| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00728230 ↗ | 2326 BROADWAY MANHATTAN | New Building | Permit Issued | 05/12/2022 | 08/04/2026 | Design HILL WEST ARCHITECTS Owner NAFTALI GROUP Contractor TITANIUM CONSTRUCTION SER Filer DOMANI CONSULTING | Underground plumbing work in conjunction with New Building Application M00728230-I1-12.18.2023-PAA-P-099.01: Removed grease interceptor and … |
| B00580365 ↗ | 737 4TH AVENUE BROOKLYN | New Building | Permit Issued | 09/23/2021 | 06/09/2026 | Design COSENTINI ASSOCIATES Owner MOORE GROUP CORP Contractor CHRISTOPHER B. MESBAH | Wall Bracket as per plans filed herewith. |
| X08018782 ↗ | 6661 BROADWAY BRONX | New Building | Permit Issued | 10/21/2022 | 05/29/2026 | Design RKTB ARCHITECTS Contractor ULTIMATE SAFETY ASS INC | Herewith filing the installation of a Fuel Storage Tank for a diesel-based Emergency Generator as per plans. Emergency Generator was filed u… |
| M00648391 ↗ | 1487 1 AVENUE MANHATTAN | New Building | Permit Issued | 01/24/2022 | 04/16/2026 | Design COSENTINI ASSOCIATES Contractor CARMEL CONSTRUCTION EAST Filer JAM CONSULTANTS, INC. | Plumbing Work in conjunction with New Building# M00648391-I1 |
| M01084707 ↗ | 210 BOWERY MANHATTAN | Alteration | Permit Issued | 07/30/2024 | 11/17/2025 | Owner 210 BOWERY CONDOMINIUM Contractor CANIDO BASONAS CONST SVC | Drawings filed herewith for FISP facade repairs. No change in use, egress or occupancy. |
| B00604543 ↗ | 16 DUPONT STREET | New Building | Permit Issued | 10/26/2021 | 10/02/2025 | Design COSENTINI ASSOCIATES Contractor MONADNOCK GEN'L CONT INC | Underground plumbing work in conjunction with new building |
| Name | Projects together | Most recent |
|---|---|---|
| COSENTINI ASSOCIATES | 3 | 06/29/2026 |
| HILL WEST ARCHITECTS | 2 | 07/09/2026 |
| LANGAN ENGINEERING | 2 | 06/29/2026 |
| MCNAMARA SALVIA | 2 | 11/11/2025 |
| WSP | 2 | 07/09/2026 |
| ABS ENGINEERING, PLLC | 1 | 08/13/2025 |
| ANCORA ENGINEERING, PLLC | 1 | 08/13/2025 |
| DENCITYWORKS ARCHITECTURE PLLC. | 1 | 06/29/2026 |
| ETTINGER ENGINEERING ASSOCIATES | 1 | 11/05/2025 |
| GEODESIGN INC. PC | 1 | 11/05/2025 |
| GKV ARCHITECTS | 1 | 06/17/2025 |
| HANSEN ENGINEERING, PC | 1 | 06/17/2025 |
| MAYRICH CONSTRUCTION | 1 | 07/09/2026 |
| MRCE | 1 | 11/11/2025 |
| OSPINO ENGINEERING PLLC | 1 | 06/29/2026 |
| PHILIP HABIB & ASSOCIATES | 1 | 06/29/2026 |
| PK Architect, PC | 1 | 07/18/2023 |
| RGCE | 1 | 06/29/2026 |
| RKTB ARCHITECTS | 1 | 11/05/2025 |
| SELLDORF ARCHITECTS | 1 | 08/13/2025 |
| TYLin | 1 | 08/13/2025 |
| VENTROP ENGINEERING CONSULTING GROU | 1 | 07/09/2026 |
| ZOLTAN M SARO ARCHITECT, PLLC | 1 | 07/30/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| CM AND ASSOCIATES CONST | 2 | 06/29/2026 |
| TT MECHANICAL CORP | 2 | 06/29/2026 |
| ACCESS PLUMBING CORP | 1 | 08/13/2025 |
| APPLE RESTORATION & WATER | 1 | 07/30/2024 |
| CANIDO BASONAS CONST SVC | 1 | 07/30/2024 |
| CARMEL CONSTRUCTION EAST | 1 | 11/11/2025 |
| DONATO PLUMBING GROUP INC | 1 | 06/17/2025 |
| DONATO, INC | 1 | 06/17/2025 |
| FIREQUEST CORP | 1 | 08/13/2025 |
| HUDSON MERIDIAN CONSTRUCT | 1 | 11/05/2025 |
| J. CAIAZZO PLBG & HTG COR | 1 | 06/17/2025 |
| KAY WATERPROOFING CORP | 1 | 07/18/2023 |
| LEMODE PLBG & HTG CORP | 1 | 11/05/2025 |
| MONADNOCK CONSTRUCTION IN | 1 | 06/17/2025 |
| MONADNOCK GEN'L CONT INC | 1 | 06/17/2025 |
| MOORE GROUP CORPORATION | 1 | 06/29/2026 |
| NEPTUNE MECHANICAL INC | 1 | 06/17/2025 |
| NEW LINE STRUCTURES & DEV | 1 | 06/29/2026 |
| NEXTCOM CONSTRUCTION, INC | 1 | 07/18/2023 |
| NULINE MCHNCL SRVCS, LLC | 1 | 06/17/2025 |
| OLYMPIAN FUEL OIL CORP | 1 | 11/05/2025 |
| PARAMOUNT SERVICES, LLC | 1 | 11/05/2025 |
| PLUMBING WORKS NYC INC | 1 | 07/09/2026 |
| TITANIUM CONSTRUCTION SER | 1 | 07/09/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| 210 BOWERY CONDOMINIUM | 1 | 07/30/2024 |
| 6661 BROADWAY DEVELOPER LLC | 1 | 11/05/2025 |
| CP VII 78TH STREET OWNER LLC | 1 | 11/11/2025 |
| GREENPOINT LANDING LOT 6 LLC | 1 | 06/17/2025 |
