Elevator apt, fireproof with stores
1482 3 AVENUE
MANHATTAN · BIN 1047654
💬 Discuss this project
1963Year Built
21Stories
D6Building Class
C1-9Zoning
224,000 sfGross Floor Area
185Units
LL97 CoveredRent Stabilized4 Open Violations 2 unresolved · 2 paperwork only ▸FISP: SWARMP
Elevator apt, fireproof with stores · Owner of record: 160 EAST 84TH ST ASSOCS · 17,828 sf lot · 12.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction12p · 4 filings · 20 docs
Penthouse6p · 1 filing · 15 docs
Floor 212p · 3 filings · 20 docs
Floor 1Under Construction13p · 4 filings · 20 docs
Cellar1p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
4 PARK AVE ASSOCIATES1309/15/2026
BROADWALL MANAGEMENT3607/08/2026
VIDARIS1307/08/2026
T-MOBILE603/22/2026
160 EAST 84TH ST ASSOCS203/22/2026
160 EAST 84TH ST ASSOCIATES2103/22/2026
160 E 84TH ST ASSOCS103/22/2026
STEGLA GROUP103/22/2026
KIMBA103/22/2026
NORTHWELL HEALTH103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES603/21/2026
CONSTRUCTION PERMIT SERVICES303/21/2026
UPRIGHT EXPEDITERS1003/21/2026
CSMR DESIGNS603/21/2026
AE DESIGN SOLUTION203/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
LEE ENGINEERING CONSULTING203/21/2026
DVA Advisors103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VANGUARD CONSTRUCTION ANDGeneral Contractor607/08/2026
RED HOOK SIGN ELECTScaffold607/08/2026
WATCH HILL WIRELESS SOLUGeneral Contractor603/21/2026
CS BRIDGE CORPGeneral Contractor307/08/2026
COMFORT ZONE MECHANICALGeneral Contractor207/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor207/08/2026
STEVEN PALMOElectrical103/21/2026
YOUNG CHOEElectrical103/21/2026
CONTROL ELEC'L CONT'G CORElectrical103/22/2026
KABACK SERVICE, INCGeneral Contractor107/08/2026
KELAIR INCGeneral Contractor107/08/2026
LIBERTY CUSTOM CONTRACTORSGeneral Contractor104/08/2026
TRIBUTE RESTORATION INCGeneral Contractor109/10/2026
MOORE RICHARDElectrical103/21/2026
INNER CITY CONTRACTINGElectrical103/21/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
RICHARD MOOREElectrical103/21/2026
CORPORATE ELEC. GROUP INCElectrical103/22/2026
RONALD TESTA, JR.Electrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC, INC.301109/04/2026
METROSPEC SIA6420106/08/2026
CC@A ENGINEERING P.C1854309/23/2025
DOMANI INSPECTION SERVICE843303/21/2025
GOLDMAN COPELAND ASSOCIAT2826204/18/2024
GRANT ENGINEERING CONSULT3512307/11/2023
IP CONCRETE TESTING AND I6252105/23/2023
GILSANZ MURRAY STEFICEK240104/19/2021
Building Lifecycle
All (187)Filed (25)Permit Issued (25)Signed Off (17)Facade (FISP) (12)Violation (60)Inspection (6)Objection (12)Special Inspection (30)
09/09/2026
Permit issued — Supported Scaffold
M01437742-I1-SF
09/04/2026
Filed — Alteration
FACADE REPAIRS AS PER DRAWINGS . THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01435453-I1
08/05/2026
Permit issued — Suspended Scaffold
M01436571-I1-SC
08/04/2026
Special inspection requirement — Masonry
Jennifer Sze
07/28/2026
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
M01436571-I1
07/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/28/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FRANCISCO PEREZ
07/23/2026
Special inspection requirement — Final
Jennifer Sze
06/16/2026
Permit issued — Mechanical Systems
M01360549-I1-MS
06/08/2026
Filed — Alteration
PROPOSE TO INSTALL A SPLIT AIR COOLED AC UNIT AS PER THE PLANS SUBMITTED HEREWITH.
