| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M01217335 ↗ | 4 EAST 43 STREET MANHATTAN | Alteration | Signed-off | 04/28/2025 | 01/27/2026 | Design YANG ENGINEERING LLC | PROPOSED INTERIOR RENOVATION ON CELLAR, 1ST THRU. 2ND FLOOR. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. |
| B00786022 ↗ | 253 82 STREET BROOKLYN | Alteration CO | Permit Issued | 08/22/2022 | 10/24/2025 | Design BAYSIDE ENGINEERING PC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON CEL, 1ST THRU 2ND FLOOR AND ATTIC, PLUMBING & GAS WORK AS PER PLAN. GENERAL CONSTRUCTION WORK UNDER DOB NOW … |
| M01288845 ↗ | 68 HESTER STREET MANHATTAN | Alteration | Signed-off | 09/17/2025 | 10/16/2025 | Design NIC DESIGN INC Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION ON CELLAR AND 1ST FLOOR. THE EXTERIOR STORE FRONT RENOVATION AND THE MECHANICAL WORK ON THE ROOF AS PER PLAN. N… |
| M01284273 ↗ | 68 HESTER STREET MANHATTAN | Alteration | Signed-off | 09/09/2025 | 10/01/2025 | Design YANG ENGINEERING LLC Owner BRUT USA INC Filer SD DESIGN STUDIO LLC | SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X01292754 ↗ | 304 EAST 173 STREET BRONX | Alteration | Permit Issued | 09/25/2025 | 09/26/2025 | Design BANGASH ASSOCIATES INC. Owner ACE GROUP NY CORP. Filer THE GREEN STUDIO | INSTALLATION OF PIPE SCAFFOLDING PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCC… |
| B01215598 ↗ | 206 FRONT STREET BROOKLYN | Alteration | Signed-off | 04/28/2025 | 07/23/2025 | Design Agile Design Engineering PC | STRUCTURAL REPAIR FOR CELLAR CEILING SLAB. RESTORE FIREPROOFING IN CELLAR COLUMNS AND SLAB TO MATCH BUILDING FIREPROOFING REQUIREMENT. |
| Name | Jobs together | Most recent |
|---|---|---|
| YANG ENGINEERING LLC | 8 | 02/11/2026 |
| JIMENEZ BUILDING CONSULTING LLC | 7 | 02/24/2025 |
| BASIC GROUPS CORP | 3 | 07/19/2023 |
| Agile Design Engineering PC | 2 | 04/28/2025 |
| BAYSIDE ENGINEERING PC | 2 | 10/23/2025 |
| LONGTIN ENGINEERING INC. | 2 | 07/15/2021 |
| LONGTIN SOLUTIONS LLC | 2 | 07/15/2021 |
| LU ENGINEERING SERVICE PC | 2 | 05/17/2022 |
| UPC ENGINEERING DPC | 2 | 07/18/2022 |
| ACTIVE DESIGN GROUP ENGINEERING | 1 | 09/09/2020 |
| ALBANNA ENGINEERING PC | 1 | 04/15/2021 |
| ALLEN SHINFELD, P.E. PLLC | 1 | 06/19/2023 |
| ARC CONSULTING ENGINEERS | 1 | 12/30/2022 |
| ASR ENGINEERING PC | 1 | 04/27/2023 |
| BANGASH ASSOCIATES INC. | 1 | 09/25/2025 |
| FLUSHING ENGINEERING SERVICE PC | 1 | 11/10/2022 |
| JMV CONSULTING ENGINEERING | 1 | 06/17/2024 |
| JUDGE ARCHITECTURE PC | 1 | 12/20/2022 |
| KL INNOVATIVE DESIGN INC | 1 | 07/19/2023 |
| KOH HO LEE CONSULTING ENGINEER | 1 | 01/03/2022 |
| L & C ASSOCIATES | 1 | 07/07/2022 |
| NIC 88 CORP | 1 | 09/17/2025 |
| NIC DESIGN INC | 1 | 09/17/2025 |
| SD DESIGN STUDIO LLC | 1 | 06/30/2021 |
