← Back
BuildNYC
Parochial school, yeshiva
Cong Machna Shalva II
1475 41ST STREET · Borough Park · BIN 3124904
💬 Discuss this project
1930Year Built
4Stories
W2Building Class
R6Zoning
44,177 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized15 Active Violations ▸FDNY Report ↗
Parochial school, yeshiva · Owner of record: 4018 CMS · 8,763 sf lot · 5.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDoria INC43p · 4 filings · 17 docs
BulkheadFoundation and structural construction1p · 1 filing · 15 docs
Floor 7Running trap with cleanout41p · 4 filings · 17 docs
Floor 6Running trap with cleanout37p · 3 filings · 17 docs
Floor 5Running trap with cleanout40p · 4 filings · 17 docs
Floor 4Running trap with cleanout37p · 3 filings · 17 docs
Floor 3Running trap with cleanout37p · 3 filings · 17 docs
Floor 2Running trap with cleanout37p · 3 filings · 17 docs
Floor 1Running trap with cleanout42p · 4 filings · 17 docs
CellarRunning trap with cleanout39p · 4 filings · 17 docs
Site & exteriorSidewalk shed installation9p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
4018 CMS1403/22/2026
NYC Department of Housing Preservation and Development503/21/2026
1475 41 LLC203/21/2026
Frankel203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/10/2019$10.8M—— → —$244/sf building
08/02/2017$6.7M—— → —$153/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Engineering Solutions509/25/2023
Bricolage Designs407/17/2023
Ashraf112/21/2022
Skyline Rigging109/13/2022
Mohammad Ahead, PE111/17/2021
Steel Core Engineering103/18/2021
Haider Engineering, P.E101/16/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bricolage Designs103/21/2026
JMT Expediting203/21/2026
Haider Engineering, P.E103/21/2026
Expediter Group1803/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & G Construction ServicesScaffold1803/21/2026
Net Power ElectricGeneral Contractor903/22/2026
Net Power ElectricElectrical903/21/2026
Townhouse BuildersGeneral Contractor407/08/2026
DoriaScaffold307/08/2026
B&B Mechanical Plumbing & HeatingPlumbing207/08/2026
Safety Fire SprinklerFire Protection207/08/2026
William K. ConstructionElectrical103/21/2026
Henry RaduskyElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma9168609/25/2023
Skyline Rigging7880109/13/2022
Building Lifecycle
All (185)Filed (14)Permit Issued (15)Signed Off (7)Violation (60)Inspection (11)Objection (48)Special Inspection (30)
05/01/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
06/06/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, open)
I
04/03/2024
Violation issued (HPD, open)
A
02/12/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD AS PER PLANS. NO CHANGE IS USE, EGRESS OR OCCUPANCY.
B08000648-I1
02/01/2024
Signed off — Alteration
proposed foundation and structural drawings submitted herewith in conj with alt 1 construction
B00488316-I1
01/31/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/29/2024
Signed off — Alteration
PROPOSED MECHANICAL PLANS FILED HEREWITH IN CONJUNCTION WITH ALT 1 JOB 321667549.
B00709345-I1
01/26/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/20/2023
Violation issued (HPD, open)
I
11/01/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/18/2023
Signed off — Alteration
PROPOSED SPRINKLER, STANDPIPE, PLUMBING PLANS FILED HEREWITH IN CONJUNCTION WITH ALT 1 JOB 321667549.
B00708554-I1
09/29/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/29/2023
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
09/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/27/2023
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
09/27/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/27/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
09/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
09/27/2023
Special inspection requirement — Maintenance information
Soorjbally Harilall
09/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
09/27/2023
Special inspection requirement — Standpipe Systems
SOORJBALLY HARILALL
09/27/2023
Special inspection requirement — Sprinkler Systems
SOORJBALLY HARILALL
09/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
09/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
09/25/2023
Filed — Alteration
PROPOSED SPRINKLER, STANDPIPE, PLUMBING PLANS FILED HEREWITH IN CONJUNCTION WITH ALT 1 JOB 321667549.
