Old law tenement
Fac Renaissance
147 5TH AVENUE · Park Slope · BIN 3019399
💬 Discuss this project
1920Year Built
4Stories
C4Building Class
R6AZoning
12,000 sfGross Floor Area
7Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Old law tenement · Owner of record: Fac Renaissance Housing Development Fund · 3,000 sf lot · 4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 1 filing · 20 docs
Floor 4Under Construction29p · 1 filing · 20 docs
Floor 3Under Construction29p · 1 filing · 20 docs
Floor 2Under Construction29p · 1 filing · 20 docs
Floor 1Under Construction46p · 1 filing · 20 docs
CellarUnder Construction53p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fifth Ave Committee3010/04/2026
Fac Renaissance Housing Development Fund303/22/2026
NYC Department of Housing Preservation and Development203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Philip Toscano Architects1108/31/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Philip Toscano Architects703/21/2026
Fischer + Makooi Architects203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AAA BuildersGeneral Contractor508/13/2026
Mercury Fire SuppFire Protection207/08/2026
MPC Plumbing & HeatingPlumbing207/08/2026
Kostyantyn GarkushaGeneral Contractor107/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Philip Toscano, Architect2474908/31/2026
AK Engineering678404/23/2026
Steel Core Engineering PL1098105/20/2024
Building Lifecycle
All (127)Filed (11)Permit Issued (10)Signed Off (1)Violation (21)Inspection (8)Objection (46)Special Inspection (30)
09/24/2026
Objection resolved — Resolved
09/24/2026
Objection resolved — Resolved
09/24/2026
Objection resolved — Resolved
09/24/2026
Objection resolved — Resolved
09/24/2026
Objection resolved — Resolved
09/24/2026
Objection resolved — Resolved
09/24/2026
Objection resolved — Resolved
09/24/2026
Objection resolved — Resolved
09/24/2026
Objection resolved — Resolved
09/23/2026
Signed off — Alteration CO
SUBSEQUENT DOCUMENT FOR SPRINKLER WORK IN CONJUNCTION WITH GC APPLICATION # X00815485-I1. WORK TO INCLUDE CAP & REMOVAL OF EXISTING SPRINKLER HEADS. INSTALLATION OF NEW PENDANT SPRINKLER HEADS.NO CHANCE TO USE, EGRESS OR OCCUPANCY
B00815485-S1
09/23/2026
Objection resolved — Resolved
09/23/2026
Objection resolved — Resolved
09/23/2026
Objection resolved — Resolved
09/03/2026
Objection raised — Scope
09/03/2026
Objection raised — Admin
09/03/2026
Objection raised — Cost
09/03/2026
Objection raised — Accessibility
09/03/2026
Objection raised — Scope
09/03/2026
Objection raised — Fire_Protection
09/03/2026
Objection raised — Fire_Protection
09/03/2026
Objection raised — Fire_Protection
09/03/2026
Objection raised — Scope
09/03/2026
Objection raised — Other
09/03/2026
Objection raised — Zoning
09/03/2026
Objection raised — Structural
08/31/2026
Filed — Alteration CO
SUBSEQUENT DOCUMENT FOR SPRINKLER WORK IN CONJUNCTION WITH GC APPLICATION # X00815485-I1. WORK TO INCLUDE CAP & REMOVAL OF EXISTING SPRINKLER HEADS. INSTALLATION OF NEW PENDANT SPRINKLER HEADS.NO CHANCE TO USE, EGRESS OR OCCUPANCY
B00815485-P6
08/12/2026
Permit issued — General Construction
B00815485-I1-GC
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
08/03/2026
Special inspection requirement — Sprinkler Systems
PHILIP TOSCANO
08/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/31/2026
Special inspection requirement — Insulation placement and R values
PHILIP TOSCANO
07/29/2026
Permit issued — Mechanical Systems
B00815485-S3-MS
07/23/2026
Filed — Alteration CO
SUBSEQUENT DOCUMENT FOR SPRINKLER WORK IN CONJUNCTION WITH GC APPLICATION # X00815485-I1. WORK TO INCLUDE CAP & REMOVAL OF EXISTING SPRINKLER HEADS. INSTALLATION OF NEW PENDANT SPRINKLER HEADS.NO CHANCE TO USE, EGRESS OR OCCUPANCY
B00815485-P7
07/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/09/2026
Special inspection requirement — Sprinkler Systems
PHILIP TOSCANO
07/09/2026
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
06/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
06/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
PHILIP TOSCANO
06/19/2026
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
06/19/2026
Special inspection requirement — Lighting controls
PHILIP TOSCANO
06/19/2026
Special inspection requirement — Interior lighting power
PHILIP TOSCANO
