| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01397968 ↗ | 321 CLINTON AVENUE BROOKLYN | Alteration | Permit Issued | 07/02/2026 | 09/29/2026 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C, SYSTEM AT APT#9 OF AN EXISTING 3.5-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,… |
| B01439042 ↗ | 759 PRESIDENT STREET BROOKLYN | Alteration | Permit Issued | 08/06/2026 | 09/09/2026 | Design NEW AIR SOLUTION INC. Owner AKAM ASSOCIATES, INC. Filer SU ARCHITECT P.C | REPLACE MINI-SPLIT A.C. SYSTEM AT APT#BG OF EXISTING 4-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EG… |
| B01423270 ↗ | 171 PROSPECT PLACE BROOKLYN | Alteration | Permit Issued | 07/09/2026 | 08/27/2026 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT AIR-CONDITIONING SYSTEM SERVING FOURTH FLOOR IN AN EXISTING FIVE-STORY, FOUR-FAMILY RESIDENTIAL BUILDING WITH MECHANICAL W… |
| B01400100 ↗ | 500 CLINTON AVENUE BROOKLYN | Alteration | Permit Issued | 06/03/2026 | 08/26/2026 | Design Black Oak Architecture, PC Owner 3RD & 85TH LLC Filer M-DIS DESIGN GROUP | INSTALLATION OF SPLIT-TYPE AIR CONDITIONING SYSTEM AT EXISTING APARTMENT #1A, INCLUDING INDOOR FAN COIL UNIT, OUTDOOR CONDENSER, REFRIGERANT… |
| M01440388 ↗ | 371 WEST STREET MANHATTAN | Alteration | Permit Issued | 08/12/2026 | 08/19/2026 | Design H&J Building Consulting Inc Filer SU ARCHITECT P.C | INSTALL NEW MINI-SPLIT AIR-CONDITIONING SYSTEM AT APT# 5A OF EXISTING 5-STORY BUILDING WITH MECHANICAL WORK ONLY AS PER PLANS FILED HERE WI… |
| B01418380 ↗ | 261 GARFIELD PLACE BROOKLYN | Alteration | Permit Issued | 07/07/2026 | 08/10/2026 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW A.C. SYSTEM AT APT#3 OF EXISTING 4-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR … |
| Name | Projects together | Most recent |
|---|---|---|
| CL ENGINEERING P.C. | 51 | 08/18/2024 |
| NEW AIR SOLUTION INC. | 30 | 08/06/2026 |
| BAYSIDE ENGINEERING PC | 5 | 08/16/2024 |
| SIMPLE ARCHITECTURE PC | 2 | 03/22/2022 |
| Black Oak Architecture, PC | 1 | 06/03/2026 |
| COGGAN + CRAWFORD ARCHITECTURE | 1 | 07/11/2022 |
| COLLADO ENGINEERING | 1 | 06/07/2023 |
| E4P CONSULTING ENGINEERING PLLC | 1 | 11/20/2023 |
| EAB ENGINEERING PC | 1 | 12/27/2024 |
| ENGINEERING PROFESSIONAL SERVICE P. | 1 | 01/20/2021 |
| ERIC SAFYAN ARCHITECT PC | 1 | 09/14/2023 |
| ERIN COWHEY ARCHITECT | 1 | 06/11/2021 |
| H&J Building Consulting Inc | 1 | 08/12/2026 |
| JOHN PATRICK CUNNINGHAM | 1 | 11/18/2021 |
| NSC ARCHITECTURE, PC | 1 | 06/24/2021 |
| SIRIS COOMBS ARCHITECTURE, PLLC | 1 | 06/23/2025 |
| SQUARE ARCH, LLC | 1 | 02/25/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| ALMA DESIGN INC | 1 | 03/22/2022 |
| AMERICAN STANDARD P&H COR | 1 | 08/18/2024 |
| AUROUS CONSTRUCTION COLL* | 1 | 06/23/2025 |
| BIG APPLE PLBG CORP | 1 | 09/14/2023 |
| BZJ CONSTRUCTION LLC | 1 | 06/11/2021 |
| CYPRESS GREEN CONST CO | 1 | 09/14/2023 |
| DARBY CONSTRUCTION SVC LL | 1 | 11/20/2023 |
| GENESIS PLBG AND HTG CORP | 1 | 06/11/2021 |
| HAPPY HOUSE CONSTRUCTION | 1 | 11/18/2021 |
| L&L CONSTRUCTION DEVELOP | 1 | 08/18/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| AKAM ASSOCIATES, INC. | 3 | 08/06/2026 |
| HALSTEAD MANAGEMENT | 2 | 06/07/2023 |
| MR. AIR NYC CORP. | 2 | 08/18/2024 |
| (HOMEOWNER) | 1 | 06/24/2025 |
| 1105 8TH AVE OWNER CORP | 1 | 10/13/2023 |
| 127 WEST 79TH STREET | 1 | 06/05/2023 |
| 23 FISKE PLACE CORP | 1 | 10/27/2023 |
| 321 CLINTON AVENUE HOUSING CORP | 1 | 07/02/2026 |
| 35 BOND STREET CORP. | 1 | 07/16/2025 |
| 3RD & 85TH LLC | 1 | 06/03/2026 |
| BROOKLYN CATTITUDE PET SITTING INC. | 1 | 09/14/2023 |
| CENTURY MANAGEMENT | 1 | 09/29/2025 |
| CHINESE ALLIANCE CENTER OF C&MA | 1 | 08/02/2023 |
| COLUMBIA 160 APARTMENT CORP. | 1 | 03/17/2025 |
