| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q00470157 ↗ | 143-03 HILLSIDE AVENUE QUEENS | Alteration | Permit Issued | 05/13/2021 | 10/15/2026 | Owner DHILLON CONSULTING INC. Contractor HORBRIDGE PLUMBING & HEAT | To install the HVAC System on the roof for conditioning space in the newly constructed extension. Install heating unit on First floor. |
| M01344474 ↗ | 633 WEST 185TH STREET MANHATTAN | Alteration | Permit Issued | 01/12/2026 | 10/09/2026 | Design MOHAMMAD AHEAD, PE Contractor ELITE GC NY INC | Installation of fire escape at front of property to address ECB Summons 039161820X. Approval to file fire escape as a NON-ALT-CO was granted… |
| X01326260 ↗ | 3198 EDSON AVENUE BRONX | Alteration CO | Permit Issued | 12/10/2025 | 10/01/2026 | Design TSL ARCHITECT,P.C. Contractor ELITE GC NY INC | Vertical and Horizontal Extension to the Existing 1 story 1 Family building Converting it from 1 family to 2 Family Dwelling. Resolve Violat… |
| Q01381704 ↗ | 22-30 MOTT AVENUE QUEENS | Alteration | Signed-off | 04/16/2026 | 07/01/2026 | Contractor THREE STAR CONSTRUCTION G | FILING APPLICATION TO ADDRESS ECB VIOLATION # 35718093Z, TO PERFORM STRUCTURAL REPAIRS TO EXISTING ONE-STORY PARKING STRUCTURE LOCATED AT TH… |
| B00976473 ↗ | 283 STERLING STREET BROOKLYN | Alteration CO | Permit Issued | 02/21/2024 | 06/18/2026 | Design KOJO SIMPSON ARCHITECT Contractor ON TOP RENOVATION INC | ALTERATION TYPE I FOR THE CONVERSION OF AN EXISTING 2 STORY & BASEMENT (1) FAMILY INTO A 2 STORY & BASEMENT RESIDENTIAL BUILDING. |
| B01098077 | 87 MONTAUK AVENUE BROOKLYN | Alteration CO | Permit Issued | 09/11/2024 | 06/18/2026 | Design CX CONSULTING CORP Contractor TEMPLE DEVELOPERS LLC | PROPOSED ENLARGEMENT AND CONVERSION OF A THREE STORY AND ATTIC TWO FAMILY BUILDING TO A ONE FAMILY AND HOUSE OF WORSHIP. |
| Person | Filings | Most recent |
|---|---|---|
| YINY CASTRO | 121 | 09/09/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Edward C. Hicks RA | 38 | 09/02/2026 |
| Jim Kusi PE | 10 | 08/01/2024 |
| AZ Professional Engineering | 5 | 07/16/2026 |
| Michael Depasquale, Architect | 4 | 07/10/2025 |
| Kojo Simpson Architect | 3 | 07/16/2026 |
| NY Home Owner | 3 | 02/05/2025 |
| TSL Architect | 3 | 08/18/2026 |
| Alberto Roman | 2 | 12/14/2023 |
| Azsk Architects | 2 | 06/04/2025 |
| Lahita Engineering | 2 | 10/16/2023 |
| SU Architect | 2 | 03/16/2023 |
| A&B World Consulting | 1 | 02/25/2025 |
| Archaq | 1 | 09/02/2026 |
| Architectural Group International | 1 | 06/16/2025 |
| Ashraf | 1 | 07/15/2020 |
| Alexander Building Consulting | 1 | 04/16/2026 |
| CKL Engineering | 1 | 07/14/2026 |
| CX Consulting | 1 | 04/20/2025 |
| Department of Parks & Recreations | 1 | 07/22/2024 |
| DP Architect | 1 | 04/22/2026 |
| Elite GC NY | 1 | 01/12/2024 |
| Joel C Torielli | 1 | 06/13/2024 |
| Jose L. Pena, P.E | 1 | 03/25/2019 |
| Mohammad Ahead, PE | 1 | 09/11/2026 |
| Nikolai Katz Architect | 1 | 12/13/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| Elite GC NY | 18 | 09/11/2026 |
| Austin Plumbing & Heating Co | 17 | 08/05/2026 |
| R & S Construction | 5 | 08/01/2024 |
| Temple Developers | 3 | 04/20/2025 |
| Amb Mechanical | 2 | 09/02/2026 |
| CHS Contracting | 2 | 08/11/2023 |
