Parochial school, yeshiva
1411 39 STREET
BROOKLYN · BIN 3124991
💬 Discuss this project
1930Year Built
4Stories
W2Building Class
M1-2Zoning
32,065 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Parochial school, yeshiva · Owner of record: BZOB 39 LLC · 8,428 sf lot · 3.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof5p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 44p · 1 filing · 20 docs
Floor 34p · 2 filings · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BZOB 392403/22/2026
BZ0B 39 LLC103/22/2026
AHRON SONS REALTY103/22/2026
OWNER OF 1411-39 ST103/22/2026
4121 14 AVE REALTY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MARK MARISCAL, ARCHITECT511/13/2025
SHARON ENGINEERING, P.C810/17/2025
REVAP CONSULTING ENGINEERS LLC209/25/2024
MOHAMMAD AHEAD, PE202/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITY EXPEDITING3003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DELUXE HOME BUILDERS CORPGeneral Contractor807/08/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor407/08/2026
PIPING & PLUMBING SOLUTIOFire Protection207/08/2026
DNA PLUMBING CONTR. INCPlumbing107/08/2026
TAP PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161010/17/2025
NORMAN C. LOK818102/28/2024
Building Lifecycle
All (155)Filed (17)Permit Issued (12)Signed Off (8)Violation (36)Inspection (10)Objection (42)Special Inspection (30)
11/13/2025
Filed — No Work
B01161708-P3
11/12/2025
Special inspection requirement — Public Assembly Emergency Lighting
Mark Mariscal
10/31/2025
Signed off — Alteration
Plumbing work in conjunction with Alt CO #321356215
B00960466-S5
10/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
10/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
10/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
10/21/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
10/21/2025
Special inspection requirement — Shutoff dampers
FAHAD FATEH
10/21/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
10/21/2025
Special inspection requirement — Final
FAHAD FATEH
10/17/2025
Filed — Alteration
Plumbing work in conjunction with Alt CO #321356215
B00960466-P3
08/14/2025
Objection resolved — Addressed
08/14/2025
Objection resolved — Addressed
08/14/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
08/14/2025
Special inspection requirement — Shutoff dampers
FAHAD FATEH
08/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
08/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
08/14/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
08/14/2025
Special inspection requirement — Final
FAHAD FATEH
08/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
08/13/2025
Objection raised — Scope
08/13/2025
Objection raised — Scope
08/01/2025
Filed — No Work
B01161708-P1
07/31/2025
Signed off — Alteration
Plumbing work in conjunction with Alt CO #321356215
B00960466-S3
07/30/2025
Signed off — Alteration
Plumbing work in conjunction with Alt CO #321356215
B00960466-S4
07/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/24/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
07/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/23/2025
Filed — Alteration
Plumbing work in conjunction with Alt CO #321356215
B00960466-P2
07/22/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
07/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/22/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/21/2025
Special inspection requirement — Public Assembly Emergency Lighting
Mark Mariscal
07/09/2025
Permit issued — Sprinklers
B00960466-S3-EW-SP
07/08/2025
Permit issued — Standpipe
B00960466-S3-EW-SD
07/01/2025
Objection resolved — Addressed
06/30/2025
Objection raised — Cost
06/30/2025
Objection resolved — Addressed
06/25/2025
Permit issued — Plumbing
B00960466-S4-PL
06/20/2025
Objection raised — Cost
06/19/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
06/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/19/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
06/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/18/2025
Objection resolved — Addressed
04/28/2025
Signed off — Alteration
Plumbing work in conjunction with Alt CO #321356215
B00960466-I1
04/28/2025
Objection raised — Fire_Protection
04/01/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/17/2025
Objection resolved — Addressed
03/11/2025
Signed off — Alteration
B01007915-I1
03/11/2025
Signed off — Alteration