| KENMORE ASSOCIATES LP | 1 | 11/20/2023 |
| READE STREET TENANTS CORP | 1 | 06/24/2024 |
| RED APPLE REAL ESTATE | 1 | 06/24/2021 |
| RUBIN FROST LLC. | 1 | 07/14/2023 |
| Reel Stories Teen Filmmaking, Inc | 1 | 10/12/2024 |
| STONE FOX ARCHITECTS, LLP | 1 | 06/16/2025 |
| SURE FOUNDATION LUTHERAN | 1 | 08/28/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| SU ARCHITECT P.C | 71 | 08/12/2026 |
| METRO DESIGN CONSULTANTS INC | 2 | 02/03/2023 |
| ARINNITY LLC | 1 | 01/20/2021 |
| HUAN DESIGN INC | 1 | 02/25/2026 |
| JANCO BUILDING CONSULTANTS, LLC. | 1 | 11/20/2023 |
| JOSEPH FELLNER | 1 | 06/11/2021 |
| KC EXPEDITING INC | 1 | 06/24/2021 |
| M-DIS DESIGN GROUP | 1 | 06/03/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 06/23/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01397968 ↗ | 321 CLINTON AVENUE BROOKLYN | Alteration | Permit Issued | 07/02/2026 | 09/29/2026 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C, SYSTEM AT APT#9 OF AN EXISTING 3.5-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,… |
| B01439042 ↗ | 759 PRESIDENT STREET BROOKLYN | Alteration | Permit Issued | 08/06/2026 | 09/09/2026 | Design NEW AIR SOLUTION INC. Owner AKAM ASSOCIATES, INC. Filer SU ARCHITECT P.C | REPLACE MINI-SPLIT A.C. SYSTEM AT APT#BG OF EXISTING 4-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EG… |
| B01423270 ↗ | 171 PROSPECT PLACE BROOKLYN | Alteration | Permit Issued | 07/09/2026 | 08/27/2026 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT AIR-CONDITIONING SYSTEM SERVING FOURTH FLOOR IN AN EXISTING FIVE-STORY, FOUR-FAMILY RESIDENTIAL BUILDING WITH MECHANICAL W… |
| B01400100 ↗ | 500 CLINTON AVENUE BROOKLYN | Alteration | Permit Issued | 06/03/2026 | 08/26/2026 | Design Black Oak Architecture, PC Owner 3RD & 85TH LLC Filer M-DIS DESIGN GROUP | INSTALLATION OF SPLIT-TYPE AIR CONDITIONING SYSTEM AT EXISTING APARTMENT #1A, INCLUDING INDOOR FAN COIL UNIT, OUTDOOR CONDENSER, REFRIGERANT… |
| M01440388 ↗ | 371 WEST STREET MANHATTAN | Alteration | Permit Issued | 08/12/2026 | 08/19/2026 | Design H&J Building Consulting Inc Filer SU ARCHITECT P.C | INSTALL NEW MINI-SPLIT AIR-CONDITIONING SYSTEM AT APT# 5A OF EXISTING 5-STORY BUILDING WITH MECHANICAL WORK ONLY AS PER PLANS FILED HERE WI… |
| B01418380 ↗ | 261 GARFIELD PLACE BROOKLYN | Alteration | Permit Issued | 07/07/2026 | 08/10/2026 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW A.C. SYSTEM AT APT#3 OF EXISTING 4-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR … |
| B01411701 ↗ | 35 PROSPECT PARK WEST BROOKLYN | Alteration | Permit Issued | 06/10/2026 | 07/06/2026 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT FIRST FLOOR OF EXISTING 18-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN US… |
| M01386613 ↗ | 316 MOTT STREET MANHATTAN | Alteration | Signed-off | 04/30/2026 | 05/21/2026 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT APT#3B OF EXISTING 7-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGR… |
| B01334309 ↗ | 821A UNION STREET BROOKLYN | Alteration | Signed-off | 12/18/2025 | 03/06/2026 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT APT#3 OF EXISTING 4-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGR… |
| B01363986 ↗ | 120A BAINBRIDGE STREET BROOKLYN | Alteration | Permit Issued | 02/25/2026 | 03/06/2026 | Design SQUARE ARCH, LLC Filer HUAN DESIGN INC | INSTALL THREE SPLIT UNITS HVAC SYSTEM FOR EXISTING THREE FAMILY HOUSE, NO CHANGE IN USE, EGRESS, AND OCCUPANCY. |
| B01245575 ↗ | 753 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 12/12/2025 | 01/21/2026 | Design NEW AIR SOLUTION INC. | INSTALLATION OF NEW DUCTWORK FOR THE KITCHEN AND BATHROOM EXHAUST AT APARTMENT #4J OF AN EXISTING 4-STORY BUILDING AS PER PLANS FILED HEREWI… |