| STUDIO DB ARCHITECTURE DPC | 1 | 05/07/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| T & T PLUMBING INC | 3 | 02/11/2026 |
| SKYLINE PRO CONSTRUCTION* | 2 | 10/23/2025 |
| ACE GROUP NY CORP | 1 | 09/25/2025 |
| ACER CONSTRUCTION INC | 1 | 07/09/2025 |
| AIR DEPOT COMM. REFR. COR | 1 | 07/09/2025 |
| AMERICAN STANDARD P&H COR | 1 | 02/24/2025 |
| CUBE BUILDERS GROUP NY | 1 | 06/19/2023 |
| DANMARC CONSTRUCTION CORP | 1 | 09/09/2020 |
| EFIN MANAGEMENT CORP | 1 | 02/24/2025 |
| SAFETY PRO CONSTRUCTION | 1 | 02/24/2025 |
| W.R. PLBG AND HTG CORP | 1 | 02/11/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| 142 FIFTH AVENUE OWNERS CORP. | 2 | 06/17/2024 |
| Atelier LIC Holdings 42-20 LLC | 2 | 07/09/2025 |
| FM CONSOLIDATED HOLDING | 2 | 10/03/2022 |
| SD DESIGN STUDIO LLC | 2 | 08/06/2024 |
| ACE GROUP NY CORP. | 1 | 09/25/2025 |
| BRUT USA INC | 1 | 09/09/2025 |
| CHARLES V COOP | 1 | 09/09/2020 |
| Eleven Waverly Associates LLC | 1 | 06/16/2022 |
| GRAND ILLUSION | 1 | 12/30/2022 |
| HAPPY GROWTH TUTORING INC | 1 | 06/09/2023 |
| Luna Bro Realty | 1 | 12/20/2022 |
| MOUNTAIN FUSION INC | 1 | 08/15/2024 |
| OTHER HALF COFFEE LLC | 1 | 09/07/2023 |
| PBA ENTERPRISE LLC | 1 | 05/17/2022 |
| VISTA ON VINEGAR HILL CONDOMINIUM | 1 | 07/22/2023 |
| Name | Jobs together | Most recent |
|---|---|---|
| SD DESIGN STUDIO LLC | 12 | 10/23/2025 |
| WILLIAM VITACCO ASSOCIATES | 3 | 06/17/2024 |
| ALPHA HOME DESIGN LLC | 2 | 09/07/2023 |
| BASIC GROUPS CORP | 2 | 09/17/2025 |
| LC EXPEDITING SERVICES CORP | 2 | 04/28/2025 |
| H&Z BUILDING NY CORP. | 1 | 05/17/2022 |
| JRK CREATIVE INC | 1 | 12/30/2022 |
| KON HO LEE CONSULTING ENGINEER, PLL | 1 | 01/03/2022 |
| M2 DESIGN INC | 1 | 11/10/2022 |
| PROJECT ENTRY | 1 | 06/19/2023 |
| RIZZO GROUP | 1 | 12/20/2022 |
| THE GREEN STUDIO | 1 | 09/25/2025 |
| UPC ENGINEERING DPC | 1 | 07/27/2021 |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M01217335 ↗ | 4 EAST 43 STREET MANHATTAN | Alteration | Signed-off | 04/28/2025 | 01/27/2026 | Design YANG ENGINEERING LLC | PROPOSED INTERIOR RENOVATION ON CELLAR, 1ST THRU. 2ND FLOOR. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. |
| B00786022 ↗ | 253 82 STREET BROOKLYN | Alteration CO | Permit Issued | 08/22/2022 | 10/24/2025 | Design BAYSIDE ENGINEERING PC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON CEL, 1ST THRU 2ND FLOOR AND ATTIC, PLUMBING & GAS WORK AS PER PLAN. GENERAL CONSTRUCTION WORK UNDER DOB NOW … |
| M01288845 ↗ | 68 HESTER STREET MANHATTAN | Alteration | Signed-off | 09/17/2025 | 10/16/2025 | Design NIC DESIGN INC Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION ON CELLAR AND 1ST FLOOR. THE EXTERIOR STORE FRONT RENOVATION AND THE MECHANICAL WORK ON THE ROOF AS PER PLAN. N… |
