| Owner | Filings | Most Recent |
|---|---|---|
| Nicotra Group | 251 | 10/13/2026 |
| Empire State Bank | 24 | 07/08/2026 |
| New You Bariatric Group | 9 | 07/08/2026 |
| Irms | 8 | 07/08/2026 |
| Staten Island Advance | 8 | 03/22/2026 |
| Group Gjonaj | 3 | 03/21/2026 |
| Corporate Commons Three | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| MPP Engineers | 4 | 08/25/2026 |
| Khachaturian Engineering Associates | 83 | 06/22/2026 |
| Cetraruddy Architecture | 4 | 06/17/2026 |
| Mascioni & Behrmann, Architecture | 4 | 04/08/2026 |
| Karbon Engineering Services | 9 | 11/03/2025 |
| T. Laporta Architect | 5 | 03/04/2025 |
| Think Design Architecture | 1 | 10/12/2023 |
| VPH Engineering Services | 2 | 08/23/2023 |
| Lawrence Group | 1 | 05/04/2023 |
| Kevin C. Gore, AIA Architect | 1 | 04/28/2023 |
| Tamborra Architecture. & Construction | 1 | 10/11/2022 |
| DRL Architects | 2 | 07/12/2022 |
| S. Rejeili Architect | 1 | 05/03/2022 |
| Rogers Calvanico Group | 3 | 03/22/2022 |
| ROTWEIN+BLAKE | 4 | 12/14/2021 |
| Richard Kornblau | 4 | 10/29/2021 |
| Dimovski Architecture | 1 | 10/26/2021 |
| Titan Engineers | 1 | 10/25/2021 |
| Murdoch Engineering | 2 | 09/02/2021 |
| Phase Zero Design | 1 | 05/10/2021 |
| Maser Consulting PA | 1 | 02/19/2021 |
| Cutrona Architecture | 1 | 01/21/2021 |
| Dooling & Company Architects | 1 | 05/09/2019 |
| KZ Engineering | 1 | 12/17/2018 |
| Bohler Engineering NY | 1 | 01/12/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| Doreen A. Rizzi, Consultant | 180 | 03/21/2026 |
| Project Expediters Consulting Co | 14 | 03/21/2026 |
| Dimovski Architecture | 10 | 03/21/2026 |
| Miriam Ortiz - Filing Rep | 8 | 03/21/2026 |
| Renaissance Code Consultants | 8 | 03/21/2026 |
| Milrose Consultants | 6 | 03/21/2026 |
| Green Light Expediting | 4 | 03/21/2026 |
| Louis Striar | 4 | 03/21/2026 |
| Think Design Architecture | 3 | 03/21/2026 |
| Synergy Building Consultants | 1 | 03/21/2026 |
| AE Design Solution | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Five Boro Associates | Fire Protection | 45 | 10/07/2026 |
| Unity Construction Services | General Contractor | 31 | 07/08/2026 |
| Capital Contracting P&H | Plumbing | 29 | 10/06/2026 |
| Construction Resources | General Contractor | 19 | 07/08/2026 |
| AAA Complete Contractor | General Contractor | 12 | 07/08/2026 |
| Ahearn-Holtzman | General Contractor | 9 | 07/08/2026 |
| Core Scaffold Systems | Scaffold | 9 | 03/21/2026 |
| Class Consulting | General Contractor | 8 | 07/22/2026 |
| Salvatore Calcagno Construction | General Contractor | 7 | 07/08/2026 |
| Control Electrical Cont'g | Electrical | 6 | 03/22/2026 |
| KCM Plumbing & Heating Co | Plumbing | 6 | 07/08/2026 |
| Full Scale Contracting | General Contractor | 4 | 03/21/2026 |
| Skyline Heating & Air * | specialty_contractor | 3 | 03/21/2026 |
| JRM Construction Management | General Contractor | 3 | 09/07/2026 |
| T.L.C. Industries | General Contractor | 3 | 07/08/2026 |
| Active Signs | Sign hanger | 2 | 07/08/2026 |
| Monello Enterprises | General Contractor | 2 | 03/21/2026 |
| Gannon Contracting | General Contractor | 2 | 07/08/2026 |
| Building Concepts | General Contractor | 2 | 07/08/2026 |
| Pro Star Plumbing, Heating & Mechanical | Plumbing | 1 | 07/08/2026 |
| Anaktora Mechanical | Plumbing | 1 | 07/08/2026 |
| New Era Mechanical Services | Plumbing | 1 | 07/08/2026 |
| NY Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Tamborra Architecture | 5339 | 53 | 08/25/2026 |
| W. Allen Engineering | 664 | 11 | 11/03/2025 |
| Project Tactical Solution | 5859 | 6 | 04/23/2025 |
| Concrete Solutions Lab Co | 5344 | 4 | 04/10/2025 |