| B01329736 ↗ | 759 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 12/24/2025 | 01/14/2026 | Design NEW AIR SOLUTION INC. Owner AKAM ASSOCIATES, INC. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT APT#2D & 4I OF EXISTING 4-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE… |
| M01310020 ↗ | 688 WASHINGTON STREET MANHATTAN | Alteration | Signed-off | 11/10/2025 | 12/15/2025 | — | INSTALL NEW SPLIT A.C. SYSTEM AND COVER THE EXISTING A.C. SLEEVE AT APT#2B OF AN EXISTING 5-STORY BUILDING WITH MECHANICAL WORK AND GENERAL … |
| M01251419 ↗ | 35 BOND STREET MANHATTAN | Alteration | Signed-off | 07/16/2025 | 09/04/2025 | Design NEW AIR SOLUTION INC. Owner 35 BOND STREET CORP, Filer SU ARCHITECT P.C | Installation of a new ductless mini-split air conditioning system in Apartment #6 of the existing 6-story building with mechanical work as p… |
| M01260704 ↗ | 49 MARKET STREET MANHATTAN | Alteration | Permit Issued | 08/01/2025 | 08/15/2025 | — | INSTALL NEW SPLIT A.C. SYSTEM AT CELLAR AND 1ST FLOOR OF EXISTING 2-STORY BUILDING WITH MECHANICAL WORK ONLY AS PER PLANS FILED HEREWITH. NO… |
| B01234018 ↗ | 608 11 STREET BROOKLYN | Alteration | Permit Issued | 06/24/2025 | 08/08/2025 | Design NEW AIR SOLUTION INC. Owner (HOMEOWNER) Filer SU ARCHITECT P.C | INSTALL NEW MULTI-ZONE SPLIT MINI A.C. SYSTEM AT EXISTING 2-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN US… |
| B01239277 ↗ | 15A BERKELEY PLACE BROOKLYN | Alteration | Signed-off | 06/25/2025 | 08/01/2025 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALLATION OF NEW DUCTLESS MINI-SPLIT AC SYSTEM IN APT. #3A, 4A, 4B OF AN EXISTING 4-STORY BUILDING. MECHANICAL WORK ONLY, AS PER PLANS FI… |
| M01224886 ↗ | 68 BARROW STREET MANHATTAN | Alteration | Signed-off | 06/16/2025 | 07/10/2025 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL SPLIT A.C. SYSTEM AT APT#4 OF EXISTING 5-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS O… |
| M00684347 ↗ | 17 WEST 17 STREET MANHATTAN | Alteration | Signed-off | 11/20/2023 | 05/27/2025 | Owner KENMORE ASSOCIATES LP | PROPOSE TO REMOVE AND INSTALL NEW AC AND HEATING EQUIPMENT AND RELATED DUCT DISTRIBUTION AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, U… |
| B01213109 ↗ | 759 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 05/02/2025 | 05/12/2025 | Design NEW AIR SOLUTION INC. | INSTALL NEW SPLIT A.C. SYSTEM AT APT#4D OF EXISTING 4-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGR… |
| M01202817 ↗ | 155 EAST 49 STREET MANHATTAN | Alteration | Signed-off | 03/31/2025 | 04/10/2025 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT APT#9E OF EXISTING 10-STORY BUILDING WITH MECHANICAL WORK, NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUP… |
| M01145708 ↗ | 6 GROVE COURT MANHATTAN | Alteration | Signed-off | 11/22/2024 | 03/25/2025 | Filer SU ARCHITECT P.C | INTERIOR RENOVATION OF ONE FAMILY RESIDENCE INCLUDING PARTITION WORK AND EXTERIOR WALL PATCHING AS PER PLANS FILED HEREWITH. NO CHANGE TO US… |
| B01163369 ↗ | 444 12 STREET BROOKLYN | Alteration | Signed-off | 02/05/2025 | 03/05/2025 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW A.C. SYSTEM AT 1ST AND 2ND FLOOR LOFT B OF EXISTING 7-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE… |
| B01159733 ↗ | 32 WOODHULL STREET BROOKLYN | Alteration | Permit Issued | 12/27/2024 | 02/11/2025 | Design EAB ENGINEERING PC | INSTALL MINI SPLIT DUCTLESS SYSTEM CONDENSERS OUTSIDE IN THE REAR YARD AND ASSOCIATED AIR HANDLERS INSIDE CELLAR, 1-3 FLOORS IN CONJUNCTION … |
| B01133968 ↗ | 160 COLUMBIA HEIGHTS BROOKLYN | Alteration | Signed-off | 11/06/2024 | 12/11/2024 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT APT.10F OF EXISTING 11-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E… |