06/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
PHILIP TOSCANO
06/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/30/2026
Violation issued (HPD, closed)
A
04/27/2026
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
04/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
04/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
PHILIP TOSCANO
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
04/23/2026
Filed — Alteration CO
SUBSEQUENT DOCUMENT FOR SPRINKLER WORK IN CONJUNCTION WITH GC APPLICATION # X00815485-I1. WORK TO INCLUDE CAP & REMOVAL OF EXISTING SPRINKLER HEADS. INSTALLATION OF NEW PENDANT SPRINKLER HEADS.NO CHANCE TO USE, EGRESS OR OCCUPANCY
B00815485-P5
03/23/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/19/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/12/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/07/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/19/2025
Permit issued — General Construction
B00815485-I1-GC
08/14/2025
Permit issued — Sprinklers
B00815485-S4-EW-SP
07/18/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/10/2025
Permit issued — Plumbing
B00815485-S1-PL
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAAA Builders08/12/2026
DOB NOWMechanical SystemsPermit IssuedKostyantyn Garkusha07/29/2026
DOB NOWGeneral ConstructionPermit IssuedAAA Builders09/19/2025
DOB NOWSprinklersSigned-offMercury Fire Supp08/14/2025
DOB NOWPlumbingSigned-offMPC Plumbing & Heating07/10/2025
DOB NOWGeneral ConstructionPermit IssuedAAA Builders10/18/2024
DOB NOWSprinklersSigned-offMercury Fire Supp08/27/2024
DOB NOWPlumbingSigned-offMPC Plumbing & Heating08/09/2024
DOB NOWGeneral ConstructionPermit IssuedAAA Builders10/11/2023
DOB NOWGeneral ConstructionPermit IssuedAAA Builders04/28/2023
BISPLISSUEDKatan P & H07/27/2018
BISBLISSUEDKatan P & H07/27/2018
BISPLISSUEDKatan P & H07/12/2017
BISBLISSUEDKatan P & H07/06/2017
BISOTISSUEDAvante Contracting04/06/2017
BISMHISSUEDAvante Contracting04/06/2017
BISEQISSUEDAdvanced Construction Equipment06/24/2016
BISPLISSUEDKatan P & H06/23/2016
BISOTISSUEDAvante Contracting06/16/2016
BISMHISSUEDAvante Contracting06/16/2016
BISEQISSUEDSSP Construction10/27/2015
BISEQISSUEDSSP Construction10/20/2015
BISSPISSUEDAccurate Mechanical08/07/2006
BISPLISSUEDA.M.N07/10/2006
BIS—ISSUEDBurda Construction06/13/2006
BISPLISSUEDA P Plumbing & Heating05/30/1995
BISEQISSUEDSrategic Construction04/04/1995
BIS—ISSUEDSrategic Construction04/04/1995
1 project · most recent 08/31/2026
FiledStatusContractorScope
08/31/2026Signed-offMercury Fire Supp41 heads
1 project · most recent 08/31/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/31/2026Signed-offMPC Plumbing & HeatingGas, Water/Sanitary
1 project · most recent 09/28/2023
General Wiring
FiledStatusContractorScope
09/28/2023Permit IssuedA & R Electrical ContractingGeneral Wiring
1 project · most recent 08/31/2026
Fence
FiledStatusContractorScope
08/31/2026Permit IssuedAAA BuildersFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/23/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/19/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/12/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/07/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/18/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
08/03/2026Energy Code Compliance InspectionsPHILIP TOSCANOprogress
08/03/2026Sprinkler SystemsPHILIP TOSCANOspecial
08/03/2026Tenant Protection Plan Compliance—special
07/31/2026Tenant Protection Plan Compliance—special
07/31/2026Insulation placement and R valuesPHILIP TOSCANOenergy_progress
07/23/2026Tenant Protection Plan Compliance—special
07/09/2026Sprinkler SystemsPHILIP TOSCANOspecial
07/09/2026Energy Code Compliance InspectionsPHILIP TOSCANOprogress
06/19/2026Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
06/19/2026Structural Stability – Alterations of existing buildingsPHILIP TOSCANOspecial
06/19/2026Energy Code Compliance InspectionsPHILIP TOSCANOprogress
06/19/2026Lighting controlsPHILIP TOSCANOenergy_progress
06/19/2026Interior lighting powerPHILIP TOSCANOenergy_progress
06/19/2026Fire-Resistance Rated ConstructionPHILIP TOSCANOprogress
04/27/2026Energy Code Compliance InspectionsPHILIP TOSCANOprogress
04/27/2026Tenant Protection Plan ComplianceAri Kamospecial