| A Tech Engineering NYC, P | 6738 | 9 | 11/15/2023 |
| Special Inspection Services | 1200 | 8 | 07/12/2022 |
| Milrose Consultants | 2003 | 4 | 04/12/2022 |
| Gregory V. Perotto, P.E | 947 | 1 | 10/29/2021 |
| Richard B. Kornblau, AIA | 3208 | 2 | 10/29/2021 |
| MEP Inspections | 1102 | 4 | 10/20/2021 |
| Catalpa Special Inspectio | 2004 | 6 | 10/20/2021 |
| Think Design Architectura | 683 | 3 | 05/13/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | Five Boro Associates | 10/06/2026 |
| DOB NOW | Plumbing | Permit Issued | Capital Contracting P&H | 10/05/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM Construction Management | 09/03/2026 |
| DOB NOW | Structural | Permit Issued | JRM Construction Management | 08/10/2026 |
| DOB NOW | General Construction | Permit Issued | JRM Construction Management | 08/10/2026 |
| DOB NOW | Structural | Permit Issued | Class Consulting | 07/20/2026 |
| DOB NOW | Plumbing | Permit Issued | Capital Contracting P&H | 04/30/2026 |
| DOB NOW | Plumbing | Signed-off | Capital Contracting P&H | 09/04/2025 |
| DOB NOW | Plumbing | Permit Issued | Capital Contracting P&H | 05/28/2025 |
| DOB NOW | Plumbing | Signed-off | Capital Contracting P&H | 04/21/2025 |
| DOB NOW | Sprinklers | Signed-off | Five Boro Associates | 03/07/2025 |
| DOB NOW | Sprinklers | Signed-off | Five Boro Associates | 03/07/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Class Consulting | 02/28/2025 |
| DOB NOW | Sprinklers | Signed-off | Five Boro Associates | 02/24/2025 |
| DOB NOW | Curb Cut | Signed-off | Unity Construction Services | 01/06/2025 |
| DOB NOW | Sprinklers | Signed-off | Five Boro Associates | 12/26/2024 |
| DOB NOW | General Construction | Signed-off | Unity Construction Services | 09/03/2024 |
| DOB NOW | Plumbing | Signed-off | Capital Contracting P&H | 08/19/2024 |
| DOB NOW | General Construction | Signed-off | Unity Construction Services | 07/26/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Unity Construction Services | 07/26/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Gannon Contracting | 07/12/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Skyline Heating & Air * | 06/20/2024 |
| DOB NOW | Sprinklers | Signed-off | Five Boro Associates | 02/29/2024 |
| DOB NOW | Plumbing | Permit Issued | Capital Contracting P&H | 02/09/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Unity Construction Services | 01/29/2024 |
| DOB NOW | Plumbing | Signed-off | Capital Contracting P&H | 01/23/2024 |
| DOB NOW | Sprinklers | Signed-off | Five Boro Associates | 01/19/2024 |
| DOB NOW | Sprinklers | Signed-off | Five Boro Associates | 01/19/2024 |
| DOB NOW | Sprinklers | Signed-off | Five Boro Associates | 01/19/2024 |
| DOB NOW | Sprinklers | Signed-off | Five Boro Associates | 01/03/2024 |
| DOB NOW | Sprinklers | Signed-off | Five Boro Associates | 01/03/2024 |
| DOB NOW | Plumbing | Signed-off | Anaktora Mechanical | 12/01/2023 |
| DOB NOW | General Construction | Signed-off | T.L.C. Industries | 11/30/2023 |
| DOB NOW | Plumbing | Signed-off | Capital Contracting P&H | 11/29/2023 |
| DOB NOW | Plumbing | Signed-off | Capital Contracting P&H | 11/24/2023 |
| DOB NOW | Mechanical Systems | Signed-off | Ahearn-Holtzman | 11/09/2023 |
| DOB NOW | Mechanical Systems | Signed-off | Class Consulting | 11/08/2023 |
| DOB NOW | General Construction | Signed-off | Class Consulting | 11/03/2023 |
| DOB NOW | General Construction | Signed-off | Class Consulting | 11/03/2023 |
| DOB NOW | General Construction | Signed-off | T.L.C. Industries | 10/30/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/25/2026 | — | — | Heating and Air Conditioning Systems, Heating Systems, Others | Heat / Cool Aaon AAON