| M01284273 ↗ | 68 HESTER STREET MANHATTAN | Alteration | Signed-off | 09/09/2025 | 10/01/2025 | Design YANG ENGINEERING LLC Owner BRUT USA INC Filer SD DESIGN STUDIO LLC | SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X01292754 ↗ | 304 EAST 173 STREET BRONX | Alteration | Permit Issued | 09/25/2025 | 09/26/2025 | Design BANGASH ASSOCIATES INC. Owner ACE GROUP NY CORP. Filer THE GREEN STUDIO | INSTALLATION OF PIPE SCAFFOLDING PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCC… |
| B01215598 ↗ | 206 FRONT STREET BROOKLYN | Alteration | Signed-off | 04/28/2025 | 07/23/2025 | Design Agile Design Engineering PC | STRUCTURAL REPAIR FOR CELLAR CEILING SLAB. RESTORE FIREPROOFING IN CELLAR COLUMNS AND SLAB TO MATCH BUILDING FIREPROOFING REQUIREMENT. |
| B01099180 ↗ | 206 FRONT STREET BROOKLYN | Alteration | Signed-off | 08/21/2024 | 07/22/2025 | Design Agile Design Engineering PC | install structural support for cut pier at 1-D, Install steel reinforcement for pier at 10-D at parking garage in cellar level only.NO CHANG… |
| Q01170298 ↗ | 42-20 13 STREET QUEENS | Alteration | Signed-off | 01/22/2025 | 07/10/2025 | Design YANG ENGINEERING LLC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON 1ST FLOOR, ROOF, FLOORING, PARTITION & STORE FRONT WORKS AS PER PLAN. REQUEST OPENING TO #42-26 13TH STREET.… |
| Q01194005 ↗ | 42-26 13 STREET QUEENS | Alteration | Permit Issued | 03/12/2025 | 04/02/2025 | Design YANG ENGINEERING LLC | FILE INTERIOR RENOVATION ON 1ST FLOOR FOR OPENING TO #42-20 13TH STREET. NO CHANGE IN USE, EGRESS, BULK, OR OCCUPANCY |
| Q01017570 ↗ | 88-81 62 DRIVE QUEENS | Alteration | Signed-off | 03/10/2024 | 12/26/2024 | Design YANG ENGINEERING LLC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON CEL, 1ST TO 2ND FLOOR. REPLACE & REPAIR STAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| 123417695BIS | 153 EAST 87 STREET MANHATTAN | — | ISSUED | 02/01/2019 | 12/23/2024 | — | OT, PL |
| M00998319 ↗ | 25 MAIDEN LANE MANHATTAN | Alteration | Permit Issued | 01/31/2024 | 10/10/2024 | Owner MOUNTAIN FUSION INC Filer SD DESIGN STUDIO LLC | PROPOSED PLUMBING WORK ON CELLAR IN CONJUNCTION WITH APPLICATION #M00998319-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00863811 ↗ | 253 82 STREET BROOKLYN | Alteration | Signed-off | 04/27/2023 | 10/03/2024 | Design ASR ENGINEERING PC | APPLICATION FILE TO CONTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHNAGE TO USE, EGRESS OR OCCUPANCY. |
| Q01092332 ↗ | 45-37 BELL BOULEVARD QUEENS | Alteration | Signed-off | 08/06/2024 | 08/07/2024 | Owner SD DESIGN STUDIO LLC Filer SD DESIGN STUDIO LLC | PROPOSE FILE APPLICATION TO INSTALL NEW AC SPLIT OUTDOOR UNIT ON ROOF. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. |
| M00381738 ↗ | 51 CHARLES STREET MANHATTAN | Alteration | Signed-off | 08/07/2020 | 05/24/2024 | Owner CHARLES V COOP Filer METROPOLIS GROUP INC | new steel lintel at window and new steel beam at roof for new roof deck. |
