| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01398389 ↗ | 119 ST MARKS AVENUE BROOKLYN | Alteration | Permit Issued | 05/13/2026 | 06/30/2026 | Design WEI STUDIO Owner 119 ST. MARKS LLC | UNIT 1 MINOR INTERIOR RENOVATION AND FACADE ALTERATION. REMOVE AND INSTALL FURRING WALLS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS … |
| Q01316472 ↗ | 84-05 MIDLAND PARKWAY QUEENS | Alteration CO | Permit Issued | 11/18/2025 | 05/29/2026 | Design GERALD CALIENDO ARCHITECTS Filer A & D BUILDING SOLUTIONS | HEREWITH FILING SUBSEQUENT PLUMBING APPLICATION Q01316472-S1 WORK IN BASEMENT AS PER PLANS FILED HEREIN. NEW INSTALLATION OF 2 FIXTURE BATH … |
| M01319664 ↗ | 126 WEST 46 STREET MANHATTAN | Alteration CO | Permit Issued | 12/01/2025 | 05/22/2026 | Design ALL CITY ENGINEERING, P.C. Owner J2C PARTNERS LLC Filer DVA Advisors | Sprinkler work as shown on filed plans |
| M01332145 ↗ | 167 WEST 72 STREET MANHATTAN | Alteration CO | Permit Issued | 01/16/2026 | 05/01/2026 | 2nd floor interior renovation combining one dwelling unit and one store into a single residential unit. Work includes non-load-bearing parti… | |
| M01289410 ↗ | 148 WEST 23 STREET MANHATTAN | Alteration | Permit Issued | 09/24/2025 | 01/27/2026 | Design WEI STUDIO Owner AKAM ASSOCIATES, INC. | INTERIOR FIT-OUT OF EXISTING RESIDENTIAL(FLOOR 1) UNIT 1G PROPOSED. REMOVE AND INSTALL NON-BEARING PARTITIONS, INSTALL MINI-SPLIT AIR CONDIT… |
| B01200850 ↗ | 615 PRESIDENT STREET BROOKLYN | Alteration | Permit Issued | 06/02/2025 | 01/06/2026 | Design WEI STUDIO | EXIST. TWO FAMILY RESIDENCE INTERIOR RENOVATION. REMOVE AND INSTALL PARTITION WALLS. INSTALL MINI-SPLIT HEAT PUMP. NO CHANGE IN USE, OCCUPAN… |
| Name | Projects together | Most recent |
|---|---|---|
| WEI STUDIO | 15 | 05/13/2026 |
| JTONIC DESIGN AND CONSTRUCTION CORP | 3 | 01/16/2026 |
| HUAN DESIGN INC. | 2 | 09/15/2025 |
| AGT ARCHITECTURE P.C. | 1 | 11/05/2025 |
| ALL CITY ENGINEERING, P.C. | 1 | 05/23/2026 |
| COLBERG ARCHITECTURE | 1 | 05/23/2026 |
| GERALD CALIENDO ARCHITECTS | 1 | 08/19/2026 |
| MG ENGINEERING D.P.C. | 1 | 09/09/2024 |
| MSM ENGINEERING SERVICES, PLLC | 1 | 03/15/2024 |
| NEW AIR SOLUTION INC. | 1 | 11/05/2025 |
| PVE ENGINEERING | 1 | 10/12/2023 |
| REDUS LLC | 1 | 08/29/2022 |
| SH ENGINEERING PLLC | 1 | 02/23/2024 |
| SQUARE ARCH, LLC | 1 | 09/15/2025 |
| UNI-D LLC | 1 | 01/29/2026 |
| XIAOFAN JIANG | 1 | 08/09/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| LG ELITE PLUMBING INC | 8 | 08/19/2026 |
| MES CONSTRUCTION CORP | 3 | 01/29/2026 |
| FINALY GENL CONTR CORP | 2 | 09/09/2024 |
| LEGUCI PIPING&HEATING LLC | 1 | 05/23/2026 |
| P & D MECHANICAL CORP | 1 | 11/05/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| Hayco Corp | 2 | 06/23/2022 |
| MATTHEW ADAM PROPERTIES | 2 | 10/12/2023 |
| SL GREEN REALTY CORP | 2 | 09/09/2024 |
| 119 ST. MARKS LLC | 1 | 05/13/2026 |
| 224-232 ATLANTIC AVENUE INVESTOR, L | 1 | 06/06/2022 |
| ABC REALTY | 1 | 03/15/2024 |
| AKAM ASSOCIATES, INC. | 1 | 09/24/2025 |
| CITYLIGHTS AT QUEENS LANDING, INC. | 1 | 01/17/2024 |
| J2C PARTNERS LLC | 1 | 05/23/2026 |
| LBR GROUP LLC | 1 | 09/15/2025 |
| NEXTG TECH LIMITED | 1 | 11/05/2025 |
