| Owner | Filings | Most Recent |
|---|---|---|
| CP VII 78th Street Owner | 212 | 10/07/2026 |
| Hiyee Realty | 10 | 03/21/2026 |
| Yusa Associates II | 8 | 03/21/2026 |
| NYC Department of Housing Preservation and Development | 5 | 07/08/2026 |
| Carmel Partners | 3 | 04/09/2026 |
| MD | 2 | 03/21/2026 |
| Chou's 3D | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Loring Consulting Engineers | 3 | 06/23/2026 |
| Spivak Architects | 1 | 06/16/2026 |
| Cosentini Associates | 20 | 05/29/2026 |
| NS Engineers | 3 | 01/09/2026 |
| Dewberry Engineers | 3 | 01/09/2026 |
| Hill West Architects | 7 | 11/11/2025 |
| Ashraf | 5 | 06/01/2025 |
| Patuxent Engineering | 12 | 03/28/2025 |
| McNamara Salvia of New York | 8 | 02/20/2025 |
| G. Blinn Consulting | 16 | 02/19/2025 |
| Gga Studios | 1 | 02/18/2025 |
| Skyline Rigging | 3 | 01/13/2025 |
| Howard Shapiro & Associates | 2 | 12/20/2023 |
| Stroh Engineering Services | 2 | 09/28/2023 |
| Velocity Monitoring & Instrumentati | 3 | 07/14/2023 |
| Advance Design Group | 1 | 04/03/2023 |
| Langan Engineering | 1 | 01/12/2023 |
| FL&M Engineering Design & Inspection | 7 | 05/10/2022 |
| Enthink Engineers | 1 | 11/30/2021 |
| Royal T&E | 1 | 04/03/2019 |
| MCRB Service | 1 | 02/11/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| J.A.M. Associates | 82 | 03/21/2026 |
| A1 Expediting Service | 32 | 03/21/2026 |
| KD Designs | 5 | 03/21/2026 |
| Domani Consulting | 2 | 03/21/2026 |
| Patuxent Engineering | 24 | 03/21/2026 |
| Howard I Shapiro Associates | 4 | 03/21/2026 |
| Stroh Engineering Services P | 4 | 03/21/2026 |
| Danico Services | 8 | 03/21/2026 |
| Rigid Structural Design | 7 | 03/21/2026 |
| Permit Services | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Carmel Construction East | General Contractor | 30 | 07/08/2026 |
| S&E Bridge & Scaffold | Scaffold | 19 | 07/08/2026 |
| Tri Borough Scaffolding | Scaffold | 15 | 07/08/2026 |
| Bunlin | Scaffold | 9 | 07/08/2026 |
| TT Mechanical | Plumbing | 9 | 07/08/2026 |
| TTM Group | Fire Protection | 4 | 07/08/2026 |
| New Imperial Construction | Scaffold | 3 | 03/21/2026 |
| Ecd NY | Scaffold | 3 | 07/08/2026 |
| RE-Brick Construction | Scaffold | 3 | 03/21/2026 |
| DHS Fraco | Scaffold | 2 | 07/08/2026 |
| MC Superstructure | Scaffold | 2 | 03/21/2026 |
| R.C. Structures | Scaffold | 2 | 07/08/2026 |
| Top Shelf Electric | Electrical | 2 | 03/21/2026 |
| LW Interior Remodeling | General Contractor | 2 | 07/02/2026 |
| Forward Mechanical | Plumbing | 2 | 07/08/2026 |
| Alba Services | Scaffold | 2 | 07/08/2026 |
| Hawkins Webb | General Contractor | 2 | 04/09/2026 |
| Lakhi General Contractor | Scaffold | 1 | 07/08/2026 |
| Accurate Mechanical Indstrs | Plumbing | 1 | 07/08/2026 |
| RPJ Electric | Electrical | 1 | 03/21/2026 |
| Ami and Associates | Fire Protection | 1 | 07/08/2026 |
| Top Plumbing and Heating | Plumbing | 1 | 07/01/2026 |
| Top Shelf Electric | General Contractor | 1 | 03/22/2026 |
| Orbit Sprinkler | Fire Protection | 1 | 07/01/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| MEP Inspections | 1102 | 1 | 06/23/2026 |
| Catalpa Special Inspectio | 2004 | 4 | 06/23/2026 |
| Spivak Architects | 6957 | 4 | 06/23/2026 |
| Special Testing & Consulting | 1688 | 20 | 05/29/2026 |
| Crosscheck Inspection Services | 544 | 2 | 01/09/2026 |
| Frank Seta & Associates | 3095 | 3 | 11/11/2025 |
| McNamara/Salvia of New YO | 4970 | 9 | 02/20/2025 |
