← Back
Two family brick
150-15 25 AVENUE
QUEENS · BIN 4106669
💬 Discuss this project
1980Year Built
2Stories
B1Building Class
R3-1Zoning
2,270 sfGross Floor Area
2Units
Two family brick · 3,948 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 11p · 1 filing · 11 docs
Cellar2p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAYMOND HO ARCHITECT, PLLC302/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OLBN ARCHITECTURAL & PLANNING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARCO PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAYMOND HO ARCHITECT, PLL1654302/18/2025
Building Lifecycle
All (9)Filed (3)Permit Issued (1)Inspection (4)Special Inspection (1)
10/03/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/18/2025
Filed — Alteration
REPLACE/REGISTER 01 BL & 1 HWH . REPLACE GAS PIPING LEAK AS PER GAS COMPANY REQUEST TO TURN ON ONE METER LOCATED AT OSP CONNECTED TO EXISTING GAS EQUIPMENT 1 BL, 1 HWH, 1 DRYER LOCATED THE CELLAR & 1 FIREPLACE & 1 STOVE LOCATED AT THE 2ND FL
Q01124814-P2
02/12/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/31/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/09/2025
Permit issued — Plumbing
Q01124814-I1-PL
12/13/2024
Filed — Alteration
REPLACE/REGISTER 01 BL & 1 HWH . REPLACE GAS PIPING LEAK AS PER GAS COMPANY REQUEST TO TURN ON ONE METER LOCATED AT OSP CONNECTED TO EXISTING GAS EQUIPMENT 1 BL, 1 HWH, 1 DRYER LOCATED THE CELLAR & 1 FIREPLACE & 1 STOVE LOCATED AT THE 2ND FL
Q01124814-P1
12/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PING MAN HO
12/05/2024
Filed — Alteration
REPLACE/REGISTER 01 BL & 1 HWH . REPLACE GAS PIPING LEAK AS PER GAS COMPANY REQUEST TO TURN ON ONE METER LOCATED AT OSP CONNECTED TO EXISTING GAS EQUIPMENT 1 BL, 1 HWH, 1 DRYER LOCATED THE CELLAR & 1 FIREPLACE & 1 STOVE LOCATED AT THE 2ND FL
Q01124814-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedARCO PLBG AND HTG INC01/09/2025
1 project · most recent 02/18/2025
Gas
FiledStatusContractorScope
02/18/2025Permit IssuedARCO PLBG AND HTG INCGas
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/03/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/12/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
12/11/2024Fire-Resistant Penetrations and JointsPING MAN HOspecial
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026Q01124814-P2Request digital key ↗
08/20/2026Q01124814-P1Request digital key ↗
08/20/2026Q01124814-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026Q01124814-P2Open ↗
08/20/2026Q01124814-P1Open ↗
08/20/2026Q01124814-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q01124814-P1Open ↗
08/23/2026Q01124814-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026Q01124814-P1Open ↗
08/20/2026Q01124814-I1Open ↗
08/20/2026Q01124814-P2Open ↗