| Horbridge Plumbing & Heating | 2 | 05/09/2026 |
| Shapiro & Sons | 2 | 12/13/2023 |
| A H Construction Co | 1 | 04/16/2024 |
| A. M. Plumbing Company | 1 | 06/25/2025 |
| Add Mechanical | 1 | 06/04/2025 |
| Advance Construction and AV Systems | 1 | 12/06/2021 |
| Anr Mechanical | 1 | 05/09/2026 |
| Ceylon Construction | 1 | 10/05/2021 |
| City Limit Construction * | 1 | 02/15/2024 |
| Custombuilt Homes | 1 | 05/09/2026 |
| Darts Contracting Co | 1 | 06/03/2024 |
| Deltamer | 1 | 04/22/2026 |
| DRM Construction | 1 | 05/09/2026 |
| Dynamic Plumbing & Sprinkler | 1 | 12/13/2023 |
| Elite Quality Construction | 1 | 07/19/2022 |
| Euro Building Group | 1 | 06/04/2025 |
| G. & S. Plumbing & Heating Co | 1 | 06/27/2023 |
| Homepro General Contracting | 1 | 02/25/2025 |
| HP Services | 1 | 02/25/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| Ftere - Finkelstein Timberger East | 4 | 08/01/2024 |
| Silverrock Development | 3 | 09/02/2026 |
| 146 Wyckoff Developer | 2 | 12/13/2023 |
| Calvary Church of God | 2 | 03/09/2022 |
| Chebar Evangelical Fellowship | 2 | 02/27/2024 |
| Cross Island Field Services | 2 | 03/16/2023 |
| 2690 Jamaica | 1 | 04/27/2023 |
| 6R Tribeca Owner | 1 | 11/02/2020 |
| Annal Management Co | 1 | 05/09/2024 |
| Chestnut Holdings | 1 | 04/16/2024 |
| Dave's Laundromat | 1 | 02/14/2022 |
| Dhillon Consulting | 1 | 05/09/2026 |
| Esteem Developments | 1 | 04/22/2026 |
| Halcyon Management Group | 1 | 07/15/2020 |
| Iglesia de Dios de la Profecia | 1 | 04/20/2025 |
| Kalimian Equities | 1 | 06/13/2024 |
| Kings Capital | 1 | 05/27/2021 |
| Northeastern Confer/Corp | 1 | 01/24/2022 |
| Related Management | 1 | 06/16/2025 |
| Rulers Assembly Ministries | 1 | 06/27/2023 |
| The Church of God in Christ Jesus O | 1 | 04/16/2024 |
| Waterfront Property Management | 1 | 06/19/2023 |
| Winnresidential | 1 | 05/20/2022 |
| Zion Group | 1 | 05/29/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| CD Consulting & Design | 1 | 05/09/2026 |
| Homes R US Sales | 1 | 07/14/2026 |
| Knightvision8555 | 1 | 07/16/2026 |
| Precision 3Sixty NYC | 1 | 08/18/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q00470157 ↗ | 143-03 HILLSIDE AVENUE QUEENS | Alteration | Permit Issued | 05/13/2021 | 10/15/2026 | Owner DHILLON CONSULTING INC. Contractor HORBRIDGE PLUMBING & HEAT | To install the HVAC System on the roof for conditioning space in the newly constructed extension. Install heating unit on First floor. |
| M01344474 ↗ | 633 WEST 185TH STREET MANHATTAN | Alteration | Permit Issued | 01/12/2026 | 10/09/2026 | Design MOHAMMAD AHEAD, PE Contractor ELITE GC NY INC | Installation of fire escape at front of property to address ECB Summons 039161820X. Approval to file fire escape as a NON-ALT-CO was granted… |
| X01326260 ↗ | 3198 EDSON AVENUE BRONX | Alteration CO | Permit Issued | 12/10/2025 | 10/01/2026 | Design TSL ARCHITECT,P.C. Contractor ELITE GC NY INC | Vertical and Horizontal Extension to the Existing 1 story 1 Family building Converting it from 1 family to 2 Family Dwelling. Resolve Violat… |
| Q01381704 ↗ | 22-30 MOTT AVENUE QUEENS | Alteration | Signed-off | 04/16/2026 | 07/01/2026 | Contractor THREE STAR CONSTRUCTION G | FILING APPLICATION TO ADDRESS ECB VIOLATION # 35718093Z, TO PERFORM STRUCTURAL REPAIRS TO EXISTING ONE-STORY PARKING STRUCTURE LOCATED AT TH… |
