Two family brick
15 LEFFERTS PLACE
BROOKLYN · BIN 3057653
💬 Discuss this project
1899Year Built
3Stories
B1Building Class
R6BZoning
3,692 sfGross Floor Area
2Units
Two family brick · 2,250 sf lot · 1.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof1p · 1 filing · 4 docs
Floor 21 filing · 6 docs
Floor 13p · 2 filings · 9 docs
Cellar1 filing · 6 docs
Basement1p · 1 filing · 6 docs
Sub-Basement1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC203/21/2026
EA DESIGN GROUP403/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLANE REMODELING COMPANYGeneral Contractor607/08/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor104/09/2026
MR. AIR NYC CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244112/16/2025
CL ENGINEERING P.C.6781102/03/2023
THE EIPEL ENGINEERING GRO2714212/13/2021
Building Lifecycle
All (42)Filed (4)Permit Issued (6)Signed Off (4)Objection (18)Special Inspection (10)
04/14/2026
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01331583-I1
12/23/2025
Permit issued — Solar
B01331583-I1-SL
12/16/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01331583-I1
05/09/2023
Signed off — Alteration
INSTALL (3) NEW HVAC CONDENSING UNITS AT OSP AND (11) INDOOR HEAT PUMP SPLIT-DUCTED UNITS ON THE EXISTING 3-STORY BUILDING WITH BASEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE IN BULK.
B08046689-I1
04/20/2023
Permit issued — Mechanical Systems
B08046689-I1-MS
03/03/2023
Objection raised — Energy
03/03/2023
Objection resolved — Addressed
03/03/2023
Objection raised — Zoning
03/03/2023
Objection resolved — Addressed
03/03/2023
Objection raised — Scope
03/03/2023
Objection resolved — Addressed
02/08/2023
Objection raised — Scope
02/08/2023
Objection resolved — Addressed
02/08/2023
Objection raised — Inspections
02/08/2023
Objection resolved — Addressed
02/08/2023
Objection raised — Scope
02/08/2023
Objection resolved — Addressed
02/08/2023
Objection raised — Scope
02/08/2023
Objection resolved — Addressed
02/08/2023
Objection raised — Scope
02/08/2023
Objection resolved — Addressed
02/08/2023
Objection raised — Scope
02/08/2023
Objection resolved — Addressed
02/08/2023
Special inspection requirement — Tenant Protection Plan Compliance
02/08/2023
Special inspection requirement — Shutoff dampers
CHRISTIAN LOZADA
02/03/2023
Filed — Alteration
INSTALL (3) NEW HVAC CONDENSING UNITS AT OSP AND (11) INDOOR HEAT PUMP SPLIT-DUCTED UNITS ON THE EXISTING 3-STORY BUILDING WITH BASEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE IN BULK.
B08046689-I1
12/15/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
12/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
12/15/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
12/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
12/02/2022
Signed off — Alteration
B00629773-I1
12/01/2022
Signed off — Alteration
B00629779-I1
11/29/2022
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
11/29/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
11/29/2022
Special inspection requirement — Final
CHRISTIAN LOZADA
11/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/20/2022
Permit issued — General Construction
B00629773-I1-GC
04/20/2022
Permit issued — Structural
B00629779-I1-ST
02/24/2022
Permit issued — Structural
B00629779-I1-ST
02/18/2022
Permit issued — General Construction
B00629773-I1-GC
12/13/2021
Filed — Alteration
B00629773-I1
12/13/2021
Filed — Alteration
B00629779-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC12/23/2025
DOB NOWMechanical SystemsPermit IssuedMR. AIR NYC CORP04/20/2023
DOB NOWGeneral ConstructionSigned-offPLANE REMODELING COMPANY04/20/2022
DOB NOWStructuralPermit IssuedPLANE REMODELING COMPANY04/20/2022
DOB NOWStructuralPermit IssuedPLANE REMODELING COMPANY02/24/2022
DOB NOWGeneral ConstructionSigned-offPLANE REMODELING COMPANY02/18/2022
BISPLISSUEDVMC PLUMBING & HEATING IN01/25/2008
BISOTISSUEDOWNER12/10/2007
BISPLISSUEDCHPH CO07/27/2005
BISOTISSUEDMARTIN CURRIE03/01/2005
3 projects · most recent 12/10/2025
General Wiring
FiledStatusContractorScope
12/10/2025CompleteBROOKYLN SOLARWORKS, LLC—
02/04/2023CompleteROGER DE ELECTRIC CO.—
12/22/2022CompleteINTELOGIC ELECTRIC, INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
02/08/2023Tenant Protection Plan Compliance—special
02/08/2023Shutoff dampersCHRISTIAN LOZADAenergy_progress
12/15/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
12/15/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
12/15/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
12/15/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
11/29/2022Mechanical SystemsCHRISTIAN LOZADAspecial
11/29/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
11/29/2022FinalCHRISTIAN LOZADAprogress
11/29/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/31/2026B00629773-I1Request digital key ↗
08/31/2026B00629779-I1Request digital key ↗
08/19/2026B01331583-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
01/25/2008310067511Open ↗
12/10/2007310067511Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/27/2008310067511Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026B00629773-I1Open ↗
08/31/2026B00629779-I1Open ↗
08/27/2026B08046689-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B08046689-I1Open ↗
08/25/2026B08046689-I1Open ↗
▸BISPC FULL REPORT1
12/04/2007310067511Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/04/2007310067511Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/04/2007310067511Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/04/2007310067511Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B08046689-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSELF-CERT PLUMBING NOTICE1
12/31/2008310067511Open ↗
▸BISSCHEDULE B - PLUMBING1
10/27/2008310067511Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026B00629773-I1Open ↗
08/31/2026B00629779-I1Open ↗
08/19/2026B01331583-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/04/2007310067511Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
12/04/2007310067511Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01331583-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/25/2008310067511Open ↗
12/10/2007310067511Open ↗