← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
144-48 ROOSEVELT AVENUE
QUEENS · Murray Hill-Broadway Flushing · BIN 4113843
💬 Discuss this project
2001Year Built
8Stories
RMBuilding Class
R6Zoning
19,811 sfGross Floor Area
43Units
Rent Stabilized39 Open Violations 38 unresolved · 1 paperwork only ▸FISP: UNSAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 8,880 sf lot · 2.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Floor 84p · 1 filing · 2 docs
Floor 74p · 1 filing · 2 docs
Floor 64p · 1 filing · 2 docs
Floor 54p · 1 filing · 2 docs
Floor 44p · 1 filing · 2 docs
Floor 34p · 1 filing · 2 docs
Floor 24p · 1 filing · 2 docs
Floor 18p · 3 filings · 14 docs
Cellar1 filing · 3 docs
Site & exterior3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS1307/08/2026
GREAT TRIBECCA HOLDING903/21/2026
ROSEWOOD TOWER HOMEOWNER203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES CHAI ARCHITECT, P.C.305/02/2023
MOHAMMAD AHEAD, PE202/16/2023
SYED ENGINEERING, P.C.104/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARSENAL BUILDING CONSULTANTS LLC603/21/2026
HTX BUILDING CONSULTING303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & G CONSTRUCTION SVCSGeneral Contractor707/08/2026
BERN CONCEPT INCGeneral Contractor303/21/2026
JOSEPH VITALEElectrical103/21/2026
VITALE, JOSEPHElectrical103/21/2026
CYCLURA PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES JH CHAI & ASSOCIATE6481305/02/2023
Building Lifecycle
All (101)Filed (6)Permit Issued (7)Signed Off (5)Facade (FISP) (14)Violation (60)Inspection (5)Special Inspection (4)
04/20/2026
Violation issued (ECB, open)
Local Law
12/14/2024
Violation issued (HPD, open)
C
12/14/2024
Violation issued (HPD, open)
C
09/30/2024
Violation issued (HPD, closed)
C
09/30/2024
Violation issued (HPD, closed)
C
09/23/2024
Violation issued (HPD, closed)
C
04/02/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVEL LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00500614-I1
04/02/2024
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
Q00830898-I1
02/22/2024
Violation issued (ECB, open)
Local Law
11/24/2023
Violation issued (HPD, closed)
I
11/15/2023
Signed off — Alteration
PL WORK FOR INTERIOR RENOVATIONS FOR DENTAL OFFICE AT 1ST FLOOR ; NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q08039896-I1
11/15/2023
Signed off — Alteration
Q08039883-I1
11/02/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/04/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/20/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/25/2023
Cycle 9 facade report submitted
08/17/2023
Cycle 9 facade inspection completed
05/04/2023
Permit issued — Sidewalk Shed
Q00830898-I1-SH
05/03/2023
Violation issued (ECB, closed)
Construction
05/03/2023
Violation issued (ECB, closed)
Construction
05/02/2023
Filed — Alteration
PL WORK FOR INTERIOR RENOVATIONS FOR DENTAL OFFICE AT 1ST FLOOR ; NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q08039896-P1
05/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joon Ho Chai
05/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Joon Ho Chai
05/01/2023
Special inspection requirement — Maintenance information
Joon Ho Chai
05/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Joon Ho Chai
04/26/2023
Violation issued (HPD, closed)
C
04/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/31/2023
Violation issued (HPD, closed)
C
03/21/2023
Violation issued (HPD, closed)
C
03/09/2023
Violation issued (HPD, closed)
C
02/16/2023
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
Q00830898-I1
02/15/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING FRONT AND REAR ELEVATION
Q00500636-I1
02/09/2023
Permit issued — Plumbing
Q08039896-I1-PL
01/06/2023
Violation issued (ECB, closed)
Construction
12/01/2022
Permit issued — General Construction
Q08039883-I1-GC-CX
11/15/2022
Filed — Alteration
PL WORK FOR INTERIOR RENOVATIONS FOR DENTAL OFFICE AT 1ST FLOOR ; NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q08039896-I1
11/15/2022
Filed — Alteration
Q08039883-I1
10/13/2022
Violation issued (ECB, open)
Construction
10/13/2022
Violation issued (ECB, closed)
Construction
10/13/2022
Violation issued (ECB, open)
Construction
10/13/2022
Violation issued (ECB, closed)