| B00976473 ↗ | 283 STERLING STREET BROOKLYN | Alteration CO | Permit Issued | 02/21/2024 | 06/18/2026 | Design KOJO SIMPSON ARCHITECT Contractor ON TOP RENOVATION INC | ALTERATION TYPE I FOR THE CONVERSION OF AN EXISTING 2 STORY & BASEMENT (1) FAMILY INTO A 2 STORY & BASEMENT RESIDENTIAL BUILDING. |
| B01098077 | 87 MONTAUK AVENUE BROOKLYN | Alteration CO | Permit Issued | 09/11/2024 | 06/18/2026 | Design CX CONSULTING CORP Contractor TEMPLE DEVELOPERS LLC | PROPOSED ENLARGEMENT AND CONVERSION OF A THREE STORY AND ATTIC TWO FAMILY BUILDING TO A ONE FAMILY AND HOUSE OF WORSHIP. |
| X00813768 ↗ | 946 EAST 222ND STREET BRONX | Alteration CO | Permit Issued | 02/10/2023 | 06/18/2026 | Design EDWARD C. HICKS RA Contractor TEMPLE DEVELOPERS LLC | PROPOSED INTERIOR RENOVATION AND CONVERSION OF A TWO-STORY AND ATTIC TWO-FAMILY BUILDING TO A ONE-FAMILY AND HOUSE OF WORSHIP. |
| Q01268651 ↗ | 14619 183RD STREET QUEENS | Alteration CO | Permit Issued | 08/28/2025 | 06/15/2026 | Design TSL ARCHITECT,P.C. Contractor ELITE GC NY INC | PLUMBING APPLICATION FOR A RENOVATED TWO FAMILY DWELLING UNITS NEW BOILERS, NEW HOT WATER HEATERS, NEW LAUNDRY AND NEW PLUMBING FIXTURES AS … |
| B01375754 ↗ | 3121 OCEAN AVENUE BROOKLYN | Alteration | Signed-off | 03/25/2026 | 04/17/2026 | Design DP ARCHITECT Owner ESTEEM DEVELOPMENTS LLC Contractor DELTAMER, INC | INTERIOR RENOVATION INCLUDING NON-LOAD BEARING PARTITIONS FOR EXISTING COMMERCIAL SPACE B0-2 OF BUSINESS (B) TYPE OCCUPANCY. NO CHANGE IS US… |
| Q01367038 ↗ | 59-25 163RD STREET QUEENS | Alteration | Signed-off | 03/05/2026 | 03/16/2026 | Design CKL Engineering Contractor AUSTIN PLBG & HTG CO.INC | LEGALIZE 3PC BATHROOM, WASHING MACHINE AND GAS DRYER AT BASEMENT IN CONJUNCTION WITH JOBNUMBER Q01264264-I1. |
| M01039733 ↗ | 315 EAST 58TH STREET MANHATTAN | Alteration | Signed-off | 06/03/2024 | 02/04/2026 | Design JIM KUSI PE Contractor DARTS CONTRACTING CO | APPLICATION BEING FILED TO REPAIR FACADE INCLUDING RE-POINTING, RESTITCHING OF BRICK MASONRY & STUCCO DETERIORATION AND TO RESOLVE ECB VIOLA… |
| B00945429 ↗ | 1236 BEDFORD AVENUE BROOKLYN | Alteration CO | Permit Issued | 10/13/2023 | 01/14/2026 | Design ARCHAQ Contractor PYRAMID FRAMERS USA INC | PL Fixtures |
| B01302340 ↗ | 5380 KINGS HIGHWAY BROOKLYN | Alteration | Permit Issued | 10/14/2025 | 01/02/2026 | Design YANG ENGINEERING LLC Owner ZION GROUP LLC Contractor AUSTIN PLBG & HTG CO.INC | INTERIOR RENOVATION AT 1ST & 2ND FLOOR, TO REMEDY CURE ECB VIOLATIONS: 39161915Z ,39161994X, 39161996J. AND FACADE REPAIR (BRICK REPOINTING)… |
| B00829178 ↗ | 669 BEDFORD AVENUE BROOKLYN | Alteration | Permit Issued | 06/20/2023 | 11/06/2025 | Design AZSK ARCHITECTS PC Contractor PRECISION HOME DEV INC | replacement |
| X00847964 ↗ | 4115 WILDER AVENUE BRONX | New Building | Permit Issued | 04/13/2023 | 09/25/2025 | Contractor POLANCO BROTHERS CORP | THE ERECTION OF AN 8 FOOT PLYWOOD CONSTRUCTION FENCE. |
| Q01267593 ↗ | 146-19GAR 183RD STREET QUEENS | Alteration | Signed-off | 08/25/2025 | 09/02/2025 | Design TSL ARCHITECT,P.C. Contractor ELITE GC NY INC | Manual removal of plywood covering on top of the existing garage (Violation #34500840P) along with its attached wooden stairs to restore bac… |
| B01260157 ↗ | 465 CLEVELAND STREET BROOKLYN | New Building | Filed — no permit on record | 08/06/2025 | — | Design KOJO SIMPSON ARCHITECT | — |
| B00617421 ↗ | 295 EAST 98TH STREET BROOKLYN | Alteration CO | Permit Issued | 12/06/2021 | 07/22/2025 | Design EDWARD C. HICKS RA Owner CALVARY CHURCH OF GOD Contractor ADVANCE CONSTR AND AV SYS | PROPOSED LEGALIZATION OF HORIZONTAL EXTENSION AND CONVERSION OF AN EXISTING RESIDENTIAL & COMMERCIAL BUILDING INTO A RESIDENTIAL & COMMUNITY… |
| Q00781160 ↗ | 80-61 230TH STREET QUEENS | Alteration CO | Permit Issued | 11/02/2022 | 06/06/2025 | Contractor THE INDO AMERICAN GROUP | To erect a construction fence on the lot line. |
| S01196154 ↗ | 141 VAN NAME AVENUE STATEN ISLAND | Alteration CO | Filed — no permit on record | 04/08/2025 | — | Design AZSK ARCHITECTS PC | — |
| X01189743 ↗ | 610 EXTERIOR STREET BRONX | Alteration | Filed — no permit on record | 03/17/2025 | — | — | |
| B01088856 ↗ | 314 16TH STREET BROOKLYN | Alteration | Permit Issued | 09/04/2024 | 03/13/2025 | Design SELF EMPLOYED Contractor A. M. PLUMBING COMPANY | FILING HEREWITH PLANS FOR THE CAP & REMOVAL OF A GAS BOILER AND THE INSTALLATION OF AN ELECTRICAL HOT WATER HEATER. |
| X01183362 ↗ | 3801 PAULDING AVENUE BRONX | Alteration | Filed — no permit on record | 02/19/2025 | — | — | |
| X01030505 ↗ | 215 MOUNT HOPE PLACE BRONX | Alteration | Signed-off | 04/26/2024 | 02/04/2025 | Design JIM KUSI PE Contractor R & S CONSTRUCTION CORP | FACADE REPAIRS OF FRONT PARAPET WALL FACING SOUTH. NO CHANGE IN USE, EGREE OR OCCUPANCY |
| X01045884 ↗ | 2785 SEDGWICK AVENUE BRONX | Alteration | Signed-off | 08/01/2024 | 02/04/2025 | Design JIM KUSI PE Contractor R & S CONSTRUCTION CORP | FACADE REPAIRS INCLUDING PARAPET WALLS, WINDOW LINTEL/SILL REPLACEMENT, RE-POINTING/RE-STITCHING OF BRICK MASONRY WALLS, ETC. NO CHANGE IN … |
| X00738880 ↗ | 597 EAST 138TH STREET BRONX | Alteration | Signed-off | 05/20/2022 | 01/21/2025 | Design JIM KUSI PE Owner WINNRESIDENTIAL Contractor R & S CONSTRUCTION CORP | EXTERIOR FACADE REPAIRS OF BRICK MASONRY RE-POINTING, RESTITCHING, WINDOW LINTEL & SILL REPLACEMENT, ETC. NO CHANGE IN USE, OCCUPANCY, OR EG… |
| Q01143529 ↗ | 241-05 87TH AVENUE QUEENS | Alteration | Signed-off | 11/19/2024 | 01/08/2025 | Contractor HUNT B CONSTRUCTION INC | The PAA is filed to update the plans for as built conditions. The changes are marked on the plans. |
| X01048900 ↗ | 3801 PAULDING AVENUE BRONX | Alteration CO | Permit Issued | 05/17/2024 | 11/25/2024 | Contractor AUSTIN PLBG & HTG CO.INC | PROPOSED CONVERSION TO AN EXISTING THREE STORY AND ONE FAMILY RESIDENCE INTO A THREE STORY AND TWO FAMILY RESIDENTIAL BUILDING AND TO SUPERS… |
| X00938587 ↗ | 2703 DECATUR AVENUE BRONX | Full Demolition | Permit Issued | 12/26/2023 | 11/13/2024 | Design NY HOME OWNER Contractor ELITE GC NY INC | Complete demolition of 2 story building |
| B01064807 ↗ | 2271 EAST 4TH STREET BROOKLYN | Alteration CO | Permit Issued | 06/20/2024 | 10/11/2024 | Design EDWARD C. HICKS RA Contractor KATAN P & H INC | HEREWITH FILED PLANS TO CONVERT TWO BUILDINGS INTO ONE BUILDING ONE FAMILY. |