B00708554-P2
09/23/2023
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
09/23/2023
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
09/23/2023
Special inspection requirement — Maintenance information
Soorjbally Harilall
09/23/2023
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
09/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
09/23/2023
Special inspection requirement — Sprinkler Systems
SOORJBALLY HARILALL
09/23/2023
Special inspection requirement — Standpipe Systems
SOORJBALLY HARILALL
09/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
09/01/2023
Special inspection requirement — Heating Systems
SOORJBALLY HARILALL
09/01/2023
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
09/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
09/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
09/01/2023
Special inspection requirement — Maintenance information
Soorjbally Harilall
09/01/2023
Special inspection requirement — Shutoff dampers
Soorjbally Harilall
09/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
09/01/2023
Special inspection requirement — Final
Soorjbally Harilall
08/25/2023
Objection resolved — Addressed
08/24/2023
Objection raised — Inspections
08/24/2023
Objection raised — Scope
08/24/2023
Objection resolved — Addressed
08/18/2023
Signed off — Alteration
B00114153-I1
08/18/2023
Signed off — Alteration
B00590551-I1
08/18/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B08053814-I1
08/17/2023
Filed — Alteration
PROPOSED MECHANICAL PLANS FILED HEREWITH IN CONJUNCTION WITH ALT 1 JOB 321667549.
B00709345-P1
08/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
08/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
08/16/2023
Special inspection requirement — Shutoff dampers
Soorjbally Harilall
08/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
08/16/2023
Special inspection requirement — Maintenance information
Soorjbally Harilall
08/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
08/16/2023
Special inspection requirement — Final
Soorjbally Harilall
07/26/2023
Objection resolved — Addressed
07/26/2023
Objection resolved — Addressed
Latest 60 of 185 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTarget Piping NY07/19/2023
DOB NOWProtection and Mechanical MethodsSigned-offDoria05/03/2023
DOB NOWMechanical SystemsSigned-offTownhouse Builders03/31/2023
DOB NOWSidewalk ShedSigned-offJ & G Construction Services03/10/2023
DOB NOWSupported ScaffoldSigned-offJ & G Construction Services12/22/2022
DOB NOWSprinklersSigned-offSafety Fire Sprinkler12/21/2022
DOB NOWStandpipeSigned-offSafety Fire Sprinkler12/21/2022
DOB NOWProtection and Mechanical MethodsSigned-offDoria09/14/2022
DOB NOWPlumbingSigned-offTarget Piping NY07/22/2022
DOB NOWMechanical SystemsSigned-offTownhouse Builders04/14/2022
DOB NOWSidewalk ShedSigned-offJ & G Construction Services04/06/2022
DOB NOWFoundationSigned-offTownhouse Builders02/05/2022
DOB NOWSidewalk ShedSigned-offJ & G Construction Services02/22/2021
DOB NOWSidewalk ShedSigned-offJ & G Construction Services01/31/2020
DOB NOWSidewalk ShedSigned-offJ & G Construction Services01/24/2019
BISEQISSUEDTownhouse Builders06/22/2023
BIS—ISSUEDTownhouse Builders03/17/2023
BISPLISSUEDB&B Mechanical Plumbing & Heating12/21/2022
BISEQISSUEDTownhouse Builders07/15/2022
BIS—ISSUEDTownhouse Builders03/22/2022
BIS—ISSUEDTownhouse Builders02/14/2022
BIS—ISSUEDTownhouse Builders02/14/2022
BISPLISSUEDB&B Mechanical Plumbing & Heating12/30/2021
BISEQISSUEDTownhouse Builders07/19/2021
BIS—ISSUEDTownhouse Builders02/26/2021
BISPLISSUEDB&B Mechanical Plumbing & Heating01/05/2021
BIS—ISSUEDTownhouse Builders12/07/2020
BISEQISSUEDTownhouse Builders08/19/2020
BIS—ISSUEDTownhouse Builders03/24/2020
BIS—ISSUEDTownhouse Builders08/30/2019
BISEQISSUEDRock Group NY05/30/2017
BISEQISSUEDJ & G GNRL Contracting02/07/2017
BISEQISSUEDTownhouse Builders01/13/2017
BISOTISSUEDTownhouse Builders01/10/2017
BISEQISSUEDLovely Construction04/21/2011
BISEQISSUEDAta Constrution04/21/2004
BISEQISSUEDLakhi General Contractor04/13/2004
5 projects · most recent 12/10/2025
General Wiring
FiledStatusContractorScope
12/10/2025CompleteNet Power ElectricGeneral Wiring
09/08/2025CompleteNet Power ElectricGeneral Wiring
03/21/2023CompleteStar Electrical Contractors—
01/28/2021CancelledStar Electrical Contractors—
09/11/2019CompleteGreen Star Electl Cont—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
01/31/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/26/2024Fail-Final General Construction Non-Directive 14FailView ↗
11/01/2023Fail-Final General Construction Non-Directive 14FailView ↗
09/29/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/29/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
