← Back
Church, synagogue, chapel
143-23 ASH AVENUE
QUEENS · Flushing-Willets Point · BIN 4539434
💬 Discuss this project
2023Year Built
—Stories
M1Building Class
R3XZoning
23,398 sfGross Floor Area
1Units
9 Open Violations 0 unresolved · 9 paperwork only ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: KOREAN PRESBYTERIAN CHURCH OF QUEENS, IN C. · 21,340 sf lot · 1.1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof3p · 2 filings · 12 docs
Floor 46p · 2 filings · 12 docs
Floor 33p · 4 filings · 15 docs
Floor 2Under Construction14p · 8 filings · 20 docs
Floor 1Under Construction12p · 7 filings · 20 docs
CellarUnder Construction18p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KAPCQ3108/28/2026
KPQC303/22/2026
CONSTRUCTION C NY DYNAMIC503/22/2026
KOREAN PRESBYTERIAN CHURCH OF QU2103/22/2026
EXPERT DESIGNERS DESIGN903/22/2026
NY DYNAMIC CONSTRUCTION C603/22/2026
JANA BUILDERS103/22/2026
THE OWNER OF103/22/2026
OWNER OF 143-22 FRANKLIN203/22/2026
I.K. CONSTRUCTION U.S.603/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
K M DOB CONSULTING2803/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
BERNARDO GAMBA103/21/2026
KRYPTON ENGINEERING403/21/2026
EXPERT DESIGNERS DESIGN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JANA BUILDERS CORPGeneral Contractor407/08/2026
POWER PLUMBING & HEATINGPlumbing307/08/2026
EXPERTDESIGNERS,DESIGNGeneral Contractor303/21/2026
JCM PRO BUILDERS LLCGeneral Contractor307/08/2026
AVON PLBG & HTG INCFire Protection207/08/2026
NAMOO ENGINEERING PLLCGeneral Contractor203/22/2026
CS BRIDGE CORPGeneral Contractor207/08/2026
SEONG JIN ELECTRIC INC.Electrical103/22/2026
POWER PLUMBING HEATINGGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NAMOO ENGINEERING PLLC8350808/26/2026
PROMISE CONSULTANTS1412109/22/2021
Building Lifecycle
All (200)Filed (27)Permit Issued (13)Signed Off (6)Violation (50)Inspection (12)Objection (62)Special Inspection (30)
08/26/2026
Filed — Alteration
FILE BE WORKTYPE IN CONJUNCTION WITH NB JOB#420663482 AND PL JOB#Q00846391.
Q00850944-P3
08/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joonhong Lim
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joonhong Lim
08/26/2026
Special inspection requirement — Heating Systems
Joonhong Lim
08/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
Joonhong Lim
08/26/2026
Special inspection requirement — Maintenance information
Joonhong Lim
08/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joonhong Lim
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joonhong Lim
08/18/2026
Special inspection requirement — Heating Systems
Joonhong Lim
08/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
Joonhong Lim
08/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joonhong Lim
08/18/2026
Special inspection requirement — Maintenance information
Joonhong Lim
08/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joonhong Lim
07/22/2026
Filed — Alteration
FILE BE WORKTYPE IN CONJUNCTION WITH NB JOB#420663482 AND PL JOB#Q00846391.
Q00850944-P2
07/22/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
07/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joonhong Lim
07/22/2026
Special inspection requirement — Maintenance information
Joonhong Lim
07/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joonhong Lim
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joonhong Lim
07/22/2026
Special inspection requirement — Heating Systems
Joonhong Lim
07/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
Joonhong Lim
07/07/2026
Objection resolved — Addressed
06/23/2026
Objection raised — Other
06/22/2026
Filed — No Work
Q01420049-I1
03/27/2026
Objection resolved — Addressed
03/23/2026
Objection raised — Admin
03/18/2026
Filed — No Work
Q01374055-I1
03/03/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/06/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/30/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2026
Permit issued — Plumbing
Q00846391-I1-PL
12/11/2025
Filed — No Work
Q01303230-I1
12/02/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01261216-I1
08/21/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/04/2025
Permit issued — Supported Scaffold
Q01261216-I1-SF
08/01/2025
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01261216-I1
06/04/2025
Signed off — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM. THIS APPLICATION IS TO REPLACE THE PREVIOUS APPLICATION #Q00596313 TO OMIT THE STANDPIPE WORK TYPE.