| MOORE GROUP CORP | 1 | 06/29/2026 |
| NAFTALI GROUP | 1 | 07/09/2026 |
| SK DEVELOPMENT | 1 | 08/13/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| WILLIAM VITACCO ASSOCIATES | 4 | 06/29/2026 |
| CONVERSANO ASSOCIATES, INC. | 1 | 07/18/2023 |
| DOMANI CONSULTING | 1 | 07/09/2026 |
| Hierarch-E LLC | 1 | 06/29/2026 |
| JAM CONSULTANTS, INC. | 1 | 11/11/2025 |
| OUTSOURCE CONSULTANTS, INC. | 1 | 11/05/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00728230 ↗ | 2326 BROADWAY MANHATTAN | New Building | Permit Issued | 05/12/2022 | 08/04/2026 | Design HILL WEST ARCHITECTS Owner NAFTALI GROUP Contractor TITANIUM CONSTRUCTION SER Filer DOMANI CONSULTING | Underground plumbing work in conjunction with New Building Application M00728230-I1-12.18.2023-PAA-P-099.01: Removed grease interceptor and … |
| B00580365 ↗ | 737 4TH AVENUE BROOKLYN | New Building | Permit Issued | 09/23/2021 | 06/09/2026 | Design COSENTINI ASSOCIATES Owner MOORE GROUP CORP Contractor CHRISTOPHER B. MESBAH | Wall Bracket as per plans filed herewith. |
| X08018782 ↗ | 6661 BROADWAY BRONX | New Building | Permit Issued | 10/21/2022 | 05/29/2026 | Design RKTB ARCHITECTS Contractor ULTIMATE SAFETY ASS INC | Herewith filing the installation of a Fuel Storage Tank for a diesel-based Emergency Generator as per plans. Emergency Generator was filed u… |
| M00648391 ↗ | 1487 1 AVENUE MANHATTAN | New Building | Permit Issued | 01/24/2022 | 04/16/2026 | Design COSENTINI ASSOCIATES Contractor CARMEL CONSTRUCTION EAST Filer JAM CONSULTANTS, INC. | Plumbing Work in conjunction with New Building# M00648391-I1 |
| M01084707 ↗ | 210 BOWERY MANHATTAN | Alteration | Permit Issued | 07/30/2024 | 11/17/2025 | Owner 210 BOWERY CONDOMINIUM Contractor CANIDO BASONAS CONST SVC | Drawings filed herewith for FISP facade repairs. No change in use, egress or occupancy. |
| B00604543 ↗ | 16 DUPONT STREET | New Building | Permit Issued | 10/26/2021 | 10/02/2025 | Design COSENTINI ASSOCIATES Contractor MONADNOCK GEN'L CONT INC | Underground plumbing work in conjunction with new building |
| M00832882 ↗ | 1270 BROADWAY MANHATTAN | Alteration | Signed-off | 05/24/2023 | 05/15/2025 | Design PK Architect, PC Contractor NEXTCOM CONSTRUCTION, INC | New cladding of existing facade from 4th floor to 12th floor. Associated insulation, structural steel fire-proofing, and guardrail installat… |
| M00553059 ↗ | 83 THOMPSON ST MANHATTAN | New Building | Permit Issued | 07/22/2021 | 02/25/2025 | Design SELLDORF ARCHITECTS Owner SK DEVELOPMENT Contractor CHRISTOPHER B. MESBAH | Support of Excavation filed herewith as shown on plans. Filed in conjunction with New Building application M00553059-I1. |
| Building | Filings | Most Recent |
|---|---|---|
| 737 4TH AVENUE ↗ | 5 | 06/29/2026 |
| 1487 1 AVENUE ↗ | 3 | 11/11/2025 |
| 6661 BROADWAY ↗ | 3 | 09/16/2025 |
| 83 THOMPSON ST ↗ | 5 | 08/13/2025 |
| 16 DUPONT STREET ↗ | 8 | 06/12/2025 |
| 210 BOWERY ↗ | 1 | 07/30/2024 |
| 2326 BROADWAY ↗ | 2 | 07/11/2024 |
| 1270 BROADWAY ↗ | 1 | 07/18/2023 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 07/28/2026 | Protection of exposed foundation insulation | 737 4TH AVENUE | Zoltan Saro | energy_progress |
| 07/28/2026 | Air barrier continuity plan testing | 737 4TH AVENUE | JOHN MCMONAGLE | energy_progress |
| 07/28/2026 | Air barrier - visual inspection | 737 4TH AVENUE | Zoltan Saro | energy_progress |
| 07/28/2026 | Insulation placement and R values | 737 4TH AVENUE | Zoltan Saro | energy_progress |
| 07/28/2026 | Fenestration areas | 737 4TH AVENUE | Zoltan Saro | energy_progress |
| 07/28/2026 | Vestibules | 737 4TH AVENUE | Zoltan Saro | energy_progress |
| 07/28/2026 | Fenestration and door U-factor and product ratings | 737 4TH AVENUE | Zoltan Saro | energy_progress |
| 07/28/2026 | Fenestration air leakage | 737 4TH AVENUE | Zoltan Saro | energy_progress |
| 07/28/2026 | Fire-Resistance Rated Construction | 737 4TH AVENUE | JOHN MCMONAGLE | progress |
| 07/28/2026 | Energy Code Compliance Inspections | 737 4TH AVENUE | Zoltan Saro | progress |
