← Back
MANHATTAN
Hotel Riu Plaza Manhattan Times Square
145 WEST 47 STREET · Midtown-Times Square · BIN 1090823
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionFire AlarmEquipmentCivilGeneralOther
Roof3p · 2 filings · 20 docs
Floor 507p · 2 filings · 8 docs
Floor 494p · 1 filing · 2 docs
Floor 4810p · 1 filing · 20 docs
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 93p · 1 filing · 2 docs
Floor 87p · 2 filings · 4 docs
Floor 73p · 1 filing · 2 docs
Floor 66p · 1 filing · 20 docs
Floor 510p · 2 filings · 20 docs
Floor 410p · 3 filings · 20 docs
Floor 310p · 3 filings · 20 docs
Floor 210p · 3 filings · 20 docs
Floor 117p · 5 filings · 20 docs
Mezzanine15p · 1 filing · 20 docs
Cellar7p · 1 filing · 20 docs
Sub-Cellar15p · 1 filing · 20 docs
Site & exterior50p · 8 filings · 20 docs
Filed — no permit issued5p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CLARITY 475103/21/2026
NY TOWER DEVELOPMENTS4607/08/2026
TRANSOM BUILDERS GROUP407/08/2026
SKYLINE SCAFFOLDING GROUP407/08/2026
DESIGN 2147303/22/2026
DORIA203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATUXENT ENGINEERING2603/21/2026
D R BROWN403/21/2026
KAZAM CONSULTANTS203/21/2026
JM ZONING, LLC.3403/21/2026
KD DESIGNS103/21/2026
MOSS ARCHITECTS203/21/2026
A1 EXPEDITING SERVICE403/21/2026
LOMBARDO PROFESSIONAL ENGINEERING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DHS FRACO LLCGeneral Contractor2707/08/2026
TB USA, L.L.CGeneral Contractor407/08/2026
FORWARD MECHANICAL CORPPlumbing307/08/2026
BUSKO REALTY CORPGeneral Contractor107/08/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor107/08/2026
A M A HOLDINGSScaffold107/08/2026
BALATON CONSULTING LLCScaffold107/08/2026
ANTHONY G FERRY INCElectrical103/22/2026
SIGNS CADScaffold107/08/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
BONDEE ENTERPRISES INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947107/09/2025
SOIL MECHANICS DRILLING C2325107/09/2025
SOTIR ASSOCIATES7473106/08/2022
TWIG SPECIAL INSPECTIONS885912/13/2021
JOEL PHAGOO ,PE, PLLC2416208/09/2021
Building Lifecycle
All (221)Filed (40)Permit Issued (32)Signed Off (18)Violation (60)Inspection (7)Objection (34)Special Inspection (30)
02/19/2026
Violation issued (ECB, open)
Elevators
07/09/2025
Filed — Alteration
Erect sign structure for advertising sign on wall. Sign filed separately # M01236468. No change of use, egress or occupancy
M01236476-I1
07/07/2025
Special inspection requirement — Post-installed Anchors
Joseph Bizarroque
06/09/2025
Permit issued — Sign
M01236468-I1-SG
06/06/2025
Filed — Alteration
Erect D/F advertising projecting sign on wall. Structure filed under separate application. No change of use, egress or occupancy
M01236468-I1
06/04/2025
Special inspection requirement — Final
RENEE RAJAPPA
06/04/2025
Special inspection requirement — Structural Steel - Welding
Joseph Bizarroque
06/04/2025
Special inspection requirement — Structural Steel - Details
Joseph Bizarroque
06/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
Gregory Perotto
06/04/2025
Special inspection requirement — Final
RENEE RAJAPPA
06/04/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Joseph Bizarroque
06/23/2023
Special inspection requirement — Public Assembly Emergency Lighting
Dave Wall
06/20/2023
Objection resolved — Addressed
06/20/2023
Objection resolved — Addressed
06/09/2023
Objection raised — Other
06/09/2023
Objection raised — Other
06/01/2023
Filed — No Work
M00349161-P3
05/31/2023
Special inspection requirement — Public Assembly Emergency Lighting
Dave Wall
01/19/2023
Signed off — Alteration
M00507793-I1
09/13/2022
Signed off — Alteration
M00107708-I1
09/07/2022
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00174411-I1
09/07/2022
Signed off — Alteration
M00382202-I1
09/07/2022
Signed off — Alteration
M00174405-I1
08/23/2022
Signed off — Alteration
M00630775-I1
08/01/2022
Signed off — Alteration
INSTALL AUTOMATIC PARKING SYSTEM. IN CONJUNCTION WITH NB #121187802
M00731261-I1
07/18/2022
Permit issued — General Construction
M00731261-I1-GC
06/08/2022
Filed — Alteration
INSTALL AUTOMATIC PARKING SYSTEM. IN CONJUNCTION WITH NB #121187802
M00731261-I1
06/08/2022
Signed off — Alteration
Installation of 3 signage as per plans filed herewith. Filed in connection with NB# 121187802.