| X00938586 ↗ | 2722 HERING AVENUE BRONX | Full Demolition | Signed-off | 12/21/2023 | 09/23/2024 | Design NY HOME OWNER Contractor ELITE GC NY INC | Complete demolition of the 1 family property |
| X00945652 ↗ | 2722GAR HERING AVENUE | Full Demolition | Signed-off | 12/21/2023 | 09/23/2024 | Design NY HOME OWNER Contractor ELITE GC NY INC | Hand demolition of detached garage. |
| X00989640 ↗ | 2722 HERING AVENUE BRONX | Alteration | Signed-off | 01/12/2024 | 09/23/2024 | Design ELITE GC NY INC Contractor ELITE GC NY INC | INSTALLATION OF CONSTRUCTION PLYWOOD FENCE IN CONJUNCTION WITH FD APPLICATION # X00938586 & X00945652. |
| X01054305 ↗ | 4130 HILL AVENUE BRONX | Alteration CO | Permit Issued | 05/30/2024 | 09/23/2024 | Design EDWARD C. HICKS RA Contractor ELITE GC NY INC | FILING TO SET NEW MEET AND BOUNDS, ALSO MINOR REPAIRS FOR WATER DAMAGE. |
| Q00995701 ↗ | 212-17 41ST AVENUE QUEENS | Alteration | Signed-off | 01/29/2024 | 09/13/2024 | Design EDWARD C. HICKS RA Contractor ELITE GC NY INC | Plumbing fixtures as per plans |
| Q00920528 ↗ | 51-23 REEDER STREET QUEENS | Alteration | Signed-off | 09/13/2023 | 09/09/2024 | Design A&B WORLD CONSULTING Contractor HOMEPRO GENERAL CONTRACTI | REPLACEMENT OF PL FIXTURES |
| X01028287 ↗ | 320 EAST 197TH STREET BRONX | Alteration | Signed-off | 04/07/2024 | 09/09/2024 | Design JIM KUSI PE Contractor R & S CONSTRUCTION CORP | FACADE REPAIRS INCLUDING BRICK MASONRY RE-POINTING/RE-STITCHING, CAST STONE, WINDOW LINTEL AND SILL DETERIORATION AT NORTH FACADE BUILDING E… |
| X01030508 ↗ | 2315 WALTON AVENUE BRONX | Alteration | Signed-off | 07/09/2024 | 07/24/2024 | Design JIM KUSI PE Contractor R & S CONSTRUCTION CORP | FACADE REPAIRS INCLUDING BRICK MASONRY RE-POINTING/RE-STITCHING, REPLACEMENT OF WINDOW LINTEL/SILL, REPAIR OF RAILING ON PARAPET WALL AND PA… |
| S01008702 ↗ | 119 WADSWORTH AVENUE STATEN ISLAND | Alteration | Signed-off | 03/05/2024 | 07/22/2024 | Design EDWARD C. HICKS RA Contractor SAHARA CONTRACTING CORP | PROPOSED ALTERATION TYPE II FOR A VERTICAL ENLARGEMENT OF A ONE STORY PORTION OF AN EXISTING TWO STORY FRAME BUILDING. NO CHANGE IN OCCUPAN… |
| X00995277 ↗ | 4416 MONTICELLO AVENUE BRONX | Alteration | Signed-off | 01/26/2024 | 07/08/2024 | Design EDWARD C. HICKS RA Contractor ELITE GC NY INC | PROPOSED ALTERATION TYPE II TO RESTORE CELLAR TO PRIOR LEGAL CONDITION, APPLICATION FILED UNDER BUILDING CODE PRIOR TO 1968. NO CHANGE IN U… |
| X08027103 ↗ | 1101 EAST 221ST STREET BRONX | Alteration CO | Permit Issued | 12/07/2022 | 06/14/2024 | Design EDWARD C. HICKS RA Contractor KBJ CONSTRUCTION CORP | PROPOSED CONVERSION OF AN EXISTING THREE-STORY AND ONE-FAMILY RESIDENCE INTO A THREE-STORY AND TWO-FAMILY RESIDENTIAL BUILDING. |
| M01059188 ↗ | 489 FIFTH AVENUE MANHATTAN | Alteration | Filed — no permit on record | 06/13/2024 | — | Design JOEL C TORIELLI Owner KALIMIAN EQUITIES LLC | — |
| X01046005 ↗ | 80 MCCLELLAN STREET BRONX | Alteration | Signed-off | 05/09/2024 | 06/13/2024 | Design JIM KUSI PE Contractor NEW FEDCO GENERAL CONTRAC | FACADE REPAIRS INCLUDING RE-POINTING/RE-STITCHING, WINDOW LINTEL/SILL REPLACEMENT AND INTERIOR PARAPET HAIRLINE, ETC. NO CHANGE IN USE, EGR… |
| X01022313 ↗ | 4712 REAR WHITE PLAINS ROAD BRONX | Alteration | Permit Issued | 03/19/2024 | 05/28/2024 | Design JIM KUSI PE Owner CHESTNUT HOLDINGS Contractor ALL PRO PLBG & HTG INC | ERECTING TEMPORARY CONSTRUCTION FENCE |