| 123895384BIS | 51 CHARLES STREET MANHATTAN | — | ISSUED | 02/19/2020 | 05/07/2024 | — | OT |
| S00627165 ↗ | 105 EMERSON AVENUE STATEN ISLAND | Alteration | Signed-off | 11/08/2021 | 10/30/2023 | Design ALLEN SHINFELD, P.E. PLLC Filer PROJECT ENTRY | INTERIOR & EXTERIOR RENOVATION AS PER PLAN TO ADDRESS ECB VIOLATION:34771826N; 34771748R; 34181571K; 34141670J; 34094645Z. NO CHANGE TO USE… |
| 402158749BIS | 117-18 ATLANTIC AVENUE QUEENS | — | ISSUED | 09/13/2006 | 09/15/2023 | — | OT, PL |
| B00908242 ↗ | 206 FRONT STREET BROOKLYN | Alteration | Signed-off | 07/22/2023 | 07/27/2023 | Design HSU & ASSOCIATES Filer SD DESIGN STUDIO LLC | FILE ALT-2 JOB FOR EXISTING CONDOMINIUM BUILDING, TO REMOVE 14 EXISTING GLASS PANEL ON THE WEST WALL ONLY. PROPOSED TO SEAL THE EXISTING OPE… |
| B00884963 ↗ | 234 UNION AVENUE BROOKLYN | Alteration | Signed-off | 06/16/2023 | 07/07/2023 | Design HSU & ASSOCIATES Owner OTHER HALF COFFEE LLC Filer ALPHA HOME DESIGN LLC | FILE ALT-2 JOB FOR AN EXISTING GROUND FLOOR COMMERCIAL UNIT. RELOCATE EXISTING PLUMBING FIXTURES , REPLACE EXISTING SPLIT UNIT SYSTEMS & MIN… |
| B00802142 ↗ | 211 BOND STREET BROOKLYN | Alteration | Signed-off | 12/30/2022 | 06/06/2023 | Design ARC CONSULTING ENGINEERS Owner GRAND ILLUSION Filer JRK CREATIVE INC | INSTALL HVAC UNITS FOR EXISTING OFFICE SPACE ON OSP,1ST AND 2ND FLOOR,NO CHANGE IN USE,EGRESS,OCCUPANCY AND BULK |
| Q00878949 ↗ | 136-04 BOOTH MEMORIAL AVE QUEENS | Alteration | Signed-off | 05/22/2023 | 05/30/2023 | Design HSU & ASSOCIATES Filer ALPHA HOME DESIGN LLC | INTERIOR RENOVATION OF EX. COMMERCIAL SPACE FOR AFTER SCHOOL LEARNING CENTER WITH MINOR PARTITION AND DOORSCHANGES. WORKS AS PER PLAN FILED … |
| Q00700391 ↗ | 39-26 24 STREET QUEENS | Alteration | Signed-off | 05/17/2022 | 03/14/2023 | Design LU ENGINEERING SERVICE PC Owner PBA ENTERPRISE LLC Filer H&Z BUILDING NY CORP. | PROPOSED RENOVATION ON PARTIAL OF 1ST FLOOR. REPAIRING FLOORING, CEILING. AND INSTALL EXHAUST FAN ON THE ROOF. NO CHANGE IN USE, EGRESS OR O… |
| Q00802331 ↗ | 41-07 CRESCENT STREET QUEENS | Alteration | Signed-off | 12/23/2022 | 01/02/2023 | Design YANG ENGINEERING LLC | PROPOSED INTERIOR RENOVATION ON THE 1ST FLOOR. REPLACE CEILING, FLOORING & PARTITION WORKS, AND CAP/ REMOVE EXISTING PLUMBING FIXTURE AT 1 S… |
| X08052620 ↗ | 3464 JEROME AVENUE BRONX | Alteration | Signed-off | 12/20/2022 | 12/30/2022 | Design JUDGE ARCHITECTURE PC Owner Luna Bro Realty Filer RIZZO GROUP | RENO EXIST 1ST FL COMMERCIAL SPACE TO NEW MEDICAL OFFICE - NO AMENDED CO AS PER BB2009-25. NEW NON-LOAD BEARING PARTITIONS, NEW LIGHTING, N… |
| M00768564 ↗ | 142 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/04/2022 | 12/28/2022 | Design JMV CONSULTING ENGINEERING | Modifications to existing mechanical systems. No change in use, egress or occupancy. |
| M00768549 ↗ | 142 5 AVENUE MANHATTAN | Alteration | Signed-off | 10/18/2022 | 11/21/2022 | Design STUDIO DB ARCHITECTURE DPC | ALTERATION OF INTERIOR WALL CONFIGURATION. REFINISHING AND INSTALLATION OF NEW FLOORING IN AREAS. RE-FINISHING OF EXISTING BATHROOMS. NO CHA… |
| Q00771937 ↗ | 42-32 162 STREET QUEENS | Alteration | Signed-off | 07/18/2022 | 10/20/2022 | Design UPC ENGINEERING DPC | Propose to remove existing 4'-0 x 16'-0 illuminated sign to address ECB violation #39063296J; and erect non-illuminated business accessory a… |
| B00441161 ↗ | 1329 WILLOUGHBY AVENUE BROOKLYN | Alteration | Signed-off | 02/05/2021 | 09/27/2022 | Owner FM CONSOLIDATED HOLDING Filer SD DESIGN STUDIO LLC | Mechanical work for SPACE #3 - MONKEY KING ONLY |
| Q07998278 ↗ | 86-22 WHITNEY AVENUE QUEENS | Alteration | Signed-off | 09/03/2022 | 09/09/2022 | Design YANG ENGINEERING LLC Filer SD DESIGN STUDIO LLC | proposed file application to replace existing electrical hvac , work as per plan. no change in use , egress or occupancy. |
| Q00735310 ↗ | 75-28 164 STREET QUEENS | Alteration CO | Permit Issued | 05/18/2022 | 07/26/2022 | Filer M2 DESIGN INC | CONVERT EXISTING ONE FAMILY INTO TWO FAMILY, INSTALL NEW KITCHEN , PARTITIONS IN 1ST, 2ND FL. REQUIRED NEW C OF O FOR TWO FAMILY. |
| M00741316 ↗ | 11 WAVERLY PLACE MANHATTAN | Alteration | Signed-off | 05/18/2022 | 05/24/2022 | Filer SD DESIGN STUDIO LLC | PROPOSE FILE APPLICATION TO RENOVATION ON PARTIAL 001 FLOOR. FLOOR CEILING & PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPA… |
| M00557936 ↗ | 990 2 AVENUE MANHATTAN | Alteration | Permit Issued | 07/15/2021 | 05/21/2022 | Design LONGTIN SOLUTIONS LLC | PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON 1ST FLOOR.PLUMBING WORK TO BE FILED UNDER SEPARATE APPLICATION. MECHANICAL WORK… |
| M00556709 ↗ | 988 2 AVENUE MANHATTAN | Alteration | Permit Issued | 07/15/2021 | 05/20/2022 | Design LONGTIN SOLUTIONS LLC | PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON 1ST AND 2ND FLOOR. PLUMBING WORK TO BE FILED UNDER SEPARATE APPLICATION. NO CHA… |
| B00547699 ↗ | 318 FENIMORE STREET BROOKLYN | Alteration | Signed-off | 07/01/2021 | 01/21/2022 | INTERIOR RENOVATION OF EXISTIN ONE FAMILY BRICK BUILDING . INSTALL A METAL DECK AT REAR. NO CHANGE IN USE OCCUPANCY OR EGRESS. | |
| Q00578625 ↗ | 77-09 249 STREET QUEENS | Alteration | Signed-off | 09/10/2021 | 12/14/2021 | Design L & C ASSOCIATES Filer BASIC GROUPS CORP | INTERIOR RENOVATION OF CELLAR, 1ST, AND 2ND FLOORS. PARTITION WORK AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. |
| B00460059 ↗ | 1329 WILLOUGHBY AVENUE BROOKLYN | Alteration | Signed-off | 02/05/2021 | 09/28/2021 | Owner FM CONSOLIDATED HOLDING | Structural work for space #3 - MONKEY KING ONLY. In conjunction with alt-2# 340799755 |
