← Back
BuildNYC
Two family converted from one family
14619 183RD STREET
QUEENS · BIN 4285911
💬 Discuss this project
1950Year Built
1.5Stories
B3Building Class
R3-2Zoning
2,184 sfGross Floor Area
2Units
7 Active Violations 0 unresolved · 7 paperwork only ▸FDNY Report ↗
Two family converted from one family · Owner of record: HR 183 · 4,500 sf lot · 0.49 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInterior work, cellar and second floor refurbishment1p · 1 filing · 20 docs
Floor 2Interior work, cellar and second floor refurbishment10p · 1 filing · 20 docs
Floor 1Interior work, cellar and second floor refurbishment10p · 1 filing · 20 docs
CellarInterior work, cellar and second floor refurbishment13p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/12/2025$630K—— → —$288/sf building
08/02/2024$937K—— → —$429/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TSL Architect508/05/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Premium Expediting Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Smith Electrical ContractingElectrical103/21/2026
Elite GC NYGeneral Contractor107/08/2026
Austin Plumbing & Heating CoPlumbing107/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Homa Professional Engineering8807508/05/2026
Building Lifecycle
All (104)Filed (5)Permit Issued (2)Signed Off (1)Violation (8)Inspection (6)Objection (52)Special Inspection (30)
10/16/2026
Signed off — Alteration CO
PLUMBING APPLICATION FOR A RENOVATED TWO FAMILY DWELLING UNITS NEW BOILERS, NEW HOT WATER HEATERS, NEW LAUNDRY AND NEW PLUMBING FIXTURES AS PER PLANS. FILED IN CONJUNCTION WITH GC APPLICATION Q01268651-I1.
Q01268651-S1
10/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/05/2026
Filed — Alteration CO
PLUMBING APPLICATION FOR A RENOVATED TWO FAMILY DWELLING UNITS NEW BOILERS, NEW HOT WATER HEATERS, NEW LAUNDRY AND NEW PLUMBING FIXTURES AS PER PLANS. FILED IN CONJUNCTION WITH GC APPLICATION Q01268651-I1.
Q01268651-P3
07/30/2026
Special inspection requirement — Fenestration areas
TAI LAWAL
07/30/2026
Special inspection requirement — Air barrier - visual inspection
TAI LAWAL
07/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
TAI LAWAL
07/30/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
TAI LAWAL
07/30/2026
Special inspection requirement — Electric vehicle service equipment requirements
TAI LAWAL
07/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
TAI LAWAL
07/30/2026
Special inspection requirement — Permanent certificate
TAI LAWAL
07/30/2026
Special inspection requirement — Ventilation and air distribution system
TAI LAWAL
07/30/2026
Special inspection requirement — Insulation placement and R values
TAI LAWAL
07/30/2026
Special inspection requirement — Maintenance information
TAI LAWAL
07/30/2026
Special inspection requirement — Chimneys and vents
EBRAHIM HEKMAT
07/30/2026
Special inspection requirement — Mechanical Systems
EBRAHIM HEKMAT
07/30/2026
Special inspection requirement — Final
TAI LAWAL
07/30/2026
Special inspection requirement — Fenestration air leakage
TAI LAWAL
07/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
TAI LAWAL
07/30/2026
Special inspection requirement — Interior lighting power
TAI LAWAL
07/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
TAI LAWAL
07/02/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
EBRAHIM HEKMAT
07/02/2026
Special inspection requirement — Permanent certificate
TAI LAWAL
07/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
TAI LAWAL
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EBRAHIM HEKMAT
07/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
TAI LAWAL
06/30/2026
Filed — Alteration CO
PLUMBING APPLICATION FOR A RENOVATED TWO FAMILY DWELLING UNITS NEW BOILERS, NEW HOT WATER HEATERS, NEW LAUNDRY AND NEW PLUMBING FIXTURES AS PER PLANS. FILED IN CONJUNCTION WITH GC APPLICATION Q01268651-I1.
Q01268651-P2
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EBRAHIM HEKMAT
06/30/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
EBRAHIM HEKMAT
06/30/2026
Special inspection requirement — Permanent certificate
TAI LAWAL
06/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
TAI LAWAL
06/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
TAI LAWAL
06/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
TAI LAWAL
06/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/15/2026
Permit issued — General Construction
Q01268651-I1-GC-CX
06/04/2026
Special inspection requirement — Ventilation and air distribution system
TAI LAWAL
06/04/2026
Special inspection requirement — Mechanical Systems
EBRAHIM HEKMAT
05/28/2026
Objection raised — Other
05/28/2026
Objection resolved — Addressed
05/11/2026
Filed — Alteration CO
PLUMBING APPLICATION FOR A RENOVATED TWO FAMILY DWELLING UNITS NEW BOILERS, NEW HOT WATER HEATERS, NEW LAUNDRY AND NEW PLUMBING FIXTURES AS PER PLANS. FILED IN CONJUNCTION WITH GC APPLICATION Q01268651-I1.
