← Back
BuildNYC
Stand-alone food establishment
149-51 CROSS ISLAND PARKWAY
QUEENS · BIN 4853394
💬 Discuss this project
2021Year Built
1Stories
K5Building Class
R3-2Zoning
1,940 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Stand-alone food establishment · Owner of record: Gcip · 9,546 sf lot · 0.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofStarbucks20p · 3 filings · 20 docs
Floor 1Starbucks33p · 6 filings · 20 docs
CellarStarbucks1p · 1 filing · 2 docs
Site & exteriorStarbucks9p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
G&K Lefferts Associates6307/08/2026
Gcip1003/21/2026
Walgreen Co103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
National Maintenance803/21/2026
Rosenbaum Design Group803/21/2026
New York Design Architects603/21/2026
Dseny Engineering Services203/21/2026
Louis Striar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kane Builders S & DGeneral Contractor807/08/2026
National MaintenanceSign hanger507/08/2026
Village P & H NYPlumbing507/08/2026
American Jersey ImproveGeneral Contractor303/21/2026
Kane Builders S & DScaffold303/21/2026
Aura PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Aks Architectural & Engineering1957202/02/2023
Macia Inspection & Testin402404/23/2021
Building Lifecycle
09/08/2025
Signed off — Alteration
VINYL REFACE ONLY OF EXISTING ILLUMINATED NON-ADVERTISING DOUBLE-SIDED ACCESSORY TENANT DIRECTORY SIGN ON GROUND STRUCTURE PERMITTED UNDER JOB NO: 401091224 - IN PROPERTY LINES -STARBUCKS WALGREENS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01200974-I1
04/16/2025
Permit issued — Sign
Q01200974-I1-SG
04/11/2025
Filed — Alteration
VINYL REFACE ONLY OF EXISTING ILLUMINATED NON-ADVERTISING DOUBLE-SIDED ACCESSORY TENANT DIRECTORY SIGN ON GROUND STRUCTURE PERMITTED UNDER JOB NO: 401091224 - IN PROPERTY LINES -STARBUCKS WALGREENS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01200974-I1
04/11/2025
Special inspection requirement — Final
ADITYA DESAI
11/14/2023
Signed off — Alteration
Installation of new on-site stormwater detention system including new catch basins, underground piping, exterior grease trap, and connection to the sewer for the proposed Starbucks Coffee building.
Q00466476-I1
95 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNational Maintenance04/16/2025
DOB NOWPlumbingSigned-offVillage P & H NY11/09/2023
DOB NOWPlumbingSigned-offVillage P & H NY10/13/2023
DOB NOWPlumbingSigned-offVillage P & H NY09/08/2022
DOB NOWPlumbingSigned-offAura Plumbing03/30/2022
DOB NOWSignSigned-offNational Maintenance03/29/2022
DOB NOWSignSigned-offNational Maintenance03/25/2022
DOB NOWSignSigned-offNational Maintenance03/24/2022
DOB NOWSignSigned-offNational Maintenance03/24/2022
DOB NOWMechanical SystemsSigned-offAmerican Jersey Improve01/26/2022
DOB NOWPlumbingSigned-offVillage P & H NY10/07/2021
DOB NOWGeneral ConstructionSigned-offKane Builders S & D07/30/2021
DOB NOWConstruction FenceSigned-offKane Builders S & D07/08/2021
DOB NOWStructuralSigned-offKane Builders S & D07/06/2021
DOB NOWPlumbingSigned-offVillage P & H NY06/30/2021
DOB NOWMechanical SystemsSigned-offKane Builders S & D06/30/2021
DOB NOWGeneral ConstructionSigned-offKane Builders S & D06/28/2021
BISEQISSUEDRSJ Contracting Services07/11/2024
BIS—ISSUEDRSJ Contracting Services07/11/2024
BISOTISSUEDAccord Power12/02/2021
BISEQISSUEDKane Builders S & D08/11/2021
BIS—ISSUEDParker Service Industries04/25/2002
3 projects · most recent 01/11/2023
General Wiring
FiledStatusContractorScope
01/11/2023CompleteQueensboro Electrical ContractingGeneral Wiring
01/05/2023CompleteMaximum ElectricGeneral Wiring
10/05/2022CompletePower Surge Electric—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
09/07/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/27/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/18/2022Pass-Final Fence Non-Directive 14PassView ↗
06/15/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/09/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/06/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/14/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/14/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/04/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
04/11/2025FinalADITYA DESAIprogress
02/03/2023Lighting controlsGiuseppe Anzaloneenergy_progress
02/03/2023Interior lighting powerGiuseppe Anzaloneenergy_progress
02/03/2023HVAC-R and service water piping design and insulationGiuseppe Anzaloneenergy_progress
02/03/2023Shutoff dampersGiuseppe Anzaloneenergy_progress
02/03/2023Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
02/03/2023FinalGiuseppe Anzaloneprogress
02/03/2023Mechanical SystemsGiuseppe Anzalonespecial
03/23/2022FinalAHMED SHAABANprogress
03/23/2022FinalAHMED SHAABANprogress
03/23/2022FinalAHMED SHAABANprogress
03/23/2022FinalAHMED SHAABANprogress
03/30/2021FinalJaclyn Peranteauprogress
03/29/2021Subgrade InspectionsJeffrey Stonesspecial
03/29/2021Concrete - Cast-In-PlaceJeffrey Stonesspecial
03/29/2021Exterior lighting powerJaclyn Peranteauenergy_progress
03/29/2021Energy Code Compliance InspectionsJeffrey Stonesprogress
02/25/2021HVAC-R and service water heating system controlsJeffrey Stonesenergy_progress
02/25/2021MasonryJeffrey Stonesspecial
02/25/2021Structural Cold-Formed SteelJeffrey Stonesspecial
02/25/2021Structural Steel - DetailsJeffrey Stonesspecial
02/25/2021Structural Steel - High Strength BoltingJeffrey Stonesspecial
02/25/2021Structural Steel - WeldingJeffrey Stonesspecial
02/25/2021Subgrade InspectionsJeffrey Stonesspecial
02/25/2021Subsurface Conditions – Fill Placement & In-Place DensityJeffrey Stonesspecial
Latest 25 of 35.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
StarbucksRestaurant / Food ServiceCellar, Floor 1, Roof
Project Q01200974 Alteration · LOC Issued · 04/11/2025
Project Q00686798 Alteration · LOC Issued · 03/23/2022
Project Q00687007 Alteration · LOC Issued · 03/23/2022
Project Q00687013 Alteration · LOC Issued · 03/23/2022
Project Q00588072 Alteration · LOC Issued · 09/14/2021
Project Q00588075 Alteration · LOC Issued · 09/13/2021
Project Q00548116 Alteration · LOC Issued · 06/28/2021
Project Q00487894 Alteration · LOC Issued · 05/26/2021
Project Q00475532 Alteration · LOC Issued · 04/23/2021
Project Q00475550 Alteration · LOC Issued · 04/02/2021
Project Q00494787 Alteration · LOC Issued · 03/30/2021
Project Q00475564 Alteration · LOC Issued · 03/29/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
178 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account