09/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/27/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
09/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/27/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/29/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
09/27/2023HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
09/27/2023Maintenance informationSoorjbally Harilallenergy_progress
09/27/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
09/27/2023Standpipe SystemsSOORJBALLY HARILALLspecial
09/27/2023Sprinkler SystemsSOORJBALLY HARILALLspecial
09/27/2023Energy Code Compliance InspectionsSoorjbally Harilallprogress
09/27/2023HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
09/23/2023Energy Code Compliance InspectionsSoorjbally Harilallprogress
09/23/2023HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
09/23/2023Maintenance informationSoorjbally Harilallenergy_progress
09/23/2023HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
09/23/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
09/23/2023Sprinkler SystemsSOORJBALLY HARILALLspecial
09/23/2023Standpipe SystemsSOORJBALLY HARILALLspecial
09/01/2023Energy Code Compliance InspectionsSoorjbally Harilallprogress
09/01/2023Heating SystemsSOORJBALLY HARILALLspecial
09/01/2023Mechanical SystemsSOORJBALLY HARILALLspecial
09/01/2023HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
09/01/2023HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
09/01/2023Maintenance informationSoorjbally Harilallenergy_progress
09/01/2023Shutoff dampersSoorjbally Harilallenergy_progress
09/01/2023HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
09/01/2023FinalSoorjbally Harilallprogress
08/16/2023HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
08/16/2023HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
Latest 25 of 52.
▾Documents — 319 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch9
08/31/2026B00590551-I1Request digital key ↗
08/30/2026B00709345-I1Request digital key ↗
08/30/2026B00708554-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
08/27/2026B00846353-I1Request digital key ↗
08/15/2026B00897369-I1Request digital key ↗
08/15/2026B00846355-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00114153-I1Request digital key ↗
▸Applications & Permits53
▸BISPLAN / WORK APPROVAL APPLICATION38
11/27/2023321667549Open ↗
11/13/2023321667549Open ↗
11/09/2023321667549Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION12
03/10/2021321667549Open ↗
01/05/2021321667549Open ↗
12/08/2020321667549Open ↗
Showing 3 of 12 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
09/13/2023340896061Open ↗
09/07/2023340896061Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/16/2019321667549Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
07/11/2023321667549Open ↗
10/17/2017321667549Open ↗
▸BISVERIFY TAX LOT1
07/11/2023321667549Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/11/2023321667549Open ↗
▸BISZONING DIAGRAM1
07/10/2019321667549Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026B00488316-I1Open ↗
▸Seals & Professional Certifications55
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/02/2026B00114153-I1Open ↗
09/01/2026B00488316-I1Open ↗
08/31/2026B00590551-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
10/11/2026B00709345-I1Open ↗
10/11/2026B00709345-I1Open ↗
09/01/2026B00897369-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
09/11/2019321667549Open ↗
11/08/2018321477451Open ↗
03/02/2018321667549Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
10/11/2026B00709345-I1Open ↗
09/01/2026B00708554-P2Open ↗
09/01/2026B00708554-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/16/2023340896061Open ↗
05/17/2017340501291Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/17/2017340501291Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/17/2017340501291Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/16/2023340896061Open ↗
06/14/2018340611617Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING6
11/27/2023321667549Open ↗
11/02/2023321667549Open ↗
11/02/2023321667549Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/16/2018321667549Open ↗
10/17/2017321667549Open ↗
▸BISSPRINKLER SYSTEMS1
09/23/2023321667549Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/26/2023321667549Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
10/26/2023321667549Open ↗
▸BIS* BOILER (BL) SIGNOFF1
09/27/2023321667549Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/14/2026B00488316-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/14/2026B00488316-I1—
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST3
02/17/2026321667549Open ↗
09/07/2023340896061Open ↗