Construction
03/15/2022
Permit issued — Supported Scaffold
Q00500636-I1-SF
03/15/2022
Permit issued — Sidewalk Shed
Q00500614-I1-SH
03/10/2022
Cycle 9 facade report signed — UNSAFE
02/18/2022
Cycle 9 facade report submitted
02/18/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/18/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/04/2022
Cycle 9 facade inspection completed
04/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/09/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVEL LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00500614-I1
04/09/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING FRONT AND REAR ELEVATION
Q00500636-I1
04/09/2021
Permit issued — Supported Scaffold
Q00500636-I1-SF
04/09/2021
Permit issued — Sidewalk Shed
Q00500614-I1-SH
07/27/2020
Violation issued (HPD, open)
C
07/27/2020
Violation issued (HPD, closed)
A
07/27/2020
Violation issued (HPD, closed)
A
07/27/2020
Violation issued (HPD, closed)
A
07/27/2020
Violation issued (HPD, closed)
A
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS05/04/2023
DOB NOWPlumbingSigned-offCYCLURA PLBG & HTG INC02/09/2023
DOB NOWGeneral ConstructionSigned-offBERN CONCEPT INC12/01/2022
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS03/15/2022
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS03/15/2022
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS04/09/2021
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS04/09/2021
BISOTISSUEDDK BUILDERS INC03/03/2022
BISOTISSUEDDK BUILDERS INC08/05/2021
BISBLISSUEDB.H. PLBG. & HTG. CORP04/09/2002
BIS—ISSUEDMETAL STONE CONSTRUCTION INC.05/21/2001
BISPLISSUEDB.H. PLUMBING & HEATING CORP.04/13/2001
BISEQISSUEDFARRINGTON CONSTR. INC.01/04/2001
BISPLISSUEDM & J PLBG & HTG MECHANICAL CORP12/11/2000
BIS—ISSUEDMETAL STONE CONSTRUCTION INC.09/22/2000
BISEQISSUEDMETAL STONE CONSTRUCTION INC08/17/2000
BIS—ISSUEDMETAL STONE CONSTRUCTION INC.08/09/2000
BISEQISSUEDMETAL STONE CONSTRUCTION INC.08/02/2000
2 projects · most recent 05/23/2023
General Wiring
FiledStatusContractorScope
05/23/2023CompleteA.C. MORGAN ELECTRICGeneral Wiring
03/24/2022Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/19/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/01/2023Fire-Resistant Penetrations and JointsJoon Ho Chaispecial
05/01/2023Energy Code Compliance InspectionsJoon Ho Chaiprogress
05/01/2023Maintenance informationJoon Ho Chaienergy_progress
05/01/2023HVAC-R and service water piping design and insulationJoon Ho Chaienergy_progress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00500636-I1Request digital key ↗
08/27/2026Q00500614-I1Request digital key ↗
08/25/2026Q08039883-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/29/2020440639971Open ↗
▸BISWORK PERMIT APPLICATION1
08/05/2021440639971Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q08039883-I1Open ↗
08/25/2026Q08039896-P1Open ↗
08/25/2026Q08039896-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026Q08039896-P1Open ↗
09/02/2026Q08039896-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/29/2020440639971Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/29/2020440639971Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/29/2020440639971Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026Q08039896-P1Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
10/29/2020440639971Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026Q08039883-I1Open ↗
08/25/2026Q08039896-I1Open ↗
08/25/2026Q08039896-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/29/2020440639971Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/29/2020440639971Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/29/2020440639971Open ↗
▸BISNYCECC ANALYSIS1
10/29/2020440639971Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/05/2021440639971Open ↗
▸Inspections & Test Reports3
▸BISMASONRY1
04/19/2021440639971Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
04/19/2021440639971Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/29/2020440639971Open ↗
▸Approvals, Objections & Sign-offs1
▸BISFINAL1
04/19/2021440639971Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/29/2020440639971Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/29/2020440639971Open ↗