| Q08015037 | 157-22 TUSKEGEE AIRMEN WAY QUEENS | Alteration | Signed-off | 10/24/2022 | 05/16/2024 | Design EDWARD C. HICKS RA Contractor TEMPLE DEVELOPERS LLC | FILING HEREWITH PLANS AND APPLICATION FOR NEW PLUMBING FIXTURES. |
| B01008843 | 3402 TILDEN AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Filed — no permit on record | 02/27/2024 | — | Design EDWARD C. HICKS RA | — |
| Q00893454 ↗ | 102-15 187TH STREET QUEENS | Alteration CO | Permit Issued | 07/07/2023 | 02/06/2024 | Design EDWARD C. HICKS RA Contractor ELITE GC NY INC | PROPOSED LEGALIZATION OF THE ERECTION OF A REAR ONE STORY EXTENSION AND THE REMOVAL OF THE ONE CAR GARAGE. FILING FOR NEW CERTIFICATE OF OCC… |
| Q00997628 ↗ | 93-10 204TH STREET QUEENS | Alteration | Filed — no permit on record | 01/30/2024 | — | Design EDWARD C. HICKS RA | — |
| M00941594 ↗ | 633 WEST 185TH STREET MANHATTAN | Alteration | Signed-off | 10/16/2023 | 01/25/2024 | Design LAHITA ENGINEERING LLC Contractor ELITE GC NY INC | REMOVE EXISTING NON-LOAD BEARING INTERIOR WALLS AT THIRD FLOOR LEVEL. REPLACE SCUTTLE LADDER AT THIRD FLOOR LEVEL. REMOVE STAIRS AT BA… |
| B00970981 ↗ | 216 BUFFALO AVENUE BROOKLYN | Alteration | Permit Issued | 12/07/2023 | 01/22/2024 | Design EDWARD C. HICKS RA Contractor PLBG P & H INC | FILING HEREWITH PLANS AND APPLICATION FILED FOR THE INSTALLATION OF 2 NEW GAS HOT WATER HEATERS AND 2 NEW GAS BOILERS. NO CHANGE IN USE, … |
| B00970444 | 3402 TILDEN AVENUE BROOKLYN | Alteration CO | Filed — no permit on record | 01/06/2024 | — | Design EDWARD C. HICKS RA | — |
| B00832925 ↗ | 1931 62ND STREET BROOKLYN | Alteration | Signed-off | 02/23/2023 | 11/22/2023 | Design EDWARD C. HICKS RA Contractor UK 2 CONSTRUCTION CORP | FILING HEREWITH PLANS AND APPLICATION FOR NEW PLUMBING FIXTURES. |
| Q00926965 ↗ | 104-40 127TH STREET QUEENS | Alteration | Permit Issued | 09/13/2023 | 09/28/2023 | Design EDWARD C. HICKS RA Contractor AUSTIN PLBG & HTG CO.INC | LEGALIZING PLUMBING WORK IN CELLAR, INCLUDE A GAS LINE FOR DRYER |
| B00907606 ↗ | 2 BERRY STREET BROOKLYN | Alteration CO | Filed — no permit on record | 08/30/2023 | — | Design EDWARD C. HICKS RA | — |
| X00897647 ↗ | 284 RESERVOIR PLACE BRONX | Alteration | Signed-off | 06/30/2023 | 07/19/2023 | Design LAHITA ENGINEERING LLC Contractor ELITE GC NY INC | REMOVE EXISTING NON-LOADBEARING INTERIOR WALLS IN BASEMENT LEVEL, REMOVE EXISTING DECK AND STAIR AT GROUND LEVEL, REMOVE AND REPLACE EXTERIO… |
| Q00893473 ↗ | 144-76 VILLAGE ROAD QUEENS | Alteration | Signed-off | 06/28/2023 | 07/14/2023 | Design EDWARD C. HICKS RA Contractor WATERWORKS PLUMBING MECH | FILING HEREWITH PLANS AND APPLICATION FILED FOR THE INSTALLATION OF A WASHER & GAS DRYER IN EXISTING KITCHEN. |
| S00741955 ↗ | 42 WESTBROOK AVENUE STATEN ISLAND | Alteration | Signed-off | 05/23/2022 | 07/10/2023 | Design EDWARD C. HICKS RA Contractor FLAVIO MECHANICAL CORP | FILING HEREWITH PLANS AND APPLICATION FILED FOR NEW PLUMBING FIXTURES |
| Q00837439 ↗ | 92-16 JAMAICA AVENUE QUEENS | Alteration | Signed-off | 04/27/2023 | 05/24/2023 | Design EDWARD C. HICKS RA Owner 2690 JAMAICA LLC Contractor AUSTIN PLBG & HTG CO.INC | RELOCATE GAS PIPING OSP AS PER PLANS. |