| Q00573098 ↗ | 254-18 NORTHERN BOULEVARD QUEENS | Alteration | Permit Issued | 09/09/2021 | 09/24/2021 | Design BASIC GROUPS CORP | Renovation of existing commercial space on first floor, no changes to use, egress or occupancy. |
| Q00540734 ↗ | 150-28 22 AVENUE QUEENS | Alteration | Signed-off | 06/16/2021 | 08/10/2021 | Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON CELLAR. REMOVE PARTITIONS, ERECT LAUNDRY ROOM & LEGALIZE WASHER & DRYER. REMEDY TO CURE ECB VIOLATIONS: #353… |
| B00525807 ↗ | 2546 OCEAN PARKWAY BROOKLYN | Alteration | Signed-off | 06/08/2021 | 06/14/2021 | Design UPC ENGINEERING DPC Filer UPC ENGINEERING DPC | PROPOSED INTERIOR RENOVATION ON FIRST FLOOR AT INDICATED AREA ONLY. NEW WORKS INCLUDE MINOR FLOOR AND PARTITION REPAIR AND FINISHES AS PER … |
| B00480674 ↗ | 206 FRONT STREET BROOKLYN | Alteration | Signed-off | 03/15/2021 | 05/20/2021 | Design LU ENGINEERING SERVICE PC | PROPOSED INTERIOR RENOVATION ON PARTIAL 1ST FLOOR, INSTALL NEW DOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00504070 ↗ | 1329 WILLOUGHBY AVENUE BROOKLYN | Alteration | Signed-off | 04/15/2021 | 05/04/2021 | Design ALBANNA ENGINEERING PC | Scope of work is to repair previously fire damaged floor joist of the rear portion of the 2nd floor, no change to use egress or occupancy. M… |
| B00493677 ↗ | 8747 19 AVENUE BROOKLYN | Alteration | Signed-off | 03/26/2021 | 04/16/2021 | Design BASIC GROUPS CORP | PROPOSE 7'-6LONG CURB CUT FRONTING 19TH AVENUE FOR THE PURPOSE OF PARKING |
| B00493818 ↗ | 8753 19 AVENUE BROOKLYN | Alteration | Signed-off | 03/26/2021 | 04/15/2021 | Design BASIC GROUPS CORP | PROPOSE 7'-6LONG CURB CUT FRONTING 19TH AVENUE FOR THE PURPOSE OF PARKING |
| Q00457725 ↗ | 169-38 26 AVENUE QUEENS | Alteration | Signed-off | 01/28/2021 | 04/15/2021 | Design BAYSIDE ENGINEERING PC Owner SD DESIGN STUDIO LLC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON CELLAR. CEILING, FLOORING & PARTITION WORKS AS PER PLAN. REMEDY TO CURE ECB VIOLATIONS: #35477474H, 35477473… |
| 340799755BIS | 1329 WILLOUGHBY AVENUE BROOKLYN | — | ISSUED | 02/16/2021 | 02/16/2021 | — | OT |
| 421743000BIS | 148-09 60 AVENUE QUEENS | — | ISSUED | 08/20/2020 | 08/20/2020 | — | OT |
| 402092917BIS | 117-18 ATLANTIC AVENUE QUEENS | — | ISSUED | 02/25/2005 | 06/14/2019 | — | OT |
| 420325703BIS | 117-18 ATLANTIC AVENUE QUEENS | — | ISSUED | 03/07/2011 | 06/14/2019 | — | OT, PL |
| 123721044BIS | 77 CHRYSTIE STREET MANHATTAN | — | ISSUED | 05/16/2019 | 05/17/2019 | — | OT, PL |
| 421726136BIS | 79-24 208 STREET QUEENS | — | ISSUED | 03/07/2019 | 03/14/2019 | — | OT, PL |
| 421716986BIS | 136-87 37 AVENUE QUEENS | — | ISSUED | 01/29/2019 | 02/13/2019 | — | OT, PL |
| 321728298BIS | 211 BOND STREET BROOKLYN | — | ISSUED | 04/05/2018 | 04/05/2018 | — | MH |
| 321698196BIS | 2222 86 STREET BROOKLYN | — | ISSUED | 01/10/2018 | 01/10/2018 | — | OT |