| B01134110 ↗ | 54 ST FELIX STREET BROOKLYN | Alteration | Signed-off | 11/12/2024 | 12/06/2024 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT EXISTING 4-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CER… |
| B01127913 ↗ | 850 NOSTRAND AVENUE BROOKLYN | Alteration | Signed-off | 11/20/2024 | 12/02/2024 | Design NEW AIR SOLUTION INC. | INSTALL NEW A.C. SYSTEM AT CELLAR AND FIRST FLOOR COMMERCIAL SPACE OF EXISTING 2-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HER… |
| B01117163 ↗ | 530 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 10/12/2024 | 10/24/2024 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL SPLIT A.C. SYSTEM AT SUITE 2F OF EXISTING 3-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRES… |
| Q01101803 ↗ | 64-20 ROOSEVELT AVENUE QUEENS | Alteration | Signed-off | 08/28/2024 | 10/16/2024 | Design NEW AIR SOLUTION INC. Owner SURE FOUNDATION LUTHERAN Filer SU ARCHITECT P.C | PROPOSED NEW A.C. SYSTEM WITH DUCT WORK AT EXISTING 2-STORY CHURCH AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF O… |
| M01050592 ↗ | 720 WEST 11 STREET MANHATTAN | Alteration | Signed-off | 08/24/2024 | 09/20/2024 | Design NEW AIR SOLUTION INC. Owner AKAM ASSOCIATES, INC. Filer SU ARCHITECT P.C | INSTALL NEW A.C. SYSTEM AT APT#1A OF EXISTING 5-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR… |
| B01081051 ↗ | 490 7 STREET BROOKLYN | Alteration | Signed-off | 08/06/2024 | 09/13/2024 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM OF EXISTING 3-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CER… |
| B00885161 ↗ | 1345 74 STREET BROOKLYN | Alteration | Signed-off | 06/06/2023 | 08/21/2024 | Design CL ENGINEERING P.C. Owner MR. AIR NYC CORP. Filer SU ARCHITECT P.C | PLUMBING WORK AT EXISTING 2.5 STORY BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| B01049904 ↗ | 759 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 06/20/2024 | 08/13/2024 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW A.C. SYSTEM AT Apt #s (1A, 1B, 1G, 3H, 4BC, 4E) OF EXISTING 4-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HERE. NO CH… |
| M01071078 ↗ | 46 CARMINE STREET MANHATTAN | Alteration | Signed-off | 06/28/2024 | 08/07/2024 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT EXISTING 4-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CER… |
| B01082149 ↗ | 753 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 07/23/2024 | 08/06/2024 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT APT#1J & 4J OF EXISTING 4-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE… |
| M01059648 ↗ | 74 READE STREET MANHATTAN | Alteration | Signed-off | 06/24/2024 | 08/06/2024 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT APT#2EF OF EXISTING 5.5-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, … |
| B01049493 ↗ | 659 MADISON STREET BROOKLYN | Alteration | Signed-off | 05/17/2024 | 07/08/2024 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW A.C. SYSTEM AT EXISTING 2-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICA… |
| M01047652 ↗ | 16 EAST 96 STREET MANHATTAN | Alteration | Signed-off | 05/19/2024 | 06/13/2024 | Design BAYSIDE ENGINEERING PC Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT APARTMENT #7D 7TH FLOOR OF EXISTING 7-STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| B01046405 ↗ | 522 CARLTON AVENUE BROOKLYN | Alteration | Signed-off | 05/17/2024 | 06/07/2024 | Design NEW AIR SOLUTION INC. Filer SU ARCHITECT P.C | INSTALL NEW A.C. SYSTEM AT EXISTING 3-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICA… |
| B01030314 ↗ | 191 ST MARKS AVENUE BROOKLYN | Alteration | Signed-off | 04/06/2024 | 05/10/2024 | Design BAYSIDE ENGINEERING PC | INSTALL NEW A.C. SYSTEM ON 2ND/3RD/4TH FLOOR OF EXISTING 4-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HERE. NO CHANGE IN USE, EG… |
| B01029878 ↗ | 366A GRAND AVENUE BROOKLYN | Alteration | Signed-off | 04/14/2024 | 05/08/2024 | Design BAYSIDE ENGINEERING PC Filer SU ARCHITECT P.C | INSTALL A.C. SYSTEM AT EXISTING 3-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE O… |
| B01018910 ↗ | 315 3 STREET BROOKLYN | Alteration | Signed-off | 03/26/2024 | 04/24/2024 | Design BAYSIDE ENGINEERING PC | INSTALL NEW SPLIT A/C AT APT#1A & APT#4A OF EXISTING 4 STORY BUILDING WITH MECHANICAL WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGR… |
| B01010248 ↗ | 321 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 02/26/2024 | 03/04/2024 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW A.C. SYSTEM AT APT#3 OF EXISTING 3.5 STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS O… |
| B00975663 ↗ | 904 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 12/28/2023 | 01/26/2024 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT SUITE #101 OF EXISTING 7-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE,… |
| M00989693 ↗ | 144 FRANKLIN STREET MANHATTAN | Alteration | Signed-off | 01/12/2024 | 01/24/2024 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT 1ST FLOOR APARTMENT#1 OF EXISTING 7-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHA… |
| B00961334 ↗ | 505 3 STREET BROOKLYN | Alteration | Signed-off | 11/14/2023 | 12/04/2023 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT EXISTING 3-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CER… |
| B00952463 ↗ | 398 CLASSON AVENUE BROOKLYN | Alteration | Signed-off | 10/25/2023 | 10/30/2023 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL SPLIT A.C. SYSTEM AT EXISTING 3-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFI… |
| B00931013 ↗ | 430 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 09/12/2023 | 09/15/2023 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C SYSTEM AT APARTMENT#3F & #6C OF EXISTING 6 STORY BUILDING AS PER PLANS FILD HEREWITH. NO CHANGE IN USE, EGRESS OR CERT… |
| Q00912207 ↗ | 43-29 162 STREET QUEENS | Alteration | Signed-off | 08/02/2023 | 08/10/2023 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW A.C. SYSTEM AT 1ST FLOOR CHURCH OF EXISTING 3 STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,… |
| B00888522 ↗ | 1105 8 AVENUE BROOKLYN | Alteration | Signed-off | 07/14/2023 | 08/09/2023 | Design CL ENGINEERING P.C. Owner 1105 8TH AVE OWNER CORP Filer SU ARCHITECT P.C | INSTALL A/C SYSTEM AT APARTMENT#B,C,E,G OF EXISTING 4 STORY BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF… |
| B00910883 ↗ | 328B PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 07/31/2023 | 08/07/2023 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT CELLAR/BASEMENT/1ST FLOOR OF EXISTING 3 STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO… |
| B00896902 ↗ | 23 FISKE PLACE BROOKLYN | Alteration | Signed-off | 07/06/2023 | 07/14/2023 | Design CL ENGINEERING P.C. Owner 23 FISKE PLACE CORP Filer SU ARCHITECT P.C | INSTALL SPLIT A.C. SYSTEM AT APARTMENT#1,3,4 OF EXISTING 4 STORY BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OF CERTIFICA… |
| M00892187 ↗ | 60 WEST 15 STREET MANHATTAN | Alteration | Signed-off | 06/23/2023 | 06/28/2023 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT 1ST FLOOR STORE OF EXISTING 6 STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN… |
| M00878020 ↗ | 77 PARK AVENUE MANHATTAN | Alteration | Signed-off | 06/05/2023 | 06/08/2023 | Design CL ENGINEERING P.C. Owner 127 WEST 79TH STREET Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A.C. SYSTEM AT CELLAR OF EXISTING 14 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| B00870967 ↗ | 369 11 STREET BROOKLYN | Alteration | Signed-off | 05/08/2023 | 06/07/2023 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW A.C. SYSTEM AT BASEMENT OF EXISTING 2 STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS … |
| B00841028 ↗ | 356 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 03/10/2023 | 05/17/2023 | Design ERIC SAFYAN ARCHITECT PC | PLUMBING WORK FOR RENOVATION OF COMMERCIAL SPACE, IN CONJUCTION WITH DOB JOB NO. B00841028-I1. |
| B00849507 ↗ | 321 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 04/28/2023 | 05/09/2023 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW A.C. SYSTEM AT APT#5 OF EXISTING 3 STORY BUILDING WITH MECHANICAL WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR C… |
| B08046689 ↗ | 15 LEFFERTS PLACE BROOKLYN | Alteration | Permit Issued | 02/03/2023 | 04/20/2023 | Design CL ENGINEERING P.C. | INSTALL (3) NEW HVAC CONDENSING UNITS AT OSP AND (11) INDOOR HEAT PUMP SPLIT-DUCTED UNITS ON THE EXISTING 3-STORY BUILDING WITH BASEMENT. NO… |
| M00840430 ↗ | 223 EAST 67 STREET MANHATTAN | Alteration | Signed-off | 03/21/2023 | 03/27/2023 | Design CL ENGINEERING P.C. | INSTALL NEW A.C. SYSTEM AT EXISTING 3 STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR CERTIFICAT… |
| B00842891 ↗ | 477 14 STREET BROOKLYN | Alteration | Signed-off | 03/15/2023 | 03/22/2023 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW A.C. SYSTEM AT EXISTING 4-STORY LANDMARK BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR … |
| M00813235 ↗ | 17 WEST 17 STREET MANHATTAN | Alteration | Signed-off | 02/17/2023 | 02/22/2023 | Design CL ENGINEERING P.C. Owner RUBIN FROST LLC. Filer SU ARCHITECT P.C | INSTALL NEW A.C. SYSTEM AT 8TH, 9TH FLOOR AND ROOF AS PER PLANS FILED HERE. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| M00377583 ↗ | 210 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 09/14/2020 | 11/23/2022 | Design COLLADO ENGINEERING Owner HALSTEAD MANAGEMENT | Addition of lobby air conditioning indoor and outdoor units. |
| M08013312 ↗ | 151 WEST 28 STREET MANHATTAN | Alteration | Signed-off | 10/03/2022 | 10/17/2022 | Design CL ENGINEERING P.C. | INSTALL (4) NEW HEAT PUMP SPLIT-DUCTLESS HVAC SYSTEM AT APT#8W OF EXISTING 9 STORY BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANG… |
| M00773513 ↗ | 874 BROADWAY MANHATTAN | Alteration | Signed-off | 08/19/2022 | 08/24/2022 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C AT APT#601 & #605 OF EXISTING 12 STORY LANDMARK BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| M00780601 ↗ | 433 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 08/08/2022 | 08/16/2022 | Design CL ENGINEERING P.C. Owner HALSTEAD MANAGEMENT Filer SU ARCHITECT P.C | INSTALL A.C. SYSTEM AT LOBBY ONLY OF EXISTING 20-STORY BUILDING AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCC… |
| B00766307 ↗ | 530 PRESIDENT STREET BROOKLYN | Alteration | Permit Issued | 07/11/2022 | 08/03/2022 | Replacement of existing split system air-conditioning equipment with new heat pumps. No change to use, occupancy, egress or bulk. | |
| B00773539 ↗ | 277 HICKS STREET BROOKLYN | Alteration | Signed-off | 07/26/2022 | 08/01/2022 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C SYSTEM AT DUPLEX LOWER/UPPER LEVEL APT#1C OF EXISTING 5 STORY BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, … |
| M00431590 ↗ | 180 THOMPSON STREET MANHATTAN | Alteration | Signed-off | 01/20/2021 | 07/15/2022 | Filer ARINNITY LLC | NEW MECHANICAL WORK IN CONJUNCTION WITH JOB # 140947028 |