B01007936-I1
02/07/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/06/2025
Filed — No Work
B00828138-P1
02/06/2025
Special inspection requirement — Public Assembly Emergency Lighting
Mark Mariscal
02/04/2025
Objection resolved — Addressed
02/04/2025
Special inspection requirement — Public Assembly Emergency Lighting
Mark Mariscal
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offEMPIRE PLUMBING INC07/09/2025
DOB NOWStandpipeSigned-offEMPIRE PLUMBING INC07/08/2025
DOB NOWPlumbingSigned-offTAP PLUMBING CORP06/25/2025
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC01/30/2025
DOB NOWMechanical SystemsSigned-offDELUXE HOME BUILDERS CORP01/30/2025
DOB NOWFoundationSigned-offDELUXE HOME BUILDERS CORP05/06/2024
DOB NOWSupported ScaffoldSigned-offDYNAMIX SCAFFOLD GROUP LL03/29/2024
DOB NOWConstruction FenceSigned-offDYNAMIX SCAFFOLD GROUP LL03/12/2024
DOB NOWConstruction FenceSigned-offDYNAMIX SCAFFOLD GROUP LL03/12/2024
DOB NOWStructuralSigned-offDELUXE HOME BUILDERS CORP01/19/2024
DOB NOWConstruction FenceSigned-offDELUXE HOME BUILDERS CORP01/18/2024
DOB NOWStructuralSigned-offDELUXE HOME BUILDERS CORP08/10/2022
BIS—ISSUEDDELUXE HOME BUILDERS CORP01/06/2025
BIS—ISSUEDDELUXE HOME BUILDERS CORP01/23/2024
BIS—ISSUEDDELUXE HOME BUILDERS CORP03/09/2023
BISOTISSUEDSIGN GROUP INC03/11/2019
BISPLISSUEDDNA PLUMBING CONTR. INC08/28/2018
BISMHISSUEDMMK HEATING AND COOLING03/20/2017
BISSPISSUEDSAFETY FIRE SPRINKLER CORP03/02/2017
BISOTISSUEDPROMPT BUILDERS NY INC03/02/2017
BISPLISSUEDDNA PLUMBING CONTR. INC03/02/2017
BIS—ISSUEDPROMPT BUILDERS NY INC11/17/2016
BISEQISSUEDPROMPT BUILDERS NY INC11/17/2016
BISMHISSUEDC & A IRON WORKS INC02/01/2006
BISBLISSUEDMETROPOLITAN HEAT & POWER CO04/19/2005
BISPLISSUEDMETROPOLITAN HEAT & POWER CO04/19/2005
BISPLISSUEDENYQ CORP02/08/2005
BIS—ISSUEDC & A IRON WORKS INC12/09/2004
BISPLISSUEDENYQ CORP12/09/2004
BISEQISSUEDC & A IRON WORKS INC11/18/2004
BISEQISSUEDC & A IRON WORKS INC02/18/2004
BISEQISSUEDC & A IRON WORKS INC02/18/2004
BISEQISSUEDATA CONSTRUCTION CORP.08/03/2001
BIS—ISSUEDATA CONSTRUCTION CORP.08/03/2001
BISEQISSUEDATA CONSTRUCTION CORP.04/27/2001
BIS—ISSUEDATA CONSTRUCTION CORP.04/27/2001
BISEQISSUEDC & A IRON WORKS INC07/26/2000
BIS—ISSUEDC & A IRON WORKS INC07/26/2000
BISOTISSUEDC & A IRON WORKS INC09/03/1999
BISEQISSUEDC & A IRON WORKS INC09/03/1999
3 projects · most recent 06/18/2025
General Wiring
FiledStatusContractorScope
06/18/2025CompleteCONTACT ELECTRIC CORPGeneral Wiring
06/19/2024CompleteSTAR ELEC'L CONTRACTORS C—
03/12/2024CompleteHIGH QUALITY ELECTRIC OF—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/24/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/22/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
07/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/22/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/01/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/07/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
11/12/2025Public Assembly Emergency LightingMark Mariscalprogress
10/21/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
10/21/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
10/21/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
10/21/2025Maintenance informationFAHAD FATEHenergy_progress
10/21/2025Shutoff dampersFAHAD FATEHenergy_progress
10/21/2025Mechanical SystemsFAHAD FATEHspecial
10/21/2025FinalFAHAD FATEHprogress
08/14/2025Maintenance informationFAHAD FATEHenergy_progress
08/14/2025Shutoff dampersFAHAD FATEHenergy_progress
08/14/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
08/14/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
08/14/2025Mechanical SystemsFAHAD FATEHspecial
08/14/2025FinalFAHAD FATEHprogress
08/14/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
07/21/2025Public Assembly Emergency LightingMark Mariscalprogress
06/19/2025Post-installed AnchorsFAHAD FATEHspecial
06/19/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/19/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/19/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/19/2025Maintenance informationFAHAD FATEHenergy_progress
06/19/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
02/06/2025Public Assembly Emergency LightingMark Mariscalprogress
02/04/2025Public Assembly Emergency LightingMark Mariscalprogress
12/05/2024Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
Latest 25 of 49.
