| Owner | Filings | Most Recent |
|---|---|---|
| SKYLINE SCAFFOLDING GROUP | 36 | 09/23/2026 |
| NYULH | 165 | 07/08/2026 |
| NYU LANGONE HEALTH | 7 | 03/22/2026 |
| LENDLEASE US CONSTRUCTION | 1 | 03/22/2026 |
| EMPIRE GENERAL CONTRACTIN | 2 | 03/21/2026 |
| LUTHERINE MEDICAL HOSPITAL | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| RIGID STRUCTURAL DESIGN, LLC | 7 | 09/16/2026 |
| JAROS BAUM & BOLLES | 103 | 08/18/2026 |
| FACILITY LEADERS IN ARCHITECTURAL/E | 1 | 06/28/2026 |
| URBAN INTEGRATIONS | 6 | 06/12/2026 |
| TPG ARCHITECTURE, LLP | 2 | 05/19/2026 |
| WJL ARCHITECTURE & ENGINEERING DPC | 6 | 04/21/2026 |
| SEVERUD ASSOCIATES CONSULTING ENGIN | 16 | 03/29/2026 |
| LORING CONSULTING ENGINEERS, INC. | 6 | 03/27/2026 |
| FRANCIS CAUFFMAN ARCHITECTS (FCA) | 2 | 03/27/2026 |
| PERKINS EASTMAN DPC | 14 | 03/05/2026 |
| CANNON DESIGN | 3 | 02/16/2026 |
| ENNEAD ARCHITECTS | 5 | 01/23/2026 |
| JACK L. GORDON ARCHITECTS, PC | 11 | 12/19/2025 |
| EFH ARCHITECTURE | 3 | 12/17/2025 |
| THORNTON TOMASETTI | 2 | 12/09/2025 |
| BRAND ACCESS SOLUTIONS | 12 | 06/18/2025 |
| ROSA CONSULTING ENGINEERS, D.P.C. | 1 | 04/16/2025 |
| TOHFAZ UDDIN PE PC | 1 | 12/13/2024 |
| PAUL PERDEK, PROF. ENG. PLLC | 12 | 01/03/2024 |
| BRONZINO ENGINEERING, P.C. | 2 | 12/04/2023 |
| SCHERER DESIGN GROUP | 1 | 10/23/2023 |
| LIZARDOS ENGINEERING | 4 | 07/06/2023 |
| SYSKA HENNESSY GROUP | 6 | 04/24/2023 |
| JFK&M CONSULTING ENGINEERS | 16 | 02/14/2023 |
| AKF ENGINEERS, LLP | 6 | 01/10/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| OUTSOURCE CONSULTANTS, INC. | 303 | 03/21/2026 |
| EUROCELT EXPEDITING, INC | 14 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 30 | 03/21/2026 |
| AE DESIGN SOLUTION | 28 | 03/21/2026 |
| Rigid Structural Design, LLC | 19 | 03/21/2026 |
| DIRECT ACCESS EXPEDITING, INC. | 2 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 19 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 1 | 03/21/2026 |
| RPO | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| EMPIRE GENERAL CONTRACTIN | General Contractor | 48 | 09/13/2026 |
| B.R. FRIES & ASSOCIATES LLC | General Contractor | 42 | 07/08/2026 |
| SKYLINE SCAFFOLDING GROUP | General Contractor | 36 | 09/18/2026 |
| SKANSKA USA BUILDING, INC | General Contractor | 24 | 08/05/2026 |
| POWERS BRIDGING & SCAFFOLDING | General Contractor | 22 | 07/08/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 21 | 09/18/2026 |
| L.F. DRISCOLL COMPANY LLC | General Contractor | 19 | 07/08/2026 |
| UNIVERSAL BUILD SUPP LLC | General Contractor | 15 | 07/08/2026 |
| ALLIANCE PLUMBING CORP | Plumbing | 12 | 09/18/2026 |
| NELSON AIR DEVICE CORP | General Contractor | 12 | 07/08/2026 |
| CARDOZA PLUMBING CORP | Plumbing | 11 | 07/08/2026 |
| LENDLEASE(US)CONSTRUCTION | General Contractor | 10 | 07/08/2026 |
| ASHLAR MECHANICAL CORP | Fire Protection | 9 | 07/08/2026 |
| NYC FIRE SPRINKLER CORP | Fire Protection | 9 | 09/13/2026 |
| EXPERT MAINTENANCE CORP | General Contractor | 7 | 04/09/2026 |
| GLASS ARMOR OF NEW YORK I | General Contractor | 7 | 07/08/2026 |
| KING HOIST & SCAFFOLDING | General Contractor | 7 | 07/08/2026 |
| PAUL M MAINTENANCE INC | General Contractor | 6 | 07/08/2026 |
| BENJAMIN CONSTRUCTION COR | General Contractor | 5 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 5 | 07/08/2026 |
| AMERICON CONSTRUCTION INC. | General Contractor | 4 | 04/09/2026 |
| J T & T AIR CONDITIONING | General Contractor | 4 | 07/08/2026 |
| SCOTT BIGMAN | Electrical | 4 | 03/21/2026 |
| BIGMAN BROS., INC. | Electrical | 4 | 03/22/2026 |
| HOLT CONSTRUCTION CORP | General Contractor | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ALAN MARGOLIN & ASSOC | 423 | 152 | 08/18/2026 |
| SONI ENGINEERING CONSULTI | 9819 | 1 | 11/12/2025 |
| G. BLINN CONSULTING, LLC | 2894 | 2 | 06/18/2025 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 14 | 07/06/2023 |
