← Back
QUEENS
144-49 NORTHERN BOULEVARD
QUEENS · BIN 4618435
💬 Discuss this project
—Year Built
—Stories
—Building Class
R6Zoning
—Gross Floor Area
—Units
LL97 Covered0 Open Violations
22,663 sf lot · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 2Under Construction6p · 3 filings · 20 docs
Floor 1Under Construction27p · 4 filings · 20 docs
2 jobs · most recent 04/15/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/15/2026Permit IssuedDZ CONSTRUCTION CORPHeating and Air Conditioning Systems, Ventilation Systems—
02/02/2026Permit IssuedFRONT WAVE CONSTRUCTION*Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Fujitsu AOU120RLAVL 120,000 BTU · Heat Pump Outdoor ×3
ARUH96TLAV2 96,000 BTU · Vrf Outdoor ×3
Ventilation
Captiveaire KB32 12,533 CFM · Exhaust Fan ×1
1 job · most recent 04/15/2026
Sprinkler System
FiledStatusContractorScope
04/15/2026——Sprinkler System
2 jobs · most recent 04/15/2026
Water/Sanitary Gas
FiledStatusContractorScope
04/15/2026Permit IssuedROCK E SMALL PLBG&HTG INCWater/Sanitary
02/02/2026Permit IssuedFOREVIEW MEP SERVICE LLCGas, Water/Sanitary
7 jobs · most recent 06/19/2025
General Wiring
FiledStatusContractorScope
06/19/2025CompleteJONG HYUN KIM—
05/20/2025CompletePOWER ELECTRICAL CONTS INGeneral Wiring
10/13/2022Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
03/24/2022CompleteR.C.M. ELECTRIC CORP.—
12/31/2021CompleteHIGH QUALITY ELECTRIC OF—
11/16/2021CompleteINTELOGIC ELECTRIC, INC.—
06/08/2021CompleteATMOS ELECTRIC SVCE CORP1 meters, 1 new_meters
1 job · most recent 02/02/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
02/02/2026Permit IssuedFRONT WAVE CONSTRUCTION*Tenant Protection Plan 72 Hour
Building Lifecycle
All (199)Filed (27)Permit Issued (32)Signed Off (12)Violation (29)Inspection (7)Objection (62)Special Inspection (30)
08/25/2026
Permit issued — Mechanical Systems
Q01334218-S1-MS
08/18/2026
Permit issued — Plumbing
Q01334218-S2-PL
06/03/2026
Permit issued — General Construction
Q01288418-I1-GC
04/30/2026
Objection raised — Scope
04/30/2026
Objection resolved — Resolved
04/30/2026
Objection raised — Cost
04/30/2026
Objection resolved — Resolved
04/30/2026
Objection raised — Cost
04/30/2026
Objection resolved — Resolved
04/30/2026
Objection raised — Cost
04/30/2026
Objection resolved — Resolved
04/15/2026
Filed — Alteration
INSTALLATION OF ONE AIR COOLED HEAT PUMP VRF AIR CONDITIONING UNIT ON 2ND FLOOR ROOF OUTDOOR, WITH TWO INDOOR AIR HANDLERS UNITS AND AIR DISTRIBUTION SYSTEMS, SERVING ONE RETAIL/PHARMACY STORE IN 1ST FLOOR UNIT 104.INSTALLATION OF TOILET EXHAUST AND CONNE
Q01334218-S1
04/15/2026
Filed — Alteration
INSTALLATION OF ONE AIR COOLED HEAT PUMP VRF AIR CONDITIONING UNIT ON 2ND FLOOR ROOF OUTDOOR, WITH TWO INDOOR AIR HANDLERS UNITS AND AIR DISTRIBUTION SYSTEMS, SERVING ONE RETAIL/PHARMACY STORE IN 1ST FLOOR UNIT 104.INSTALLATION OF TOILET EXHAUST AND CONNE
Q01334218-S3
04/15/2026
Filed — Alteration
INSTALLATION OF ONE AIR COOLED HEAT PUMP VRF AIR CONDITIONING UNIT ON 2ND FLOOR ROOF OUTDOOR, WITH TWO INDOOR AIR HANDLERS UNITS AND AIR DISTRIBUTION SYSTEMS, SERVING ONE RETAIL/PHARMACY STORE IN 1ST FLOOR UNIT 104.INSTALLATION OF TOILET EXHAUST AND CONNE
Q01334218-S2
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
04/06/2026
Special inspection requirement — Final
Kaijin Liang
04/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
ZHENHUAN XU
04/06/2026
Special inspection requirement — Heating Systems
ZHENHUAN XU
04/06/2026
Special inspection requirement — Mechanical Systems
ZHENHUAN XU
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
04/06/2026
Special inspection requirement — Sprinkler Systems
04/06/2026
Special inspection requirement — Post-installed Anchors
ZHENHUAN XU
04/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
04/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
04/06/2026
Special inspection requirement — Maintenance information
ZHENHUAN XU
04/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
ZHENHUAN XU
04/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
04/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
ZHENHUAN XU