| 07/28/2026 | Fire-Resistant Penetrations and Joints | 737 4TH AVENUE | JOHN MCMONAGLE | special |
| 07/28/2026 | Wall Panels, Curtain Walls, and Veneers | 737 4TH AVENUE | Zoltan Saro | special |
| 07/28/2026 | Sprayed fire-resistant materials | 737 4TH AVENUE | JOHN MCMONAGLE | special |
| 06/24/2026 | Insulation placement and R values | 737 4TH AVENUE | Zoltan Saro | energy_progress |
| 06/24/2026 | Fire-Resistance Rated Construction | 737 4TH AVENUE | JOHN MCMONAGLE | progress |
| 06/24/2026 | Fire-Resistant Penetrations and Joints | 737 4TH AVENUE | JOHN MCMONAGLE | special |
| 06/24/2026 | Air barrier continuity plan testing | 737 4TH AVENUE | JOHN MCMONAGLE | energy_progress |
| 06/24/2026 | Protection of exposed foundation insulation | 737 4TH AVENUE | Zoltan Saro | energy_progress |
| 06/24/2026 | Fenestration air leakage | 737 4TH AVENUE | Zoltan Saro | energy_progress |
| 06/24/2026 | Wall Panels, Curtain Walls, and Veneers | 737 4TH AVENUE | Zoltan Saro | special |
| 06/24/2026 | Fenestration and door U-factor and product ratings | 737 4TH AVENUE | Zoltan Saro | energy_progress |
| 06/24/2026 | Energy Code Compliance Inspections | 737 4TH AVENUE | Zoltan Saro | progress |
| 06/24/2026 | Vestibules | 737 4TH AVENUE | Zoltan Saro | energy_progress |
| 06/24/2026 | Fenestration areas | 737 4TH AVENUE | Zoltan Saro | energy_progress |
| 06/24/2026 | Air barrier - visual inspection | 737 4TH AVENUE | Zoltan Saro | energy_progress |
| 06/24/2026 | Sprayed fire-resistant materials | 737 4TH AVENUE | JOHN MCMONAGLE | special |
| 12/04/2025 | Air barrier - visual inspection | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/04/2025 | Fenestration areas | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/04/2025 | Air barrier continuity plan testing | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/04/2025 | Fenestration air leakage | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/04/2025 | Vestibules | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/04/2025 | Protection of exposed foundation insulation | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/04/2025 | Insulation placement and R values | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/04/2025 | Fenestration and door U-factor and product ratings | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 12/04/2025 | Fire-Resistance Rated Construction | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 12/04/2025 | Tenant Protection Plan Compliance | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 12/04/2025 | Exterior Insulation and Finish Systems (EIFS) | 1487 1 AVENUE | PATRICK ORRICO | special |
| 12/04/2025 | Wall Panels, Curtain Walls, and Veneers | 1487 1 AVENUE | PATRICK ORRICO | special |
| 12/04/2025 | Fire-Resistant Penetrations and Joints | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 11/10/2025 | Exterior Insulation and Finish Systems (EIFS) | 1487 1 AVENUE | PATRICK ORRICO | special |
| 11/10/2025 | Fire-Resistant Penetrations and Joints | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 11/10/2025 | Tenant Protection Plan Compliance | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 11/10/2025 | Wall Panels, Curtain Walls, and Veneers | 1487 1 AVENUE | PATRICK ORRICO | special |
| 11/10/2025 | Fire-Resistance Rated Construction | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 11/10/2025 | Insulation placement and R values | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 11/10/2025 | Vestibules | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 11/10/2025 | Protection of exposed foundation insulation | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 11/10/2025 | Fenestration air leakage | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 11/10/2025 | Air barrier continuity plan testing | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 11/10/2025 | Air barrier - visual inspection | 1487 1 AVENUE | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |