021140479104Open ↗
10/19/2021140479104Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
08/15/2026M00598312-I1Open ↗
08/13/2026M00508842-I1Open ↗
08/31/2026M00674188-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
09/17/2022121722706Open ↗
08/08/2022120834428Open ↗
10/19/2021140479104Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/17/2022121722706Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/31/2026M00674188-I1Open ↗
▸Inspections & Test Reports51
▸BISTECHNICAL REPORT: RESPONSIBILITY46
04/12/2023120715645Open ↗
10/27/2022102259342Open ↗
10/27/2022102259342Open ↗
Showing 3 of 46 on file for this type
▸BISSPRAYED FIRE-RESISTANT MATERIALS2
09/17/2022121722706Open ↗
09/17/2022121722706Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/17/2022121722706Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
09/17/2022121722706Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
09/17/2022121722706Open ↗
▸Approvals, Objections & Sign-offs90
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST47
04/12/2023120715645Open ↗
10/28/2022102259342Open ↗
10/19/2022120974918Open ↗
Showing 3 of 47 on file for this type
▸BISADMINISTRATIVE OBJECTIONS22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE16
01/27/2023121209423Open ↗
01/26/2023121209423Open ↗
11/17/2022121209423Open ↗
Showing 3 of 16 on file for this type
▸BISFINAL2
09/17/2022121722706Open ↗
08/08/2022120834428Open ↗
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership84
▸BISCOST AFFIDAVIT83
03/28/2024121209423Open ↗
05/22/2023121209423Open ↗
09/26/2022121209423Open ↗
Showing 3 of 83 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms94
▸BISEFILING COVER SHEET40
02/26/2021121209423Open ↗
Showing 1 of 40 on file for this type
▸BISADDITIONAL INFORMATION37
08/18/2022121209423Open ↗
09/17/2021140479104Open ↗
02/24/2021123830364Open ↗
Showing 3 of 37 on file for this type
▸BISBOROUGH INTAKE FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
03/03/2021140999329Open ↗
Showing 1 of 8 on file for this type
▸Other Documents20
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
07/26/2022101379394Open ↗
10/19/2021140479104Open ↗
10/19/2021140479104Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDHCR Document5
09/04/2026M00464888-I1Open ↗
09/04/2026M00464888-P1Open ↗
08/13/2026M08055430-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPlot Diagram3
11/23/2021121209423Open ↗
Showing 1 of 3 on file for this type
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION2
09/17/2022121722706Open ↗
09/17/2022121722706Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01381516-I1Open ↗