04/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
04/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
04/06/2026
Special inspection requirement — Maintenance information
ZHENHUAN XU
04/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
03/20/2026
Permit issued — General Construction
Q01334218-I1-GC
03/18/2026
Objection resolved — Resolved
03/18/2026
Objection resolved — Resolved
03/18/2026
Objection resolved — Resolved
03/18/2026
Objection resolved — Resolved
02/25/2026
Permit issued — Plumbing
Q01288418-S1-PL
02/15/2026
Objection raised — Zoning
02/15/2026
Objection raised — Mechanical
02/15/2026
Objection raised — Fire_Protection
02/15/2026
Objection raised — Structural
02/10/2026
Objection resolved — Addressed
02/05/2026
Objection raised — Cost
02/02/2026
Filed — Alteration
TO INSTALL COMMERCIAL EXHAUST HOOD AND FANS, HVAC UNITS FOR EATING AND DRINKING ESTABLISHMENT AT 001 FLOOR, UNIT 110 &111 IN CONJUNCTION WITH GC WORK TYPE Q01288418-I1 AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01288418-S2
01/30/2026
Special inspection requirement — Duct leakage testing, insulation and design
QIANG SU
01/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
QIANG SU
01/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
QIANG SU
01/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
QIANG SU
01/30/2026
Special inspection requirement — Maintenance information
QIANG SU
01/30/2026
Special inspection requirement — Shutoff dampers
QIANG SU
01/26/2026
Permit issued — General Construction
Q01288418-I1-GC
01/13/2026
Special inspection requirement — Final
01/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
QIANG SU
01/13/2026
Special inspection requirement — Mechanical Systems
QIANG SU
01/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIANG SU
01/13/2026
Special inspection requirement — Energy Code Compliance Inspections
QIANG SU
01/12/2026
Filed — Alteration
INSTALLATION OF ONE AIR COOLED HEAT PUMP VRF AIR CONDITIONING UNIT ON 2ND FLOOR ROOF OUTDOOR, WITH TWO INDOOR AIR HANDLERS UNITS AND AIR DISTRIBUTION SYSTEMS, SERVING ONE RETAIL/PHARMACY STORE IN 1ST FLOOR UNIT 104.INSTALLATION OF TOILET EXHAUST AND CONNE
Q01334218-I1
01/07/2026
Objection resolved — Addressed
Latest 60 of 199 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FRONT WAVE CONSTRUCTION6107/08/2026
W L GROUP DEVELOPMENT807/08/2026
KINGS GROUP NY CORP1303/22/2026
PARKSITE CONSTRUCTION CORP703/22/2026
CONSTRUCTION* FRONT WAVE203/22/2026
HSBC TECHNOLOGY AND SERVICES303/21/2026
FLUSHING SAVINGS BANK603/21/2026
REPUBLIC NATIONAL BANK103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/28/2017$11.2M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN GROUP IN H K603/21/2026
LOMBARDO BUILDING CONSULTANTS1203/21/2026
MY ARCHITECT403/21/2026
NEXT STEP BUILDING SOLUTIONS403/21/2026
BMB BUILDING CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRONT WAVE CONSTRUCTION*General Contractor2807/08/2026
KINGS GROUP NY CORPGeneral Contractor903/21/2026
NEXTCOM CONSTRUCTION, INC.General Contractor403/21/2026
PARKSITE CONSTRUCTION CORGeneral Contractor303/21/2026
NEPTUNE SIGNS AWNINGSScaffold207/08/2026
DZ CONSTRUCTION CORPGeneral Contractor208/26/2026
RRP PLUMBING CORPFire Protection107/08/2026
INTELOGIC ELECTRIC, INC.Electrical103/22/2026
PACIFIC PLBG&HTG CORPPlumbing107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing108/20/2026
RRP PLUMBING CORPPlumbing107/08/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUAN DESIGN INC7669404/15/2026
SU ARCHITECT PC6857302/02/2026
DESIGN GROUP IN H&K LLC1363308/07/2025
PROFESSIONAL SOLUTIONS GR1756210/08/2024
BUREAU VERITAS NA6902103/29/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDZ CONSTRUCTION CORP08/25/2026
DOB NOWPlumbingPermit IssuedROCK E SMALL PLBG&HTG INC08/18/2026
DOB NOWGeneral ConstructionPermit IssuedFRONT WAVE CONSTRUCTION*06/03/2026
DOB NOWGeneral ConstructionPermit IssuedDZ CONSTRUCTION CORP03/20/2026
DOB NOWPlumbingPermit IssuedPACIFIC PLBG&HTG CORP02/25/2026
DOB NOWGeneral ConstructionPermit IssuedFRONT WAVE CONSTRUCTION*01/26/2026
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC09/19/2025
