← Back
Predominantly retail with other uses
150-11 14 AVENUE
QUEENS · BIN 4533774
💬 Discuss this project
1931Year Built
2Stories
K4Building Class
R3-2Zoning
4,983 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: LBR GROUP LLC · 6,875 sf lot · 0.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof1p · 2 filings · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 1
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LBR GROUP4107/08/2026
OWNER OF 150-11 14 AVE103/22/2026
YUEMEI703/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/19/2022$1.6M—D & D BROTHERS LLC → LBR GROUP LLC$321/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SQUARE ARCH, LLC209/15/2025
HUAN DESIGN INC.1508/15/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JTONIC DESIGN & CONSTRUCTGeneral Contractor407/08/2026
PROSPERITY CONSTRUCTION*General Contractor407/08/2026
SHUN SHENG CONSTRUCTIONGeneral Contractor303/21/2026
LG ELITE PLUMBING INCPlumbing207/08/2026
P & D MECHANICAL CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUAN DESIGN INC76691209/15/2025
M. INT'L ENGINEERING PLLC3129201/16/2024
Building Lifecycle
All (86)Filed (17)Permit Issued (8)Signed Off (7)Violation (12)Inspection (12)Special Inspection (30)
10/27/2025
Signed off — Alteration
PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR THE EXISTING COMMERCIAL KITCHEN SPACE.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01220303-S2
10/27/2025
Signed off — Alteration
PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR THE EXISTING COMMERCIAL KITCHEN SPACE.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01220303-S1
10/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/15/2025
Filed — Alteration
PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR THE EXISTING COMMERCIAL KITCHEN SPACE.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01220303-P5
08/15/2025
Filed — Alteration
PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR THE EXISTING COMMERCIAL KITCHEN SPACE.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01220303-P4
08/15/2025
Signed off — Alteration
PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR THE EXISTING COMMERCIAL KITCHEN SPACE.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01220303-I1
08/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
ZHENHUAN XU
08/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
08/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
08/15/2025
Special inspection requirement — Maintenance information
ZHENHUAN XU
08/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
08/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
08/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
08/15/2025
Special inspection requirement — Shutoff dampers
ZHENHUAN XU
08/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
08/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
08/15/2025
Special inspection requirement — Maintenance information
ZHENHUAN XU
08/15/2025
Special inspection requirement — Final
ZHENHUAN XU
08/15/2025
Special inspection requirement — Mechanical Systems
ZHENHUAN XU
08/14/2025
Filed — Alteration
PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR THE EXISTING COMMERCIAL KITCHEN SPACE.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01220303-P3
08/14/2025
Filed — Alteration
PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR THE EXISTING COMMERCIAL KITCHEN SPACE.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01220303-P2
08/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
08/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
08/13/2025
Special inspection requirement — Maintenance information
ZHENHUAN XU
08/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
06/27/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/18/2025
Filed — Alteration
PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR THE EXISTING COMMERCIAL KITCHEN SPACE.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01220303-P1
06/18/2025
Permit issued — Mechanical Systems
Q01220303-S2-MS
06/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
06/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
06/18/2025
Special inspection requirement — Maintenance information
ZHENHUAN XU
06/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
06/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
06/09/2025
Filed — Alteration
PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR THE EXISTING COMMERCIAL KITCHEN SPACE.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01220303-S2
05/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/20/2025
Permit issued — Plumbing
Q01220303-S1-PL
05/12/2025
Filed — Alteration
PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR THE EXISTING COMMERCIAL KITCHEN SPACE.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01220303-S1
05/12/2025
Permit issued — General Construction
Q01220303-I1-GC
05/08/2025
Filed — Alteration
PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR THE EXISTING COMMERCIAL KITCHEN SPACE.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01220303-I1
05/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
05/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
ZHENHUAN XU
05/03/2025
Special inspection requirement — Final
ZHENHUAN XU
07/24/2024
Signed off — Alteration
INSTALL NEW ROOF RAIN TO CONNECT TO EXISTING DRAINAGE SYSTEM FOR ASSOCIATED JOB Q00886404-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01076860-I1
07/22/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/19/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/19/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/10/2024
Permit issued — Plumbing
Q01076860-I1-PL
07/07/2024
Filed — Alteration
INSTALL NEW ROOF RAIN TO CONNECT TO EXISTING DRAINAGE SYSTEM FOR ASSOCIATED JOB Q00886404-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01076860-I1
06/24/2024
Signed off — Alteration
Q08040601-I1
06/14/2024
Signed off — Alteration CO
INTERIOR RENOVATION TO ADD NEW SPRINKLER HEADS AND ASSOCIATE PIPES FOR THE EXISTING SPRINKLER SYSTEM.