| ATLAS ATC ENGINEERING INC | 8011 | 2 | 05/12/2021 |
| JOEL PHAGOO ,PE, PLLC | 2416 | 1 | 03/06/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | ALLIANCE PLUMBING CORP | 09/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 09/17/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | SAFWAY ATLANTIC, LLC | 09/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 09/17/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | SKYLINE SCAFFOLDING GROUP | 09/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 09/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SKYLINE SCAFFOLDING GROUP | 09/17/2026 |
| DOB NOW | Construction Fence | Permit Issued | SAFWAY ATLANTIC, LLC | 09/17/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | SAFWAY ATLANTIC, LLC | 09/17/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | BENJAMIN CONSTRUCTN CORP | 09/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | NYC FIRE SPRINKLER CORP | 09/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | EMPIRE GENERAL CONTRACTIN | 09/11/2026 |
| DOB NOW | General Construction | Permit Issued | EMPIRE GENERAL CONTRACTIN | 09/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 09/08/2026 |
| DOB NOW | Plumbing | Permit Issued | FRESH MEADOW MECH PLBG LL | 08/31/2026 |
| DOB NOW | Boiler Equipment | Permit Issued | CHAMPION COMBUSTION CORP | 08/28/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | FRESH MEADOW MECHANICAL C | 08/27/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | FRESH MEADOW MECHANICAL C | 08/26/2026 |
| DOB NOW | Sprinklers | Permit Issued | ARCHER CONSULTANTS GROUP | 08/18/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | RACANELLI CONSTRUCTION CO | 08/18/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SKANSKA USA BUILDING, INC | 08/04/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 07/31/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 07/31/2026 |
| DOB NOW | Structural | Permit Issued | SKANSKA USA BUILDING, INC | 07/30/2026 |
| DOB NOW | General Construction | Permit Issued | SKANSKA USA BUILDING, INC | 07/29/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 07/24/2026 |
| DOB NOW | General Construction | Permit Issued | RACANELLI CONSTRUCTION CO | 07/22/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | SKYLINE SCAFFOLDING GROUP | 07/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | ARCHER CONSULTANTS GROUP | 06/22/2026 |
| DOB NOW | Plumbing | Permit Issued | CAPITAL CONTR P&H CORP | 06/10/2026 |
| DOB NOW | Plumbing | Permit Issued | CAPITAL CONTR P&H CORP | 06/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 05/19/2026 |
| DOB NOW | Standpipe | Permit Issued | SIRINA FIRE PROT CORP | 05/18/2026 |
| DOB NOW | Construction Fence | Permit Issued | SKYLINE SCAFFOLDING GROUP | 05/15/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | TOPLINE NYC CONTRACTING | 05/15/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | SKYLINE SCAFFOLDING GROUP | 04/28/2026 |
| DOB NOW | General Construction | Permit Issued | SKANSKA USA BUILDING, INC | 04/28/2026 |
| DOB NOW | General Construction | Permit Issued | SKANSKA USA BUILDING, INC | 04/27/2026 |
| DOB NOW | Construction Fence | Permit Issued | SKYLINE SCAFFOLDING GROUP | 04/24/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | SKYLINE SCAFFOLDING GROUP | 04/24/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/18/2026 | Permit Issued | FRESH MEADOW MECHANICAL C | Ventilation Systems | Ventilation Acrovent DDR 1,500 CFM · Exhaust Fan ×1 |
| 07/07/2026 | Permit Issued | EMPIRE GENERAL CONTRACTIN | Heating Systems | Heating Precision Coils HW58S01Q10-24x56-RH 3,100 CFM ×1 |
| 05/20/2026 | Permit Issued | RACANELLI CONSTRUCTION CO | Air Conditioning Systems, Ventilation Systems | Cooling Climatemaster SR-024 24,000 BTU · Wshp ×1 Ventilation — DDM-16 2,700 CFM · Ductwork ×2 |