04/27/2026HVAC-R and service water piping design and insulationPHILIP TOSCANOenergy_progress
04/27/2026Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
09/03/2024Tenant Protection Plan ComplianceAri Kamospecial
09/03/2024Structural Stability – Alterations of existing buildingsPHILIP TOSCANOspecial
09/03/2024Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
09/03/2024Fire-Resistance Rated ConstructionPHILIP TOSCANOprogress
09/03/2024Energy Code Compliance InspectionsPHILIP TOSCANOprogress
09/03/2024Lighting controlsPHILIP TOSCANOenergy_progress
09/03/2024Interior lighting powerPHILIP TOSCANOenergy_progress
Latest 25 of 46.
▾Documents — 174 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/17/2026B00815485-P7Request digital key ↗
08/17/2026B00815485-P3Request digital key ↗
08/17/2026B00815485-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits23
▸BISWORK PERMIT APPLICATION12
07/30/2018321396397Open ↗
07/30/2018321396397Open ↗
07/14/2017321396397Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
11/02/2017321396397Open ↗
06/20/2016340393700Open ↗
06/02/2016321396397Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/14/2017321396397Open ↗
▸Seals & Professional Certifications71
▸DOB NOWProgress Inspector Seal & Signature24
09/14/2026B00815485-I1Open ↗
09/14/2026B00815485-I1Open ↗
09/14/2026B00815485-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/14/2026B00815485-I1Open ↗
09/14/2026B00815485-I1Open ↗
09/14/2026B00815485-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
05/14/2019340393700Open ↗
06/17/2016321396397Open ↗
06/02/2016321396397Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/17/2026B00815485-P7Open ↗
08/17/2026B00815485-P1Open ↗
08/17/2026B00815485-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
06/20/2016340393700Open ↗
06/02/2016321396397Open ↗
10/29/2015321256458Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/02/2016321396397Open ↗
10/29/2015321256458Open ↗
10/26/2015321256467Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/20/2016340393700Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/20/2016340393700Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
11/02/2017321396397Open ↗
06/02/2016321396397Open ↗
05/02/2016321375873Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/02/2017321396397Open ↗
06/02/2016321396397Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
10/14/2017321396397Open ↗
10/14/2017321396397Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/17/2026B00815485-P6Open ↗
08/13/2026B00815485-P3Open ↗
08/13/2026B00815485-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES2
06/20/2016340393700Open ↗
06/02/2016321396397Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00815485-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/17/2026B00815485-P7Open ↗
08/17/2026B00815485-S4Open ↗
08/17/2026B00815485-S1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/02/2016321396397Open ↗
05/02/2016321375873Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/17/2016321396397Open ↗
06/02/2016321396397Open ↗
05/02/2016321375873Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
09/26/2019321396397Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/20/2016340393700Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/20/2016340393700Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/26/2019321396397Open ↗
05/14/2019340393700Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/29/2015321256458Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT8
09/26/2019321396397Open ↗
06/02/2016321396397Open ↗
06/02/2016321396397Open ↗
Showing 3 of 8 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
07/30/2018321396397Open ↗
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET8
06/02/2016321396397Open ↗
06/02/2016321396397Open ↗
06/02/2016321396397Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION3
08/07/2018321396397Open ↗
02/06/2018321396397Open ↗
06/09/2017321396397Open ↗
▸BISBOROUGH INTAKE FORM2
09/26/2019321396397Open ↗
05/14/2019340393700Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/20/2016340393700Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification5
08/17/2026B00815485-P3Open ↗
08/17/2026B00815485-P1Open ↗
08/17/2026B00815485-P2Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
06/20/2016340393700Open ↗
06/02/2016321396397Open ↗
06/02/2016321396397Open ↗