Q00843300-I1
06/02/2025
Violation issued (ECB, open)
Unknown
04/30/2025
Signed off — Alteration
Q01096729-I1
04/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/09/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/04/2025
Signed off — Alteration
Q01097112-I1
03/21/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/29/2025
Permit issued — Plumbing
Q00846391-I1-PL
01/22/2025
Permit issued — Sprinklers
Q00843300-I1-EW-SP
01/16/2025
Permit issued — Boiler Equipment
Q00850944-I1-BE
01/10/2025
Permit issued — Curb Cut
Q01096729-I1-CC
01/10/2025
Permit issued — Curb Cut
Q01097112-I1-CC
01/08/2025
Objection resolved — Addressed
12/31/2024
Objection raised — Other
12/23/2024
Filed — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM. THIS APPLICATION IS TO REPLACE THE PREVIOUS APPLICATION #Q00596313 TO OMIT THE STANDPIPE WORK TYPE.
Q00843300-P1
12/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
Joonhong Lim
12/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
Joonhong Lim
12/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joonhong Lim
12/09/2024
Special inspection requirement — Maintenance information
Joonhong Lim
12/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Joonhong Lim
11/29/2024
Filed — Alteration
PLUMBING WORK FOR GAS EQUIPMENT IN CONJUNCTION WITH NEW BUILDING APPLICATION #420663482.
Q00846391-P1
11/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joonhong Lim
Latest 60 of 200 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPOWER PLUMBING & HEATING01/23/2026
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP08/04/2025
DOB NOWPlumbingPermit IssuedPOWER PLUMBING & HEATING01/29/2025
DOB NOWSprinklersSigned-offAVON PLBG & HTG INC01/22/2025
DOB NOWBoiler EquipmentPermit IssuedPOWER PLUMBING & HEATING01/16/2025
DOB NOWCurb CutSigned-offJANA BUILDERS CORP01/10/2025
DOB NOWCurb CutSigned-offJANA BUILDERS CORP01/10/2025
DOB NOWSprinklersSigned-offAVON PLBG & HTG INC04/20/2023
DOB NOWSidewalk ShedSigned-offJCM PRO BUILDERS LLC10/31/2022
DOB NOWSidewalk ShedSigned-offJCM PRO BUILDERS LLC05/18/2022
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP07/08/2021
DOB NOWSidewalk ShedSigned-offJCM PRO BUILDERS LLC05/13/2021
DOB NOWConstruction FencePermit IssuedEXPERTDESIGNERS,DESIGN09/26/2019
BIS—ISSUEDPROTON CCM LLC10/22/2025
BIS—ISSUEDJANA BUILDERS CORP07/10/2025
BISPLISSUEDPOWER PLUMBING & HEATING01/16/2025
BIS—ISSUEDJANA BUILDERS CORP09/09/2024
BISEQISSUEDNY DYNAMIC CONSTRUCTION C01/19/2024
BISPLISSUEDPOWER PLUMBING & HEATING11/14/2023
BIS—ISSUEDJANA BUILDERS CORP08/08/2023
BIS—RE-ISSUEDNY DYNAMIC CONSTRUCTION C02/09/2023
BISEQISSUEDNY DYNAMIC CONSTRUCTION C11/03/2022
BIS—ISSUEDNY DYNAMIC CONSTRUCTION C11/03/2022
BISPLISSUEDPOWER PLUMBING & HEATING10/06/2022
BIS—ISSUEDNY DYNAMIC CONSTRUCTION C11/04/2021
BISEQISSUEDNY DYNAMIC CONSTRUCTION C11/04/2021
BISPLISSUEDPOWER PLUMBING & HEATING08/11/2021
BIS—ISSUEDNY DYNAMIC CONSTRUCTION C07/28/2021
BIS—ISSUEDEXPERTDESIGNERS,DESIGN11/26/2020
BISEQISSUEDEXPERTDESIGNERS,DESIGN10/09/2020
BIS—ISSUEDEXPERTDESIGNERS,DESIGN10/09/2020
BISPLISSUEDPOWER PLUMBING & HEATING07/24/2020
BIS—ISSUEDEXPERTDESIGNERS,DESIGN10/16/2019
BISEQISSUEDEXPERTDESIGNERS,DESIGN10/16/2019
BISEQISSUEDNEPTUNE INC02/09/2011
BISEQISSUEDNEPTUNE INC02/09/2011
BISEQISSUEDNEPTUNE INC05/18/2010
BISEQISSUEDNEPTUNE INC05/18/2010
BISPLISSUEDWADE PLUMBING & HEATING01/30/2004
BIS—ISSUEDKOREAN PRESBYTERIAN CHURCH OF QN07/03/2003
+ 3 more permits on file
1 project · most recent 09/22/2021
FiledStatusContractorScope
09/22/2021———
1 project · most recent 11/29/2024
Gas
FiledStatusContractorScope
11/29/2024Permit IssuedPOWER PLUMBING & HEATINGGas
5 projects · most recent 03/17/2026
General Wiring
FiledStatusContractorScope
03/17/2026CompleteTF ELECTRICAL CORPGeneral Wiring
07/17/2025CompleteTF ELECTRICAL CORPGeneral Wiring
04/03/2025CompleteSEONG JIN ELECTRIC INC.General Wiring
05/25/2021CompleteMAGNA ELECTRIC CORP—
08/07/2020CompleteSEONG JIN ELECTRIC INC.1 meters, 1 new_meters
1 project · most recent 09/16/2019
Fence
FiledStatusContractorScope
09/16/2019Permit IssuedEXPERTDESIGNERS, DESIGN &Fence
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
07/22/2026Fail-Final Boiler Equipment InspectionFailView ↗