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC09/19/2025
DOB NOWMechanical SystemsSigned-offNEXTCOM CONSTRUCTION, INC08/08/2025
DOB NOWPlumbingSigned-offRALPH W. LANDOLFI JR.07/10/2025
DOB NOWSprinklersSigned-offRRP PLUMBING CORP05/05/2025
DOB NOWGeneral ConstructionSigned-offNEXTCOM CONSTRUCTION, INC04/17/2025
DOB NOWConstruction FenceSigned-offFRONT WAVE CONSTRUCTION*06/03/2024
DOB NOWSupport of ExcavationSigned-offPARKSITE CONSTRUCTION COR05/10/2024
DOB NOWGeneral ConstructionSigned-offFRONT WAVE CONSTRUCTION*01/16/2024
DOB NOWCurb CutSigned-offFRONT WAVE CONSTRUCTION*01/12/2024
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP09/14/2023
DOB NOWSupported ScaffoldSigned-offFRONT WAVE CONSTRUCTION*08/18/2023
DOB NOWProtection and Mechanical MethodsSigned-offFRONT WAVE CONSTRUCTION*05/25/2023
DOB NOWProtection and Mechanical MethodsSigned-offFRONT WAVE CONSTRUCTION*05/25/2023
DOB NOWConstruction FenceSigned-offFRONT WAVE CONSTRUCTION*01/06/2023
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP10/05/2022
DOB NOWSupported ScaffoldSigned-offFRONT WAVE CONSTRUCTION*09/09/2022
DOB NOWSupported ScaffoldSigned-offFRONT WAVE CONSTRUCTION*05/31/2022
DOB NOWProtection and Mechanical MethodsSigned-offFRONT WAVE CONSTRUCTION*05/16/2022
DOB NOWProtection and Mechanical MethodsSigned-offFRONT WAVE CONSTRUCTION*05/06/2022
DOB NOWSupported ScaffoldSigned-offFRONT WAVE CONSTRUCTION*05/05/2022
DOB NOWConstruction FenceSigned-offFRONT WAVE CONSTRUCTION*01/12/2022
DOB NOWConstruction FenceSigned-offFRONT WAVE CONSTRUCTION*12/21/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP09/30/2021
DOB NOWConstruction FenceSigned-offFRONT WAVE CONSTRUCTION*06/02/2021
DOB NOWConstruction FenceSigned-offFRONT WAVE CONSTRUCTION*11/05/2020
BISSDISSUEDMPS PLUMBING & HEATING INC01/24/2025
BISPLISSUEDMPS PLUMBING & HEATING INC10/10/2024
BIS—ISSUEDFRONT WAVE CONSTRUCTION*05/31/2024
BISSDISSUEDMPS PLUMBING & HEATING INC08/23/2023
BISPLISSUEDMPS PLUMBING & HEATING INC08/23/2023
BIS—ISSUEDFRONT WAVE CONSTRUCTION*05/25/2023
BIS—ISSUEDFRONT WAVE CONSTRUCTION*11/01/2022
BISPLISSUEDMPS PLUMBING & HEATING INC07/13/2022
+ 16 more permits on file
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/03/2025Pass-Final Sign Permit InspectionPassView ↗
07/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/15/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/11/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/09/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/20/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
04/06/2026Energy Code Compliance InspectionsZHENHUAN XUprogress
04/06/2026FinalKaijin Liangprogress
04/06/2026Tenant Protection Plan ComplianceZHENHUAN XUspecial
04/06/2026Heating SystemsZHENHUAN XUspecial
04/06/2026Mechanical SystemsZHENHUAN XUspecial
04/06/2026Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
04/06/2026Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
04/06/2026Sprinkler Systems—special
04/06/2026Post-installed AnchorsZHENHUAN XUspecial
04/06/2026HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
04/06/2026HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
04/06/2026Maintenance informationZHENHUAN XUenergy_progress
04/06/2026Tenant Protection Plan ComplianceZHENHUAN XUspecial
04/06/2026HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
04/06/2026Tenant Protection Plan ComplianceZHENHUAN XUspecial
04/06/2026HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
04/06/2026HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
04/06/2026Maintenance informationZHENHUAN XUenergy_progress
04/06/2026HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
01/30/2026Duct leakage testing, insulation and designQIANG SUenergy_progress
01/30/2026HVAC-R and service water heating system controlsQIANG SUenergy_progress
01/30/2026HVAC-R and service water heating equipmentQIANG SUenergy_progress
01/30/2026HVAC-R and service water piping design and insulationQIANG SUenergy_progress
01/30/2026Maintenance informationQIANG SUenergy_progress
01/30/2026Shutoff dampersQIANG SUenergy_progress
Latest 25 of 59.