| 04/21/2026 | Permit Issued | AMERICON CONSTRUCTION INC | Air Conditioning Systems, Ventilation Systems | Cooling Liebert ×4 Ventilation Twin City Fan TL-400R 275 CFM · Exhaust Fan ×3 |
| 03/29/2026 | — | — | Ventilation Systems | Ventilation Twin City Fan BAV-122 1,300 CFM ×2 |
| 10/29/2025 | Permit Issued | SKANSKA USA BUILDING, INC | Air Conditioning Systems, Generators | Cooling Generators Caterpillar 3516C 2,000 kW · Generator ×3 |
| 07/08/2025 | Permit Issued | SKANSKA USA BUILDING, INC | Air Conditioning Systems | Cooling |
| 05/19/2025 | Permit Issued | CENTRAL CONSULTING & CONT | Ventilation Systems | Ventilation Twin City Fan BCV-122 1,300 CFM · Exhaust Fan ×1 |
| 04/13/2022 | Permit Issued | B.R. FRIES & ASSOCIATES L | Heating Systems | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/07/2026 | Permit Issued | NYC FIRE SPRINKLER CORP | — |
| 05/20/2026 | Permit Issued | ARCHER CONSULTANTS GROUP | — |
| 04/23/2026 | Permit Issued | A & F FIRE PROTECTION CO | 72 heads |
| 03/29/2026 | — | — | Sprinkler System |
| 03/27/2026 | — | — | 87 heads |
| 03/06/2026 | — | — | 4 heads |
| 01/05/2026 | Permit Issued | PAR FIRE PROTECTION LLC | 236 heads |
| 12/19/2025 | Permit Issued | PREFERRED SPKLR AND MECH | Sprinkler System |
| 11/21/2025 | Permit Issued | ARCHER CONSULTANTS GROUP | 52 heads |
| 11/12/2025 | Permit Issued | PAR FIRE PROTECTION LLC | Sprinkler System |
| 10/29/2025 | Permit Issued | SIRINA FIRE PROT CORP | — |
| 04/19/2022 | Permit Issued | ASHLAR MECHANICAL CORP | 36 heads |
| 07/16/2021 | Permit Issued | NYC FIRE SPRINKLER CORP | — |
| 12/21/2020 | Signed-off | SIRINA FIRE PROT CORP | 4 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/18/2026 | Permit Issued | FRESH MEADOW MECH PLBG LL | Gas, Water/Sanitary |
| 07/07/2026 | Permit Issued | CARDOZA PLUMBING CORP | Water/Sanitary |
| 05/20/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 04/23/2026 | — | — | — |
| 04/21/2026 | Permit Issued | CAPITAL CONTR P&H CORP | Water/Sanitary |
| 03/29/2026 | — | — | Medical Gas, Water/Sanitary |
| 03/27/2026 | — | — | Gas, Water/Sanitary |
| 03/27/2026 | — | — | Water/Sanitary |
| 03/06/2026 | — | — | Water/Sanitary |
| 02/17/2026 | Permit Issued | CAPITAL CONTR P&H CORP | Water/Sanitary |
| 01/05/2026 | Permit Issued | PAR PLUMBING CO., INC | Medical Gas, Water/Sanitary |
| 12/19/2025 | Permit Issued | ALLIANCE PLUMBING CORP | Water/Sanitary |
| 11/21/2025 | — | — | — |
| 11/12/2025 | Permit Issued | CARDOZA PLUMBING CORP | Water/Sanitary |
| 10/29/2025 | Permit Issued | J.M. BOTTO INC | Storm |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2026 | Permit Issued | HUGH O'KANE ELEC. CO. INC | General Wiring |
| 07/17/2026 | Permit Issued | ALLAN BRITEWAY ELECTRICAL | General Wiring |
| 06/19/2026 | Permit Issued | TOP SHELF ELECTRIC CORP | — |
| 01/13/2026 | Permit Issued | BIGMAN BROS., INC. | General Wiring |
| 10/10/2025 | Permit Issued | BIGMAN BROS., INC. | General Wiring |
| 09/10/2025 | Permit Issued | HUGH O'KANE ELEC. CO. INC | General Wiring |
| 09/02/2025 | Permit Issued | FOREST ELECTRIC CORP. | General Wiring |
| 09/02/2025 | Permit Issued | FOREST ELECTRIC CORP. | General Wiring |
| 09/02/2025 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 07/29/2025 | Permit Issued | FOREST ELECTRIC CORP. | General Wiring |
| 04/22/2025 | Permit Issued | E-J ELEC. INSTALLATION CO | General Wiring |
| 03/12/2025 | Complete | RIGID ELECTRIC, INC. | General Wiring |
| 02/11/2025 | Permit Issued | E-J ELEC. INSTALLATION CO | — |
| 01/06/2025 | Permit Issued | BIGMAN BROS., INC. | General Wiring |
| 12/02/2024 | Permit Issued | CORPORATE ELEC. GROUP INC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/29/2026 | — | — | Steel |
| 11/12/2025 | Permit Issued | PAR FIRE PROTECTION LLC | Steel, Concrete |
| 10/29/2025 | Permit Issued | SIRINA FIRE PROT CORP | Steel, Concrete |