▾Documents — 244 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch12
08/26/2026B00960466-S5Request digital key ↗
08/26/2026B00960466-S4Request digital key ↗
08/26/2026B00960466-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly5
08/23/2026B00828138-P1Request digital key ↗
08/19/2026B01161708-P3Request digital key ↗
08/19/2026B01161708-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits38
▸BISPLAN / WORK APPROVAL APPLICATION22
12/11/2025321356215Open ↗
07/24/2025321356215Open ↗
07/23/2025321356215Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION10
01/25/2024321356215Open ↗
03/09/2023321356215Open ↗
03/08/2023321356215Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
07/17/2018321356215Open ↗
07/17/2018321356215Open ↗
02/02/2017321356215Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/06/2019321356215Open ↗
▸BISFILE PA APPLICATION FOR SYNAGOGUE1
02/24/2023321356215Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISVERIFY TAX LOT1
05/08/2025321356215Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
06/28/2019321356215Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/06/2026321356215Open ↗
▸BISZONING APPEAL1
07/18/2018321356215Open ↗
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/29/2026B00763384-P2Open ↗
08/29/2026B00763384-S1Open ↗
08/29/2026B00763384-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
07/29/2019321430572Open ↗
07/29/2019321430572Open ↗
06/28/2019321356215Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B00828138-I1Open ↗
08/31/2026B00763384-I1Open ↗
08/29/2026B00960466-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026B00763384-I1Open ↗
08/30/2026B00960466-S3Open ↗
08/29/2026B00960466-P2Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
02/08/2017321430572Open ↗
10/31/2016321356215Open ↗
04/25/2016321356215Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/12/2018321500684Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
11/04/2016321356215Open ↗
04/25/2016321356215Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/26/2026B00960466-S5Open ↗
08/26/2026B00960466-S4Open ↗
08/15/2026B00763384-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/18/2016321430572Open ↗
04/25/2016321356215Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
06/28/2019321356215Open ↗
06/28/2019321356215Open ↗
06/28/2019321430572Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
06/28/2019321356215Open ↗
06/28/2019321430572Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/29/2024321356215Open ↗
07/20/2023321356215Open ↗
▸BISEXTERIOR LIGHTING POWER1
08/05/2025321356215Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/05/2025321356215Open ↗
▸BISINTERIOR LIGHTING POWER1
08/05/2025321356215Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00960466-S5Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
08/07/2019321430572Open ↗
08/07/2019321430572Open ↗
03/15/2017321430572Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
03/15/2019321920597Open ↗
02/07/2017321430572Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/29/2024321356215Open ↗
07/20/2023321356215Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
03/02/2017321430572Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
02/16/2017321430572Open ↗
▸BISSOIL BEARING PRESSURE (AI-1) 27-6781
02/10/2017321430572Open ↗
▸BISDEP Hydrant Flow Test Letter1
02/16/2017321430572Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
12/30/2024321356215Open ↗
▸Approvals, Objections & Sign-offs25
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
12/26/2019321356215Open ↗
11/21/2019321356215Open ↗
11/08/2019321356215Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
12/11/2025321356215Open ↗
05/14/2025321356215Open ↗
02/27/2025321356215Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER4
01/25/2024321356215Open ↗
03/09/2023321356215Open ↗
03/08/2023321356215Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT10
06/28/2019321430572Open ↗
06/25/2019321920597Open ↗
01/31/2019321920597Open ↗
Showing 3 of 10 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
01/25/2024321356215Open ↗
03/09/2023321356215Open ↗
03/08/2023321356215Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms35
▸BISADDITIONAL INFORMATION18
07/25/2025321356215Open ↗
07/25/2025321356215Open ↗
02/28/2025321356215Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM11
12/26/2019321356215Open ↗
11/21/2019321356215Open ↗
11/08/2019321356215Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET6
01/31/2019321920597Open ↗
02/08/2017321430572Open ↗
02/08/2017321500684Open ↗
Showing 3 of 6 on file for this type
▸Other Documents14
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION4
11/15/2018321430572Open ↗
11/15/2018321430572Open ↗
11/15/2018321430572Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM2
01/06/2026321356215Open ↗
04/25/2016321356215Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
10/31/2016321356215Open ↗
10/31/2016321356215Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
08/05/2025321356215Open ↗
▸BISACCESSIBILITY WAIVER (PEO1)1
02/16/2017321430572Open ↗
▸BISTCO - Supporting Documents1
01/28/2025321356215Open ↗
▸BISUnknown1
06/25/2019321920597Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
02/24/2023321356215Open ↗
▸BISBSA VARIANCE1
01/05/2023321356215Open ↗