M00364834-I1
06/07/2022
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
05/25/2022
Inspection — Fail-Final Sign Permit Inspection
Fail
View inspection ↗
05/24/2022
Signed off — Alteration
M00595224-I1
05/04/2022
Inspection — Fail-Final Sign Permit Inspection
Fail
View inspection ↗
05/04/2022
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Hany Demetry
05/04/2022
Special inspection requirement — Energy Code Compliance Inspections
Hany Demetry
05/04/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Hany Demetry
05/04/2022
Special inspection requirement — Final
Hany Demetry
04/18/2022
Violation issued (ECB, closed)
Construction
04/18/2022
Violation issued (ECB, closed)
Construction
04/18/2022
Violation issued (ECB, closed)
Site Safety
03/28/2022
Objection resolved — Addressed
03/21/2022
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
03/18/2022
Permit issued — Protection and Mechanical Methods
M00507793-I1-PM
03/10/2022
Violation issued (ECB, closed)
Construction
02/23/2022
Violation issued (ECB, closed)
Construction
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection resolved — Addressed
02/18/2022
Objection raised — Structural
02/18/2022
Objection raised — Inspections
02/18/2022
Objection raised — Structural
02/18/2022
Objection raised — Fire_Protection
02/06/2022
Signed off — Alteration
M00189729-I1
02/06/2022
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD STAIR TOWER ON EAST SIDE FOR ADJACENT PROPERTY WORKER ACCESS DURING CONSTRUCTION. SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC CC. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00211967-I1
02/06/2022
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00107387-I1
02/06/2022
Signed off — Alteration
INSTALLATION OF SCAFFOLD FOR EMERGENCY EGRESS IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN USE OR OCCUPANCY.
M00188865-I1
02/01/2022
Filed — No Work
M00349161-P2
01/31/2022
Special inspection requirement — Public Assembly Emergency Lighting
Dave Wall
01/26/2022
Signed off — Alteration
FURNISH AND INSTALL THREE (3) SETS OF DUPLEX FUEL OIL PUMPING SYSTEMS WITH ALL ASSOCIATED. ACCESSORIES AS INDICATED AND SPECIFIED IN THE DESIGN DOCUMENT.FILED IN CONJUNCTION WITH NB# 121187802.
M00332244-I1
01/26/2022
Signed off — Alteration
Installation of 4 gas fired hot water boilers as per plans filed herewith..FILED IN CONJUNCTION WITH NB# 121187802.
M00332258-S1
01/26/2022
Signed off — Alteration
Installation of 4 gas fired hot water boilers as per plans filed herewith..FILED IN CONJUNCTION WITH NB# 121187802.