| B00826319 ↗ | 27 ARION PLACE BROOKLYN | Alteration | Signed-off | 02/14/2023 | 05/18/2023 | Design EDWARD C. HICKS RA Contractor WATERFRONT PROPERTY MGMT | ALTERATION TYPE II FOR THE INTERIOR DEMOLITION OF ERECTED PARTITIONS AND MEZZANINE IN AN EXISTING DWELLING UNIT 209 OF A 66 D.U. RESIDENTIAL… |
| S00694737 ↗ | 42 WESTBROOK AVENUE STATEN ISLAND | Alteration CO | Permit Issued | 03/31/2022 | 05/05/2023 | Design EDWARD C. HICKS RA Contractor CHS CONTRACTING | PROPOSED CONVERSION TO AN EXISTING ONE AND HALF STORY ONE FAMILY RESIDENCE INTO A TWO STORY AND HALF TWO FAMILY RESIDENCE BUILDING. |
| B08048355 ↗ | 331 BEDFORD AVENUE BROOKLYN | Alteration | Permit Issued | 12/06/2022 | 04/18/2023 | Design NIKOLAI KATZ ARCHITECT Owner 146 WYCKOFF DEVELOPER Contractor SHAPIRO & SONS INC | PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC JOB #B08048335-I1. NO CHANGE IN BULK, NO CHANGE IN USE OR EGRESS OR OCCUPANCY. SEE PL… |
| X00768651 ↗ | 3186 WISSMAN AVENUE BRONX | Alteration | Permit Issued | 07/06/2022 | 12/16/2022 | Design EDWARD C. HICKS RA Contractor AUSTIN PLBG & HTG CO.INC | PLUMBING SPECIFICATIONS AND WORK TYPES FILED IN CONJUNCTION WITH ALT II APPLICATION # X00762157-I1. |
| B00586382 ↗ | 112 WALTON STREET BROOKLYN | Alteration | Permit Issued | 09/15/2021 | 10/20/2022 | Design EDWARD C. HICKS RA Owner 146 WYCKOFF DEVELOPER Contractor SHAPIRO & SONS INC | ALTERATION TYPE II FOR THE RESTORATION OF ONE DWELLING UNIT ON FIRST FLOOR, FILED TO CURE ECB VIOLATION # 35460606J, 39010983M AND 39017574N… |
| B08012086 ↗ | 717 HEMLOCK STREET BROOKLYN | Alteration | Filed — no permit on record | 10/06/2022 | — | Design EDWARD C. HICKS RA | — |
| X00675084 ↗ | 3801 PAULDING AVENUE BRONX | Alteration | Signed-off | 04/14/2022 | 08/29/2022 | Design SU ARCHITECT, P.C. Contractor MR. PLUMBER, INC. | TO RESOLVE ECB VIOLATION 35336452H BY CAP AND REMOVING 3PC BATHOOM, ILLEGAL PLUMBING FIXTURES AND THEIR PIPING AT BASEMENT, 001FL AND 002 FL… |
| Q00773875 ↗ | 89-30 164TH STREET QUEENS | Alteration | Signed-off | 07/19/2022 | 08/16/2022 | Design EDWARD C. HICKS RA Contractor ELITE QUALITY CONSTRUCTIO | ALTERATION TYPE II FOR THE INTERIOR RENOVATION OF (1) DWELLING UNIT (#6I) OF AN EXISTING 200-FAMILY RESIDENTIAL BUILDING. NO CHANGE IN BULK,… |
| X00773890 ↗ | 3301 BARKER AVENUE BRONX | Alteration | Signed-off | 07/19/2022 | 08/05/2022 | Design EDWARD C. HICKS RA Contractor AUSTIN PLBG & HTG CO.INC | PROPOSED INSTALLATION OF 3 COMBINATION GAS BOILERS AND REMOVAL OF (1) OIL BOILER WITH STORAGE TANK AND (1) HOT WATER HEATER. |
| B00712763 ↗ | 157 STUYVESANT AVENUE BROOKLYN | Alteration | Signed-off | 06/13/2022 | 07/27/2022 | Design JIM KUSI PE Contractor OWNERS GC NY LLC | FILING FOR THE INSTALLATION OF ELECTRICAL MECHANICAL EQUIPMENT-ELECTRICAL SPLIT OUTDOOR CONDENSERS AND ELECTRICAL INDOOR HANDLERS. FILED IN… |
| X00694780 ↗ | 3301 BARKER AVENUE BRONX | Alteration | Signed-off | 03/30/2022 | 04/23/2022 | Design EDWARD C. HICKS RA Contractor ELITE GC NY INC | REPAIR FIRE DAMAGE ON 3RD FLOOR APT. REPLACE DOORS/WINDOWS |
| B00650676 ↗ | 295 EAST 98TH STREET BROOKLYN | Alteration | Permit Issued | 03/09/2022 | 03/31/2022 | Design EDWARD C. HICKS RA Owner CALVARY CHURCH OF GOD Contractor RKA PIPING AND HEATING | FILING HEREWITH PLANS AND APPLICATION FOR NEW PLUMBING FIXTURES. |