10/17/2017321667549Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
09/11/2019321667549Open ↗
09/11/2019321667549Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/16/2023340896061Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/30/2026B00709345-I1Open ↗
08/30/2026B00708554-P2Open ↗
08/15/2026B00708554-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/23/2018340611617Open ↗
05/17/2017340501291Open ↗
Showing 2 of 3 on file for this type
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
09/11/2019321667549Open ↗
11/08/2018321477451Open ↗
10/17/2017321667549Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis3
08/30/2026B00709345-I1Open ↗
08/15/2026B00708554-I1Open ↗
08/14/2026B00488316-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/24/2023321667549Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
09/05/2023321667549Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/21/2023321667549Open ↗
▸BISLIGHTING CONTROLS1
09/20/2023321667549Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/30/2026B00709345-I1Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/07/2023340501291Open ↗
07/23/2018340611617Open ↗
05/17/2017340501291Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
02/12/2021321667549Open ↗
10/24/2019321667549Open ↗
09/11/2019321667549Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
10/24/2023321667549Open ↗
09/11/2019321667549Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
09/11/2019321667549Open ↗
09/11/2019321667549Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
09/05/2023321667549Open ↗
08/07/2023340501291Open ↗
▸BISMASONRY1
09/05/2023321667549Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
09/20/2023321667549Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
03/12/2018321667549Open ↗
▸BISDEP Hydrant Flow Test Letter1
06/14/2018340611617Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
09/20/2023321667549Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
09/05/2023321667549Open ↗
▸Approvals, Objections & Sign-offs31
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/30/2026B00709345-I1Open ↗
08/30/2026B00708554-P2Open ↗
08/27/2026B00846353-I1Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
06/06/2023321667549Open ↗
05/11/2023321667549Open ↗
02/28/2023321667549Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
08/09/2023340501291Open ↗
08/03/2023301776059Open ↗
06/23/2023340455698Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/11/2019321477451Open ↗
04/05/2019321477451Open ↗
▸BISFINAL1
08/07/2023340501291Open ↗
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT9
11/20/2018321667549Open ↗
11/08/2018321477451Open ↗
07/23/2018340611617Open ↗
Showing 3 of 9 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST4
05/23/2017340501291Open ↗
Showing 1 of 4 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
03/26/2020321667549Open ↗
09/11/2019321667549Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
05/14/2025321667549Open ↗
08/02/2023301776059Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/14/2026B00488316-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/14/2026B00488316-I1Open ↗
▸Filing & Intake Forms20
▸BISBOROUGH INTAKE FORM6
03/10/2021321667549Open ↗
04/11/2019321477451Open ↗
04/05/2019321477451Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET5
06/22/2018321667549Open ↗
06/14/2018321764523Open ↗
10/17/2017321667549Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION5
09/21/2023321667549Open ↗
09/26/2019321667549Open ↗
07/23/2018340611617Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/16/2023340896061Open ↗
06/14/2018340611617Open ↗
05/17/2017340501291Open ↗
Showing 3 of 4 on file for this type
▸Other Documents20
▸DOB NOWHPD4: CONH Pilot Program6
08/30/2026B00709345-I1Open ↗
08/30/2026B00708554-P2Open ↗
08/15/2026B00708554-I1Open ↗
Showing 3 of 6 on file for this type
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN2
08/07/2023340501291Open ↗
08/07/2023340501291Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
10/27/2023321667549Open ↗
10/24/2023321667549Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
08/24/2023340896061Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
09/20/2023321667549Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMAINTENANCE INFORMATION1
09/20/2023321667549Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
08/16/2023340896061Open ↗
▸DOB NOWHPD: CONH Pilot1
08/14/2026B00488316-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/14/2026B00488316-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026B00488316-I1Open ↗
▸DOB NOWPlot Diagram1
08/14/2026B00488316-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00114153-I1Open ↗