RNA-031-D-A-3
GJBOA-AO4NO 361,000 BTU · Rooftop Unit ×1 Heating Markel MARKEL 3 kW · Unit Heater ×1 Other Mitsubishi Electric MITSUBISHI TURY Condensing Unit ×2 |
| 04/16/2026 | Permit Issued | JRM Construction Management | Heating and Air Conditioning Systems | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | — | — | Sprinkler System |
| 04/16/2026 | Permit Issued | Five Boro Associates | Sprinkler System |
| 11/03/2025 | Signed-off | Five Boro Associates | 143 heads |
| 03/22/2022 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | — | — | Water/Sanitary |
| 04/16/2026 | Permit Issued | Capital Contracting P&H | Medical Gas, Water/Sanitary |
| 11/03/2025 | Permit Issued | Capital Contracting P&H | Gas |
| 03/22/2022 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/14/2026 | Permit Issued | Control Electrical Cont'g | General Wiring |
| 04/30/2024 | Complete | Control Electrical Cont'g | General Wiring |
| 02/06/2024 | Complete | Forest Electric | General Wiring |
| 12/21/2023 | Complete | Control Electrical Cont'g | General Wiring |
| 12/19/2023 | Complete | Control Electrical Cont'g | General Wiring |
| 11/09/2023 | Complete | Control Electrical Cont'g | General Wiring |
| 11/09/2023 | Complete | Control Electrical Cont'g | General Wiring |
| 06/29/2023 | Complete | Control Electrical Cont'g | General Wiring |
| 06/29/2023 | Complete | Control Electrical Cont'g | General Wiring |
| 06/06/2023 | Complete | Control Electrical Cont'g | General Wiring |
| 03/07/2023 | Complete | Control Electrical Cont'g | General Wiring |
| 12/06/2022 | Complete | Control Electrical Cont'g | General Wiring |
| 09/22/2022 | Complete | Control Electrical Cont'g | General Wiring |
| 04/26/2022 | Complete | Control Electrical Cont'g | General Wiring |
| 01/18/2022 | Complete | Control Electrical Cont'g | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/08/2026 | Permit Issued | Class Consulting | Steel, Concrete |
| 04/16/2026 | Permit Issued | Five Boro Associates | Steel |
| Date | Type | Result | Report |
|---|---|---|---|
| 12/08/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/14/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/01/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/30/2025 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 04/24/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/12/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/11/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/07/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/04/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/27/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/16/2024 | Certified Medical Gas - MG - PL - Roughing | Certified | View ↗ |
| 12/16/2024 | Certified Medical Gas - MG - PL - Test | Certified | View ↗ |
| 12/03/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/27/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/04/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/11/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/09/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/29/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/07/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/05/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/12/2024 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 07/01/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/26/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/12/2024 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 04/25/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/21/2026 | Air barrier — testing | — | energy_progress |
| 08/07/2026 | Structural Steel - Welding | Nicholas Tamborra | special |
| 08/07/2026 | Final | Ronald Victorio | progress |
| 08/07/2026 | Structural Cold-Formed Steel | Nicholas Tamborra | special |
| 08/07/2026 | Structural Steel - High Strength Bolting | Nicholas Tamborra | special |
| 08/07/2026 | Concrete - Cast-In-Place | Nicholas Tamborra | special |
| 08/07/2026 | Structural Stability – Alterations of existing buildings | Nicholas Tamborra | special |
| 08/07/2026 | Structural Steel - Details | Nicholas Tamborra | special |
| 08/04/2026 | Insulation placement and R values | — | energy_progress |
| 08/04/2026 | Interior lighting power | — | energy_progress |
| 08/04/2026 | Air barrier - visual inspection | — | energy_progress |
| 08/04/2026 | Maintenance information | — | energy_progress |
| 08/04/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 08/04/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 08/04/2026 | Wall Panels, Curtain Walls, and Veneers | — | special |
| 08/04/2026 | Fenestration air leakage | — | energy_progress |
| 08/04/2026 | Vestibules | — | energy_progress |
| 08/04/2026 | Fenestration areas | — | energy_progress |
| 08/04/2026 | Lighting controls | — | energy_progress |
| 08/04/2026 | Sprayed fire-resistant materials | — | special |
| 08/04/2026 | Concrete - Cast-In-Place | — | special |
| 07/13/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 07/13/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 07/13/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 07/13/2026 | Energy Code Compliance Inspections | — | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Edward Jones | Bank / Financial branch | Floor 6 | Project S00862637 |
| STATEN iSLAND ORAL & MAXILLOFACIAL SURGERY | Medical / Healthcare | Floors 6, 7 | Project S00851938 |
| Northwell Health | Medical / Healthcare | Floor 7 | Project S00843384 |
| Mount Sinai Health System | Medical / Healthcare | Floors 1, 2, 8, Penthouse, Roof | Project S00820785 Project S00823546 Project S00826672 Project S00820749 Project S00711002 Project S00711008 Project S00707625 |
| VNS Health | Office | Floor 7 | Project S00783479 Project S00783463 Project S00783449 |
| NYPD Medical | Medical / Healthcare | Floor 2 | Project S00793503 Project S00794263 Project S00793452 |
| Empire state | Office | Floors 1, 7 | Project S00640004 Project S00668517 Project S00669366 Project S00410535 Project S00410704 |
| JAG-ONE Physical | Medical / Healthcare | Floor 7 | Project S00663949 Project S00663969 Project S00663932 |
| Labcorp | Medical / Healthcare | Floors 1, 2, Roof | Project S00575806 Project S00576165 Project S00576177 Project S00575828 Project S00610580 Project S00472125 Project S00611054 Project S00610317 Project S00610480 |
| Crossroads /proscript | Office | Floor 7 | Project S00567061 |
| Staten Island Advance | Office | Floor 6 | Project S00545618 Project S00549067 Project S00549068 |
| New York Bariatric Group | Medical / Healthcare | Floor 2 | Project S00508645 Project S00508667 Project S00508850 |
| IRMS | Medical / Healthcare | Floor 2 | Project S00513087 Project S00514953 Project S00515026 |
| AT&T | Telecom site | — | Project S00472081 |
| AT&T Corporate Real Estate | Office | — | Project S00470617 |
| Ameriprise Financial | Office | Floor 2 | Project S00299307 Project S00299338 Project S00299356 |
| Extended MLTC | Office | Floor 6 | Project S00360537 Project S00358757 |
| Pienza Restaurant | Restaurant / Food Service | Floor 1 | Project S00299050 Project S00299056 |
| Integration Charter Schools | Education | Floors 3–5 | Project S00349186 |