M00332258-I1
Latest 60 of 221 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedA.M.A HOLDINGS INC06/09/2025
DOB NOWGeneral ConstructionSigned-offBUSKO REALTY CORP07/18/2022
DOB NOWProtection and Mechanical MethodsSigned-offTB USA, L.L.C03/18/2022
DOB NOWBoiler EquipmentSigned-offBONDEE ENTERPRISES INC12/28/2021
DOB NOWCurb CutSigned-offTB USA, L.L.C11/27/2021
DOB NOWSidewalk ShedSigned-offDHS FRACO11/17/2021
DOB NOWConstruction FenceSigned-offDHS FRACO11/17/2021
DOB NOWBoiler EquipmentSigned-offFORWARD HEATING CORP10/27/2021
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO09/29/2021
DOB NOWBoiler EquipmentSigned-offFORWARD HEATING CORP09/23/2021
DOB NOWConstruction FenceSigned-offDHS FRACO08/19/2021
DOB NOWSidewalk ShedSigned-offDHS FRACO08/19/2021
DOB NOWSupported ScaffoldSigned-offDHS FRACO08/19/2021
DOB NOWSignSigned-offFRANK ZANFARDINO07/29/2021
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP07/27/2021
DOB NOWProtection and Mechanical MethodsSigned-offTB USA, L.L.C06/09/2021
DOB NOWSupported ScaffoldSigned-offDHS FRACO03/26/2021
DOB NOWBoiler EquipmentSigned-offRANSHAW PLBG & HTG LLC11/05/2020
DOB NOWBoiler EquipmentSigned-offFORWARD HEATING CORP09/25/2020
DOB NOWConstruction FenceSigned-offDHS FRACO08/20/2020
DOB NOWSidewalk ShedSigned-offDHS FRACO08/18/2020
DOB NOWSupported ScaffoldSigned-offDHS FRACO08/10/2020
DOB NOWSupported ScaffoldSigned-offDHS FRACO08/21/2019
DOB NOWSidewalk ShedSigned-offDHS FRACO08/20/2019
DOB NOWSidewalk ShedSigned-offDHS FRACO08/19/2019
DOB NOWSupported ScaffoldSigned-offDHS FRACO08/19/2019
DOB NOWConstruction FenceSigned-offDHS FRACO08/16/2019
DOB NOWSupported ScaffoldSigned-offDHS FRACO07/08/2019
DOB NOWSupported ScaffoldSigned-offDHS FRACO07/05/2019
DOB NOWSidewalk ShedSigned-offDHS FRACO05/31/2019
DOB NOWConstruction FenceSigned-offDHS FRACO05/31/2019
DOB NOWSidewalk ShedSigned-offDHS FRACO12/10/2018
BIS—ISSUEDTB USA, L.L.C02/11/2022
BISPLISSUEDHEADQUARTERS MECH INC01/14/2022
BIS—ISSUEDTB USA, L.L.C01/14/2022
BIS—ISSUEDTB USA, L.L.C11/05/2021
BIS—ISSUEDTB USA, L.L.C09/14/2021
BIS—ISSUEDTB USA, L.L.C06/21/2021
BIS—ISSUEDTB USA, L.L.C04/26/2021
BISOTISSUEDTB USA, L.L.C03/29/2021
+ 38 more permits on file
12 projects · most recent 04/14/2025
General Wiring
FiledStatusContractorScope
04/14/2025Permit IssuedANTHONY G FERRY INCGeneral Wiring
05/26/2022CompleteCITY ELEC'L SIGN ERECTORS—
08/17/2021CompleteSIGNS CAD CORP—
08/17/2021CompleteSIGNS CAD CORP—
04/24/2020CompleteANTHONY G FERRY INCGeneral Wiring
04/23/2020CompleteANTHONY G FERRY INCGeneral Wiring
07/01/2019CompleteSTAR ELEC'L CONTRACTORS C—
07/01/2019CompleteSTAR ELEC'L CONTRACTORS C—
07/01/2019CompleteSTAR ELEC'L CONTRACTORS C—
01/25/2019CompleteV. VASS ELECTRIC CORP—
12/07/2018CompleteNASH ELECTRIC SERVICES IN—
09/25/2018CompleteANTHONY G FERRY INC—
1 project · most recent 07/09/2025
FiledStatusContractorScope
07/09/2025——1 scope_items
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/07/2022Pass-Final Sign Permit InspectionPassView ↗
05/25/2022Fail-Final Sign Permit InspectionFailView ↗
05/04/2022Fail-Final Sign Permit InspectionFailView ↗
03/21/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
01/12/2022Pass-Final PL - UndergroundPassView ↗
11/30/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
11/15/2021Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
07/07/2025Post-installed AnchorsJoseph Bizarroquespecial
06/04/2025FinalRENEE RAJAPPAprogress
06/04/2025Tenant Protection Plan ComplianceGregory Perottospecial
06/04/2025Structural Steel - WeldingJoseph Bizarroquespecial
06/04/2025Structural Steel - DetailsJoseph Bizarroquespecial
06/04/2025Structural Steel - High Strength BoltingJoseph Bizarroquespecial
06/04/2025FinalRENEE RAJAPPAprogress