M01360549-I1
05/07/2026
Signed off — Alteration
Northwell Health Cardiology: modify existing HVAC infrastructure to conform with new layouts @ 1st and 2nd floors.
M00469525-I1
04/29/2026
Violation issued (HPD, closed)
A
03/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH YOUNG
03/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH YOUNG
03/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH YOUNG
02/16/2026
Special inspection requirement — Final
JOSEPH YOUNG
02/16/2026
Special inspection requirement — Mechanical Systems
JOSEPH YOUNG
02/16/2026
Special inspection requirement — Maintenance information
JOSEPH YOUNG
02/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
JOSEPH YOUNG
10/16/2025
Special inspection requirement — Maintenance information
CHAROULIS CHARALAMBOUS
10/16/2025
Special inspection requirement — Electrical motors and elevators
CHAROULIS CHARALAMBOUS
10/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CHAROULIS CHARALAMBOUS
10/16/2025
Special inspection requirement — Final
CHAROULIS CHARALAMBOUS
10/16/2025
Special inspection requirement — Mechanical Systems
CHAROULIS CHARALAMBOUS
10/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
CHAROULIS CHARALAMBOUS
10/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
CHAROULIS CHARALAMBOUS
10/09/2025
Signed off — Alteration
Interior demolition and partition work associated with combination of two dwelling units, 20E and Penthouse, in accord with TPPN3/97 as per plans filed herewith.
M01195034-I1
09/23/2025
Filed — Alteration
Northwell Health Cardiology: modify existing HVAC infrastructure to conform with new layouts @ 1st and 2nd floors.
M00469525-P2
07/21/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
07/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
07/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
07/21/2025
Special inspection requirement — Final
JOHN MCMONAGLE
07/21/2025
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
07/19/2025
Filed — Alteration
Interior demolition and partition work associated with combination of two dwelling units, 20E and Penthouse, in accord with TPPN3/97 as per plans filed herewith.
M01195034-P1
07/11/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
07/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/11/2025
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
07/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
07/11/2025
Special inspection requirement — Final
JOHN MCMONAGLE
06/04/2025
Violation issued (HPD, closed)
A
04/02/2025
Permit issued — General Construction
M01195034-I1-GC
03/21/2025
Filed — Alteration
Interior demolition and partition work associated with combination of two dwelling units, 20E and Penthouse, in accord with TPPN3/97 as per plans filed herewith.
M01195034-I1
01/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2024
Violation issued (ECB, open)
Construction
09/12/2024
Signed off — Alteration
Northwell Cardiology: modify plumbing fixtures to conform with new layouts @ cellar, 1st and 2nd floors.
M00469533-I1
04/29/2024
Permit issued — Mechanical Systems
M01012659-I1-MS
04/18/2024
Filed — Alteration
Removal of existing chiller and instillation of new chiller in cellar MER room. No change in use, egress or occupancy.
M01012659-I1
04/08/2024
Cycle 9 facade report signed — SWARMP
03/14/2024
Special inspection requirement — HVAC-R and service water heating system controls
DANIEL COLOMBINI
03/14/2024
Special inspection requirement — HVAC-R and service water heating equipment
DANIEL COLOMBINI
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/21/2024
Cycle 9 facade report submitted
02/15/2024
Cycle 9 facade inspection completed
02/13/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/13/2023
Signed off — Alteration
REPLACEMENT OF EXISTING 10 TON HVAC SYSTEM FOR STORE LOCATED ON FLOOR 01. REPLACE EXISTING AIR HANDLER AND OUTDOOR CONDENSING UNIT WITH NEW 10-TON SPLIT HEAT PUMP.