| R.KING WINDOW CORP. SYST | 1 | 08/28/2024 |
| Wanshixiang LLC | 1 | 12/28/2025 |
| Z&Z Group 168 INC. | 1 | 05/02/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| NORTHEAST EXPEDITING LLC | 2 | 10/12/2023 |
| RIZZO GROUP | 2 | 09/09/2024 |
| A & D BUILDING SOLUTIONS | 1 | 08/19/2026 |
| AGT ARCHITECTURE P.C. | 1 | 11/05/2025 |
| BMG GROUP USA | 1 | 01/29/2026 |
| DVA Advisors | 1 | 05/23/2026 |
| GARDEN STATE OF NJ DATA RECOVERY | 1 | 01/29/2026 |
| JD DESIGN ASSOCIATES INC | 1 | 03/15/2024 |
| LC EXPEDITING SERVICES CORP | 1 | 11/05/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01398389 ↗ | 119 ST MARKS AVENUE BROOKLYN | Alteration | Permit Issued | 05/13/2026 | 06/30/2026 | Design WEI STUDIO Owner 119 ST. MARKS LLC | UNIT 1 MINOR INTERIOR RENOVATION AND FACADE ALTERATION. REMOVE AND INSTALL FURRING WALLS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS … |
| Q01316472 ↗ | 84-05 MIDLAND PARKWAY QUEENS | Alteration CO | Permit Issued | 11/18/2025 | 05/29/2026 | Design GERALD CALIENDO ARCHITECTS Filer A & D BUILDING SOLUTIONS | HEREWITH FILING SUBSEQUENT PLUMBING APPLICATION Q01316472-S1 WORK IN BASEMENT AS PER PLANS FILED HEREIN. NEW INSTALLATION OF 2 FIXTURE BATH … |
| M01319664 ↗ | 126 WEST 46 STREET MANHATTAN | Alteration CO | Permit Issued | 12/01/2025 | 05/22/2026 | Design ALL CITY ENGINEERING, P.C. Owner J2C PARTNERS LLC Filer DVA Advisors | Sprinkler work as shown on filed plans |
| M01332145 ↗ | 167 WEST 72 STREET MANHATTAN | Alteration CO | Permit Issued | 01/16/2026 | 05/01/2026 | 2nd floor interior renovation combining one dwelling unit and one store into a single residential unit. Work includes non-load-bearing parti… | |
| M01289410 ↗ | 148 WEST 23 STREET MANHATTAN | Alteration | Permit Issued | 09/24/2025 | 01/27/2026 | Design WEI STUDIO Owner AKAM ASSOCIATES, INC. | INTERIOR FIT-OUT OF EXISTING RESIDENTIAL(FLOOR 1) UNIT 1G PROPOSED. REMOVE AND INSTALL NON-BEARING PARTITIONS, INSTALL MINI-SPLIT AIR CONDIT… |
| B01200850 ↗ | 615 PRESIDENT STREET BROOKLYN | Alteration | Permit Issued | 06/02/2025 | 01/06/2026 | Design WEI STUDIO | EXIST. TWO FAMILY RESIDENCE INTERIOR RENOVATION. REMOVE AND INSTALL PARTITION WALLS. INSTALL MINI-SPLIT HEAT PUMP. NO CHANGE IN USE, OCCUPAN… |
| Q01330824 ↗ | 43-11 BELL BOULEVARD QUEENS | Alteration | Signed-off | 12/28/2025 | 01/06/2026 | Owner Wanshixiang LLC | 1ST FLOOR INTERIOR RENOVATION. INSTALL PARTITION WALLS, PLUMBING FIXTURES, AND MILLWORKS AS SHOWN ON DRAWINGS. INSTALL EXHAUST SYSTEM, NO CH… |
| Q01220303 ↗ | 150-11 14 AVENUE QUEENS | Alteration | Signed-off | 05/08/2025 | 06/18/2025 | Design HUAN DESIGN INC. Owner LBR GROUP LLC | PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR THE EXISTING COMMERCIAL KITCHEN SPACE.NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01195703 ↗ | 136 SMITH STREET BROOKLYN | Alteration | Signed-off | 05/02/2025 | 05/12/2025 | Owner Z&Z Group 168 INC. | 1ST FLOOR INTERIOR RENOVATION. INSTALL PARTITION WALLS, PLUMBING FIXTURES, AND MILLWORKS, REPLACE STOREFRONT FENESTRATION AS SHOWN ON DRAWIN… |