| Langan Engineering, Env, Surveyin | 1265 | 7 | 02/20/2025 |
| Skyline Rigging | 7880 | 3 | 01/13/2025 |
| G. Blinn Consulting | 2894 | 3 | 05/21/2024 |
| Mueser Rutledge Consulting | 977 | 3 | 08/08/2023 |
| 20/20 Inspections | 1471 | 2 | 09/21/2022 |
| Urban Integrations | 7993 | 1 | 04/14/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | LW Interior Remodeling | 06/30/2026 |
| DOB NOW | Plumbing | Signed-off | Top Plumbing and Heating | 06/29/2026 |
| DOB NOW | Sprinklers | Permit Issued | Orbit Sprinkler | 06/29/2026 |
| DOB NOW | General Construction | Signed-off | LW Interior Remodeling | 06/26/2026 |
| DOB NOW | Sprinklers | Signed-off | TTM Group | 05/28/2026 |
| DOB NOW | General Construction | Permit Issued | Carmel Construction East | 04/16/2026 |
| DOB NOW | Plumbing | Signed-off | Accurate Mechanical Indstrs | 03/25/2026 |
| DOB NOW | Plumbing | Signed-off | Forward Heating | 03/13/2026 |
| DOB NOW | Sprinklers | Signed-off | Ami and Associates | 03/12/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Hawkins Webb | 03/06/2026 |
| DOB NOW | General Construction | Signed-off | Hawkins Webb | 02/24/2026 |
| DOB NOW | Curb Cut | Signed-off | Carmel Construction East | 09/23/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Bunlin | 07/24/2025 |
| DOB NOW | Supported Scaffold | Signed-off | Bunlin | 06/02/2025 |
| DOB NOW | General Construction | Permit Issued | Carmel Construction East | 04/23/2025 |
| DOB NOW | General Construction | Signed-off | Carmel Construction East | 02/19/2025 |
| DOB NOW | Sprinklers | Signed-off | TTM Group | 01/16/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Bunlin | 12/30/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | Bunlin | 12/27/2024 |
| DOB NOW | Supported Scaffold | Signed-off | S&E Bridge & Scaffold | 12/05/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | Doria | 10/24/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | Doria | 10/21/2024 |
| DOB NOW | Standpipe | Signed-off | TT Mechanical | 10/08/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E Bridge & Scaffold | 09/27/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | S&E Bridge & Scaffold | 09/27/2024 |
| DOB NOW | Construction Fence | Signed-off | S&E Bridge & Scaffold | 09/26/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E Bridge & Scaffold | 09/26/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E Bridge & Scaffold | 09/26/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Carmel Construction East | 09/20/2024 |
| DOB NOW | Plumbing | Signed-off | TT Mechanical | 09/12/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | Bunlin | 09/09/2024 |
| DOB NOW | Standpipe | Signed-off | TT Mechanical | 08/19/2024 |
| DOB NOW | Supported Scaffold | Signed-off | S&E Bridge & Scaffold | 07/26/2024 |
| DOB NOW | General Construction | Permit Issued | Carmel Construction East | 07/11/2024 |
| DOB NOW | Structural | Signed-off | Carmel Construction East | 07/11/2024 |
| DOB NOW | Boiler Equipment | Signed-off | Forward Heating | 06/27/2024 |
| DOB NOW | General Construction | Permit Issued | Carmel Construction East | 04/18/2024 |
| DOB NOW | Structural | Signed-off | Carmel Construction East | 04/10/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E Bridge & Scaffold | 03/28/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | Bunlin | 02/16/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/23/2026 | Permit Issued | LW Interior Remodeling | Heating and Air Conditioning Systems | Heat / Cool Enertech ZT060G00LM1CSS 79,400 BTU · Condensing Unit ×2 |