| X00674123 ↗ | 3801 PAULDING AVENUE BRONX | Alteration | Filed — no permit on record | 02/14/2022 | — | Design SU ARCHITECT, P.C. | — |
| Q00658081 ↗ | 189-03 UNION TURNPIKE QUEENS | Alteration | Signed-off | 01/07/2022 | 01/26/2022 | Design ALBERTO ROMAN Owner DAVE'S LAUNDROMAT INC Contractor AUSTIN PLBG & HTG CO.INC | FILING HEREWITH PLANS AND APPLICATION FILED FOR NEW GAS FIXTURES. IN ADDITION FILING FOR INSTALLATION OF SPRINKLER RISER AND 3 SPRINKLER HE… |
| B00577815 ↗ | 1741 EAST 28TH STREET BROOKLYN | Alteration | Permit Issued | 10/05/2021 | 01/24/2022 | Design EDWARD C. HICKS RA Contractor CEYLON CONSTRUCTION LLC | ERECT 8 ft HIGH TEMPORARY CONSTRUCTION PLYWOOD FENCE ON PROPERTY LINE IN CONJUCTION WITH JOB# 340750002. |
| B00604501 | 5518 CHURCH AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Filed — no permit on record | 01/24/2022 | — | Design EDWARD C. HICKS RA Owner NORTHEASTERN CONFER/CORP | — |
| B00591067 ↗ | 702 EVERGREEN AVENUE BROOKLYN | Alteration | Signed-off | 09/14/2021 | 01/13/2022 | Design EDWARD C. HICKS RA Contractor PARK MANAGEMENT USA CORP | ALTERATION TYPE II FOR THE INTERIOR RENOVATION OF AN EXISTING 6 FAMILY RESIDENTIAL AND COMMERCIAL BUILDING. NO CHANGE IN BULK, USE, OCCUPAN… |
| B00286460 ↗ | 260 NEW YORK AVENUE BROOKLYN | Alteration | Signed-off | 12/31/2019 | 11/10/2021 | Design JIM KUSI PE Contractor PRIME PIPING & HEATING IN | RELOCATION OF BATHROOMS AND KITCHENETTES AND ADDITION OF BATHROOMS ON BASEMENT,AND FIRST THRU THIRD FLOORS. ALSO REPAIRS TO EXISTING STAIRS … |
| S00577806 ↗ | 19 GRIDLEY AVENUE STATEN ISLAND | Alteration | Permit Issued | 08/18/2021 | 11/01/2021 | Design EDWARD C. HICKS RA Contractor CHS CONTRACTING | ERECT 8 ft HIGH TEMPORARY CONSTRUCTION PLYWOOD FENCE ON PROPERTY LINE IN CONJUCTION WITH JOB# 520397516. |
| B00491602 ↗ | 145 SOMERS STREET BROOKLYN | Alteration | Signed-off | 05/27/2021 | 06/28/2021 | Design EDWARD C. HICKS RA Owner KINGS CAPITAL Contractor ZONE PLUMBING & HEATING C | PLUMBING APPLICATION FILED IN CONJUCTION WITH JOB # 340783584, REPLACE AND RELOCATE PLUMBING FIXTURES AND INSERT NEW FIXTURES AT CELLAR AS I… |
| B00515844 ↗ | 8612 4TH AVENUE BROOKLYN | Alteration | Filed — no permit on record | 06/10/2021 | — | Design EDWARD C. HICKS RA | — |
| B00410494 ↗ | 1741 EAST 28TH STREET BROOKLYN | Alteration | Filed — no permit on record | 10/15/2020 | — | — | |
| M00383874 ↗ | 86 WEST BROADWAY MANHATTAN | Alteration | Signed-off | 09/11/2020 | 09/23/2020 | Design OCV ARCHITECTS Contractor AUSTIN PLBG & HTG CO.INC | ALL PLUMBING FIXTURES TO BE RELOCATED, NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00316888 ↗ | 952 60TH STREET BROOKLYN | Alteration | Signed-off | 02/19/2020 | 03/10/2020 | Design ASHRAF CORP Owner HALCYON MANAGEMENT GROUP Contractor P.H. WORKS INC | ALTERATION TYPE II TO INSTALL NEW PLUMBING FIXTURES FOR 3 MERCANTILE SPACES. |
| X00145687 ↗ | 210 MOUNT HOPE PLACE BRONX | Alteration | Signed-off | 03/25/2019 | 03/26/2019 | Design JOSE L. PENA,P.E. Contractor SAMUEL & SONS P & H INC | PROPOSED REPLACEMENT OF (2) EXISTING OIL BOILER WITH 2 GAS FIRED BOILERS AND (2) EXISTING GAS FIRED HOT WATER HEATERS. |