| M01115924 ↗ | 445 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/28/2024 | 12/06/2024 | Design AGT ARCHITECTURE P.C. Owner NEXTG TECH LIMITED Filer AGT ARCHITECTURE P.C. | MODIFICATIONS TO SPRINKLER SYSTEM |
| B01098676 ↗ | 230 CALYER STREET BROOKLYN | Alteration | Signed-off | 08/28/2024 | 09/04/2024 | Design WEI STUDIO Owner R.KING WINDOW CORP. SYST | 1ST FLOOR INTERIOR RENOVATION. INSTALL PARTITION WALLS AND MILLWORKS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. |
| Q01057175 ↗ | 37-17 PRINCE STREET QUEENS | Alteration | Permit Issued | 06/12/2024 | 08/13/2024 | Design HUAN DESIGN INC. | INTERIOR RENOVATION OF PLUMBING FIXTURES WITH ASSOCIATED PIPES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q00840179 ↗ | 106-16 221 STREET QUEENS | Alteration CO | Permit Issued | 03/14/2023 | 07/22/2024 | Design UNI-D LLC Filer BMG GROUP USA | PLUMBING WORK PER ATTACHED DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01003365 ↗ | 485 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/23/2024 | 07/17/2024 | Design MG ENGINEERING D.P.C. Owner SL GREEN REALTY CORP Filer RIZZO GROUP | Modifications to the existing HVAC system on the 1st floor (Dae Day Coffee) as per plans. No change to use, egress or occupancy. |
| M01004504 ↗ | 485 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/23/2024 | 06/20/2024 | Design SH ENGINEERING PLLC Owner SL GREEN REALTY CORP. Filer RIZZO GROUP | Minor demolition with installation of new door, ceilings and finishes on the on the 1st floor (Dae Day Coffee) as per plans. No change to us… |
| M01057890 ↗ | 153 1 AVENUE MANHATTAN | Alteration | Signed-off | 06/04/2024 | 06/17/2024 | Design WEI STUDIO | 1ST FLOOR INTERIOR RENOVATION. INSTALL PARTITION WALLS, AIR CONDITIONING SYSTEM, AND KITCHEN HOOD EXHAUST SYSTEM. NO CHANGE IN USE, OCCUPANC… |
| M01053409 ↗ | 311 EAST 38 STREET MANHATTAN | Alteration | Signed-off | 05/21/2024 | 05/30/2024 | Design WEI STUDIO | UNIT 14E MINOR INTERIOR RENOVATION. REMOVE INTERIOR NON LOAD BEARING PARTITIONS, INSTALL NEW NON LOAD BEARING PARTITIONS AND KITCHEN CABINET… |
| M01031726 ↗ | 275 GREENWICH STREET MANHATTAN | Alteration | Signed-off | 04/07/2024 | 04/23/2024 | Design WEI STUDIO | INTERIOR FIT-OUT OF EXISTING RESIDENTIAL(FLOOR 9) UNIT 9DS PROPOSED. INCLUDING PARTITION REMOVAL AND INSTALLATION AS PER PLANS. NO CHANGE OF… |
| Q00987430 ↗ | 4-74 48 AVENUE QUEENS | Alteration | Signed-off | 01/17/2024 | 02/16/2024 | Design WEI STUDIO | UNIT 21AB MINOR INTERIOR RENOVATION. INSTALL NEW PARTITION WALLS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. |
| B00986006 ↗ | 2 NORTHSIDE PIERS BROOKLYN | Alteration | Signed-off | 01/04/2024 | 01/29/2024 | Design WEI STUDIO | UNIT 7G MINOR INTERIOR RENOVATION. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. |
| M00803585 ↗ | 146 WEST 26 STREET MANHATTAN | Alteration | Signed-off | 12/28/2022 | 11/14/2023 | Design PVE ENGINEERING Owner MATTHEW ADAM PROPERTIES Filer NORTHEAST EXPEDITING LLC | INSTALL NEW CONDENSER-WATER FED WATER SOURCE HEAT PUMP FOR COOLING AND ASSOCIATED DUCTWORK AND PIPING AS PER PLANS HEREWITH. ALL WORK IS AT … |
| M00949453 ↗ | 303 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 10/23/2023 | 11/01/2023 | Owner ABC REALTY Filer JD DESIGN ASSOCIATES INC | INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH PARTITON AND MECHANICAL WORK ON THE 1ST FLOOR. NO CHANGE IN USE, EGRSS OR OCCUPANCY. |
| M00865512 ↗ | 146 WEST 26 STREET MANHATTAN | Alteration | Signed-off | 05/26/2023 | 08/24/2023 | Design XIAOFAN JIANG Owner MATTHEW ADAM PROPERTIES Filer NORTHEAST EXPEDITING LLC | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH BUILD OUT CONSTRUCTION FOR VELVET BY UNICE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00912766 ↗ | 56 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 08/08/2023 | 08/10/2023 | Design WEI STUDIO | 1ST FLOOR INTERIOR RENOVATION. INSTALLATION OF KITCHEN HOOD EXHAUST SYSTEM. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. |
| B00912979 ↗ | 56 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 08/08/2023 | 08/10/2023 | Design WEI STUDIO | INSTALL CONSTRUCTION FENCE IN CONJUNCTION WITH MAIN ALT |
| Q00868922 ↗ | 102-15 63 AVENUE QUEENS | Alteration | Signed-off | 05/11/2023 | 05/16/2023 | Design WEI STUDIO | 2 FAMILY HOUSE MINOR INTERIOR AND FACADE RENOVATION. INSTALL 2-ZONE AC UNIT. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. |
| X07993852 ↗ | 2362 WESTCHESTER AVENUE BRONX | Alteration | Signed-off | 08/29/2022 | 09/15/2022 | Design REDUS LLC | Installation of curtain wall as per plan; Installation of front front doors as per plan; Installation of steel lintels as per plan. |
| X00741288 ↗ | 2398 ARTHUR AVENUE BRONX | Alteration | Signed-off | 06/17/2022 | 06/23/2022 | Design WEI STUDIO Owner Hayco Corp | 1ST FLOOR MINOR INTERIOR RENOVATION. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. |
| X00748656 ↗ | 2398 ARTHUR AVENUE BRONX | Alteration | Signed-off | 06/01/2022 | 06/16/2022 | Design WEI STUDIO Owner Hayco Corp | INSTALL CONSTRUCTION FENCE IN CONJUNCTION WITH MAIN ALT |
| B00728674 ↗ | 232 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 05/19/2022 | 06/13/2022 | Design WEI STUDIO | SUBSEQUENTLY FILE THE PL WORK TYPE IN CONJUNCTION WITH DOB NOW JOB #B00728674-I1 |
| Building | Filings | Most Recent |
|---|---|---|
| 167 WEST 72 STREET ↗ | 1 | 07/08/2026 |
| 485 LEXINGTON AVENUE ↗ | 4 | 07/08/2026 |
| 445 PARK AVENUE ↗ | 5 | 07/08/2026 |
| 150-11 14 AVENUE ↗ | 4 | 07/08/2026 |
| 146 WEST 26 STREET ↗ | 4 | 07/08/2026 |
| 311 EAST 38 STREET ↗ | 1 | 07/08/2026 |
| 232 ATLANTIC AVENUE ↗ | 1 | 07/08/2026 |
| 2 NORTHSIDE PIERS ↗ | 4 | 07/08/2026 |
| 4-74 48 AVENUE ↗ | 1 | 07/08/2026 |
| 119 ST MARKS AVENUE ↗ | 1 | 07/02/2026 |
| 84-05 MIDLAND PARKWAY ↗ | 1 | 04/09/2026 |
| 126 WEST 46 STREET ↗ | 2 | 04/09/2026 |
| 106-16 221 STREET ↗ | 8 | 04/09/2026 |
| 43-11 BELL BOULEVARD ↗ | 1 | 04/09/2026 |
| 148 WEST 23 STREET ↗ | 1 | 04/09/2026 |
| 615 PRESIDENT STREET ↗ | 2 | 04/09/2026 |
| 37-17 PRINCE STREET ↗ | 1 | 04/09/2026 |
| 102-15 63 AVENUE ↗ | 3 | 03/21/2026 |
| 275 GREENWICH STREET ↗ | 3 | 03/21/2026 |
| 230 CALYER STREET ↗ | 3 | 03/21/2026 |
| 2398 ARTHUR AVENUE ↗ | 6 | 03/21/2026 |
| 153 1 AVENUE ↗ | 3 | 03/21/2026 |
| 136 SMITH STREET ↗ | 3 | 03/21/2026 |
| 56 WILLOUGHBY STREET ↗ | 6 | 03/21/2026 |
| 2362 WESTCHESTER AVENUE ↗ | 3 | 03/21/2026 |
| 303 PARK AVENUE SOUTH ↗ | 3 | 03/21/2026 |