| Owner | Filings | Most Recent |
|---|---|---|
| 142 FIFTH AVENUE OWNERS | 148 | 09/12/2026 |
| HUBB NYC PROPERTIES | 13 | 07/08/2026 |
| KINGS GROUP NY | 13 | 07/08/2026 |
| SILVERLINING INC. | 5 | 03/22/2026 |
| 142 5TH AVENUE OWNER | 27 | 03/22/2026 |
| JAU CO B % 142 5 OWNERS C | 1 | 03/22/2026 |
| QONER'S CORP CARE OF 5 W | 1 | 03/22/2026 |
| COBB JAN 142 5 AVE OWN | 1 | 03/22/2026 |
| COBB JAN 142 FIFTH AVE | 1 | 03/22/2026 |
| DEZER PROPERTIES | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ALL CITY ENGINEERING P.C. | 3 | 08/04/2026 |
| HALO ARCHITECTURE PLLC | 2 | 06/09/2026 |
| CES ENGINEERING LLC | 10 | 04/07/2026 |
| COREY A. THOMAS | 4 | 04/06/2026 |
| FMO ENGINEERING PC | 1 | 12/17/2025 |
| JEFFREY KAMEN ARCHITECT | 3 | 09/24/2025 |
| MAYERFELD ARCHITECTURE PLLC | 3 | 04/09/2025 |
| SALVATOR A. CARADONNA JR. | 1 | 02/19/2025 |
| RUSSELL M. BAUMANN, ARCHITECT | 2 | 11/14/2024 |
| STARK CONSULTING, LLC | 1 | 10/23/2024 |
| JMV CONSULTING ENGINEERING | 5 | 06/17/2024 |
| KZ ENGINEERING, P.C | 1 | 05/17/2024 |
| STUDIO DB ARCHITECTURE DPC | 2 | 05/07/2024 |
| PLEDGER ARCHITECT, PLLC | 2 | 01/11/2024 |
| FAITH ROSE | 1 | 09/01/2023 |
| TECC SOLUTIONS | 1 | 10/27/2022 |
| ALPHA HOME DESIGN LLC | 1 | 07/14/2022 |
| KCE CONSULTING ENGINEERING PLLC | 1 | 06/13/2022 |
| SYED ENGINEERING, P.C. | 3 | 05/20/2021 |
| A DEGREE OF FREEDOM STRUCTURAL ENGI | 1 | 08/04/2020 |
| ROYAL ENGINEERING, P.C | 1 | 11/16/2018 |
| NEW YORK DESIGN ARCHITECTS, LLP | 1 | 10/26/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| WILLIAM VITACCO ASSOCIATES | 19 | 03/21/2026 |
| J CALLAHAN CONSULTING | 14 | 03/21/2026 |
| JEFFREY KAMEN ARCHITECT | 3 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 1 | 03/21/2026 |
| ALL IN PERMIT CONSULTANTS | 1 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 6 | 03/21/2026 |
| PDG BUILDING CONSULTANTS LLC LLC | 6 | 03/21/2026 |
| BOYD CONSULTING | 2 | 03/21/2026 |
| EXPEDITION NYC | 1 | 03/21/2026 |
| DI DIO ARCHITECTURE, PC | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SILVERLINING INTERIORS | General Contractor | 6 | 07/08/2026 |
| KINGS GROUP NY CORP | General Contractor | 6 | 07/08/2026 |
| HCMC GROUP INC | General Contractor | 4 | 07/08/2026 |
| THINK CONSTRUCTION LLC | General Contractor | 4 | 07/08/2026 |
| CARRICK CONTRACTING INC | General Contractor | 4 | 03/21/2026 |
| VISION BUILD RENOVATION I | General Contractor | 3 | 09/12/2026 |
| DYNAMIC BLUE WATER MECH | Plumbing | 2 | 07/08/2026 |
| L.A.S CONSTRUCTION & SERV | General Contractor | 2 | 03/21/2026 |
| ORBIT SPRINKLER CORP | Fire Protection | 2 | 07/08/2026 |
| CS BRIDGE CORP | General Contractor | 2 | 03/21/2026 |
| RENOVATION PARTNERS INC | General Contractor | 2 | 07/08/2026 |
| ARCON PLBG SOLUTIONS | Plumbing | 2 | 07/08/2026 |
| OAK & STONE DEMOLITION | General Contractor | 1 | 04/09/2026 |
| SMD CONSTRUCTION GROUP IN | General Contractor | 1 | 04/09/2026 |
| CROSSFIELD PLBG.&HTG | Plumbing | 1 | 06/02/2026 |
| FULTON PLBG & HTG CORP | Plumbing | 1 | 07/08/2026 |
| GANIC PLUMBING & HTG INC | Plumbing | 1 | 07/08/2026 |
| NEW MILLENNIUM P & H CORP | Plumbing | 1 | 07/08/2026 |
| ORBIT PLBG & HTG INC | Plumbing | 1 | 07/08/2026 |
| CITY SIGNS | Scaffold | 1 | 07/08/2026 |
| ANTHONY COSTANZO | Electrical | 1 | 03/21/2026 |
| NATIONAL SIGN LIGHTING | Scaffold | 1 | 07/08/2026 |
| CHARLES PARKS | Electrical | 1 | 03/21/2026 |
| CRESCO ELECTRICAL CORP | Electrical | 1 | 03/22/2026 |
| KEFALOGIANNIS, ELEFTERIOS | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SKYLINE ENGINEERING, PLLC | 267 | 3 | 04/07/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 5 | 04/06/2026 |
| BANGASH ASSOCIATES INC | 8488 | 1 | 12/17/2025 |
| FMO ENGINEERING PC | 1798 | 1 | 12/17/2025 |
| ARCO ENGINEERING PC | 3769 | 1 | 09/24/2025 |
| HALO ARCHITECTURE PLLC | 8021 | 1 | 06/09/2025 |
| CES ENGINEERING LLC | 1277 | 3 | 05/20/2025 |
| ACE STRUCTURAL ENGINEERIN | 496 | 2 | 05/01/2025 |
| JEFFREY KAMEN ARCHITECT | 3901 | 1 | 05/01/2025 |
| LANE ENGINEERING CONSULTI | 2967 | 1 | 11/19/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | VISION BUILD RENOVATION I | 09/10/2026 |
| DOB NOW | General Construction | Permit Issued | VISION BUILD RENOVATION I | 09/10/2026 |
| DOB NOW | Structural | Permit Issued | MARK CONTRACTING NY INC | 06/05/2026 |
| DOB NOW | Plumbing | Permit Issued | CROSSFIELD PLBG.&HTG.CORP | 05/18/2026 |
| DOB NOW | Sprinklers | Permit Issued | CROSSFIELD PLBG.&HTG | 05/14/2026 |
| DOB NOW | Plumbing | Permit Issued | GANIC PLUMBING & HTG INC | 10/29/2025 |
| DOB NOW | Plumbing | Signed-off | ARCON PLBG SOLUTIONS | 10/24/2025 |
| DOB NOW | General Construction | Signed-off | OAK & STONE DEMOLITION | 08/26/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | KALE CONSTRUCTION INC | 08/04/2025 |
| DOB NOW | General Construction | Signed-off | VISION BUILD RENOVATION I | 08/01/2025 |
| DOB NOW | General Construction | Permit Issued | SMD CONSTRUCTION GROUP IN | 05/20/2025 |
| DOB NOW | Plumbing | Signed-off | SUPER PLUMBERS CORP | 02/27/2025 |
| DOB NOW | Sign | Signed-off | NATIONAL MAINTENANCE, INC | 02/25/2025 |
| DOB NOW | Plumbing | Signed-off | FULTON PLBG & HTG CORP | 02/13/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SILVERLINING INTERIORS | 01/31/2025 |
| DOB NOW | General Construction | Signed-off | SILVERLINING INTERIORS | 01/31/2025 |
| DOB NOW | Mechanical Systems | Signed-off | THINK CONSTRUCTION LLC | 01/22/2025 |
| DOB NOW | General Construction | Permit Issued | RENOVATION PARTNERS INC | 12/16/2024 |
| DOB NOW | Sprinklers | Permit Issued | ORBIT SPRINKLER CORP | 12/03/2024 |
| DOB NOW | Sprinklers | Permit Issued | ALL PRO PLBG & HTG INC | 11/21/2024 |
| DOB NOW | Plumbing | Signed-off | SUPER PLUMBERS CORP | 11/08/2024 |
| DOB NOW | General Construction | Signed-off | ASE HVAC INC | 11/04/2024 |
| DOB NOW | Plumbing | Signed-off | ARCON PLBG SOLUTIONS | 10/25/2024 |
| DOB NOW | General Construction | Signed-off | THINK CONSTRUCTION LLC | 09/11/2024 |
| DOB NOW | Sprinklers | Signed-off | CAPITOL FIRE SPRINKLER CO | 05/29/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | CS BRIDGE CORP | 05/17/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | B & H RESTORATION, INC | 04/11/2024 |
| DOB NOW | Plumbing | Signed-off | NEW MILLENNIUM P & H CORP | 04/09/2024 |
| DOB NOW | Mechanical Systems | Signed-off | SILVERLINING INTERIORS | 03/06/2024 |
| DOB NOW | General Construction | Signed-off | SILVERLINING INTERIORS | 03/01/2024 |
| DOB NOW | Mechanical Systems | Signed-off | THINK CONSTRUCTION LLC | 01/26/2024 |
| DOB NOW | General Construction | Signed-off | THINK CONSTRUCTION LLC | 01/02/2024 |
| DOB NOW | Mechanical Systems | Signed-off | RENOVATION PARTNERS INC | 08/21/2023 |
| DOB NOW | Structural | Signed-off | CARRICK CONTRACTING | 05/18/2023 |
| DOB NOW | Plumbing | Signed-off | ORBIT PLBG & HTG INC | 02/09/2023 |
| DOB NOW | Sprinklers | Permit Issued | ORBIT SPRINKLER CORP | 01/19/2023 |
| DOB NOW | Mechanical Systems | Signed-off | HCMC GROUP INC | 12/28/2022 |
| DOB NOW | General Construction | Signed-off | HCMC GROUP INC | 11/21/2022 |
| DOB NOW | Sign | Signed-off | ELMER DAWSON | 08/09/2022 |
| DOB NOW | Structural | Signed-off | CARRICK CONTRACTING | 07/27/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/04/2026 | Permit Issued | VISION BUILD RENOVATION I | Air Conditioning Systems | Cooling Mitsubishi Electric PUHY-EM96TXU-A 108,000 BTU · Vrf Outdoor ×1 PURY-EM72TXU-A 80,000 BTU · Vrf Outdoor ×1 |
| 04/07/2026 | Signed-off | SILVERLINING INTERIORS | Air Conditioning Systems, Associated Ducts and Piping | Cooling Daikin RXTQ60TAVJUA 57,500 BTU · Vrf Outdoor ×1 |
| 04/06/2026 | Permit Issued | KALE CONSTRUCTION INC | Air Conditioning Systems | Cooling Bryant Single Stage Air Conditioner BA13NA060-G 5 tons · Condensing Unit ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/04/2026 | — | — | Sprinkler System |
| 04/06/2026 | Permit Issued | CROSSFIELD PLBG.&HTG.CORP | Sprinkler System |
| 09/24/2025 | — | — | 23 heads |
| 05/20/2025 | Permit Issued | ALL PRO PLBG & HTG INC | 34 heads |
| 06/17/2024 | Permit Issued | ORBIT SPRINKLER CORP | 176 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/04/2026 | — | — | Water/Sanitary |
| 04/07/2026 | Signed-off | ARCON PLBG SOLUTIONS | Gas, Water/Sanitary |
| 04/06/2026 | Permit Issued | CROSSFIELD PLBG.&HTG | Water/Sanitary |
| 10/14/2025 | Signed-off | DYNAMIC BLUE WATER MECH | Gas, Water/Sanitary |
| 09/24/2025 | Permit Issued | GANIC PLUMBING & HTG INC | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/07/2025 | Complete | Y.S ELECTRIC | General Wiring, Lighting |
| 08/04/2025 | Permit Issued | R & T ELECTRICAL CORP | General Wiring |
| 06/08/2025 | Permit Issued | CRESCO ELECTRICAL CORP | General Wiring |
| 03/04/2025 | Complete | PROFF ELECTRICAL LLC | — |
| 11/20/2024 | Permit Issued | A.L. ELECTRICAL CORP. | General Wiring |
| 11/07/2024 | Complete | INFINITY ELECTRIC, INC | General Wiring |
| 05/15/2024 | Complete | NASH ELECTRIC SERVICES IN | — |
| 03/13/2024 | Complete | ZIP ELECTRIC INC | General Wiring |
| 08/03/2023 | Complete | ECNY ELEC'L CONTR'S, INC | General Wiring |
| 01/17/2023 | Complete | CRESCO ELECTRICAL CORP | General Wiring |
| 11/29/2022 | Complete | CRESCO ELECTRICAL CORP | General Wiring |
| 04/24/2022 | Complete | CMY ELECTRICAL CORP | — |
| 08/07/2020 | Complete | TWINTECH ELECTRIC INC | General Wiring |
| 12/18/2019 | Complete | ALL WAYS ELECTRIC CORP.W | — |
| 11/14/2019 | Complete | JANON ELECTRIC CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/20/2021 | — | — | Sidewalk Shed |
| 10/26/2018 | Permit Issued | L.A.S CONSTRUCTION & SERV | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/17/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/10/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/27/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/11/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 03/04/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 01/20/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 01/16/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/23/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/12/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/03/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/23/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/01/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/28/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/28/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/31/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/28/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/18/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/21/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/20/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/13/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/06/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/04/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/04/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/15/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/15/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/04/2026 | Tenant Protection Plan Compliance | — | special |
| 07/31/2026 | Tenant Protection Plan Compliance | — | special |
| 06/22/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/22/2026 | Post-installed Anchors | — | special |
| 06/22/2026 | Tenant Protection Plan Compliance | — | special |
| 06/12/2026 | Interior lighting power | — | energy_progress |
| 06/06/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 06/06/2026 | Energy Code Compliance Inspections | — | progress |
| 06/06/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/06/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/06/2026 | Energy Code Compliance Inspections | — | progress |
| 06/06/2026 | Maintenance information | — | energy_progress |
| 06/06/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 06/06/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 06/06/2026 | Shutoff dampers | — | energy_progress |
| 06/06/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 06/06/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/06/2026 | Energy Code Compliance Inspections | — | progress |
| 06/06/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 06/06/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 06/06/2026 | Maintenance information | — | energy_progress |
| 06/06/2026 | Exhaust and Vent Systems in Plenums and Ducts | — | special |
| 06/03/2026 | Mechanical Systems | — | special |
| 06/03/2026 | Sprinkler Systems | — | special |
| 06/03/2026 | Final | — | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Cole Haan | Retail | Floor 1 | Project M01144853 |
| Silk-Verdolini | Office | Floor 8 | Project M00890937 |
| Little Monster Films | Office | Floor 5 | Project M00768549 |