| 01/09/2026 | Signed-off | Hawkins Webb | Heating and Air Conditioning Systems | Heat / Cool Goodman EX HP-1-5 GZS060G00LM4CSS/ EX HP-1-6 GZS060G00LM4CSS 5 tons · Split System ×2 |
| 11/11/2025 | Permit Issued | Carmel Construction East | Heating and Air Conditioning Systems | Heat / Cool Goodman GZS018D0XLM4CSS 18,000 CFM · Wshp ×4 GZS024D0XLM4CSS 700 CFM · Wshp ×4 GZS036D0XLM0CSS 48,000 BTU · Wshp ×3 GZS015D0XLM0CSS 800 CFM · Wshp ×2 GZS042D0XLM4CSS 2,040 CFM · Wshp ×2 ECH096AHNGACVBS 3,000 CFM · Wshp ×1 ECH120AHP2A2VBS 2,600 CFM · Wshp ×1 GZS009D0XLM0CSS 50 CFM · Wshp ×1 GZS030D0XLM4CSS 4,000 CFM · Wshp ×1 GZS048D0XLM4CSS 1,130 CFM · Wshp ×1 GZS072D0XLM4CSS 2,040 CFM · Wshp ×1 GZS009G0XLM0CSS-HSA0VAA0ASC1S 350 CFM · Wshp ×4 GZS018G0XLM4CSS-HSA0VBA0ASC1S 18,800 CFM · Wshp ×4 GZS024D0XLM4CSS-HSA0VBA0ASC1S 700 CFM · Wshp ×4 GZS036G0XLM4CSS-HSA0VBA0ASC1S 36,000 BTU · Wshp ×4 GZS042D0XLM4CSS-HSB0VBA0ASC1S 1,270 CFM · Wshp ×4 ECH096AHCGACVBS 3,000 CFM · Wshp ×2 ECH120AHCGACWBS 3,100 CFM · Wshp ×2 GZS015G0XLM4CSS-HSA0VAA0ASC1S 800 CFM · Wshp ×2 GZS015G0XRM4CSS-HSA0VAA0ASC1S 800 CFM · Wshp ×2 GZS018G0XLE4CSS-HSA0VBA0ASC1S 800 CFM · Wshp ×2 GZS018G0XRE4CSS-HSA0VBA0ASC1S 510 CFM · Wshp ×2 GZS024D0XLM4CSS-HSB0VBA0ASC1S 860 CFM · Wshp ×2 American Standard TMS-N0100.217.HDD.WD.ECNFCB 9,050 CFM ×2 Baltimore Aircoil S15E-1285-07KN 88,080 CFM · Cooling Tower ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/23/2026 | Permit Issued | Orbit Sprinkler | Sprinkler System |
| 05/29/2026 | Signed-off | TTM Group | 6,600 heads, 255 outlets |
| 01/09/2026 | Signed-off | Ami and Associates | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/23/2026 | Signed-off | Top Plumbing and Heating | Water/Sanitary |
| 01/09/2026 | Signed-off | Accurate Mechanical Indstrs | Water/Sanitary |
| 11/11/2025 | Signed-off | TT Mechanical | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/29/2026 | Permit Issued | P & Z Electric | General Wiring |
| 03/25/2026 | Complete | Nyco Electric | General Wiring |
| 03/12/2026 | Complete | Jam Electrical | — |
| 10/07/2025 | Complete | Top Shelf Electric | General Wiring |
| 08/27/2025 | Complete | Top Shelf Electric | General Wiring |
| 11/06/2024 | Complete | Top Shelf Electric | 3 meters, 3 new_meters |
| 12/18/2023 | Complete | Nash Electric Services | — |
| 10/26/2023 | Complete | Nash Electric Services | — |
| 04/11/2022 | Complete | V. Vass Electric | — |
| 04/11/2022 | Permit Issued | V. Vass Electric | — |
| 01/08/2022 | Permit Issued | High Quality Electric of | — |
| 12/10/2021 | Permit Issued | Richard Neu | — |
| 04/01/2019 | Permit Issued | Green Power Electric | — |
| 02/16/2018 | Permit Issued | WCK Electric | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/11/2025 | Permit Issued | Carmel Construction East | Steel, Concrete, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/30/2021 | Permit Issued | RE-Brick Construction | Sidewalk Shed |
