← Back
BuildNYC
Elevator apt, semi-fireproof without stores
142-30 SANFORD AVENUE
QUEENS · BIN 4117038
💬 Discuss this project
1955Year Built
6Stories
D1Building Class
R7-1Zoning
106,415 sfGross Floor Area
106Units
LL97 CoveredRent Stabilized130 Active Violations 119 unresolved · 11 paperwork only 2 old, status unconfirmed ▸FISP: No Report Filed
Elevator apt, semi-fireproof without stores · 30,610 sf lot · 3.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofDecommission antenna site and remove roof equipment1p · 1 filing · 4 docs
Floor 4Unit 4K1p · 1 filing · 3 docs
Floor 3
Floor 2
Floor 1
CellarNew gas piping and meter installation8p · 3 filings · 20 docs
Sub-BasementDecommission antenna site and remove roof equipment1 filing · 4 docs
Site & exteriorHeavy Duty Sidewalk Shed InstallationUnder Construction13p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Petro Realty1803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rigid Structural Design104/24/2026
CKL Engineering108/04/2025
New Age205/23/2024
Chun Engineering Consultant104/28/2023
ADS & Y201/06/2022
GBN Engineering109/21/2021
Green Design110/09/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Cavalry103/21/2026
Cavalry Management203/21/2026
Biltmore Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MNK EnterprisesScaffold407/08/2026
Sideris Plumbing & HeatingPlumbing307/08/2026
Intersystem ConstructionScaffold310/19/2026
CavalryGeneral Contractor307/08/2026
Harry Construction GroupGeneral Contractor203/21/2026
G.bassolino PlumbingPlumbing107/08/2026
Gotham CommunicationsGeneral Contractor107/08/2026
Aqueduct MechanicalPlumbing107/08/2026
Triple G ConstructionGeneral Contractor103/21/2026
Capital Construction & PAGeneral Contractor111/01/2021
Davrial EnterprisesGeneral Contractor112/03/2003
MikabGeneral Contractor111/12/2010
Omega General ContractingGeneral Contractor107/08/2011
Racanelli Construction GRGeneral Contractor212/19/2013
Sba Communication GroupGeneral Contractor111/20/2003
Sonia J ContractingGeneral Contractor112/01/2017
Spartan Plumbing & HeatingPlumbing107/08/2011
Squan Construction ServiceGeneral Contractor103/31/2008
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Chun Engineering Consulta9605108/04/2025
New Age Engineering7746205/23/2024
M. International Engineering3129104/28/2023
ADS & Y3783101/06/2022
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
10/14/2026
Permit renewed — Sidewalk Shed
Renewed without changes
Q01376307-I1-SH
07/22/2026
Permit renewed — Sidewalk Shed
Renewed with changes
Q01376307-I1-SH
06/30/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
Q01262672-I1-GC
05/07/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
247 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedIntersystem Construction10/14/2026
DOB NOWSidewalk ShedPermit IssuedIntersystem Construction07/22/2026
DOB NOWSidewalk ShedPermit IssuedIntersystem Construction04/27/2026
DOB NOWPlumbingPermit IssuedSideris Plumbing & Heating12/16/2025
DOB NOWGeneral ConstructionPermit IssuedCavalry08/19/2025
DOB NOWPlumbingPermit IssuedG.bassolino Plumbing06/16/2025
DOB NOWPlumbingPermit IssuedSideris Plumbing & Heating05/30/2024
DOB NOWBoiler EquipmentSigned-offSideris Plumbing & Heating05/28/2024
DOB NOWGeneral ConstructionSigned-offCavalry05/02/2023
DOB NOWGeneral ConstructionPermit IssuedHarry Construction Group03/08/2022
DOB NOWPlumbingSigned-offAqueduct Mechanical02/16/2022
DOB NOWGeneral ConstructionSigned-offGotham Communications11/09/2021
DOB NOWSidewalk ShedSigned-offMNK Enterprises10/27/2021
DOB NOWSidewalk ShedSigned-offMNK Enterprises10/20/2020
BISOTISSUEDCapital Construction & PA11/01/2021
BISOTISSUEDSonia J Contracting12/01/2017
BISOTISSUEDRacanelli Construction GR12/19/2013
BISOTISSUEDRacanelli Construction GR09/18/2013
BISOTISSUEDOmega General Contracting07/08/2011
BISPLISSUEDSpartan Plumbing & Heating07/08/2011
BISOTISSUEDMikab11/12/2010
BISOTISSUEDSquan Construction Services03/31/2008
BISOTISSUEDDavrial Enterprises12/03/2003
BISOTISSUEDSba Communication Group11/20/2003
BISOTISSUEDTriple G Construction02/05/2002
1 project · most recent 01/06/2022
Gas Water/Sanitary
FiledStatusContractorScope
01/06/2022Signed-offAqueduct MechanicalGas, Water/Sanitary
3 projects · most recent 03/20/2026
General Wiring
FiledStatusContractorScope
03/20/2026Permit IssuedAurora Electrical Contg—
02/22/2022CompleteH. & L. ElectricGeneral Wiring
10/09/2020Permit IssuedRichard Neu—
1 project · most recent 04/24/2026
Sidewalk Shed
FiledStatusContractorScope
04/24/2026Permit IssuedIntersystem ConstructionSidewalk Shed
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/08/2025Pass-Final Boiler Equipment InspectionPassView ↗
11/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/24/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/12/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
04/27/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
04/27/2024Tenant Protection Plan ComplianceStephen Shishkospecial
04/27/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
04/27/2024HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
04/27/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
04/27/2024Fire-Resistant Penetrations and JointsStephen Shishkospecial
04/27/2024Tenant Protection Plan ComplianceStephen Shishkospecial
04/27/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
04/27/2024HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
04/28/2023Post-installed AnchorsNANIK MASSANDspecial
04/28/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
04/27/2023Tenant Protection Plan ComplianceNANIK MASSANDspecial
04/26/2023FinalNANIK MASSANDprogress
01/05/2022Energy Code Compliance InspectionsSIDERIS CARAMINTZOSprogress
01/04/2022Fire-Resistant Penetrations and JointsSIDERIS CARAMINTZOSspecial
01/04/2022FinalSIDERIS CARAMINTZOSprogress
08/19/2021FinalGregory Nowakprogress
138 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account