03/03/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/30/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/21/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
08/26/2026HVAC-R and service water heating equipmentJoonhong Limenergy_progress
08/26/2026Fire-Resistant Penetrations and JointsJoonhong Limspecial
08/26/2026Heating SystemsJoonhong Limspecial
08/26/2026HVAC-R and service water heating system controlsJoonhong Limenergy_progress
08/26/2026Maintenance informationJoonhong Limenergy_progress
08/26/2026HVAC-R and service water piping design and insulationJoonhong Limenergy_progress
08/18/2026Fire-Resistant Penetrations and JointsJoonhong Limspecial
08/18/2026Heating SystemsJoonhong Limspecial
08/18/2026HVAC-R and service water heating system controlsJoonhong Limenergy_progress
08/18/2026HVAC-R and service water piping design and insulationJoonhong Limenergy_progress
08/18/2026Maintenance informationJoonhong Limenergy_progress
08/18/2026HVAC-R and service water heating equipmentJoonhong Limenergy_progress
07/22/2026HVAC-R and service water heating equipmentJoonhong Limenergy_progress
07/22/2026Maintenance informationJoonhong Limenergy_progress
07/22/2026HVAC-R and service water piping design and insulationJoonhong Limenergy_progress
07/22/2026Fire-Resistant Penetrations and JointsJoonhong Limspecial
07/22/2026Heating SystemsJoonhong Limspecial
07/22/2026HVAC-R and service water heating system controlsJoonhong Limenergy_progress
12/09/2024HVAC-R and service water heating equipmentJoonhong Limenergy_progress
12/09/2024HVAC-R and service water heating system controlsJoonhong Limenergy_progress
12/09/2024Fire-Resistant Penetrations and JointsJoonhong Limspecial
12/09/2024Maintenance informationJoonhong Limenergy_progress
12/09/2024HVAC-R and service water piping design and insulationJoonhong Limenergy_progress
11/29/2024Fire-Resistant Penetrations and JointsJoonhong Limspecial
11/29/2024HVAC-R and service water heating equipmentJoonhong Limenergy_progress
Latest 25 of 39.
▾Documents — 340 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch17
08/27/2026Q00512658-I1Request digital key ↗
08/27/2026Q00553662-P2Request digital key ↗
08/27/2026Q00553662-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly5
08/25/2026Q00844676-P1Request digital key ↗
08/25/2026Q00844706-I1Request digital key ↗
08/21/2026Q00844769-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
08/18/2026Q01303230-I1Request digital key ↗
08/17/2026Q01374055-I1Request digital key ↗
08/15/2026Q01420049-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00228579-I1Request digital key ↗
▸Applications & Permits76
▸BISPLAN / WORK APPROVAL APPLICATION55
07/28/2025420663482Open ↗
07/16/2025420663482Open ↗
07/02/2025420663482Open ↗
Showing 3 of 55 on file for this type
▸BISWORK PERMIT APPLICATION15
04/25/2025420663482Open ↗
10/11/2023420663482Open ↗
03/15/2023420663482Open ↗
Showing 3 of 15 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation4
09/23/2024440438206Open ↗
03/23/2018440438206Open ↗
03/20/2018440438206Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
09/23/2024440438206Open ↗
09/23/2024440438206Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM4
06/21/2023420663482Open ↗
03/07/2018420663482Open ↗
Showing 2 of 4 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED3
08/11/2017421539179Open ↗
Showing 1 of 3 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/19/2017420663482Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/15/2018420663482Open ↗
▸Seals & Professional Certifications50
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/29/2026Q00000540-I1Open ↗
08/29/2026Q00000539-I1Open ↗
08/28/2026Q00228579-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
10/23/2019420663482Open ↗
10/23/2019420663482Open ↗
10/23/2019420663482Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/29/2026Q00596313-I1Open ↗
09/29/2026Q00596313-I1Open ↗
09/23/2026Q00850944-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026Q00850944-P3Open ↗
09/23/2026Q00850944-I1Open ↗
09/21/2026Q00850944-P1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
10/02/2017440438206Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING7