M00843611-I1
09/04/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/04/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/26/2023
Signed off — Alteration
Decommission of existing Sprint site. Remove antennas and equipment from the roof. Conduits to remain. Service connection in basement. Initial installation approved under application #103517838
M00770777-I1
07/18/2023
Objection resolved — Addressed
Latest 60 of 187 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedTRIBUTE RESTORATION INC09/09/2026
DOB NOWSuspended ScaffoldPermit IssuedTRIBUTE RESTORATION INC08/05/2026
DOB NOWMechanical SystemsPermit IssuedKELAIR INC06/16/2026
DOB NOWGeneral ConstructionSigned-offLIBERTY CUSTOM CONTRACTOR04/02/2025
DOB NOWMechanical SystemsPermit IssuedCOMFORT ZONE MECHANICAL04/29/2024
DOB NOWMechanical SystemsSigned-offKABACK SERVICE06/13/2023
DOB NOWMechanical SystemsPermit IssuedCOMFORT ZONE MECHANICAL03/21/2023
DOB NOWAntennaSigned-offWATCH HILL WIRELESS SOLU11/16/2022
DOB NOWGeneral ConstructionSigned-offVANGUARD CONSTRUCTION AND06/23/2022
DOB NOWMechanical SystemsSigned-offVANGUARD CONSTRUCTION AND06/23/2022
DOB NOWGeneral ConstructionSigned-offWATCH HILL WIRELESS SOLU06/29/2021
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC05/19/2021
DOB NOWStructuralSigned-offVANGUARD CONSTRUCTION AND05/13/2021
DOB NOWMechanical SystemsSigned-offVANGUARD CONSTRUCTION AND05/10/2021
DOB NOWGeneral ConstructionSigned-offVANGUARD CONSTRUCTION AND05/10/2021
DOB NOWSignPermit IssuedRED HOOK SIGN AND ELECT01/03/2020
DOB NOWSignPermit IssuedRED HOOK SIGN AND ELECT12/05/2019
DOB NOWSignPermit IssuedRED HOOK SIGN AND ELECT12/05/2019
DOB NOWSignPermit IssuedRED HOOK SIGN AND ELECT12/05/2019
DOB NOWSignPermit IssuedRED HOOK SIGN AND ELECT12/05/2019
DOB NOWSignPermit IssuedRED HOOK SIGN AND ELECT12/05/2019
DOB NOWConstruction FenceSigned-offCS BRIDGE CORP05/20/2019
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP05/08/2019
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC07/25/2018
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/21/2018
BISPLISSUEDJAM SEWER CLEANING SVC11/17/2021
BISMHISSUEDKIMBA INDUSTRIES INC08/19/2019
BISSPISSUEDSEAN COAKLEY P & H INC05/31/2019
BISPLISSUEDJAM SEWER CLEANING SVC05/29/2019
BISMHISSUEDUNIVERSAL MGMT & CONT COR05/24/2019
BISOTISSUEDUNIVERSAL MGMT & CONT COR05/24/2019
BISMHISSUEDJA SALERNO SR. & SONS INC04/26/2019
BISOTISSUEDJA SALERNO SR. & SONS INC04/26/2019
BISSPISSUEDJ. CAIAZZO PLBG & HTG CORP04/05/2019
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR04/05/2019
BISMHISSUEDSMJ CONSTRUCTION TECH,LLC04/01/2019
BISOTISSUEDSMJ CONSTRUCTION TECH,LLC03/25/2019
BISOTISSUEDH&B CONSTR SERVICES INC02/06/2019
BISOTISSUEDH&B CONSTR SERVICES INC07/27/2018
BISOTISSUEDC & D RESTORATION INC06/13/2018
+ 35 more permits on file
3 projects · most recent 06/08/2026
Air Conditioning Systems Associated Ducts and Piping Cooling Towers
FiledStatusContractorScopeMake / Model / Capacity
06/08/2026Permit IssuedKELAIR INCAir Conditioning Systems
Cooling
Fujitsu MODEL #A0UH36KVWAS4 36,000 BTU · Condensing Unit ×1
