← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
P/chester Condominium
1469 WEST AVENUE · Parkchester · BIN 2096629
💬 Discuss this project
0Year Built
—Stories
RMBuilding Class
R6Zoning
1,842,649 sfGross Floor Area
2,141Units
Rent Stabilized651 Active Violations 644 unresolved · 7 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Parkchester South Condominium Associates · 914,087 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofHeavy duty sidewalk shed installationUnder Construction10p · 3 filings · 17 docs
BulkheadHeavy duty sidewalk shed installationUnder Construction2p · 4 filings · 20 docs
Floor 1Ground floor slab reinforcementUnder Construction2p · 1 filing · 10 docs
Site & exteriorHeavy duty sidewalk shed installationUnder Construction18p · 4 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Parkchester Preservation Company1303/21/2026
PSC303/22/2026
P/Chester Condo303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Connolly Engineering103/26/2026
Kma Designs103/19/2026
Rimkus New York201/05/2026
Arquitectura Varela101/18/2025
CNS Inspection Services105/19/2022
Sullivan102/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants403/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pna ContractingGeneral Contractor207/08/2026
Kings Group NYScaffold207/08/2026
Flanagan BrianElectrical103/21/2026
WCK ElectricElectrical103/22/2026
Castcapa ConstructionGeneral Contractor103/26/2026
Two-Tone ContractingGeneral Contractor107/08/2026
LemxScaffold107/08/2026
High Quality Electric ofElectrical103/21/2026
Pna ContractingScaffold104/09/2026
Eco Electrical ServcsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Connolly Engineering, PLL3427103/26/2026
Outsource Special Inspection2827103/26/2026
Soni Engineering Consulting9819103/16/2026
Rimkus New York9809101/05/2026
Rimkus New York8123201/28/2025
Building Lifecycle
All (95)Filed (9)Permit Issued (9)Signed Off (5)Facade (FISP) (12)Violation (46)Special Inspection (14)
09/10/2026
Signed off — Alteration
X01141662-I1
06/10/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC
X01323403-S1
05/13/2026
Permit issued — General Construction
X01325234-I1-GC-CX
04/22/2026
Permit issued — General Construction
X01323403-I1-GC
03/26/2026
Filed — Alteration
X01325234-I1
03/20/2026
Permit issued — Sidewalk Shed
X01323403-S1-SH
03/19/2026
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC
X01323403-S1
03/19/2026
Permit issued — Suspended Scaffold
X01356941-I1-SC
03/16/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
X01356941-I1
03/16/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
03/16/2026
Special inspection requirement — Post-installed Anchors
nayan soni
01/05/2026
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC
X01323403-I1
12/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Daniel Presburger
12/05/2025
Special inspection requirement — Masonry
Daniel Presburger
12/05/2025
Special inspection requirement — Post-installed Anchors
Daniel Presburger
12/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
Daniel Presburger
11/26/2025
Special inspection requirement — Final
daniel connolly
11/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
daniel connolly
11/26/2025
Special inspection requirement — Post-installed Anchors
daniel connolly
11/26/2025
Special inspection requirement — Structural Steel - Details
daniel connolly
11/26/2025
Special inspection requirement — Structural Steel - Welding
daniel connolly
11/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
11/26/2025
Special inspection requirement — Structural Steel - High Strength Bolting
daniel connolly
11/21/2025
Special inspection requirement — Final
Daniel Presburger
06/25/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01164265-I1
06/17/2025
Violation issued (HPD, closed)
C
03/18/2025
Permit issued — General Construction
X01141662-I1-GC
02/11/2025
Permit issued — Suspended Scaffold
X01174695-I1-SC
02/07/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
X01174695-I1
01/28/2025
Filed — Alteration
X01141662-I1
01/21/2025
Permit issued — Sidewalk Shed
X01164265-I1-SH
01/18/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01164265-I1
05/20/2024
Violation issued (HPD, open)
B
05/20/2024
Violation issued (HPD, closed)
B
05/09/2024
Violation issued (HPD, open)
B
05/09/2024
Violation issued (HPD, open)
B
05/09/2024
Violation issued (HPD, open)
B
05/09/2024
Violation issued (HPD, open)
B
05/09/2024
Violation issued (HPD, open)
B
05/09/2024
Violation issued (HPD, open)
B
05/09/2024
Violation issued (HPD, closed)
B
05/09/2024
Violation issued (HPD, open)
B
03/14/2024
Violation issued (HPD, open)
C
03/14/2024
Violation issued (HPD, open)
C
02/20/2023
Cycle 9 facade report submitted
02/20/2023
Cycle 9 facade report signed — SAFE
02/16/2023
Signed off — Alteration
X00675058-I1
02/13/2023
Signed off — Alteration
X00739171-I1
01/31/2023
Cycle 9 facade inspection completed
05/20/2022
Permit issued — Sidewalk Shed
X00739171-I1-SH
05/19/2022
Filed — Alteration
X00739171-I1
04/25/2022
Permit issued — General Construction
X00675058-I1-GC
02/26/2022
Filed — Alteration
X00675058-I1
07/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/28/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/23/2019
Violation issued (HPD, open)
A
08/23/2019
Violation issued (HPD, closed)
A
08/23/2019
Violation issued (HPD, closed)
A