| 04/03/2019 | Permit Issued | Lakhi General Contractor | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/09/2026 | Signed-off | Accurate Mechanical Indstrs | Tenant Protection Plan 72 Hour |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/16/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/11/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/11/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/08/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/17/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/09/2025 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 09/19/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/11/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/06/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/06/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/06/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 01/21/2025 | Pass-Final SD - Up to 3 Requested Floors | Pass | View ↗ |
| 01/15/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/03/2025 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 11/14/2024 | Fail-Final SP - Up to 3 Requested Floors | Fail | View ↗ |
| 11/14/2024 | Pass-Final SD - More than 10 Requested Floors | Pass | View ↗ |
| 11/07/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/10/2024 | Pass-Final SD - Fire Pump | Pass | View ↗ |
| 10/08/2024 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 09/10/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/04/2024 | Pass-Final PL - Underground | Pass | View ↗ |
| 08/26/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/19/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/07/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/18/2026 | Fire-Resistant Penetrations and Joints | ERIC BERLENT | special |
| 06/09/2026 | Standpipe Systems | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 06/09/2026 | Sprinkler Systems | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/27/2026 | Metering | Howard Spivak | energy_progress |
| 05/11/2026 | Sprinkler Systems | Nicolas Crosetto | special |
| 05/11/2026 | Tenant Protection Plan Compliance | Howard Spivak | special |
| 05/11/2026 | Interior lighting power | Howard Spivak | energy_progress |
| 05/11/2026 | Fire-Resistant Penetrations and Joints | ERIC BERLENT | special |
| 05/11/2026 | Tenant Protection Plan Compliance | Howard Spivak | special |
| 05/11/2026 | Post-installed Anchors | Nicolas Crosetto | special |
| 05/11/2026 | Lighting controls | Howard Spivak | energy_progress |
| 12/31/2025 | Sprinkler Systems | EUGENE BIFULCO | special |
| 12/31/2025 | Final | EUGENE BIFULCO | progress |
| 12/31/2025 | Mechanical Systems | EUGENE BIFULCO | special |
| 12/31/2025 | Final | Shamsul Siddique | progress |
| 12/04/2025 | Insulation placement and R values | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/04/2025 | Air barrier - visual inspection | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/04/2025 | Fenestration areas | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/04/2025 | Air barrier continuity plan testing | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/04/2025 | Fenestration air leakage | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/04/2025 | Vestibules | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/04/2025 | Protection of exposed foundation insulation | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/04/2025 | Fenestration and door U-factor and product ratings | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/04/2025 | Fire-Resistance Rated Construction | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 12/04/2025 | Tenant Protection Plan Compliance | SEBASTIAN SETTEDUCATE JR., P.E | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Spear | Office | Floor 1 | Project M01400318 |
| Club Pilates | Fitness / Recreation | Floor 1 | Project M01341272 Project M01311471 |