07/16/2025420663482Open ↗
03/06/2025420663482Open ↗
01/21/2025420663482Open ↗
Showing 3 of 7 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
06/03/2025420663482Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
02/15/2018420663482Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
06/03/2025420663482Open ↗
▸BISSPRINKLER SYSTEMS1
06/04/2025420663482Open ↗
▸Safety & Tenant Protection11
▸BISSTREET TREE CHECKLIST4
03/20/2018440438206Open ↗
03/05/2018420663482Open ↗
Showing 2 of 4 on file for this type
▸BISSTREET TREES SITE PLAN2
07/18/2025440438206Open ↗
07/18/2025440438206Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
03/06/2018420663482Open ↗
02/07/2018440438206Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
12/27/2019420663482Open ↗
▸BISSTREET TREE SIGNOFF1
11/14/2025420663482Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos3
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/23/2019420663482Open ↗
10/23/2019420663482Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/06/2018420663482Open ↗
03/06/2018420663482Open ↗
▸BISFENESTRATION AIR LEAKAGE1
06/03/2025420663482Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
06/03/2025420663482Open ↗
▸BISEXTERIOR LIGHTING POWER1
06/03/2025420663482Open ↗
▸BISINTERIOR LIGHTING POWER1
06/03/2025420663482Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
06/03/2025420663482Open ↗
▸BISFENESTRATION AREAS1
06/03/2025420663482Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
06/03/2025420663482Open ↗
▸Inspections & Test Reports9
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
07/27/2021420663482Open ↗
07/27/2021420663482Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
01/02/2025420663482Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
06/03/2025420663482Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
06/03/2025420663482Open ↗
▸BISMASONRY1
06/03/2025420663482Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
10/23/2019420663482Open ↗
▸BISFUEL-GAS PIPING (WELDING)1
06/04/2025420663482Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
06/03/2025420663482Open ↗
▸Approvals, Objections & Sign-offs49
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
08/25/2026Q00844676-P1Open ↗
08/21/2026Q00844769-I1Open ↗
08/21/2026Q01096729-I1Open ↗
Showing 3 of 23 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE15
10/10/2024420663482Open ↗
05/15/2024420663482Open ↗
03/22/2024420663482Open ↗
Showing 3 of 15 on file for this type
▸BISSUPERSEDING LETTER4
10/11/2023420663482Open ↗
03/15/2023420663482Open ↗
01/10/2022420663482Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/26/2025420663482Open ↗
11/26/2020420663482Open ↗
Showing 2 of 3 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
12/30/2025440438206Open ↗
▸Cost, Insurance & Ownership8
▸BISPROJECT-SPECIFIC GL INSURANCE4
03/15/2023420663482Open ↗
09/07/2021420663482Open ↗
11/26/2020420663482Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
10/11/2023420663482Open ↗
04/11/2022420663482Open ↗
▸BISCOST AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms39
▸BISADDITIONAL INFORMATION19
01/31/2025420663482Open ↗
11/07/2024420663482Open ↗
10/17/2024440438206Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET12
02/16/2018420663482Open ↗
10/24/2017420663482Open ↗
10/24/2017420663482Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM5
04/25/2025420663482Open ↗
04/25/2025420663482Open ↗
10/11/2023420663482Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
10/02/2017440438206Open ↗
Showing 1 of 2 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
11/07/2024420663482Open ↗
03/21/2023420663482Open ↗
03/21/2023420663482Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM4
02/07/2018440438206Open ↗
12/19/2017420663482Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWAlternate Plan 12
08/25/2026Q00844676-P1Open ↗
08/14/2026Q00844676-I1Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
06/03/2025420663482Open ↗
▸BISSHUTOFF DAMPERS1
06/03/2025420663482Open ↗
▸BISLOWEST FLOOR ELEVATION1
06/03/2025420663482Open ↗
▸BISDOC.7 - AMEND ZD1 AS PER PLAN CHANGES1
10/03/2019420663482Open ↗
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
11/14/2025420663482Open ↗