09/23/2025Signed-offVANGUARD CONSTRUCTION ANDAir Conditioning Systems, Associated Ducts and Piping
Cooling
Johnson Controls ZT037E15U2B5BCA5E2 3 tons · Doas ×2
Lg ARUM121BTE5 10 tons · Vrf Outdoor ×2
Heating
Lg City-Multi 10 tons · Split System ×2
Ventilation
Lg City-Multi 10 tons · Split System ×2
Ducts & Piping
Lg City-Multi 10 tons · Split System ×2
04/18/2024Permit IssuedCOMFORT ZONE MECHANICALCooling Towers—
10 projects · most recent 12/04/2025
General Wiring Lighting
FiledStatusContractorScope
12/04/2025CompleteMAXIMUM ELECTRIC CORP.—
04/14/2025Permit IssuedWESTSIDE ELECTRIC INCGeneral Wiring
09/23/2022CompleteAMER. ELEVATOR & MACH. CO—
04/21/2021Permit IssuedCONTROL ELEC'L CONT'G CORGeneral Wiring
02/12/2021Permit IssuedAMER. ELEVATOR & MACH. COGeneral Wiring
12/14/2020Permit IssuedCORPORATE ELEC. GROUP INCGeneral Wiring
01/14/2020Permit IssuedASKO ELEC CONST & MAIN INGeneral Wiring
05/15/2019Permit IssuedPOWER TECH ELECTRIC CORP.1 meters, 1 new_meters
04/10/2019CancelledY.S ELECTRICGeneral Wiring, Lighting
02/19/2018CompleteBOROWIDE ELECT'L CONTR'S—
1 project · most recent 07/28/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/28/2026Permit IssuedTRIBUTE RESTORATION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/13/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/04/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/03/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
08/04/2026MasonryJennifer Szespecial
07/28/2026Tenant Protection Plan Compliance—special
07/28/2026Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
07/23/2026FinalJennifer Szeprogress
03/26/2026HVAC-R and service water heating equipmentJOSEPH YOUNGenergy_progress
03/26/2026HVAC-R and service water piping design and insulationJOSEPH YOUNGenergy_progress
03/26/2026HVAC-R and service water heating system controlsJOSEPH YOUNGenergy_progress
02/16/2026FinalJOSEPH YOUNGprogress
02/16/2026Mechanical SystemsJOSEPH YOUNGspecial
02/16/2026Maintenance informationJOSEPH YOUNGenergy_progress
02/16/2026Tenant Protection Plan ComplianceJOSEPH YOUNGspecial
10/16/2025Maintenance informationCHAROULIS CHARALAMBOUSenergy_progress
10/16/2025Electrical motors and elevatorsCHAROULIS CHARALAMBOUSenergy_progress
10/16/2025HVAC-R and service water piping design and insulationCHAROULIS CHARALAMBOUSenergy_progress
10/16/2025FinalCHAROULIS CHARALAMBOUSprogress
10/16/2025Mechanical SystemsCHAROULIS CHARALAMBOUSspecial
10/16/2025HVAC-R and service water heating system controlsCHAROULIS CHARALAMBOUSenergy_progress
10/16/2025HVAC-R and service water heating equipmentCHAROULIS CHARALAMBOUSenergy_progress
07/21/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
07/21/2025Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
07/21/2025Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
07/21/2025FinalJOHN MCMONAGLEprogress
07/21/2025Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
07/11/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
07/11/2025Tenant Protection Plan Compliance—special
Latest 25 of 43.