Q01268651-P1
05/11/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/22/2026
Permit issued — Plumbing
Q01268651-S1-PL
03/05/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
02/26/2026
Objection resolved — Addressed
02/19/2026
Objection raised — Cost
01/28/2026
Objection raised — Energy
01/28/2026
Objection raised — Scope
12/23/2025
Objection resolved — Addressed
12/22/2025
Filed — Alteration CO
PLUMBING APPLICATION FOR A RENOVATED TWO FAMILY DWELLING UNITS NEW BOILERS, NEW HOT WATER HEATERS, NEW LAUNDRY AND NEW PLUMBING FIXTURES AS PER PLANS. FILED IN CONJUNCTION WITH GC APPLICATION Q01268651-I1.
Q01268651-S1
12/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedElite GC NY06/15/2026
DOB NOWPlumbingSigned-offAustin Plumbing & Heating Co04/22/2026
BIS—ISSUEDStar Homes Design & Management12/03/2012
BIS—ISSUEDStar Homes Design & Management11/23/2011
BIS—ISSUEDStar Homes Design & Management11/13/2009
BIS—ISSUEDStar Home Design & Management02/23/2009
BIS—ISSUEDCambira Construction09/28/2005
1 project · most recent 08/05/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/05/2026Permit IssuedElite GC NYVentilation Systems
Ventilation
1 project · most recent 08/05/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/05/2026Signed-offAustin Plumbing & Heating CoGas, Water/Sanitary
1 project · most recent 08/20/2025
General Wiring
FiledStatusContractorScope
08/20/2025CompleteWMS Electrical ContngGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/11/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/11/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
07/30/2026Fenestration areasTAI LAWALenergy_progress
07/30/2026Air barrier - visual inspectionTAI LAWALenergy_progress
07/30/2026HVAC-R and service water heating system controlsTAI LAWALenergy_progress
07/30/2026Fenestration and door U-factor and product ratingsTAI LAWALenergy_progress
07/30/2026Electric vehicle service equipment requirementsTAI LAWALenergy_progress
07/30/2026HVAC-R and service water heating equipmentTAI LAWALenergy_progress
07/30/2026Permanent certificateTAI LAWALenergy_progress
07/30/2026Ventilation and air distribution systemTAI LAWALenergy_progress
07/30/2026Insulation placement and R valuesTAI LAWALenergy_progress
07/30/2026Maintenance informationTAI LAWALenergy_progress
07/30/2026Chimneys and ventsEBRAHIM HEKMATspecial
07/30/2026Mechanical SystemsEBRAHIM HEKMATspecial
07/30/2026FinalTAI LAWALprogress
07/30/2026Fenestration air leakageTAI LAWALenergy_progress
07/30/2026HVAC-R and service water piping design and insulationTAI LAWALenergy_progress
07/30/2026Interior lighting powerTAI LAWALenergy_progress
07/02/2026HVAC-R and service water piping design and insulationTAI LAWALenergy_progress
07/02/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)EBRAHIM HEKMATspecial
07/02/2026Permanent certificateTAI LAWALenergy_progress
07/02/2026HVAC-R and service water heating equipmentTAI LAWALenergy_progress
07/02/2026Fire-Resistant Penetrations and JointsEBRAHIM HEKMATspecial
07/02/2026HVAC-R and service water heating system controlsTAI LAWALenergy_progress
06/30/2026Fire-Resistant Penetrations and JointsEBRAHIM HEKMATspecial
06/30/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)EBRAHIM HEKMATspecial
06/30/2026Permanent certificateTAI LAWALenergy_progress
Latest 25 of 60.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/16/2026Q01268651-P3Request digital key ↗
08/16/2026Q01268651-I1Request digital key ↗
08/16/2026Q01268651-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
09/02/2025402376870Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01268651-I1Open ↗
▸Seals & Professional Certifications60
▸DOB NOWProgress Inspector Seal & Signature48
09/28/2026Q01268651-P3Open ↗
09/28/2026Q01268651-P3Open ↗
09/28/2026Q01268651-P3Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/28/2026Q01268651-P3Open ↗
09/02/2026Q01268651-P1Open ↗
08/26/2026Q01268651-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/16/2026Q01268651-P3Open ↗
08/16/2026Q01268651-P1Open ↗
08/16/2026Q01268651-P2Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/16/2026Q01268651-P3Open ↗
08/16/2026Q01268651-I1Open ↗
08/15/2026Q01268651-P1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/16/2026Q01268651-P3Open ↗
08/15/2026Q01268651-P1Open ↗
08/13/2026Q01268651-I1Open ↗