▾Documents — 473 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch25
08/27/2026Q00543784-I1Request digital key ↗
08/26/2026Q00707898-I1Request digital key ↗
08/26/2026Q00598804-P2Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/15/2026Q01320865-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00422639-I1Request digital key ↗
▸Applications & Permits132
▸BISPLAN / WORK APPROVAL APPLICATION114
11/21/2025421621846Open ↗
10/29/2025401715131Open ↗
10/29/2025401622507Open ↗
Showing 3 of 114 on file for this type
▸BISWORK PERMIT APPLICATION12
05/09/2025421621846Open ↗
Showing 1 of 12 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
12/21/2023421691431Open ↗
Showing 1 of 3 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
10/29/2025401715131Open ↗
10/29/2025401622507Open ↗
10/29/2025400397183Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/28/2025421621846Open ↗
▸Seals & Professional Certifications90
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/27/2026Q00422639-I1Open ↗
08/26/2026Q00707898-I1Open ↗
08/26/2026Q00598804-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/02/2026Q01334218-I1Open ↗
09/02/2026Q01334218-I1Open ↗
09/02/2026Q01334218-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/05/2026Q01045483-I1Open ↗
09/05/2026Q01045483-I1Open ↗
09/05/2026Q01045483-I1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment23
▸BISEQUIPMENT USE PERMITS9
03/24/2025421621846Open ↗
03/24/2025421621846Open ↗
03/24/2025421621846Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING5
02/12/2025421621846Open ↗
09/29/2023421621846Open ↗
Showing 2 of 5 on file for this type
▸BISSTANDPIPE SYSTEMS2
01/24/2025440545849Open ↗
01/21/2025421621846Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/21/2025421621846Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
01/28/2025421621846Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/21/2025421621846Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER SYSTEMS1
01/21/2025421621846Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/28/2025421621846Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
01/28/2025421621846Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST3
12/21/2023421691431Open ↗
Showing 1 of 3 on file for this type
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
01/21/2025421621846Open ↗
01/21/2025421621846Open ↗
01/21/2025421621846Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER1
01/21/2025421621846Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/21/2025421621846Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/21/2025421621846Open ↗
▸BISFENESTRATION AREAS1
01/21/2025421621846Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/21/2025421621846Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/21/2025421621846Open ↗
▸Inspections & Test Reports35
▸BISTECHNICAL REPORT: RESPONSIBILITY14
01/24/2025440545849Open ↗
01/24/2025440545849Open ↗
01/24/2025421621846Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER10
07/15/2025421621846Open ↗
07/15/2025421621846Open ↗
07/15/2025421621846Open ↗
Showing 3 of 10 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
12/31/2024421621846Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/31/2024421621846Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/21/2025421621846Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/31/2024421621846Open ↗
▸BISMASONRY1
12/31/2024421621846Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
12/31/2024421621846Open ↗
▸Approvals, Objections & Sign-offs40
▸BISSCHEDULE A - OCCUPANCY / USE22
11/21/2025421621846Open ↗
01/22/2025421621846Open ↗
01/21/2025421621846Open ↗
Showing 3 of 22 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
09/09/2025421691431Open ↗
02/10/2025421621846Open ↗
01/30/2025421621846Open ↗
Showing 3 of 13 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
09/09/2025421691431Open ↗
09/09/2025421691431Open ↗
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
01/24/2025440545849Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT3
03/07/2025440545849Open ↗
Showing 1 of 3 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/07/2025440545849Open ↗
▸Filing & Intake Forms45
▸BISADDITIONAL INFORMATION28
12/09/2025421621846Open ↗
12/03/2025421621846Open ↗
02/21/2025421621846Open ↗
Showing 3 of 28 on file for this type
▸BISBOROUGH INTAKE FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEFILING COVER SHEET7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents6
▸BISSHUTOFF DAMPERS1
01/21/2025421621846Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
09/09/2025421691431Open ↗
▸BISUNDERPINNING (2014)1
12/31/2024421621846Open ↗
▸BISVESTIBULES1
01/21/2025421621846Open ↗
▸BISMAINTENANCE INFORMATION1
01/21/2025421621846Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
09/09/2025421691431Open ↗