| B00751173 ↗ | 21 BERKELEY PLACE BROOKLYN | Alteration | Signed-off | 06/11/2022 | 06/16/2022 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C AT APARTMENT #2A OF EXISTING 4 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| M00740227 ↗ | 240 EAST 79 STREET MANHATTAN | Alteration | Signed-off | 05/20/2022 | 05/28/2022 | Design CL ENGINEERING P.C. | S.O.W.: INSTALL NEW A/C SYSTEM AT APT#9C ON 9TH FLOOR OF EXISTING 16-STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| B00720084 ↗ | 158 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 04/18/2022 | 05/25/2022 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT AL/C SYSTEM AT 3RD FLOOR APT#3E OF EXISTING 5 STORY BUILDING AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGRESS OR CER… |
| B00728645 ↗ | 467 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 05/11/2022 | 05/18/2022 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C SYSTEM AT 3RD FLOOR APT#12 OF EXISTING 5 STORY MULTI-FAMILY WALK-UP BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE … |
| B00725749 ↗ | 91 BUTLER STREET BROOKLYN | Alteration | Signed-off | 05/02/2022 | 05/06/2022 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C SYSTEM AT 3RD FLOOR APT#3B OF EXISTING 3 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| B00715865 ↗ | 377 1 STREET BROOKLYN | Alteration | Signed-off | 04/15/2022 | 04/22/2022 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | ONLY INSTALL A SINGLE-ZONE SYSTEM FOR THE CELLAR LIVING ROOM AREA OF EXISTING 4 STORY BUILDING AS PER PLANS FILED HERE WITH. NO CHANGE IN US… |
| B00460230 ↗ | 285 WEIRFIELD STREET BROOKLYN | Alteration | Signed-off | 03/20/2021 | 04/15/2022 | Design SIMPLE ARCHITECTURE PC | NEW (3) COOLING AND HEATING SPLIT SYSTEMS. |
| B00682491 ↗ | 78 14 STREET BROOKLYN | Alteration | Signed-off | 03/29/2022 | 03/31/2022 | Design CL ENGINEERING P.C. Owner MR. AIR NYC CORP. Filer SU ARCHITECT P.C | INSTALL NEW A/C SYSTEM AT EXISTING WAREHOUSE AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| B00701877 ↗ | 917 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 03/22/2022 | 03/28/2022 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C SYSTEM AT APT#3 OF EXISTING 4 STORY BUILDING AS PER PLANS FILED HERE. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUP… |
| B00632489 ↗ | 393 2 STREET BROOKLYN | Alteration | Permit Issued | 11/18/2021 | 03/16/2022 | Design JOHN PATRICK CUNNINGHAM | HEREBY FILING FOR THE RENOVATION OF 2 FAMILY DWELLING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 321739561BIS | 294 13 STREET BROOKLYN | — | ISSUED | 10/08/2019 | 03/07/2022 | — | MH, OT, PL |
| B00664204 ↗ | 320 77 STREET BROOKLYN | Alteration | Signed-off | 01/22/2022 | 01/31/2022 | Design CL ENGINEERING P.C. | INSTALL NEW SPLIT A/C SYSTEM AT 1ST FLOOR OF EXISTING 3-STORY BUILDING AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE… |
| B00663414 ↗ | 377 1 STREET BROOKLYN | Alteration | Signed-off | 01/25/2022 | 01/29/2022 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C SYSTEM AT APT#4 & APT#2 OF EXISTING 4-STORY BUILDING AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGRESS OR CERTIFI… |
| M00660150 ↗ | 32 WEST 20 STREET MANHATTAN | Alteration | Signed-off | 01/12/2022 | 01/29/2022 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C AT 9 FLOOR APT# 9B & 9C OF EXISTING 11-STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| B00460213 ↗ | 285 WEIRFIELD STREET BROOKLYN | Alteration | Signed-off | 01/25/2021 | 01/12/2022 | Design SIMPLE ARCHITECTURE PC | INTERIOR RENOVATION OF A 3 STORY PLUS CELLAR 2 FAMILY BUILDING. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY. |
| B00617702 ↗ | 436 36 STREET BROOKLYN | Alteration | Signed-off | 12/10/2021 | 12/21/2021 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C SYSTEM AT EXISTING 2 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| B00641997 ↗ | 315 3 STREET BROOKLYN | Alteration | Signed-off | 12/10/2021 | 12/16/2021 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C AT CELLAR AND 1ST FLOOR AT APT#1B OF EXISTING 4 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| M00531714 ↗ | 57 LEONARD STREET MANHATTAN | Alteration | Signed-off | 06/01/2021 | 11/20/2021 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | Install new split A/C at basement, 1st floor and 5th floor of existing 5 story building. No change in use, egress and certificate of occupan… |