Q00886404-S2
04/17/2024
Signed off — Alteration CO
INTERIOR RENOVATION TO ADD NEW SPRINKLER HEADS AND ASSOCIATE PIPES FOR THE EXISTING SPRINKLER SYSTEM.
Q00886404-S1
03/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/15/2024
Special inspection requirement — Air barrier - visual inspection
ZHENHUAN XU
03/06/2024
Filed — Alteration CO
INTERIOR RENOVATION TO ADD NEW SPRINKLER HEADS AND ASSOCIATE PIPES FOR THE EXISTING SPRINKLER SYSTEM.
Q00886404-P3
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJTONIC DESIGN & CONSTRUCT06/18/2025
DOB NOWPlumbingSigned-offLG ELITE PLUMBING INC05/20/2025
DOB NOWGeneral ConstructionSigned-offJTONIC DESIGN & CONSTRUCT05/12/2025
DOB NOWPlumbingSigned-offLG ELITE PLUMBING INC07/10/2024
DOB NOWSprinklersSigned-offP & D MECHANICAL CORP10/06/2023
DOB NOWConstruction FenceSigned-offPROSPERITY CONSTRUCTION*10/06/2023
DOB NOWStructuralPermit IssuedPROSPERITY CONSTRUCTION*08/07/2023
DOB NOWGeneral ConstructionSigned-offSHUN SHENG CONSTRUCTION12/06/2022
BISOTISSUEDACCORD POWER INC03/12/2014
BISFPISSUEDPINNACLE PLBG & HTG CORP01/18/2013
BISPLISSUEDPINNACLE PLBG & HTG CORP01/18/2013
BISOTISSUEDAMG PACIFIC CONSTRUCTION INC08/24/2007
BISPLISSUEDFIRST CHOICE PLG INC.01/31/1996
BISOTISSUEDWKL CONST INC.01/29/1996
BISOTISSUEDN.A.M. INTERNATIONAL CONSTR. INC03/11/1991
1 project · most recent 03/06/2024
Sprinkler System
FiledStatusContractorScope
03/06/2024Signed-offCMP PIPING INCSprinkler System
2 projects · most recent 05/19/2025
General Wiring
FiledStatusContractorScope
05/19/2025CompleteGOODALL ELECTRIC CORP—
04/06/2024CompleteGOODALL ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
10/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/27/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/22/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/19/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/19/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/01/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/27/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/25/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
08/15/2025Tenant Protection Plan Compliance—special
08/15/2025Tenant Protection Plan ComplianceZHENHUAN XUspecial
08/15/2025HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
08/15/2025HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
08/15/2025Maintenance informationZHENHUAN XUenergy_progress
08/15/2025HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
08/15/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
08/15/2025HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
08/15/2025Shutoff dampersZHENHUAN XUenergy_progress
08/15/2025HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
08/15/2025HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
08/15/2025Maintenance informationZHENHUAN XUenergy_progress
08/15/2025FinalZHENHUAN XUprogress
08/15/2025Mechanical SystemsZHENHUAN XUspecial
08/14/2025Tenant Protection Plan Compliance—special
08/13/2025HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
08/13/2025HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
08/13/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
08/13/2025Maintenance informationZHENHUAN XUenergy_progress
08/13/2025HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
06/18/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
06/18/2025Tenant Protection Plan Compliance—special
06/18/2025HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
06/18/2025Maintenance informationZHENHUAN XUenergy_progress
06/18/2025HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
Latest 25 of 43.
▾Documents — 162 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/25/2026Q08040601-I1Request digital key ↗
08/24/2026Q00809290-I1Request digital key ↗
08/23/2026Q00886404-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION7
09/04/2024400158119Open ↗
09/04/2024402648685Open ↗
08/21/2024401832086Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION3
03/14/2014440120548Open ↗
01/25/2013420800048Open ↗
01/25/2013420800048Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/23/2026Q00886404-P3Open ↗
08/13/2026Q00886404-P1Open ↗
08/13/2026Q00886404-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00886404-I1Open ↗
▸Seals & Professional Certifications59
▸DOB NOWProgress Inspector Seal & Signature25
09/01/2026Q01220303-P4Open ↗
09/01/2026Q01220303-P4Open ↗
09/01/2026Q01220303-P4Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/25/2026Q08040601-I1Open ↗
08/24/2026Q00809290-I1Open ↗
08/23/2026Q00886404-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026Q01220303-P4Open ↗
09/01/2026Q01220303-P1Open ↗
08/28/2026Q00886404-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
12/26/2013420800048Open ↗
12/03/2013420800048Open ↗
01/09/2013420800048Open ↗
Showing 3 of 4 on file for this type
▸BISApplicant / Owner Signature1
12/26/2013440120548Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE4
01/16/2014420800048Open ↗
12/16/2013420800048Open ↗
12/02/2013420800048Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
01/09/2013420800048Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
01/09/2013420800048Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/25/2026Q08040601-I1Open ↗
08/24/2026Q00809290-I1Open ↗
08/23/2026Q00886404-P2Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/09/2013420800048Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
02/12/2014440120548Open ↗
▸Energy Compliance11
▸BISAS-BUILT ENERGY ANALYSIS4
11/10/2015440120548Open ↗
11/10/2015440120548Open ↗
12/26/2013420800048Open ↗
Showing 3 of 4 on file for this type
▸BISSOLAR TAX ABATEMENT APPLICATION2
11/10/2015440120548Open ↗
11/10/2015440120548Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/10/2015440120548Open ↗
11/10/2015440120548Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/09/2013420800048Open ↗
▸BISTR8: Energy Code Progress Inspections1
02/12/2014440120548Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
02/12/2014440120548Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT4
08/23/2026Q00886404-P3Open ↗
08/13/2026Q00809290-I1Open ↗
08/13/2026Q00886404-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/10/2015440120548Open ↗
11/10/2015440120548Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q00886404-I1Open ↗
08/13/2026Q00809290-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/10/2015440120548Open ↗
11/10/2015440120548Open ↗
12/26/2013420800048Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/16/2014420800048Open ↗
12/26/2013420800048Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter2
11/10/2015440120548Open ↗
11/10/2015440120548Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/09/2013420800048Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
11/10/2015440120548Open ↗
11/10/2015440120548Open ↗
02/12/2014440120548Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
12/26/2013440120548Open ↗
▸BISADDITIONAL INFORMATION1
11/10/2015440120548Open ↗
▸BISEFILING COVER SHEET1
01/09/2013420800048Open ↗
▸Other Documents18
▸DOB NOWPlot Diagram4
08/23/2026Q00886404-P3Open ↗
08/13/2026Q00886404-P1Open ↗
08/13/2026Q00886404-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/23/2026Q00886404-P3Open ↗
08/13/2026Q00886404-I1Open ↗
08/13/2026Q00886404-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/23/2026Q00886404-P3Open ↗
08/13/2026Q00886404-P1Open ↗
08/13/2026Q00886404-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification3
08/23/2026Q00886404-P1Open ↗
08/23/2026Q00886404-P3Open ↗
08/23/2026Q00886404-I1Open ↗
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
12/02/2013420800048Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00886404-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00886404-I1Open ↗