06/23/2023Public Assembly Emergency LightingDave Wallprogress
05/31/2023Public Assembly Emergency LightingDave Wallprogress
05/04/2022Alternative Materials - OTCR Buildings Bulletin NumberHany Demetryspecial
05/04/2022Structural Stability – Alterations of existing buildingsHany Demetryspecial
05/04/2022FinalHany Demetryprogress
05/04/2022Energy Code Compliance InspectionsHany Demetryprogress
01/31/2022Public Assembly Emergency LightingDave Wallprogress
01/25/2022Public Assembly Emergency LightingDave Wallprogress
12/13/2021Maintenance informationDave Wallenergy_progress
12/13/2021HVAC and service water heating system controls Dave Wallenergy_progress
12/13/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsDave Wallspecial
12/13/2021Shutoff dampersDave Wallenergy_progress
12/13/2021Electrical motorsDave Wallenergy_progress
12/10/2021Electrical motorsDave Wallenergy_progress
12/10/2021Maintenance informationDave Wallenergy_progress
12/10/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsDave Wallspecial
12/10/2021Shutoff dampersDave Wallenergy_progress
12/10/2021HVAC and service water heating system controls Dave Wallenergy_progress
Latest 25 of 62.
▾Documents — 756 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch11
09/06/2026M00107708-I1Request digital key ↗
09/06/2026M00107387-I1Request digital key ↗
09/03/2026M00507793-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment8
09/04/2026M00332244-I1Request digital key ↗
09/04/2026M00332244-P1Request digital key ↗
09/04/2026M00332244-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly6
09/03/2026M00542235-P1Request digital key ↗
09/03/2026M00542235-I1Request digital key ↗
08/15/2026M00349161-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed5
09/06/2026M00107387-I1Request digital key ↗
09/05/2026M00174405-I1Request digital key ↗
08/15/2026M00107387-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold4
09/05/2026M00188865-I1Request digital key ↗
09/05/2026M00189729-I1Request digital key ↗
09/05/2026M00211967-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sign3
09/03/2026M00364834-P2Request digital key ↗
09/03/2026M00364834-P1Request digital key ↗
09/03/2026M00364834-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence3
09/03/2026M00174411-P1Request digital key ↗
09/03/2026M00174411-I1Request digital key ↗
09/03/2026M00174411-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/04/2026M00321526-I1Request digital key ↗
▸Applications & Permits150
▸BISPLAN / WORK APPROVAL APPLICATION99
02/08/2024121187802Open ↗
10/06/2023123826958Open ↗
08/24/2023121187802Open ↗
Showing 3 of 99 on file for this type
▸BISWORK PERMIT APPLICATION41
04/29/2022121187802Open ↗
02/14/2022121187802Open ↗
01/14/2022121187802Open ↗
Showing 3 of 41 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
12/22/2021140920065Open ↗
12/15/2021123745527Open ↗
12/15/2021123767860Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation3
12/13/2022123745368Open ↗
Showing 1 of 3 on file for this type
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
04/17/2024121187802Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
10/07/2022121187802Open ↗
▸BISPRIOR TO FCO PLEASE CHECK YES IN PW1SECTION 9 FOR RESTRICTIVE DEC/EASEMENT1
03/27/2024121187802Open ↗
▸Seals & Professional Certifications159
▸DOB NOWDPL-1: Design Professional Seal & Signature40
09/05/2026M00189729-I1Open ↗
09/05/2026M00211967-I1Open ↗
09/04/2026M00332244-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature38
09/29/2026M00630775-I1Open ↗
09/19/2026M00174405-I1Open ↗
09/13/2026M00542235-P1Open ↗
Showing 3 of 38 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/23/2026M00332244-I1Open ↗
08/27/2026M01236476-I1Open ↗
08/27/2026M01236476-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment56
▸BISEQUIPMENT USE PERMITS33
10/18/2021121187802Open ↗
10/18/2021121187802Open ↗
10/18/2021121187802Open ↗
Showing 3 of 33 on file for this type
▸BISSCHEDULE B - PLUMBING11
08/01/2022121187802Open ↗
12/14/2021121187802Open ↗
12/01/2021123759174Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection6
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE SIGNOFF1
02/16/2022121187802Open ↗
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
01/07/2022121187802Open ↗
12/22/2021140920065Open ↗
11/23/2021140920065Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
03/14/2024121187802Open ↗
11/23/2021140920065Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M00332258-I1Open ↗
08/13/2026M00332258-S1Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/27/2022121187802Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/07/2022121187802Open ↗
▸BISELECTRIC MOTORS1
01/27/2022121187802Open ↗
▸BISLIGHTING CONTROLS1
01/27/2022121187802Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/27/2022121187802Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00332258-S1Open ↗
▸Inspections & Test Reports73
▸BISTECHNICAL REPORT: RESPONSIBILITY50
09/14/2022140970689Open ↗
09/13/2022140970689Open ↗
07/08/2022121187802Open ↗
Showing 3 of 50 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS2
08/29/2022121187802Open ↗
01/27/2022121187802Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT2
03/27/2024121187802Open ↗
10/19/2021121187802Open ↗
▸BISDOB FINAL INSPECTION REQUIRED1
12/22/2021140920065Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFOOTING AND FOUNDATION INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs65
▸BISSCHEDULE A - OCCUPANCY / USE33
09/15/2022121187802Open ↗
08/08/2022121187802Open ↗
08/08/2022121187802Open ↗
Showing 3 of 33 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
02/06/2024123826958Open ↗
09/14/2022140970689Open ↗
08/25/2022123759174Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFINAL4
08/22/2022140827210Open ↗
05/09/2022140710540Open ↗
Showing 2 of 4 on file for this type
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE9
04/29/2022121187802Open ↗
02/11/2022121187802Open ↗
01/14/2022121187802Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW37
12/08/2023123826958Open ↗
12/09/2021123767860Open ↗
12/09/2021123745527Open ↗
Showing 3 of 7 on file for this type
▸BISBPP: ENGINEERS AFFIDAVIT1
12/13/2022123745368Open ↗
▸Filing & Intake Forms69
▸BISADDITIONAL INFORMATION30
12/13/2022123745368Open ↗
07/12/2022121187802Open ↗
01/18/2022141005249Open ↗
Showing 3 of 30 on file for this type
▸BISBOROUGH INTAKE FORM15
02/14/2022121187802Open ↗
01/14/2022121187802Open ↗
11/08/2021121187802Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00509596-P1Open ↗
▸Other Documents33
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION16
09/14/2022140970689Open ↗
09/14/2022140970689Open ↗
Showing 2 of 16 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
11/05/2021121187802Open ↗
11/05/2021121187802Open ↗
Showing 2 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
12/13/2022123745368Open ↗
Showing 1 of 2 on file for this type
▸BISCHIMNEYS2
04/08/2022121187802Open ↗
04/08/2022121187802Open ↗
▸BISSMOKE CONTROL SYSTEMS2
04/08/2022121187802Open ↗
04/08/2022121187802Open ↗
▸DOB NOWAlternate Plan 12
09/03/2026M00542235-I1Open ↗
09/03/2026M00542235-P1Open ↗
▸BISPRIOR TO FCO REVISE PW1 SECTION 19YOUHAVE PROPOSED LOADING BERTH 628SFASSHOWN ON YOUR PW1A FLOOR 001.1
04/06/2023121187802Open ↗
▸BISOTCR Final Accept, Auto Park Sys1
10/13/2022121187802Open ↗
▸BIS* LOADING DECK WEATHER SEALS1
01/27/2022121187802Open ↗
▸BISPROVIDE PF3 RECEIPT FROM PARKS DEPARTMENT FOR 11 TREES.1
12/13/2022123745368Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type