| B00626245 ↗ | 111 BERKELEY PLACE BROOKLYN | Alteration | Signed-off | 11/12/2021 | 11/19/2021 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C SYSTEM AT EXISTING 3 STORY LANDMARK BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| Q00617694 ↗ | 46-15 SKILLMAN AVENUE QUEENS | Alteration | Permit Issued | 11/12/2021 | 11/19/2021 | Design CL ENGINEERING P.C. | INSTALL NEW A/C SYSTEM AT FIRST FLOOR OF EXISTING 4 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| B00526753 ↗ | 465 1 STREET BROOKLYN | Alteration | Signed-off | 06/08/2021 | 11/10/2021 | Design ERIN COWHEY ARCHITECT Filer JOSEPH FELLNER | RENOVATION OF UNIT #2 IN TWO FAMILY DWELLING. PARTITION AND PLUMBING AT CELLAR AND THIRD FLOOR. MECHANICAL WORK AT 2ND FL, 3RD FLOOR AND ROO… |
| B00617696 ↗ | 322 12 STREET BROOKLYN | Alteration | Signed-off | 11/05/2021 | 11/10/2021 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW A/C SYSTEM AT APT#3 OF EXISTING 4 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| B00593813 ↗ | 252 13 STREET BROOKLYN | Alteration | Signed-off | 09/24/2021 | 09/29/2021 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C AT EXISTING 2 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| B00534706 ↗ | 471 13 STREET BROOKLYN | Alteration | Signed-off | 06/09/2021 | 08/30/2021 | Design CL ENGINEERING P.C. | Install new split A/C at existing 2 stories landmark building. No change in use, egress or certificate of occupancy. |
| Q00534710 ↗ | 45-65 162ND STREET QUEENS | Alteration | Signed-off | 06/09/2021 | 08/30/2021 | Design CL ENGINEERING P.C. | Install new split A/C at existing 2 stories building. No change in use, egress or certificate of occupancy. |
| Q00553334 ↗ | 58-21 70 AVENUE QUEENS | Alteration | Signed-off | 08/06/2021 | 08/30/2021 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C AT EXISTING 2 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| M00485787 ↗ | 77 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/19/2021 | 08/27/2021 | Design BAYSIDE ENGINEERING PC Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C AT APT. 9A OF EXISTING 14 STORIES BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| B00552667 ↗ | 121 PARK PLACE BROOKLYN | Alteration | Signed-off | 07/16/2021 | 07/22/2021 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C AT EXISTING 3 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPACNY. |
| B00552894 ↗ | 21 BERKELEY PLACE BROOKLYN | Alteration | Signed-off | 07/07/2021 | 07/16/2021 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C AT APARTMENT #2B OF EXISTING 4 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |
| Q00547552 ↗ | 68-42 ALDERTON STREET QUEENS | Alteration | Signed-off | 06/29/2021 | 07/07/2021 | Design CL ENGINEERING P.C. | Install new split A/C at existing 2 story building. No change in use, egress or certificate of occupancy. |
| B00543949 ↗ | 437 2 STREET BROOKLYN | Alteration | Signed-off | 06/23/2021 | 06/29/2021 | Design CL ENGINEERING P.C. | INSTALL NEW SPLIT A/C AT APARTMENT#3 AND APARTMENT#4 AT EXISTING 4 STORY MULTI-FAMILY WALK-UP BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFIC… |
| M00531975 ↗ | 874 BROADWAY MANHATTAN | Alteration | Signed-off | 06/02/2021 | 06/08/2021 | Design CL ENGINEERING P.C. Filer SU ARCHITECT P.C | INSTALL NEW SPLIT A/C AT EXISTING 12 STORY LANDMARK BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. |