▾Documents — 465 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch12
09/15/2026M01435453-I1Request digital key ↗
09/06/2026M00020989-I1Request digital key ↗
09/03/2026M00512027-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sign6
09/05/2026M00260150-I1Request digital key ↗
09/05/2026M00191719-I1Request digital key ↗
09/05/2026M00191708-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/21/2026M00469525-I1Request digital key ↗
08/21/2026M00469525-P2Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026M00469513-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026M00469548-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/03/2026M00469533-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00169092-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00162872-I1Request digital key ↗
▸Applications & Permits80
▸BISPLAN / WORK APPROVAL APPLICATION43
02/09/2022123761580Open ↗
01/28/2022123761580Open ↗
09/09/2020123894848Open ↗
Showing 3 of 43 on file for this type
▸BISWORK PERMIT APPLICATION36
01/10/2020123732283Open ↗
10/02/2019123894848Open ↗
08/19/2019123894848Open ↗
Showing 3 of 36 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications124
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION35
02/07/2020123732283Open ↗
02/07/2020123732283Open ↗
02/07/2020123732283Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
09/29/2026M01195034-P1Open ↗
09/29/2026M01195034-P1Open ↗
09/29/2026M01195034-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/15/2026M01435453-I1Open ↗
09/06/2026M00020989-I1Open ↗
09/05/2026M00260630-I1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
05/29/2019123894848Open ↗
05/07/2019123761580Open ↗
05/07/2019123761580Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026M01435453-I1Open ↗
09/22/2026M01012659-I1Open ↗
09/22/2026M01012659-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
09/10/2020123894848Open ↗
09/01/2020123894848Open ↗
01/22/2020123732283Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
05/31/2018140770182Open ↗
05/18/2018140752950Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
05/31/2018140770182Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment31
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
02/07/2020123732283Open ↗
02/06/2020123732283Open ↗
07/10/2019123761580Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
11/25/2020123894848Open ↗
01/22/2020123732283Open ↗
01/13/2020123732283Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
01/28/2022123761580Open ↗
Showing 1 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS2
11/25/2020123894848Open ↗
01/22/2020123732283Open ↗
▸BISSPRINKLER SYSTEMS1
04/26/2021123761580Open ↗
▸Safety & Tenant Protection13
▸BISTenant Protection Plan and Notes7
05/30/2019123894848Open ↗
05/30/2019123894848Open ↗
05/07/2019123761580Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan6
09/05/2026M00260630-I1Open ↗
08/13/2026M00260150-I1Open ↗
08/13/2026M00260626-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos33
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/15/2026M01435453-I1Open ↗
09/03/2026M00512027-I1Open ↗
08/31/2026M00843611-I1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
05/29/2019123894848Open ↗
03/08/2019140752950Open ↗
07/19/2018123484096Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
05/24/2019123761580Open ↗
05/08/2019123806480Open ↗
05/07/2019123761580Open ↗
▸BISDEP ASBESTOS PROJECT CONDITIONAL COMPLETION FORM1
05/18/2018140752950Open ↗
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
02/07/2020123732283Open ↗
02/07/2020123732283Open ↗
12/05/2019123732283Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
11/09/2020123894848Open ↗
01/24/2020123732283Open ↗
12/04/2019123484096Open ↗
Showing 3 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00512027-I1Open ↗
08/13/2026M00469513-I1Open ↗
08/13/2026M00469525-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLIGHTING CONTROLS1
11/09/2020123894848Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY5
04/26/2021123761580Open ↗
04/26/2021123761580Open ↗
08/03/2020123894848Open ↗
Showing 3 of 5 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/09/2020123894848Open ↗
▸BISMECHANICAL SYSTEMS1
11/09/2020123894848Open ↗
▸Approvals, Objections & Sign-offs25
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
11/09/2020123894848Open ↗
02/07/2020123732283Open ↗
02/06/2020123732283Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/30/2019123894848Open ↗
06/13/2018140752950Open ↗
05/18/2018140752950Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER2
04/26/2019123732283Open ↗
04/26/2019123732283Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT30
11/09/2020123894848Open ↗
02/07/2020123732283Open ↗
02/03/2020123732283Open ↗
Showing 3 of 30 on file for this type
▸Filing & Intake Forms46
▸BISBOROUGH INTAKE FORM16
02/07/2020123894848Open ↗
02/06/2020123732283Open ↗
02/03/2020123732283Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET12
05/29/2019123894848Open ↗
05/08/2019123806480Open ↗
05/07/2019123761580Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION12
09/11/2020123894848Open ↗
09/11/2020123894848Open ↗
08/01/2019123732283Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
05/31/2018140770182Open ↗
Showing 1 of 6 on file for this type
▸Other Documents9
▸DOB NOWDHCR Document6
08/15/2026M00469548-I1Open ↗
08/13/2026M00469525-I1Open ↗
08/13/2026M00469525-P2Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/16/2026M01436571-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01436571-I1Open ↗