08/15/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/19/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTwo-Tone Contracting05/13/2026
DOB NOWGeneral ConstructionPermit IssuedPna Contracting04/22/2026
DOB NOWSidewalk ShedSigned-offKings Group NY03/20/2026
DOB NOWSuspended ScaffoldPermit IssuedPna Contracting03/19/2026
DOB NOWGeneral ConstructionSigned-offPna Contracting03/18/2025
DOB NOWSuspended ScaffoldPermit IssuedPna Contracting02/11/2025
DOB NOWSidewalk ShedSigned-offLemx01/21/2025
DOB NOWSidewalk ShedSigned-offKings Group NY05/20/2022
DOB NOWGeneral ConstructionSigned-offCastcapa Construction04/25/2022
BIS—ISSUEDService Sign Erectors Co05/16/2017
BISPLISSUEDR.J.C. Mechanical09/23/2016
BISOTISSUEDTorc09/16/2016
BISPLISSUEDBayview Plumbing & Heating09/17/2012
BISOTISSUEDGray Gold Contracting08/14/2012
BISMHISSUEDGray Gold Contracting08/14/2012
BISEQISSUEDEverest Scaffolding03/19/2010
BISEQISSUEDEverest Scaffolding11/23/2009
BISOTISSUEDTechnical Construction Services08/02/2005
BISOTISSUEDPPC Construction07/30/2002
BISPLISSUEDBlueprint Plumbing04/18/2002
BISOTISSUEDPPC Construction04/18/2002
BISEQISSUEDAtlantic-Heydt07/17/2001
BISOTISSUEDDNA Construction05/23/2001
BISEQISSUEDSpring Enterpris04/27/2001
4 projects · most recent 03/04/2026
General Wiring
FiledStatusContractorScope
03/04/2026CompleteHigh Quality Electric of NYC—
01/18/2025CompleteWCK Electric—
06/01/2022CompleteHigh Quality Electric of—
04/12/2021CompleteE-J Electric Installation CoGeneral Wiring
1 project · most recent 03/19/2026
Sidewalk Shed
FiledStatusContractorScope
03/19/2026Permit IssuedPna ContractingSidewalk Shed
2 projects · most recent 03/16/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/16/2026Permit IssuedPna ContractingSuspended Scaffold (SC)
02/07/2025Permit IssuedPna ContractingSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
03/16/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
03/16/2026Post-installed Anchorsnayan sonispecial
12/18/2025Energy Code Compliance InspectionsDaniel Presburgerprogress
12/05/2025MasonryDaniel Presburgerspecial
12/05/2025Post-installed AnchorsDaniel Presburgerspecial
12/04/2025Tenant Protection Plan ComplianceDaniel Presburgerspecial
11/26/2025Finaldaniel connollyprogress
11/26/2025Structural Stability – Alterations of existing buildingsdaniel connollyspecial
11/26/2025Post-installed Anchorsdaniel connollyspecial
11/26/2025Structural Steel - Detailsdaniel connollyspecial
11/26/2025Structural Steel - Weldingdaniel connollyspecial
11/26/2025Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
11/26/2025Structural Steel - High Strength Boltingdaniel connollyspecial
11/21/2025FinalDaniel Presburgerprogress
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026X00675058-I1Request digital key ↗
08/24/2026X00739171-I1Request digital key ↗
08/20/2026X01164265-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION8
05/16/2017220597227Open ↗
10/07/2016220550669Open ↗
09/20/2016220550669Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
05/16/2017220597227Open ↗
09/16/2016220550669Open ↗
08/13/2012220226351Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications35
▸DOB NOWSpecial Inspector Seal & Signature11
08/29/2026X01323403-I1Open ↗
08/29/2026X01323403-I1Open ↗
08/29/2026X01323403-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026X00675058-I1Open ↗
08/24/2026X00739171-I1Open ↗
08/20/2026X01141662-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
05/16/2017220597227Open ↗
09/16/2016220550669Open ↗
08/13/2012220226351Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
05/16/2017220597227Open ↗
09/16/2016220550669Open ↗
08/13/2012220226351Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
08/13/2012220226351Open ↗
08/13/2012220226351Open ↗
11/23/2009220038359Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026X01323403-I1Open ↗
08/29/2026X01323403-I1Open ↗
08/22/2026X01325234-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/16/2017220597227Open ↗
09/16/2016220550669Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
12/04/2012220226351Open ↗
11/27/2012220226351Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/16/2016220550669Open ↗
▸BISSCHEDULE B - PLUMBING1
08/13/2012220226351Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
09/16/2016220550669Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026X00675058-I1Open ↗
08/20/2026X01141662-I1Open ↗
08/17/2026X01323403-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/16/2016220550669Open ↗
08/13/2012220226351Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/23/2009220038359Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/16/2016220550669Open ↗
08/13/2012220226351Open ↗
08/13/2012220226351Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00675058-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
08/13/2012220226351Open ↗
11/23/2009220038359Open ↗
▸BISBSA-CPC APPROVAL1
11/23/2009220038359Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026X01323403-S1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/16/2017220597227Open ↗
09/16/2016220550669Open ↗
08/13/2012220226351Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET5
05/16/2017220597227Open ↗
09/16/2016220550669Open ↗
08/13/2012220226351Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸DOB NOWManufacturer's Specifications2
08/17/2026X01356941-I1Open ↗
08/13/2026X01174695-I1Open ↗
▸DOB NOWCalculations2
08/17/2026X01356941-I1Open ↗
08/13/2026X01174695-I1Open ↗