| 02/07/2025 | Permit Issued | SKANSKA USA BUILDING, INC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/12/2026 | Permit Issued | SKYLINE SCAFFOLDING GROUP | Scaffold |
| 01/23/2026 | Permit Issued | SKYLINE SCAFFOLDING GROUP | Sidewalk Shed |
| 06/18/2025 | Permit Issued | SAFWAY ATLANTIC, LLC | Scaffold |
| 12/18/2024 | Permit Issued | SAFWAY ATLANTIC, LLC | Scaffold |
| 12/18/2024 | Permit Issued | SAFWAY ATLANTIC, LLC | Fence |
| 03/23/2021 | Permit Issued | LENDLEASE(US)CONSTRUCTION | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/12/2025 | Permit Issued | BENJAMIN CONSTRUCTN CORP | Suspended Scaffold (SC) |
| 12/14/2023 | Permit Issued | C&C DALEY'S CONST.CORP | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/24/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 08/14/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/28/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 05/01/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/29/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/23/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/19/2025 | Fail-Final Boiler Equipment Inspection | Fail | View ↗ |
| 09/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/17/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/02/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/18/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/23/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/25/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/24/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/19/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/27/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/19/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/02/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/24/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/24/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/01/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/11/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/10/2026 | Post-installed Anchors | Young Suh | special |
| 07/10/2026 | Chimneys and vents | Young Suh | special |
| 07/10/2026 | High-Pressure Steam Piping (Welding) | Young Suh | special |
| 07/10/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 06/23/2026 | HVAC-R and service water heating equipment | Young Suh | energy_progress |
| 06/23/2026 | Energy Code Compliance Inspections | Young Suh | progress |
| 06/23/2026 | Duct leakage testing, insulation and design | Young Suh | energy_progress |
| 06/23/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 06/23/2026 | Interior lighting power | Young Suh | energy_progress |
| 06/23/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 06/23/2026 | Heating Systems | Young Suh | special |
| 06/23/2026 | HVAC-R and service water heating system controls | Young Suh | energy_progress |
| 06/23/2026 | Maintenance information | Young Suh | energy_progress |
| 06/23/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 06/23/2026 | Lighting controls | Young Suh | energy_progress |
| 06/23/2026 | Post-installed Anchors | Young Suh | special |
| 06/23/2026 | HVAC-R and service water piping design and insulation | Young Suh | energy_progress |
| 06/23/2026 | Post-installed Anchors | Young Suh | special |
| 06/09/2026 | Sprinkler Systems | Young Suh | special |
| 06/09/2026 | Post-installed Anchors | Young Suh | special |
| 06/09/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 06/04/2026 | Electrical motors and elevators | Young Suh | energy_progress |
| 06/04/2026 | Duct leakage testing, insulation and design | Young Suh | energy_progress |
| 06/04/2026 | HVAC-R and service water heating system controls | Young Suh | energy_progress |
| 06/04/2026 | HVAC-R and service water heating system controls | Young Suh | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Nyu Langone Brooklyn | Medical / Healthcare | Floor 2 | Project B00709485 |